BID 2021-89 Clarifying Questions 1.pdf
PDF 130 KB Posted
- Solicitation number
- S-C01010-00000999
- Issued by
- Clackamas County, Oakland City, Oregon
About this file
This document is a response to clarifying questions submitted by interested firms for Invitation to Bid #2021-89 Bowman Building Covered Parking Structure Project. The project is located in Clackamas County and Oregon City, Oregon. The bid solicitation covers the construction of a covered parking structure, including the possible remediation of contaminated soil. The bid schedule includes a line item for 10 yards of contaminated soil mitigation, and any additional costs for contaminated soil remediation will be addressed through change orders. The solicitation also clarifies the requirements for anchor rod size and grade, which need to be specified by the structural engineer. The response to these clarifying questions is intended to provide additional details and clarification, but does not alter the original bid solicitation.
Regarding pricing and funding, the document states that the cost for contaminated soil remediation will be captured through change orders and paid based on the bid schedule. The project appears to be funded by the local government entities, but the document does not provide specific details on funding sources or amounts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2021-89
Bowman Building Covered Parking Structure Project (“BID”)
RESPONSE TO CLARIFYING QUESTIONS
November 2, 2021
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. Would you be able to clarify the intended strategy for dealing with contaminated materials? The revised F6 language from the Supplemental General Conditions says the “Contractor… shall perform mitigation as part of contracted work.” Additionally, the Project Information attachment says that “Contractor shall be responsible for project necessitated removal of hazardous soils” in the event the containment layer is breached.
My question is: if contaminated soils are encountered shallower than 24” depth or outside of the area shown in the DEQ map, is remediation/removal expected to be part of the cost of work (included) or will the cost of remediation/removal be added via change order?
Answer: Because of the uncertainty in location and/or amount of the contaminated soil, the bid schedule asks for a mitigation cost for 10 yards of contaminated soil. If contaminated soil is encountered, the cost will be captured in a change order and payed based on bid schedule.
2. The detail in the drawings calls out the anchor rod size and grade as being per the building manufacturer yet after speaking Webb Steel Buildings, it needs to be spec’d by the structural engineer for the project. Can you please advise me on how to proceed as I need this answered to have an accurate bid?
Answer: See Addendum #1.
End of Clarifying Questions #1