BID 2022-47 Addendum 1 5.15.22.pdf

PDF 507 KB Posted

Attached to
BID# 2022-47 Lolo Pass Road Stabilization and Surface Preservation Project
Solicitation number
S-C01010-00002880
Issued by
Clackamas County, Oregon

About this file

This document is an Addendum to Invitation to Bid #2022-47 for the Lolo Pass Road Stabilization and Surface Preservation Project issued by Clackamas County, Oregon. The Addendum amends the original bid by replacing the Bid Schedule. The project includes various roadwork activities such as excavation, embankment, geogrid, riprap, aggregate base, asphalt concrete paving, pavement markings, permanent seeding, and landscaping. Key quantities include 13,500 square yards of cold plane pavement removal, 1,185 tons of asphalt concrete paving for inlay, and 9,000 tons of asphalt concrete paving for the top lift. The bid schedule also includes items for temporary work zone traffic control, erosion control, turbidity monitoring, construction survey, and removal of structures and obstructions.

The estimated construction cost for this project is not provided. The bid schedule includes unit prices and total estimated quantities for the various work items. Bidders must submit their bids by the due date, which is not specified in this Addendum. The contract award date and term are also not provided. Funding sources and requirements are not detailed in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2022-47

Lolo Pass Road Stabilization and Surface Preservation Project

ADDENDUM NUMBER 1

May 16, 2022

On April 19, 2022, Clackamas County (“County”) published Invitation to Bid #2022-47 (“BID”). The County has found that it is in its interest to amend the BID through the issuance of this Addendum #1. Except as expressly amended below, all other terms and conditions of the original BID and subsequent Addenda shall remain unchanged.

1. Remove and replace the Bid Schedule with the attached titled LOLO PASS ROAD

PAVEMENT PROJECT BID SCHEDULE

2. “ODOT Standard Details BR140, BR141, BR145, BR157 and BR165 are also included by reference in the bid package.”

Attachments:

• Addendum #1 LOLO PASS ROAD PAVEMENT PROJECT BID SCHEDULE

End of Addendum #1

LOLO PASS ROAD PAVEMENT PROJECT

BID SCHEDULE - Addendum No. 1

ESTIMATED CONSTRUCTION COSTS

ITEM SECTION DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL

1 00180 Workplace Harassment Prevention Plan LS 1

2 00196 Extra Work as Authorized LS 1 $100,000.00 $100,000.00

3 00210 Mobilization LS 1

4 00221 Temporary Work Zone Traffic Control, Complete LS 1

5 00245 Temporary Water Management Facility in Sandy River LS 1

6 00270 Temporary Fence, 6 Ft Chain Link Fence with Concrete Blocks

FOOT 1,000

7 00280 Erosion Control LS 1

8 00280 Construction Entrance, Type 1 Each 1

9 00280 Sediment Barrier, Type 8 Foot 920

10 00280 Straw Bale Each 16

11 00290 Turbidity Monitoring LS 1

12 00290 Work Contanment Plan LS 1

13 00290 Pollution Control Plan LS 1

14 00305 Construction Survey Work LS 1

15 00310 Removal of Structures and Obstructions LS 1

16 00320 Clearing and Grubbing LS 1

17 00330 Earthwork - Excavation & Embankment LS 1

18 00350 Geogrid for Reinforced Slope SQYD 2,100

19 00350 Type 2 Riprap Geotextile SQYD 1,450

20 00390 Filter Blanket SQYD 1,500

21 00390 Loose Riprap, Class 12,000 Ton 7,000

21.1 00585 Asphaltic Plug Joint Seals LS 1

21.2 00585 Poured Joint Seals LS 1

22 00620 Cold Plane Pavement Removal, 1.5" Deep for Inlay SQYD 13,500

May 16, 2022

General Conditions

Mobilization and Traffic Control

Roadwork

Bases and Wearing Surfaces

Bridges

LOLO PASS ROAD PAVEMENT PROJECT

BID SCHEDULE - Addendum No. 1

ESTIMATED CONSTRUCTION COSTS

ITEM SECTION DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL

May 16, 2022

23 00620 Cold Plane Pavement Removal, 0" to 2" Deep SQYD 4,073

24 00620 Cold Plane Pavement Removal, 2" Deep SQYD 720

25 00640 Aggregate Base TON 3,300

26 00744 Level 3, 1/2 Inch Dense, ACP - Inlay TON 1,185

27 00744 Level 3, 1/2 Inch Dense, ACP - Top Lift TON 9,000

28 00749 Extra for Asphalt Approaches EACH 52

29 00855 Bi-Directional Yellow Type 1AR Markers, Recessed EACH 523

30 00865 Thermoplastic, Extruded, Surface, Non-Profiled FOOT 83,664

31 00867 Pavement Bar, Type B-HS SQFT 100

32 00905 Remove and Reinstall Existing Signs LS 1

33 01030 Permanent Seeding ACRE 0.5

34 01040 Topsoil CUYD 200

35 01040 Trees, Bare Root EACH 193

36 01040 Shrubs, Bare Root EACH 769

37 01040 Shrubs, Live Stakes EACH 2,960

38 01040 Shrubs, #1 Container EACH 40

39 01040 Groundcover, #1 Container EACH 75

40 01040 Groundcover, Bare Root EACH 24

41 01091 Fish Logs EACH 9

42 01091 Fish Rocks, Type 3 (Boulders around Root Wads) EACH 60

43 01091 Brushlayering LS 1

Total Bid

Permanent Traffic Safety and Guidance Devices

Permanent Traffic Control and Illumination Systems

Right of Way Development and Control