This is a Scope of Work document from the Ohio Department of Natural Resources (ODNR), Division of Wildlife for water control structure removal and replacement at Big Island Wildlife Area in Marion County, Ohio. The project involves removing an existing corrugated metal riser water control structure and installing a new Agri drain 18" water control structure with a 6' riser, including stainless steel rodent guards and beaver exclusion fencing. The contractor must also place riprap extending 20 feet on either side of the structure, repair any ruts, and re-seed disturbed areas. All work must be completed between the bid close date and June 14th, 2025. Site visits are encouraged during daytime hours at Big Island Wildlife Area before the inquiry period ends.
The contract will be awarded to the lowest responsive and responsible bidder based on total cost. Contractors are responsible for purchasing all materials, locating underground utilities, and coordinating with the ODNR project agent before beginning work. The work location is at 6683 LaRue-Prospect Rd, New Bloomington, OH 43341. If the contractor fails to complete the work within the specified timeline, ODNR reserves the right to prorate or cancel the purchase order. No specific funding amounts or sources are mentioned in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of work: for water control structure removal and replacement at Big Island Wildlife Area, Marion County, OH History and Overview
Big Island Wildlife area is in a former wetland prairie where agricultural development has taken over. The primary management for this location is to restore wetland and grassland habitats. Wetlands have been a primary focus as they provide opportunities for the public to partake in recreational activities (i.e. birding, trapping, hunting, etc.) and areas for waterbirds to nest, feed, and loaf. Water levels must be properly managed as the natural fluctuation influences the activity of wildlife. Water control structures are instrumental for this process given their ability to control water movement across the landscape. As time has passed, more efficient structures have been developed, and replacements are necessary. Therefore, the ODNR, Division of Wildlife is seeking contractors to remove one existing water control structure and install a new Agri drain 18” with a 6’ riser at Big Island Wildlife Area, Marion County, Ohio (Figure 1 and Figure 2).
Task 1: Removal of Corrugated Metal Riser Water Control Structure:
Task Overview This task is to remove an existing water control structure and remove unwanted debris.
Specifications
· Contractor is to remove the existing water control structure and remove unwanted debris.
· Contractor is responsible for preparing the site for the installation of a new water control structure.
Task 2: Placement of Agri Drain Water Control Structure:
Task Overview This task is the preparation and placement of a new Agri-drain water control structure.
Specifications
· Contractor is to place a new Agri drain 18” water control structure with a 6’ riser at the same location from the removal conducted in task one. Follow manufacturer’s instructions for installation (Figure 3).
· Contractor to install 18” stainless steel rodent guards in the pipe ditch of the new water control structure. 18" Stainless Rat Guard
· Contractor to install a beaver exclusion fence on wetland side of the new water control structure to the specifications of the area manager (Figure 4).
· Contractor is to place riprap (D Rock) 20 feet on either side of the Agri Drain structure facing the wetland.
General Conditions:
· Contractor is responsible for repairing any ruts greater than 4 inches deep created by equipment onsite.
· Any areas disturbed by construction to be re-seeded and mulched with an approved seed mix.
· Contractor is responsible for purchasing all materials associated with the project scope.
· No trees >5” DBH may be cut between the dates of March 31-October 15.
Timeframe and Permitting for All Work Tasks:
The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Vendors need to submit bids in terms of total cost. The contract will be awarded to the lowest responsive bidder and responsible bidder by low lot total.
It will be the responsibility of the contractor to locate any underground utilities before they begin work. The contractor is required to contact the ODNR, Division of Wildlife project Agent at least two business days prior to initially entering the property for work. All work to be completed between bid close date to June 14th, 2025.
If the successful bidder does not provide the specified services by the timelines listed above, the ODNR, Division of Wildlife reserves the right to prorate or cancel the purchase order.
Address of work location:
6683 LaRue-Prospect Rd, New Bloomington, OH 43341
Big Island Wildlife Area Headquarters, 5393 Larue-Prospect Rd, New Bloomington, OH 43341
Guidelines for Bidding:
Prior to submitting a bid response, bidders are encouraged to visit the work site location and view the areas noted in the scope of work before the end of the inquiry period noted in the bid opening. Big Island Wildlife Area is open to public access and may be visited during daytime hours. Please contact Robert Batterson (Primary contact) or Katherine Camarda (Secondary Contact).
The awarded supplier will be required to sign an Addendum to Bid Quote or Personal Services.
Thank you for your interest!
| Primary Project Agent | Secondary Project Agent | |||
| Robert Batterson | Katherine Camarda | |||
| Assistant Wildlife Management Supervisor | Wildlife Area Coordinator | |||
| Robert.Batterson@dnr.ohio.gov | Katherine.Allen@dnr.ohio.gov | |||
| 614-424-9985 | 614-673-1155 |
Figure 1. Location of the old water control structure.
Figure 2. Map of the location of the water control structure at Big Island Wildlife Area.
Figure 3. Agri Drain description and device explanation.
Figure 4. Beaver exclusion device.
image3.jpg image4.jpg image5.png image6.png image1.png image2.png