About this file
This is a comprehensive set of mechanical, structural, and electrical design and specification documents for the Brighton High School (BHS) Rooftop Mechanical Replacement and Renovation project, prepared for Brighton Area Schools (BAS) in Brighton, Michigan. The project involves the replacement of existing rooftop HVAC equipment and infrastructure, including the removal of multiple rooftop units (RTUs), an energy recovery ventilator (ERV), and a cooling tower, along with the installation of new mechanical equipment. New equipment includes one air-cooled chiller (ACCH-1) with a capacity of 440 tons and integral primary pump, one cooling tower (CT-1) with a capacity of 434 tons, two energy recovery ventilators (ERV-1 and ERV-2), and fourteen new rooftop units (RTU-C1 through RTU-C22). The project requires structural reinforcement of the existing roof framing to support the new chiller weighing 30,258 pounds and cooling tower weighing 20,858 pounds, including new steel pipe columns, beams, and reinforcement of existing trusses. All work must comply with the 2021 Michigan Building Code, 2023 National Electrical Code, and applicable OSHA standards. The documents are dated June 26, 2026, and are prepared for bids and permits.
The structural design specifies new W10x15 and W12x26 beams, new 3-inch Schedule 40 steel pipe columns with cap and base plates, and field-welded reinforcement to existing structural elements. All structural steel conforms to AISC Load and Resistance Factor Design standards with specified ASTM material grades and E70 series welding. The mechanical system operates in a lead/standby configuration with the new air-cooled chiller as a redundant unit to the existing water-cooled chiller, managed by the building automation system through automated isolation valves. Chilled water piping includes Schedule 40 black steel with threaded, grooved, or welded fittings, with all piping insulated with minimum 2-inch fiberglass insulation featuring a vapor barrier. The electrical work includes disconnection and removal of existing equipment connections, provision of new disconnect switches and service receptacles for new rooftop equipment, and a dedicated feeder from the main switchboard to the new air-cooled chiller with an assumed run length of approximately 550 feet. All mechanical, electrical, and structural contractors are responsible for field verification of existing conditions, coordination with other trades, and compliance with manufacturer recommendations and code requirements prior to final installation and commissioning.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| BHS Rooftop Mechanical Replacement RFP Packet 07 02 2026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P Q Q.5 R R.3O.5
S
- BRIGHTON HIGH SCHOOL -
BRIGHTON AREA SCHOOLS (BAS)
MECHANICAL UNITS REPLACEMENT
conn engineering consultants, inc.
commercial+industrial+institutional+residential structural engineering
107 n. bridge st.
po box 791 linden, mi 48451
p. 810.458.4350
f. 810.458.4592 www.connengineering.com seal:
A B C D E F G H I J job information:
While every attempt has been made to produce error free documents, it is the responsibility of the builder and/or client to verify all existing conditions, dimensions, details, code compliance and specifications preceding commencement of work.
Prior to acceptance of these documents, the engineer takes full responsibility for changes and errors and/or omissions, but is relieved of these responsibilities once these documents have been accepted. The design and original drawings of this project remain the property of Conn Engineering Consultants, Inc. and no additional persons or parties may use this design and/or drawings for any other purpose without the consent of Conn Engineering Consultants, Inc.
c 2026 Conn Engineering Consultants, Inc.
copyright information:
SHEET
ISSUED FOR DATE
JOB NO :
SCALE :
DRAWN :
CHECKED :
DATE :
SHEET TITLE :
K
B R
IG
H
T O
N S
C H
O O
LS
R O
O
FT
O P
F R
A M
E
B
R
IG
T H
T O
N R
D B
R
IG
H T
O N
, M I
APPROVAL 06.25.26
Bids & Permits 6/26/26
06.16.26
JMC
AS NOTED
26-264
X/X = 1'-0"
SHEET TITLE 1
SHEET TITLE 1
EX
. W x1
1.
EX
. W x1
1.
EX
. W x1
1.
EX. W16x26 (BELOW)
EX. W16x26 (BELOW)
EX
. W x4
BE
LO
W
EX
. W x1
1.
EX
. W x4
BE
LO
W
EX
. T
-1 T
RU
SS
B
EL
O W
(R
EI
N
FO
RC
E
PE
R
D
ET
A
IL
4/ S1
EX
. T
-1 T
RU
SS
B
EL
O W
EX. 20HS JOIST @ 5'-0"
O.C. (TYPICAL)
EX. W16x26 BELOW
'-0
T1
C
LE
A R
SP
A
N
'-0
2' -6
'-1 0"
2' -6
5'
-0
'-0
1'
-8
/8
NEW CHILLER
(WEIGHT = 30,258 LBS)
'-6
/8
6'-9"
6'-9" 12'-6"
Scale: 3/16" = 1'-0"
PARTIAL ROOF FRAMING PLAN1 N
O
RT
H
'-8
/8
NEW 3" SCH40
STEEL PIPE
COLUMN
NEW 3" SCH40
STEEL PIPE
COLUMN
22'-3"1'-0"
'-6
'-0
N
EW
W x1
BE
A
M
N
EW
W x1
BE
A
M
NEW W12x26 BEAM (BELOW)
NEW W12x26 BEAM (BELOW)
EX. C10
EX. W14x34 BELOW
EX. W8x10EX. W8x10 EX. W8x10
EX. W8x10EX. W8x10 EX. W8x10
EX. W8x10EX. W8x10 EX. W8x10
EX. W10 BELOW
EX. W10 BELOW
EX
. W x2
EX
. W x2
EX
. W x2
EX
. W x2
EX
. W x2
EX. W8x10EX. W8x10 EX. W8x10
EX. W14x34 BELOW
GENERAL STRUCTURAL NOTES
1. GOVERNING BUILDING CODE - 2021 MICHIGAN BUILDING CODE
2. THE STRUCTURAL NOTES ARE INTENDED TO AUGMENT THE DRAWINGS AND
SPECIFICATIONS. SHOULD CONFLICTS EXIST BETWEEN THE DRAWINGS,
SPECIFICATIONS AND THE STRUCTURAL NOTES, THE STRICTEST PROVISION
SHALL GOVERN.
3. THE STRUCTURAL DRAWINGS FORM AN INTEGRAL PART OF THE CONTRACT
DOCUMENTS, WHICH INCLUDE ARCHITECTURAL, STRUCTURAL,
MECHANICAL, ELECTRICAL, SITE DRAWINGS AND SPECIFICATIONS.
COORDINATE THE STRUCTURAL DRAWINGS WITH THE REQUIREMENTS
SHOWN IN THE OTHER COMPONENTS OF THE CONTRACT DOCUMENTS.
4. TYPICAL DETAILS AND OTHER DETAILS APPLY TO CONDITIONS THAT ARE
SIMILAR TO THE CONDITIONS DESCRIBED IN THE DETAILS, EVEN IF THEY ARE
NOT SPECIFICALLY REFERENCED ON THE PLANS.
5. THE CONTRACTOR IS RESPONSIBLE FOR MEANS, METHODS, SEQUENCES AND
PROCEDURES OF CONSTRUCTION.
6. THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND STABLE AFTER THE
BUILDING IS FULLY COMPLETED. DETERMINE ERECTION PROCEDURE AND
SEQUENCE, AND TO ENSURE THE SAFETY OF THE BUILDING AND ITS
COMPONENT PARTS DURING ERECTION. THIS INCLUDES THE ADDITION OF
TEMPORARY BRACING, GUYS OR TIE DOWNS IF NECESSARY. RETAIN
OWNERSHIP OF SUCH MATERIAL AFTER COMPLETION OF THE PROJECT.
7. CONSTRUCTION SHALL COMPLY FULLY WITH THE APPLICABLE PROVISIONS
OF OSHA AND THE LOCAL GOVERNING CODES, LATEST EDITION, AND ALL
REQUIREMENTS SPECIFIED IN THE CODES SHALL BE ADHERED TO AS IF THEY
WERE CALLED FOR OR SHOWN ON THE DRAWINGS. THIS SHALL NOT BE
CONSTRUED TO MEAN THAT REQUIREMENTS SET FORTH ON THE DRAWING
MAY BE MODIFIED BECAUSE THEY ARE MORE STRINGENT THAN THE CODE
REQUIREMENTS OR BECAUSE THEY ARE NOT SPECIFICALLY REQUIRED BY
CODE.
DESIGN LOADS
1. THE STRUCTURE IS DESIGNED FOR THE FOLLOWING LIVE LOADS IN ADDITION
TO THE LATERAL LOADS AND SUPERIMPOSED DEAD LOADS AND
SELF-WEIGHT OF THE STRUCTURE. WHERE APPLICABLE, THE LIVE LOADS ARE
REDUCED IN ACCORDANCE WITH THE PROVISIONS OF THE BUILDING CODE.
THE SNOW LOADS ON LOWER ROOFS ADJACENT TO HIGH ROOFS OR
SLOPED ROOFS ARE INCREASED FOR THE EFFECT OF DRIFTING.
2. BUILDING IS NOT DESIGNED FOR FUTURE VERTICAL OR HORIZONTAL
EXPANSION.
LIVE LOAD
ROOF SNOW LOAD:
GROUND SNOW LOAD: 25 PSF
FLAT ROOF SNOW LOAD (MINIMUM ROOF LOAD): 17.5 PSF
SNOW EXPOSURE FACTOR: 1.0
SNOW LOAD IMPORTANCE FACTOR: 1.0
THERMAL FACTOR: 1.0
ADDITIONAL LOADING DUE TO DRIFTING AT CHANGES IN ROOF ELEVATIONS
AND ICE AT OVERHANGS PER APPLICABLE CODE.
DEAD LOAD
EXISTING ROOF: 30 PSF
CHILLER: 25,900 LBS.
OPEN COOLING TOWER: 19,090 LBS.
WIND LOAD
BASIC DESIGN WIND SPEED, V: 115 MPH
ALLOWABLE STRESS DESIGN WIND SPEED, Vasd: 90 MPH
EXPOSURE CATEGORY: C
INTERNAL PRESSURE COEFFICIENT: 0.18
SEISMIC LOAD
DESIGN CATEGORY: B
SITE CLASSIFICATION: D - DEFAULT
SEISMIC IMPORTANCE FACTOR: 1.00
Ss = 0.094 S1 = 0.046 SDs = 0.100
SD1 = 0.073
STRUCTURAL STEEL
1. ALL STRUCTURAL STEEL SHALL CONFORM TO THE 14TH EDITION OF THE LOAD
AND RESISTANCE FACTOR DESIGN (L.R.F.D.) “MANUAL OF STEEL
CONSTRUCTION” OF THE AISC.
2. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING ASTM
SPECIFICATIONS AND MINIMUM YIELD STRENGTHS:
MEMBER ASTM MIN. YIELD STRENGTH
W SHAPES A992 50 KSI
HSS TUBES A500 (GRADE B) 46 KSI
ROUND HSS TUBES A500 (GRADE B) 42 KSI
PIPE A53 (GRADE B) 35 KSI
MISC. PLATES/SHAPES A992 50KSI
CONNECTION BOLTS A325 92 KSI
ANCHOR BOLTS F1554 36 KSI
THREADED RODS A36 36 KSI
3. WELDING SHALL BE DONE WITH APPROPRIATE E70 SERIES ELECTRODES
COMPATIBLE WITH THE NEW AND EXISTING STEEL. WELDS AND WELDING
PROCEDURES SHALL CONFORM TO THE "STRUCTURAL WELDING CODE -
STEEL" OF THE AMERICAN WELDING SOCIETY ANSI/AWS D1.1.
4. WHERE FIELD REVISIONS ARE REQUIRED DUE TO UNFORESEEN
CIRCUMSTANCES, SUBMIT ALL CHANGES FOR REVIEW TO THE PROFESSIONAL
ENGINEER.
5. THE LENGTH, DIMENSION AND CONNECTION DETAIL FROM NEW
STRUCTURAL MEMBERS TO THE EXISTING STRUCTURE SHALL BE FIELD VERIFIED
BEFORE FABRICATION. FIELD MODIFICATIONS TO THE FABRICATED MEMBER
OR CONNECTION ARE NOT ALLOWED WITHOUT PRIOR APPROVAL BY THE
ARCHITECT/ENGINEER OF THE CONTRACTOR'S SKETCHES OR SHOP
DRAWINGS REFLECTING THESE MODIFICATIONS.
6. WELDING SHALL BE DONE BY WELDERS QUALIFIED IN ACCORDANCE WITH
THE REQUIREMENTS OF THE CURRENT "STRUCTURAL WELDING CODE - STEEL",
AMERICAN WELDING SOCIETY, AWS D1.1.
EXISTING STEEL JOISTS:
1. EXISTING STEEL JOISTS ARE ASSUMED TO BE A36 STEEL.
2. THE MANUFACTURER OF THE JOISTS IS ASSUMED TO BE A MEMBER OF THE
STEEL JOIST INSTITUTE.
3. FABRICATED TRUSSES ARE ASSUMED TO BE BUILT PER ORIGINAL
CONSTRUCTION DOCUMENTS.
4. REFER TO DETAILS FOR REINFORCEMENT OF EXISTING TRUSSES.
NEW COOLING TOWER
(WEIGHT = 20,858 LBS)
'-0
6'
-6
19'-11"
9' -1
3/
4"
7'-0" 9'-1" 7'-0"
4' -0
5'
-0
5' -4
'-6
2' -8
5'-10"
28'-11"
EX
W
8x
30'-0"
S102
EX. 3"Ø STEEL
COLUMNS
EX. 3"Ø STEEL
COLUMNS
S102
S102
EX
. W
8x
25'-7 1/2"
S102
SIM.
S102
SIM.
conn engineering consultants, inc.
commercial+industrial+institutional+residential structural engineering
107 n. bridge st.
po box 791 linden, mi 48451
p. 810.458.4350
f. 810.458.4592 www.connengineering.com seal:
A B C D E F G H I J job information:
While every attempt has been made to produce error free documents, it is the responsibility of the builder and/or client to verify all existing conditions, dimensions, details, code compliance and specifications preceding commencement of work.
Prior to acceptance of these documents, the engineer takes full responsibility for changes and errors and/or omissions, but is relieved of these responsibilities once these documents have been accepted. The design and original drawings of this project remain the property of Conn Engineering Consultants, Inc. and no additional persons or parties may use this design and/or drawings for any other purpose without the consent of Conn Engineering Consultants, Inc.
c 2026 Conn Engineering Consultants, Inc.
copyright information:
SHEET
ISSUED FOR DATE
JOB NO :
SCALE :
DRAWN :
CHECKED :
DATE :
SHEET TITLE :
K
B R
IG
H
T O
N S
C H
O O
LS
R O
O
FT
O P
F R
A M
E
B
R
IG
T H
T O
N R
D B
R
IG
H T
O N
, M I
APPROVAL 06.25.26
Bids & Permits 6/26/26
06.16.26
JMC
AS NOTED
26-264
SECTIONS & DETAILS
Scale: 3/8" = 1'-0"
CHILLER SECTION DETAIL1
NEW CHILLER
(WEIGHT = 30,258 LBS)
EX. 20HS JOIST @ 5'-0"
O.C. (TYPICAL)
NEW W10x15 BEAM
NEW W12x26 BEAM (BELOW)
EX. T1 STEEL TRUSS
NEW WT6x13 VERTICAL NEW WT6x13 VERTICAL
EX. W10x11.5
EX. W16x26
EX. W16x26
EX. W18x40
S102
Scale: 3/8" = 1'-0"
CHILLER SECTION DETAIL2
EX. 20HS JOIST @ 5'-0"
O.C. (TYPICAL)
NEW 3" SCH40 STEEL PIPE COLUMN
W/ 12" STEEL CAP AND BASE PLATES
ATTACHED W/ (4) 34"Ø A325 STEEL
BOLTS EACH
NEW W10x15 BEAM
NEW W12x26 BEAM (BELOW)
EX. T1 STEEL TRUSS
NEW WT6x13 VERTICAL
NEW CHILLER
(WEIGHT = 30,258 LBS)
NOTES:
1. ALL STEEL REINFORCEMENT TO BE FIELD WELDED TO
EXISTING STEEL.
2. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS
PRIOR TO INSTALLATION OF REINFORCEMENT.
NOTES:
1. ALL STEEL REINFORCEMENT TO BE FIELD WELDED TO
EXISTING STEEL.
2. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS
PRIOR TO INSTALLATION OF REINFORCEMENT.
3/16" TYP.
ATTACH NEW BEAM W/
(3) 34"Ø A325 STEEL BOLTS
Scale: 3/8" = 1'-0"
CHILLER SECTION DETAIL7
EX. C10
EX. W8x10
EX. W16x26
NEW COOLING TOWER
(WEIGHT = 20,858 LBS)
EX. W14x34 BEAM
TOP OF EXISTING ROOF
EX. STEEL RAIL
NEW COOLING TOWER TO
BE PLACED DIRECTLY OVER
STEEL BEAMS BELOW
EX. HSS5x5 COLUMN
EX. W8x10
4" SHEAR PLATE
ATTACHED W/ (3) 34"Ø
A325 STEEL BOLTS
3/16" (3) SIDES
NEW 3" SCH40 STEEL PIPE COLUMN
W/ 12" STEEL CAP AND BASE PLATES
ATTACHED W/ (4) 34"Ø A325 STEEL
BOLTS EACH
NEW 3" SCH40 STEEL PIPE COLUMN
W/ 12" STEEL CAP AND BASE PLATES
ATTACHED W/ (4) 34"Ø A325 STEEL
BOLTS EACH
EX. (2) L2 1/2 x 2 x 3/16
TO BE REINFORCED (SEE
DETAIL 5/S102) EX. (2) L2 1/2 x 2 x 3/16
TO BE REINFORCED (SEE
DETAIL 5/S102)
NEW WT6x13 VERTICAL
Scale: 3/8" = 1'-0"
REINFORCED TRUSS - T14
NEW WT6x13 VERTICAL
EX. (2) L3 1/2 x 3 x 1/4
TO BE REINFORCED (SEE
DETAIL 5/S102)
EX. (2) L2 1/2 x 2 x 5/16
TO BE REINFORCED (SEE
DETAIL 5/S102)
EX. (2) L3 x 2 x 1/4 TO BE
REINFORCED (SEE
DETAIL 5/S102) Scale: 3/8" = 1'-0"
REINFORCED WEB5
NEW 1"Ø A36 STEEL BAR
EACH SIDE OF AS
SHOWN
EXISTING TRUSS WEB
1/4 1-12
Scale: 3/8" = 1'-0"
TRUSS ATTACHMENT DETAIL6
NEW W12x26 BEAM (BELOW)
EX. T1 STEEL TRUSS
NEW WT6x13 VERTICAL
3/16" TYP.
ATTACH NEW BEAM W/
(3) 34"Ø A325 STEEL BOLTS
3/16" TYP.
6/S102
P Q Q.5 R R.3O.5ON.7
S
S
BLBLBLBL
CLR
1. COORDINATE NEW PIPING WITH BUILDING STRUCTURAL CONDITIONS,
EQUIPMENT MANUFACTURER RECOMMENDATIONS AND ALL OTHER
TRADES TO AVOID INTERFERENCES.
2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER
MANUFACTURERS RECOMMENDATIONS.
3. ALL MECHANICAL RELATED CORING THROUGH WALLS AND FLOORS
SHALL BE BY MECHANICAL CONTRACTOR. SEAL ALL PENETRATIONS
THROUGH RATED WALLS AND FLOORS WITH U.L. RATED CAULK
SEALANT IN ACCORDANCE WITH THE SPECIFICATION REQUIREMENTS.
1. COORDINATE SHUT-DOWN OF ANY SYSTEM WITH THE BUILDING
SERVICES PERSONNEL PRIOR TO SYSTEM SHUT-DOWN.
2. REMOVE (INCLUDING DISCONNECTION OF) MECHANICAL SERVICE AS
INDICATED AND/OR DESCRIBED ALONG WITH PIPING, HANGERS,
SUPPORTS, CONTROLS AND ALL RELATED ACCESSORIES.
3. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES
PRIOR TO DEMOLITION.
4. WHERE DAMAGE OCCURS DURING DEMOLITION, THE CONTRACTOR
SHALL REPAIR AS REQUIRED SO AS TO BE COMPATIBLE WITH
EXISTING.
5. WHERE DUCT AND/OR PIPE INSULATION HAS BEEN DAMAGED, THE
CONTRACTOR SHALL REPAIR AS REQUIRED SO AS TO BE COMPATIBLE
WITH EXISTING.
6. ALL ITEMS DEMOLISHED SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF PROPERLY, UNLESS NOTED OTHERWISE.
7. LIMITS OF DEMOLITION ARE INDICATED ON THE DRAWINGS. SHOULD
EXISTING FIELD CONDITIONS REQUIRE MODIFICATIONS OF THESE
LIMITS FOR THE PROPER INSTALLATION OF NEW WORK, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR SUCH MODIFICATIONS.
8. CAP AND SEAL AIRTIGHT ALL UNUSED OPENINGS ON THE RETURN
AND SUPPLY DUCTWORK.
GENERAL NOTES:
1. PROVIDE MATERIALS AND EQUIPMENT AND EXECUTE THE WORK,
INCLUDING ALL TESTING AND INSPECTIONS, IN COMPLIANCE WITH THE
APPLICABLE PROVISIONS OF FEDERAL, STATE AND LOCAL
GOVERNMENT LAWS, ORDINANCES, REFERENCED CODES AND
STANDARDS CURRENT AS OF THE ISSUE DATE OF THESE DRAWINGS.
ALL MORE STRINGENT REQUIREMENTS OF THE CONTRACT DOCUMENTS
SHALL MODIFY, SUPPLEMENT AND SUPERSEDE APPLICABLE PORTIONS
OF GOVERNING LAWS, ORDINANCES, CODES AND STANDARDS.
2. CONTRACTOR SHALL PRESENT CERTIFICATE TO THE OWNER THAT ALL
APPLICABLE BUILDING PERMITS HAVE BEEN SECURED PRIOR TO
STARTING ANY WORK, AND PROVIDE THE OWNER WITH ALL REQUIRED
CERTIFICATES OF FINAL APPROVAL FROM THE GOVERNING
JURISDICTIONS AT COMPLETION OF THE WORK. PROVIDE ALL SHOP
DRAWINGS AS REQUIRED IN FOLLOWING SECTIONS.
3. MAKE ALL CONNECTIONS TO EXISTING SYSTEMS DURING DESIGNATED
PERIODS UPON APPROVAL OF THE OWNER AND AT NO INCREASE IN
CONTRACT SUM.
4. EXISTING FACILITIES:
A. DO NOT INTERRUPT EXISTING UTILITIES UTILIZED BY THE OWNER
EXCEPT AS SPECIFIED OR WHEN APPROVED IN WRITING, AND THEN
ONLY AFTER TEMPORARY UTILITY SERVICES HAVE BEEN
APPROVED AND PROVIDED. INTERRUPTIONS MUST BE SCHEDULED
TO SUIT THE OWNER'S REQUIREMENTS.
B. VERIFY ALL EXISTING WORK, WHERE EXISTING CONNECTIONS ARE
PARTIAL, PROVIDE ALL NECESSARY MATERIALS, LABOR AND
EQUIPMENT REQUIRED TO MODIFY EXISTING WORK. IN ADDITION,
MAINTAIN INTEGRITY OF THE EXISTING SYSTEMS. RECTIFY ANY
CONTAMINATION, DEGRADATION OF CLEANLINESS OR DAMAGE TO
THE EXISTING SYSTEMS TO THE SATISFACTION OF THE OWNER.
PROVIDE ALL WORK SO REQUIRED AT NO INCREASE IN THE
CONTRACTOR'S ORIGINAL PROPOSAL.
5. COORDINATE EXACT LOCATION OF CONSTRUCTION TO PRECLUDE ANY
INTERFERENCES BETWEEN PIPING, WIRING, LIGHTING FIXTURES,
DUCTWORK, BUILDING EQUIPMENT, PROCESS EQUIPMENT AND OTHER
CONSTRUCTION.
6. PROVIDE LABOR, INCLUDING FIELD ERECTION AND SUPERVISION,
MATERIALS, EQUIPMENT AND ANCILLARIES, AND COORDINATE,
PROCURE, FABRICATE, DELIVER, ERECT OR INSTALL, INTERFACE WITH
EXISTING WORK, START, DEBUG AND TEST ALL SYSTEMS AS
NECESSARY TO PROVIDE THE OWNER WITH A COMPLETE, OPERATING
FACILITY IN CONFORMANCE WITH THE CONSTRUCTION BID
DOCUMENTS.
7. ALL CUTTING AND PATCHING THAT MAY BE NECESSARY FOR THE
INSTALLATION OF THE MECHANICAL CONTRACTOR'S WORK SHALL BE
PERFORMED AND REPAIRED BY THE TRADE WHOM NORMALLY
PERFORMS THAT WORK AND PAID FOR BY THE MECHANICAL
CONTRACTOR. NO CUTTING OF THE BUILDING STRUCTURAL SYSTEM
SHALL BE PERFORMED.
8. THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE PRIOR TO
SUBMITTING HIS BID TO FAMILIARIZE HIMSELF WITH THE ACTUAL
PROJECT CONDITIONS AND TO CHECK FOR ANY INTERFERENCES
BETWEEN HIS WORK AND THAT OF THE OTHER TRADES, AND/OR ANY
APPARENT VIOLATIONS OF LOCAL OR STATE CODES, LAWS,
ORDINANCES AND REGULATIONS. SHOULD ANY VIOLATIONS OR
INTERFERENCES APPEAR AND DEPARTURE FROM THE DESIGN INTENT
OF THE CONTRACT DOCUMENTS IS REQUIRED, THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT PRIOR TO ENTERING INTO A CONTRACT
WITH THE OWNER. FAILURE TO PROVIDE THE ARCHITECT WITH THE
AFOREMENTIONED NOTIFICATION SHALL RESULT IN THE CONTRACTOR
BEING HELD RESPONSIBLE TO COMPLETE ALL WORK TO MEET THE
INTENT OF THE CONTRACT DOCUMENTS WITH NO ADDITIONAL
EXPENSES BEING INCURRED BY THE OWNER.
9. THE DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL LOCATIONS
AND ARRANGEMENTS OF ALL THE EQUIPMENT AND PIPING. THE
DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS BUILDING
CONSTRUCTION AND ALL OTHER WORK WILL PERMIT. DO NOT SCALE
DRAWINGS FOR EXACT MEASUREMENTS.
10. DEMOLITION OF MECHANICAL EQUIPMENT SHALL INCLUDE ALL EXISTING
PIPING, VALVES, CONTROLS, SUPPORTS, AND EQUIPMENT WHERE SUCH
ITEMS ARE NOT REQUIRED FOR THE PROPER OPERATION OF THE
REVISED SYSTEM. REMOVE, RECONNECT, CAP, PLUG AND REPLACE
EXISTING PIPING AND DUCTWORK.
GENERAL NOTES: PIPING
1. THE PIPING SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE
WITH ALL STATE AND LOCAL CODES. THE PIPING CONTRACTOR SHALL
OBTAIN ALL PERMITS, PAY ALL FEES, AND ARRANGE FOR ALL
INSPECTIONS FOR HIS WORK. AT THE COMPLETION OF THE PROJECT,
THE PIPING CONTRACTOR SHALL FURNISH THE OWNER WITH
CERTIFICATES OF FINAL INSPECTIONS AND APPROVALS.
2. PIPING SHALL BE AS FOLLOWS:
A. CHILLED WATER PIPING:
1) CHILLED WATER PIPING SHALL BE SCHEDULE 40, BLACK STEEL
WITH THREADED, GROOVED OR WELDED FITTINGS.
B. VALVES:
1) BALL VALVES SHALL BE TWO PIECE FULL PORT BRONZE BALL
VALVES WITH STAINLESS STEEL TRIM, TFE SEATS WITH 316
STAINLESS STEEL BALL AND STEM. THREADED BODY PACK NUT
DESIGN WITH ADJUSTABLE STEM PACKING WITH THREADED OR
SOLDERED ENDS. RATED FOR 150 PSIG SWP AND 600 PSIG
CWP.
2) CHECK VALVES SHALL BE SWING CHECK WITH BRONZE DISC,
CLASS 150, ASTM B62. Y PATTERN DESIGN WITH THREADED OR
SOLDERED ENDS. RATED FOR 300 PSIG CWP.
C. PIPING INSULATION:
1) ALL CHILLED WATER PIPING SHALL BE INSULATED WITH
MINIMUM 2" THICK FIBERGLASS INSULATION, WITH A FIRE
RETARDANT JACKET, HAVING AN AVERAGE R VALUE OF 3.45.
CHILLED WATER PIPING INSULATION SHALL BE PROVIDED WITH
A VAPOR BARRIER. PROVIDE PREFORMED SECTIONS WITH PVC
COVERS AT ALL FITTINGS.
2) PIPE INSULATION SHALL HAVE A FLAME SPREAD AND SMOKE
DENSITY RATING NOT EXCEEDING 25/50, AS TESTED PER ASTM
STANDARD E-84.
3. PIPING SHALL BE SUPPORTED FROM HANGERS AT AN ADEQUATE
DISTANCE WITH SUPPORTING HANGER RODS FASTENED TO THE
BUILDING FRAMING WHENEVER POSSIBLE. SUPPORT SPACING SHALL
NOT EXCEED THE HANGER SPACING REQUIREMENTS PER SECTION 308
OF THE LOCAL PLUMBING CODE.
4. ISOLATE PIPING AND EQUIPMENT FROM THE BUILDING STRUCTURE
WITH INSULATING HANGERS AND FITTINGS AS REQUIRED TO PREVENT
GALVANIC CORROSION OF THE BUILDING PIPING SYSTEMS.
5. FURNISH AND INSTALL ISOLATION VALVES AT ALL SERVICE POINTS OR
EQUIPMENT CONNECTIONS.
6. LABEL ALL PIPING SYSTEMS WITH MANUFACTURED SELF ADHESIVE OR
PRE-TENSIONED PIPE MARKERS. MARKERS SHALL INDICATE SERVICE
AND DIRECTION OF FLOW. MARK PIPE NEAR: VALVES, BRANCH
CONNECTIONS, PENETRATIONS, ACCESS DOORS AND NEAR MAJOR
PIECES OF EQUIPMENT.
7. THE PIPING CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND
PROVIDE ROUGH-INS FOR ALL EQUIPMENT FURNISHED BY OTHER
CONTRACTORS. AFTER ALL EQUIPMENT HAS BEEN INSTALLED BY
OTHER CONTRACTORS, THE PIPING CONTRACTOR SHALL MAKE ALL
FINAL CONNECTIONS AND SHALL INCLUDE IN HIS BASE BID ALL VALVES,
UNIONS, COUPLINGS, ETC., THAT ARE REQUIRED TO MAKE FINAL
CONNECTIONS.
8. THE CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS
OF ALL EQUIPMENT FURNISHED BY THIS CONTRACTOR WITH THE
ELECTRICAL CONTRACTOR.
9. THE PIPING CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED
UNDER THIS CONTRACT TO BE FREE FROM DEFECTIVE WORKMANSHIP
AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER THE ACCEPTANCE
OF THE BUILDING BY THE OWNER, AND SHOULD DEFECTS OCCUR
WITHIN THIS PERIOD, REPAIR AND/OR REPLACE DEFECTIVE ITEMS AND
ANY DAMAGE RESULTING FROM FAILURE OF THESE ITEMS, AT NO
EXPENSE TO THE OWNER.
10. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF HIS EQUIPMENT
AND WORK WITH OTHER BUILDING TRADES TO AVOID ANY
INTERFERENCES BETWEEN HIS WORK AND THE WORK OF OTHER
TRADES.
11. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER N.E.C.)
ABOVE AND AROUND ANY EXISTING ELECTRICAL PANELS, EQUIPMENT
AND TRANSFORMERS WHEN ROUTING OVERHEAD PIPING.
12. CONTRACTOR SHALL PROVIDE PROTECTION FOR PIPING INSTALLED IN
CONCEALED SPACES TO PREVENT DAMAGE FROM FASTENERS.
PIPE TURNED UP
PIPE TURNED DOWN
PIPE OUT BOTTOM
PIPE OUT TOP
UNION
PLUG VALVE
CHECK VALVE
SYMBOL DESCRIPTION
CONNECT NEW TO EXISTING
BUTTERFLY VALVE
CHILLED WATER RETURN PIPING
CHILLED WATER SUPPLY PIPING
CHWR
CHWS
REMOVE / DEMOLISH
ACC-# AIR COOLED CHILLER
CHWP-# CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CTWP-# COOLING TOWER WATER PUMP
C.O. CLEAN OUT
CT-# COOLING TOWER
DIA/Ø DIAMETER
(E) EXISTING
G.P.M. GALLONS PER MINUTE
HHWS HEATING HOT WATER SUPPLY
HHWR HEATING HOT WATER RETURN
(TYP.) TYPICAL
VFD VARIABLE FREQUENCY DRIVE
WCCH-# WATER COOLED CHILLER
WH-# WATER HEATER
SYMBOLS
SPECIFICATIONS ABBREVIATIONS
EXISTING SERVICE TO BE CAPPED
(E) EXISTING
MECHANICAL GENERAL NOTES:
DEMOLITION GENERAL NOTES:
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
A T E O F M I C H I GA N
06/26/26
#DEMOLITION KEY NOTES:
1. REMOVE AND PROPERLY DISPOSE OF THE EXISTING ROOF
TOP UNIT IN ITS ENTIRETY. DISCONNECT ALL ELECTRICAL
AND CONTROL WIRING AND THE HEATING HOT AND
CHILLED WATER PIPING. EXISTING SUPPLY AND RETURN
DUCTWORK CONNECTIONS WITHIN EXISTING CURB TO
REMAIN. EXISTING SUPPORT RAILS ARE TO REMAIN IN
PLACE AND BE PROTECTED DURING REMOVAL
OPERATIONS. EQUIPMENT SHALL BE REMOVED FROM THE
SITE AND REMAIN THE PROPERTY OF THE OWNER OR
DISPOSED OF PROPERLY IF THE OWNER DOES NOT WANT
THEM.
2. REMOVE AND PROPERLY DISPOSE OF THE EXISTING
ENERGY RECOVERY UNIT IN ITS ENTIRETY. DISCONNECT
ALL ELECTRICAL AND CONTROL WIRING AND THE HEATING
HOT AND CHILLED WATER PIPING. EXISTING SUPPORT
RAILS ARE TO REMAIN IN PLACE AND BE REUSED FOR NEW
UNIT SUPPORT. EXISTING DUCTWORK IS ALSO TO REMAIN
AND SHALL BE LEFT INTACT, CLEAN, AND READY FOR
RECONNECTION TO NEW EQUIPMENT. REPAIR ANY MINOR
DAMAGE TO ADJACENT MATERIALS CAUSED BY REMOVAL
WORK. EQUIPMENT SHALL BE REMOVED FROM THE SITE
AND REMAIN THE PROPERTY OF THE OWNER OR
DISPOSED OF PROPERLY IF THE OWNER DOES NOT WANT
THEM.
(E) RTU-C221(E) RTU-C18 1 (E) RTU-C201(E) RTU-C121
(E) RTU-91
(E) RTU-101
(E) RTU-C71
(E) RTU-C51
(E) RTU-C61
(E) RTU-C81
(E) RTU-C31
(E) RTU-C11
(E) RTU-C21
(E) RTU-C41
(E) ERV-B22
(E) ERV-B12
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
C H
W R
C H
W R
C H
W R
C H
W S
C H
W S
C H
W S
H H
W S
H H
W S
H H
W S
H H
W S
H H
W S
H H
W S
H H
W S
H H
W R
H H
W R
H H
W R
H H
W R
H H
W R
H H
W R
HHWR
HHWS
CHWS
CHWR
1 (E)CT
33 3
CHWR CHWR
C H
W R
C H
W R
C H
W R
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
C H
W R
CHWR CHWR CHWR
CHWS CHWS CHWS CHWS
HHWR
HHWS
H H
W S
H H
W S
HHWS HHWS
CHWS
CHWR
HHWS
HHWR
HHWR HHWR HHWR HHWR
H H
W R
H H
W R
HHWR HHWR
H H
W R
H H
W R
CHWS CHWS
CHWR
C H
W S
C H
W R
CHWR CHWR CHWR CHWR CHWR CHWR CHWR
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
CHWS CHWS CHWS CHWS
C H
W R
C H
W R
C H
W S
CHWS
C H
W S
CHWS
CHWS
C H
W S
CHWS
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
CHWS
CHWS
C H
W S
C H
W S
CHWR
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W R
CHWR
CHWR
CHWR
C H
W S
C H
W S
C H
W S
(E )6
"C H
W S
(E)6"
(E)8"
CHWS
(E)10"
C H
W S
(E)6"
(E)6"CHWS
(E)6"CHWS
(E )1
0" C
H W
S H
H W
S H
H W
S H
H W
S
H H
W R
H H
W R
H H
W R
(E)8"HHWS
HHWS HHWS HHWS
(E)CHWP-3
(E)CHWP-4
(E)CHWP-2
(E)CH-1
(E)WH-1
(E)WH-2
(E)6" (E)4"
(E)4"
(E)CHWP-1
(E)CHWP-6
TO ICE TANK
(E)DRY COOLER
CHWR
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
CHWS
CHWS
(E )1
0"
(E)2" TOWER WATER MAKEUP
(E)8" (E)8"
(E)CHWP-5
#KEY NOTES:
1. REMOVE EXISTING COOLING TOWER, INCLUDING ALL ASSOCIATED
PIPING, SUPPORTS, AND ELECTRICAL CONNECTIONS.
CONTRACTOR SHALL PROPERLY DISCONNECT, DRAIN, AND
DISPOSE OF EXISTING EQUIPMENT IN ACCORDANCE WITH
APPLICABLE CODES. PROVIDE AND INSTALL NEW COOLING
TOWER COMPLETE WITH ALL REQUIRED PIPING, VALVES,
CONTROLS, AND ELECTRICAL CONNECTIONS. COORDINATE ALL
WORK WITH EXISTING CONDITIONS. ENSURE PROPER SUPPORT,
ALIGNMENT, AND COMMISSIONING OF THE NEW UNIT PER
MANUFACTURER’S RECOMMENDATIONS.
2. CONTRACTOR SHALL DISCONNECT AND REMOVE THE EXISTING
ENERGY RECOVERY UNIT (ERU) IN ITS ENTIRETY, INCLUDING ALL
ASSOCIATED DUCTWORK, CONTROLS, PIPING, SUPPORTS, AND
APPURTENANCES.
ALL ELECTRICAL, CONTROL WIRING, AND PIPING CONNECTIONS
SHALL BE PROPERLY DISCONNECTED AND MADE SAFE PRIOR TO
REMOVAL.
3. EXISTING STRUCTURAL STEEL BEAM AND STRUCTURAL
SUPPORTS SHALL REMAIN AND BE PROTECTED DURING
DEMOLITION. DO NOT CUT, MODIFY, OR DAMAGE ANY
STRUCTURAL ELEMENTS.
4. DISCONNECT AND REMOVE ASSOCIATED DUCTWORK BACK TO
THE NEAREST MAIN OR AS INDICATED ON THE DRAWINGS, AND
CAP AND PROVIDE A WATERTIGHT SEAL AT ALL ROOF AND WALL
OPENINGS.
5. DISCONNECT AND REMOVE EXISTING PIPING BACK TO THE
NEAREST ACTIVE MAIN AS INDICATED. PROVIDE CAPS AT ALL
OPEN ENDS AND ENSURE A WATERTIGHT SEAL.
6. RELOCATE EXISTING PIPING AS REQUIRED TO ACCOMMODATE
THE NEW CHILLER. FIELD VERIFY FINAL LOCATION PRIOR TO
INSTALLATION ( APPROXIMATELY MINIMUM 10'-0" EAST).
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
A T E O F M I C H I GA N
06/26/26
P Q R
RTU-C8
RTU-C6
RTU-C7
RTU-C5
RTU-C10 RTU-C9
RTU-C4
RTU-C2
RTU-C3
RTU-C1
RTU-C20RTU-C18 RTU-C22
RTU-C18
1 1
#KEY NOTES:
1. CONTRACTOR SHALL FURNISH AND INSTALL A NEW AIR HANDLING UNIT (AHU) ON AN
ADAPTOR CURB THAT ALIGNS WITH THE EXISTING ROOF CURB FROM THE UNIT
THAT WAS REMOVED IN THIS AREA. FIELD MEASURE EXACT EXISTING CURB
DIMENSIONS PRIOR TO FABRICATION OF THE ADAPTOR CURB TO ENSURE PROPER
FIT.
RECONNECT / EXTEND SUPPLY AND RETURN DUCTWORK WITHIN ADAPTOR CURB
AS REQUIRED. MODIFY, EXTEND, OR PROVIDE TRANSITIONS AS REQUIRED TO
MAINTAIN A COMPLETE, AIRTIGHT SYSTEM.
PROVIDE AND INSTALL NEW CHILLED WATER AND HEATING WATER PIPING AS
REQUIRED TO CONNECT TO THE NEW AHU COIL CONNECTION POINTS. PROVIDE
ISOLATION VALVES, BALANCING VALVES, STRAINERS, UNIONS, AND ALL REQUIRED
ACCESSORIES FOR A COMPLETE INSTALLATION.
PROVIDE CONTROL VALVES AT EACH COIL (CHILLED WATER AND HEATING WATER),
COMPLETE WITH ACTUATORS COMPATIBLE WITH THE EXISTING BUILDING
MANAGEMENT SYSTEM (BMS). CONTROL VALVES SHALL BE SIZED AND SELECTED
FOR PROPER MODULATION AND SYSTEM PERFORMANCE.
ALL CONTROLS, SENSORS, ACTUATORS, AND CONTROL WIRING SHALL BE
PROVIDED AND INTEGRATED WITH THE EXISTING BMS. COORDINATE WITH
CONTROLS CONTRACTOR TO ENSURE FULL FUNCTIONALITY, INCLUDING
TEMPERATURE CONTROL, VALVE MODULATION, AND SYSTEM MONITORING.
ALL PIPING SHALL BE PROPERLY SUPPORTED, INSULATED, FLUSHED, AND TESTED.
PROVIDE AIR VENTS AND DRAIN VALVES AS REQUIRED FOR PROPER SYSTEM
OPERATION.
SEAL ANY NEW ROOF PENETRATIONS WATERTIGHT AND COORDINATE WITH
ROOFING CONTRACTOR AS REQUIRED.
CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND COORDINATE
WORK WITH ALL TRADES.
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
ERV-B11
ERV-B21
#KEY NOTES:
1. CONTRACTOR SHALL FURNISH AND INSTALL A NEW
ENERGY RECOVERY VENTILATOR UNIT (ERV). UNIT
TO BE MOUNTED ON THE EXISTING STEEL SUPPORT
BEAMS AS INDICATED. SECURE NEW UNIT TO
EXISTING STEEL AS REQUIRED.
ALL CONTROLS, SENSORS, ACTUATORS, AND
CONTROL WIRING SHALL BE PROVIDED AND
INTEGRATED WITH THE EXISTING BMS. COORDINATE
WITH CONTROLS CONTRACTOR TO ENSURE FULL
FUNCTIONALITY, INCLUDING TEMPERATURE
CONTROL VALVE MODULATION, AND SYSTEM
MONITORING. INSTALLING CONTRACTOR SHALL
VERIFY ALL EXISTING FIELD CONDITIONS AND
COORDINATE WORK WITH ALL OTHER TRADES.
2. RECONFIGURE EXISTING DUCTWORK AS REQUIRED
TO CONNECT TO THE NEW UNIT. MODIFY
TRANSITIONS, ADAPTERS, OR OFFSETS AS REQUIRED
TO ALIGN WITH THE NEW ERV DUCT CONNECTION
FLANGES. INSPECT EXISTING DUCT INSULATION AND
REPLACE ANY DAMAGED SECTIONS. ENSURE ALL
REUSED DUCT JOINTS ARE RESEALED TO MEET
CURRENT LEAKAGE REQUIREMENTS. INSULATE ALL
NEW DUCTWORK TO MATCH EXISTING AND SEAL
WATER TIGHT.
3. EXTEND / REWORK CHILLED WATER AND HEATING
WATER PIPING AS REQUIRED TO CONNECT TO THE
NEW ERV COILS CONNECTION LOCATIONS. PROVIDE
ISOLATION BALL VALVES, BALANCING VALVES,
STRAINERS, UNIONS, AND ALL REQUIRED
ACCESSORIES FOR A COMPLETE INSTALLATION. ALL
PIPING SHALL BE PROPERLY SUPPORTED,
INSULATED, FLUSHED, AND TESTED. PROVIDE AIR
VENTS AND DRAIN VALVES AS REQUIRED FOR
PROPER SYSTEM OPERATION.
4. PROVIDE A CONTROL VALVES AT EACH COIL (CHILLED
WATER AND HEATING WATER), COMPLETE WITH
ACTUATORS COMPATIBLE WITH THE BUILDING
MANAGEMENT SYSTEM (BMS). CONTROL VALVES
SHALL BE SIZED AND SELECTED FOR PROPER
MODULATION AND SYSTEM PERFORMANCE.
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
CHWR CHWR
C H
W R
C H
W R
C H
W R
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
C H
W R
CHWR CHWR CHWR
CHWS CHWS CHWS CHWS
HHWR
HHWS
H H
W S
H H
W S
HHWS HHWS
CHWS
CHWR
HHWS
HHWR
HHWR HHWR HHWR HHWR HHWR
H H
W R
H H
W R
HHWR HHWR
H H
W R
H H
W R
CHWS CHWS
CHWR
C H
W S
C H
W R
CHWR CHWR CHWR CHWR CHWR CHWR CHWR
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
CHWS CHWS CHWS CHWS
C H
W R
C H
W R
C H
W S
CHWS
C H
W S
CHWS
CHWS
C H
W S
CHWS
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
CHWS
CHWS
C H
W S
C H
W S
CHWR
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W R
CHWR
CHWR
CHWR
C H
W S
C H
W S
C H
W S
(E )6
"C H
W S
(E)6"
(E)8"
(E)10"
C H
W S
(E)6"
(E)6"CHWS
(E)6"CHWS
(E )1
0" C
H W
S H
H W
S H
H W
S H
H W
S
H H
W R
H H
W R
H H
W R
(E)8"HHWS
HHWS HHWS HHWS
(E)CHWP-3
(E)CHWP-4
(E)CHWP-2
(E)WCCH-1
(E)WH-1
(E)WH-2
(E)6" (E)4"
(E)4"
(E)CHWP-1
(E)CHWP-6
TO ICE TANK
(E)DRY COOLER
CHWR
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
CHWS
CHWS
1 CT-1
EXISTING STEEL
SUPPORT BEAMS
NEW STEEL SUPPORT BEAMS
(BY STRUCTURAL TRADES)
SERVICE CLEARANCE
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W R
CHWR
CHWS
(E )1
0"
6" 6"
EXISTING STEEL
SUPPORT BEAM
ACCH-1
6" 6"
FLEX CONNECTION (TYP.)
TEMPERATURE GAUGE(TYP.)
PRESSURE GAUGE (TYP.)
FLOW SWITCH
STRAINER
BUTTERFLY (TYP.)
(E)2" TOWER WATER MAKEUP
(E)8" (E)8"
PIPE SUPPORT
(TYPICAL)
(E)CHWP-5
(E)CTWP-1
(E)CTWP-2
6"
6"
RELOCATED
PIPING
#KEY NOTES:
1. PROVIDE AND INSTALL NEW COOLING TOWER.
CONNECT NEW COOLING TOWER TO EXISTING
SUPPLY, RETURN AND BYPASS COOLING TOWER
WATER PIPING AS WELL AS TOWER FILL PIPING.
EXISTING VALVES AND STRAINERS SHALL REMAIN.
PROVIDE ANY ADDITIONAL PIPING, CONTROLS, AND
ELECTRICAL CONNECTIONS REQUIRED FOR A
COMPLETE AND OPERATIONAL SYSTEM. COORDINATE
ALL WORK WITH EXISTING CONDITIONS. FIELD VERIFY
EXISTING CONDITIONS PRIOR TO MAKING
CONNECTIONS.
2. STRUCTURAL TRADES TO PROVIDE ADDITIONAL
STRUCTURAL SUPPORT STEEL AND VERIFY THE
CAPACITY OF THE EXISTING SUPPORT STEEL. REFER
TO SPECIFIED CHILLER MANUFACTURER
INSTALLATION MANUAL FOR EXACT REQUIREMENTS
AND POINT WEIGHTS INCLUDING LOCATION OF ALL
VIBRATION ISOLATORS.
3. PROVIDE / REWORK WATER TIGHT SEAL AND SLEEVE
THRU EXISTING WALL AS REQUIRED TO
ACCOMMODATE NEW 6" CHILLED WATER PIPING.
4. CONNECT NEW 6" CHILLED WATER SUPPLY INTO
EXISTING CHILLED WATER PIPING IN THIS AREA.
EXACT CONNECTION LOCATION SHALL BE
FIELD-VERIFIED AND COORDINATED WITH EXISTING
CONDITIONS.
5. PROVIDE (2) NEW 6" 2-POSITION ISOLATION VALVES.
VALVE SHALL MODULATE IN COORDINATION WITH
ACTIVE CHILLER OPERATION. VALVES SHALL BE BRAY
SERIES 70 CONTROLS (120 VOLT) TO MATCH EXISTING
CHILLER CONTROL VALVES.
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VERI F Y A LL W O R K AND SH AL L N OT IF Y TH E A RC HI TEC T
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
A T E O F M I C H I GA N
06/26/26
P Q R
SPREADER TO BE
USED ON PIPE SIZED
ON 10" AND ABOVE
INSULATED PIPE
(COLD)
MIN. 4" INSULATED PIPES
(HOT OR DUEL TEMP.)
(4" AND 5")
INSULATED PIPES
(HOT OR DUEL TEMP.)
(MIN. 6")
SPREADER TO BE
USED ON PIPE SIZED
ON 10" AND ABOVE
INSULATED PIPE
(COLD)
(MIN. 4")
INSULATED SADDLES
AND SHIELDS
STANDARD PIPE
COVERING
INSULATED PIPE
(HOT OR COLD)
(MAX. 4" )
INSULATED PIPE
(MAX. 4" )
HANGER PIPE DETAILS
N.T.S.
PIPE SUPPORT DETAIL
N.T.S.
GALVANIZED SHEET METAL
SHIELD - SEE SCHEDULE FOR
GAUGE THICKNESS AND
LENGTH
"A"
REFRACTORY INSERT (90° WEDGE) SAME
THICKNESS AS INSULATION AND OF
WIDTH "A" SHOWN IN SCHEDULE BELOW
VAPOR BARRIER
LAP CEMENT
CALCIUM SILICATE
INSULATION- SEE
SPECIFICATION FOR
THICKNESS
STEEL BAND AROUND
PERIMETER OF SHIELD
AT EACH END (TYP.)
INSULATION SADDLE AND
SHEILD SCHEDULES
PIPE
SIZE
SHIELD GAUGE
AND LENGTH
INSERT WIDTH "A"
COLD LINES
HOT OR
DUEL TEMP.
LINES
4" - 6" 50 GA. - 6" LG. 4" 4"
PIPE HANGER SCHEDULE
STEEL PIPE
(STANDARD WEIGHT) COPPER TUBING
PIPE SIZE ROD SIZE MAX. SPACING PIPE SIZE ROD SIZE MAX.
SPACING
1" MAX. 3/8" 8'-0" 1" MAX. 3/8" 5'-0"
1" - 2" 3/8" 10'-0" 1 1/4" - 1 1/2 3/8" 7'-0"
2 1/2" - 3" 1/2" 12'-0" 2" 1/2" 10'-0"
4" - 5" 5/8" 16'-0" 2 1/2" - 3" 1/2" 10'-0"
6" - 10" 3/4" 16'-0" 4" 5/8" 10'-0"
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
AIR COOLED CHILLER SCHEDULE
MARK MANUFACTURER MODEL NUMBER TYPE
NOMINAL
CAPACITY
(TONS)
EVAPORATOR ICE BUILD ICE MELT CONDENSER COMPRESSOR PUMPS REFRIGERANT ELECTRICAL
WEIGHT
(LBS) NOTES:
FLOW
GPM FLUID TYPE # OF
PASSES
FOULING
FACTOR
E.W.T.
°F
L.W.T.
°F
CAPACITY
(TONS)
W.P.D.
(FT. HEAD)
E.W.T.
°F
L.W.T.
°F
CAPACITY
(TONS)
W.P.D.
(FT. HEAD)
AMBIENT
ICE BUILD
°F
AMBIENT
ICE MELT
°F
NO. OF
FANS
FAN FLA
(EA) TYPE
NUMBER
OF
COMP.
RLA
(EACH) TYPE FLOW (GPM)
TOTAL HEAD
PRESSURE
(FT H20)
MOTOR
(HP) TYPE NUMBER OF
CIRCUITS
CHARGE PER
CIRCUIT
(LBS)
VOLTS /
PHASE M.C.A. M.O.P.
ACCH-1 TRANE ACR-C-440 AIR COOLED 440 800
30%
ETHYLENE
GLYCOL
2 0.0001 31.72 22.00 294.8 56.3 56.12 42.00 430.9 55.1 85 95 18 2.7 SCREW 3
251.8 195.7 242.1
TACO 800 125 40 R-513A 2 366 / 177 480 / 3 856.8 1,000 30,500 1 - 7
NOTES:
1. PROVIDE WITH LIQUID, DISCHARGE AND SUCTION LINE SHUT-OFF VALVES
2. PROVIDE A SINGLE POINT DISCONNECT SWITCH WITH CIRCUIT PROTECTION
3. PROVIDE WITH PHASE & UNDER/OVER VOLTAGE PROTECTION
4. PROVIDE A FIVE YEAR COMPRESSOR PARTS WARRANTY
5. PROVIDE A RUBBER IN SHEAR ISOLATOR KIT
6. PUMP PACKAGE SHALL BE EQUIPPED WITH:
A. SINGLE TACO 40HP PUMP WITH VFD FOR BALANCING
B. TYPE INLET STRAINER
C. COMBINATION TRIPLE-DUTY OUTLET VALVE HAVING A DRIP-TIGHT DISCHARGE SHUTOFF VALVE, NON-SLAM CHECK VALVE, AND FLOW THROTTLING VALVE D. COMBINATION SUCTION GUIDE WITH FLOW STABILIZING OUTLET VANES AND STAINLESS STEEL STRAINER WITH A DISPOSABLE FINE-MESH STRAINER FOR START-UP E. FACTORY POWER AND CONTROL WIRING FROM THE CHILLER TO THE PUMP PACKAGE CONTROL PANEL
F. THERMAL DISPERSION TYPE FLOW SWITCH MOUNTED AND WIRED
G. INTERCONNECTING SCHEDULE 40 PIPING WITH VICTAULIC COUPLINGS
H. INSULATION OF ALL COLD SURFACES
COOLING TOWER SCHEDULE
MARK MANUFACTURER MODEL NUMBER TYPE
CAPACITY
(TONS)
AIR DATA FAN DATA ELECTRICAL WATER DATA DIMENSIONS
WEIGHT
(LBS) NOTES:
CFM
E.W.B.
(°F) # HP VOLTS /
PHASE FLA MOCP
FLOW
(GPM)
E.W.T.
(°F)
L.W.T.
(°F)
STATIC LIFT
(FT.HD.)
WIDTH
(FT.)
HEIGHT
(FT.) LENGTH (FT.)
CT-1 MARLEY NC8405QAN1 CROSSFLOW 434 113,060 77.2 1 20 460 / 3 33 70 1,300 93.5 84.5 12.3 19'-11" 11'-11" 9'-10" 20,200 1-12
(APPROVED EQUAL: EVAPCO, BALTIMORE AIR COIL, TOWER TECH)
NOTES:
1. PROVIDE WITH WELDED TYPE 304 STAINLESS STEEL WATER BASIN.
2. PROVIDE WITH LOW SOUND FAN ASSEMBLY.
3. PROVIDE WITH 8"Ø BOTTOM INLET AND 14"Ø BOTTOM OUTLET PIPING CONNECTIONS & 10"Ø BYPASS CONNECTION
4. VARIABLE SPEED FAN(S) WITH CONTROLLER(S).
5. PROVIDE AND INSTALL UNIT ON MANUFACTURER RECOMMENDED RESTRAINED SPRING ISOLATORS.
6. UNIT SHALL BE U.L. LISTED.
7. PROVIDE O.S.H.A. APPROVED SERVICE PLATFORM WITH HAND RAIL AND ACCESS LADDER.
8. PROVIDE VIBRATION CUT OUT SWITCH.
9. PROVIDE EXTENDED LUBRICATION LINES.
10. PROVIDE MECHANICAL, ELECTRIC MAKE-UP WATER CONTROL PACKAGE.
11. PROVIDE 5 YEAR FAN, SHAFT, AND INTERIOR WARRANTY.
12. PROVIDE TOTALLY ENCLOSED FAN MOTOR(S).
ENERGY RECOVERY VENTILATOR SCHEDULE
MARK MANUFACTURER MODEL NUMBER
SUPPLY FAN EXHAUST FAN SUMMER HEAT WHEEL
PERFORMANCE
WINTER HEAT WHEEL
PERFORMANCE PRE-HEAT COOLING COIL HOT WATER HEATING COIL FILTERS
WEIGHT
(LBS)
ELECTRICAL
ACCESSORIES
SA / OA
(CFM)
ESP.
(IN WG) BHP HP VFD
EA
(CFM)
ESP.
(IN WG) BHP HP VFD
OA °F
(DB / WB)
RAT °F
(DB / WB)
LAT °F
(DB / WB)
E.A.T.
DB / WB
(°F)
R.A.T.
DB / WB
(°F)
L.A.T.
DB / WB
(°F)
E.A.T.
DB
(°F)
L.A.T.
DB
(°F)
E.W.T.
(°F)
L.W.T.
(°F)
TOTAL
(MBH)
WATER
FLOW
(GPM)
E.A.T.
DB
(°F)
L.A.T.
DB
(°F)
E.W.T.
(°F)
L.W.T.
(°F)
TOTAL
(MBH)
PRE.
SA & EA
FINAL
SA
VOLT /
PHASE MCA MOP
ERV-1 ANNEXAIR ERU-E-05-HW-EW-HW-NC-4-S-B 6,100 1.5 6.54 8.0 YES 6,100 0.75 3.86 4.5 YES 86.2 / 76.7 72 / 63 75.0 / 64.5 0 / -1 70 / 63 40.3 / 40.1 -10 10 42 34 135 37 52.7 90 160 135 251 2"
MERV 10
4"
MERV 13 2,300 460 / 3 17 25 1, 2
ERV-2 ANNEXAIR ERU-E-05-HW-EW-HW-NC-4-S-B 6,100 1.5 6.54 8.0 YES 6,100 0.75 3.86 4.5 YES 86.2 / 76.7 72 / 63 75.0 / 64.5 0 / -1 70 / 63 40.3 / 40.1 -10 10 42 34 135 37 52.7 90 160 135 251 2"
MERV 10
4"
MERV 13 2,300 460 / 3 17 25 1, 2
(APPROVED EQUAL: TRANE, AAON, DAIKIN APPLIED, VALENT, VENMAR)
NOTES:
1. UNIT TO BE MOUNTED ON EXISTING STEEL SUPPORT BEAMS.
2. ENTHALPY WHEEL HAS A 1/4 HP MOTOR AND SHALL MODULATE FOR FROST CONTROL.
ROOF TOP UNIT SCHEDULE
MARK MANUFACTURER MODEL
NUMBER
MINIMUM
OUTSIDE
AIR
(CFM)
SUPPLY FAN SECTION COOLING COIL - (BASED ON 30% ETHYLENE GLYCOL) HEATING COIL FILTERS ELECTRICAL
WEIGHT
(LBS) NOTES
# OF
FANS
TOTAL
FAN
AIRFLOW
(CFM)
E.S.P.
(IN W.G.)
TOTAL
BHP
(EA)
RPM
(EA)
HP
(EA)
FACE
VEL.
(FPM)
COIL
ROWS
ENT
AIR
DB
(°F)
ENT
AIR
WB
(°F)
LVG
AIR
DB
(°F)
LVG
AIR
WB
(°F)
AIR
PD
(IN WG)
SENSIBLE
CAPACITY
(MBH)
TOTAL
CAPACITY
(MBH)
FLOW
RATE
(GPM)
ENT
WATER
TEMP
(°F)
LVG
WATER
TEMP
(°F)
FACE
VEL.
(FPM)
OF
ROWS
ENT
AIR
DB
(°F)
LVG
AIR
DB
(°F)
AIR
PD
(IN WG)
TOTAL
CAPACITY
(MBH)
FLOW
RATE
(GPM)
ENT
WATER
TEMP
(°F)
LVG
WATER
TEMP
(°F)
MAX
FACE
VEL
(FPM)
FILTER EFFICIENCY
CIRCUIT #1 (SUPPLY
FAN+CONTROLS+LIGHTS+SWITCH) CIRCUIT #2 RECEPTACLE
PRE FINAL VOLTS /
PHASE F.L.A. M.C.A. M.O.P. VOLTS /
PHASE F.L.A. M.C.A. M.O.P.
RTU-C1
THRU
RTU-C10
TRANE CSAA004 1,800 1 1,800 3.5" 2.46 4499 3 399 6 85 76 54 53.9 0.6 62.19 136.73 25.5 42 54.2 399 2 0 78 0.113 152.26 13.4 180 157.3 324 (2) 2" PLEATED /
MERV 8
(2) 12" BAG
CARTRIDGE 65%
MERV 13
480 / 3 6.1 A 7.3 15 115 / 1 8.0 A 10.0 15 2,300 1 - 9
RTU-C12,
RTU-C18
RTU-C20,
RTU-C22
TRANE CSAA004 1,800 1 1,800 3.5" 2.46 4499 3 399 6 85 76 54 53.9 0.6 62.19 136.73 25.5 42 54.2 399 2 0 78 0.113 152.26 13.4 180 157.3 324 (2) 2" PLEATED /
MERV 8
(2) 12" BAG
CARTRIDGE 65%
MERV 13
480 / 3 6.1 A 7.3 15 115 / 1 8.0 A 10.0 15 2,300 1 - 9
(APPROVED EQUAL: CARRIER, VENTROL, VENMAR, DAIKIN, SEASONS 4, CLIMATE CRAFT)
NOTES:
1. SUPPLY AIR MOTOR SHALL BE DIRECT DRIVE, CONTROLLED BY A VARIABLE FREQUENCY DRIVE.
2. PROVIDE 5% LINE REACTORS FOR VARIABLE SPEED DRIVE.
3. PROVIDE INDIVIDUAL HOT WATER AND CHILLED WATER COILS.
4. ALL DAMPERS WITHIN THE UNIT ARE TO BE PROVIDED BY UNIT MANUFACTURER.
5. PROVIDE HINGED ACCESS DOORS.
6. HEATING HOT WATER DATA BASED ON (100% WATER) AND CHILLED WATER DATA BASED ON (30% ETHYLENE GLYCOL)
7. DOUBLE WALL, THERMALLY BROKEN INSULATED CABINET WITH 2" FOAM INJECTED r-13 INSULATION.
8. PROVIDE CUSTOM ADAPTOR CURB TO MOUNT NEW UNIT ON EXISTING CURB.
9. PROVIDE MARINE LIGHT IN THE FAN, COILING COIL, HEATING COIL AND MIXING BOX SECTIONS.
THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED TO
DETERMINE THE DESIGN INTENT. THE CONTRACTOR SHALL FIELD
VER IF Y A LL W O R K AN D S HAL L N O TI FY T HE A RC HI TE CT
IMMEDIATELY OF ANY DISCREPANCIES IN THE DOCUMENTS
BEFORE PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES. NOTICE: THIS DRAWING AND THE DESIGN
ARE THE PROPERTY OF MECHANICAL ELECTRICAL ENGINEERING
CONSULTANTS, PC AND NO ALTERATIONS AND/OR TRANSFERS OF
WORK ARE PERMITTED UNLESS WRITTEN APPROVAL IS GRANTED
BY MECHANICAL ELECTRICAL ENGINEERING CONSULTANTS, PC.
MEEC JOB # 26-0029
JORDAN
KOENIG
ENGINEER
6201059789 No.
L I C
E N
S E D
P R O F E S S I O N A L E NG
I N
E E
R
S T
DAT (AI)
MAD (AO)
CLG (AO)
HSP ALM (BI)
HSP INTLK (HDW)
SP CO2 (AI)
RAH (AI)
SA SD (HDW)
SA HUM (AI)
OAH (AI)
OAT (AI) MA LLT (BI)MAT (AI)
SAF (BI)
RAT (AI)
SPT (AI)
SPT SP (AI) SPH (AI)
CC LAT (AI)
FIL ALM (AI)
RH LAT (AI)
FIL ALM (AI)
SAF (BO)
RA SD (HDW)
HTG (AO) SAF (AO)
RHW T (AI)
CHW T (AI)
T - 22
ACT - 12
V - 12
D - 13
DPS - 11
CO2 - 2
D - 14
H - 6
SD - 3
OA
H - 9
VFD - 6
H - 7T - 8 LLT - 8
DA
T - 16
RA
DPT- 9
T - 6
T-2
H - 3
T - 18
DPT - 45
T - 20
DPT - 13
R - 3
SD - 1
V - 15
VFD - 7
SKT - 24
TT
Points List: AIR HANDLING UNIT [QTY: 14]
Point Name POINTS ALARMS
G R
A
PH
IC
A
N A
LO
G
H A
R D
W A
R E
IN
PU
T (A
I) B
IN
A
R Y
H A
R D
W A
R E
IN
PU
T (B
I) A
N A
LO
G
H A
R D
W A
R E
O U
TP
U
T (A
O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
SO
FT
W
A R
E
PO
IN
T
(S
FT
H
A R
D W
A R
E
IN
TE
R
LO
C
K (H
D W
W
IR
EL
ES
S
(W
LS
N
ET
W
O R
K (N
ET
H
IG
H A
N A
LO
G
L
IM
IT
LO
W A
N A
LO
G
L
IM
IT
B
IN
A
R Y
LA
TC
H D
IA
G
N O
ST
IC
SE
N
SO
R
F A
IL
C
O M
M U
N
IC
A
TI
O N
F A
IL
COIL LEAVING AIR LOW TEMP
CUTOUT ALARM
LLT
X X
COOLING COIL LEAVING
TEMPERATURE
CC LAT
X X X X X
COOLING OUTPUT COMMAND
CLG
X X
DISCHARGE AIR TEMPERATURE
DAT
X X X X X
DISCHARGE AIR STATIC PRESSURE
LOCAL
DA SP
X X X X X
ENERGY WHEEL SPEED COMMAND
EW SPD
X X
FINAL FILTER ALARM
FIL ALM
X X
FILTER ALARM
FIL ALM
X X
HEATING OUTPUT COMMAND
HTG
X X
HIGH STATIC ALARM
HSP ALM
X X X X
HIGH STATIC ALARM INTERLOCK
HSP INTLK
X
MIXED AIR DAMPER COMMAND
MAD
X X
MIXED AIR LOW TEMPERATURE
CUTOUT ALARM
MA LLT
X X
MIXED AIR TEMPERATURE LOCAL
MAT
X X X X
OUTDOOR AIR RELATIVE HUMIDITY
LOCAL
OAH
X X
OUTDOOR AIR TEMPERATURE
LOCAL
OAT
X X
REHEAT LEAVING COIL
TEMPERATURE LOCAL
RH LAT
X X X X X
REHEAT OUTPUT COMMAND
RH
X X
RETURN AIR HUMIDITY LOCAL
RAH
X X X
RETURN AIR TEMPERATURE LOCAL
RAT
X X
RETURN SMOKE DETECTOR INPUT
RA SD
X
SPACE CO2 CONCENTRATION LOCAL
SP CO2
X X X
SPACE HUMIDITY LOCAL
SPH
X X X
SPACE TEMPERATURE LOCAL
SPT
X X X X X
SPACE TEMPERATURE SETPOINT
LOCAL
SPT SP
X X
SUPPLY AIR HUMIDITY LOCAL
SA HUM
X X X X X
SUPPLY FAN SPEED COMMAND
SAF
X X
SUPPLY FAN START STOP COMMAND
SAF
X X
SUPPLY FAN STATUS
SAF
X X
SUPPLY SMOKE DETECTOR INPUT
SA SD
X
BAS COMMUNICATION STATE
BAS COM
X X
DISCHARGE AIR COOLING SETPOINT
DA CL SP
X
DISCHARGE AIR HEATING SETPOINT
DA HT SP
X
MAINTENANCE REQUIRED
MNT REQ
X X
MIXED AIR TEMPERATURE LOW LIMIT
SETPOINT
MA LLT STPT
X
OCCUPIED COOLING SETPOINT
OCC CLG STPT
X X
OCCUPIED HEATING SETPOINT
OCC HTG STPT
X X
SUPPLY FAN FAILURE
SF FAIL
X X X
UNOCCUPIED COOLING SETPOINT
UNOCC CLG STPT
X X
UNOCCUPIED HEATING SETPOINT
UNOCC HTG STPT
X X
LEAVING CHILLED WATER
TEMPERATURE
CHW T
X X
LEAVING PREHEAT WATER
TEMPERATURE
PHW T
X X
LEAVING REHEAT WATER
TEMPERATURE
RHW T
X X
SEQUENCE OF OPERATION: ROOF TOP UNITS (RTU-C1, RTU-C2, RTU-C3, RTU-C4, RTU-C5, RTU-C6, RTU-C7, RTU-C8, RTU-C9, RTU-C10, RTU-12, RTU-C18, RTU-C20, RTU-C22)
BUILDING AUTOMATION SYSTEM INTERFACE:
THE BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE CONTROLLER OCCUPIED BYPASS, MORNING WARM-UP/PRE-COOL, OCCUPIED/UNOCCUPIED AND HEAT/COOL MODES. IF A BAS IS NOT PRESENT, OR COMMUNICATION IS LOST WITH THE BAS THE CONTROLLER SHALL OPERATE USING DEFAULT MODES AND
SETPOINTS.
OCCUPIED:
DURING OCCUPIED PERIODS, THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND THE MIXED AIR DAMPERS SHALL OPEN TO MAINTAIN MINIMUM VENTILATION REQUIREMENTS. IN THE COOLING MODE THE CHILLED WATER VALVE SHALL MODULATE TO CONTROL THE ACTIVE SPACE TEMPERATURE SETPOINT. IN THE HEATING MODE THE HOT WATER VALVE SHALL MODULATE TO CONTROL THE ACTIVE SPACE TEMPERATURE SETPOINT. IF THE SPACE TEMPERATURE SENSOR FAILS, THE COOLING AND HEATING SHALL FALLBACK TO CONTROL TO THE DISCHARGE AIR TEMPERATURE SETPOINT OF 70 DEG F (ADJ.) AND AN ALARM SHALL BE ANNUNCIATED AT THE BAS. THE SUPPLY FAN SHALL BE DISABLED, THE CHILLED WATER VALVE SHOULD CLOSE, THE HEATING VALVE SHOULD CLOSE, THE OUTDOOR AIR SHOULD CLOSE, AND AN ALARM SHOULD ANNUNCIATE AT THE BAS.
UNOCCUPIED:
DURING THE UNOCCUPIED PERIODS, THE SUPPLY FAN SHALL BE DISABLED, THE OUTSIDE AIR DAMPER SHALL CLOSE, THE MECHANICAL COOLING SHALL BE DISABLED, THE MECHANICAL HEATING SHALL BE DISABLED, TO CONSERVE ENERGY. WHEN THE SPACE TEMPERATURE IS ABOVE THE UNOCCUPIED COOLING SETPOINT OF 85
DEG F (ADJ.) THE SUPPLY FAN SHALL START, THE OUTDOOR DAMPER SHALL REMAIN CLOSED,
THE OUTDOOR DAMPER SHALL MODULATE IF ECONOMIZING IS ENABLED AND REMAIN CLOSED IF NOT ECONOMIZING, AND THE MECHANICAL COOLING SHALL BE ENABLED. WHEN THE SPACE TEMPERATURE FALLS BELOW THE UNOCCUPIED COOLING SETPOINT OF 85.0 DEG. F (ADJ.) MINUS THE UNOCCUPIED DIFFERENTIAL OF
4.0 DEG. F (ADJ.) THE SUPPLY FAN SHALL STOP, THE OUTDOOR DAMPER SHALL REMAIN CLOSED, AND THE MECHANICAL COOLING SHALL BE DISABLED. WHEN THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED HEATING SETPOINT OF 60.0 DEG. F (ADJ.) THE SUPPLY FAN SHALL START, THE OUTDOOR DAMPER SHALL REMAIN CLOSED, AND THE MECHANICAL HEATING SHALL BE ENABLED. WHEN THE SPACE TEMPERATURE IS ABOVE THE UNOCCUPIED HEATING SETPOINT OF 60.0 DEG. F (ADJ.) PLUS THE UNOCCUPIED DIFFERENTIAL OF
4.0 DEG. F (ADJ.) THE SUPPLY FAN SHALL STOP, THE OUTDOOR DAMPER SHALL REMAIN CLOSED, AND THE
MECHANICAL HEATING SHALL BE DISABLED.
OPTIMAL START:
THE BAS SHALL MONITOR THE SCHEDULED OCCUPIED TIME, OCCUPIED SPACE SETPOINTS AND SPACE
TEMPERATURE TO CALCULATE WHEN THE OPTIMAL START OCCURS.
OPTIMAL STOP:
THE BAS SHALL MONITOR THE SCHEDULED UNOCCUPIED TIME, OCCUPIED SETPOINTS AND SPACE TEMPERATURE TO CALCULATE WHEN THE OPTIMAL STOP OCCURS. WHEN THE OPTIMAL STOP MODE IS ACTIVE THE UNIT CONTROLLER SHALL SWITCH TO THE UNOCCUPIED MODE. OUTSIDE AIR DAMPER SHALL REMAIN
ENABLED TO PROVIDE MINIMUM VENTILATION.
OCCUPIED BYPASS:
THE BAS SHALL MONITOR THE STATUS OF THE ON AND CANCEL BUTTONS OF THE SPACE TEMPERATURE SENSOR. WHEN AN OCCUPIED BYPASS REQUEST IS RECEIVED FROM A SPACE SENSOR, THE UNIT SHALL TRANSITION FROM ITS CURRENT OCCUPANCY MODE TO OCCUPIED BYPASS MODE AND THE UNIT SHALL
MAINTAIN THE SPACE TEMPERATURE TO THE OCCUPIED SETPOINTS (ADJ.).
HEAT/COOL MODE:
WHEN THE SPACE TEMPERATURE RISES ABOVE THE OCCUPIED COOLING SETPOINT THE MODE SHALL TRANSITION TO COOLING. WHEN THE SPACE TEMPERATURE FALLS BELOW THE OCCUPIED HEATING SETPOINT THE MODE SHALL TRANSITION TO HEATING. WHEN THE SPACE TEMPERATURE IS BELOW THE OCCUPIED COOLING SETPOINT AND ABOVE THE OCCUPIED HEATING SETPOINT THE MODE SHALL REMAIN IN ITS LAST STATE. IF THE SPACE TEMPERATURE SENSOR FAILS, THE MODE SHALL DEFAULT TO HEATING AND AN ALARM
SHALL ANNUNCIATE AT THE BAS.
MORNING WARM-UP MODE:
DURING OPTIMAL START, IF THE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING SETPOINT A MORNING WARM-UP MODE SHALL BE ACTIVATED. WHEN MORNING WARM-UP IS INITIATED THE UNIT SHALL ENABLE THE HEATING AND FAN(S). THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED. WHEN THE SPACE TEMPERATURE REACHES THE OCCUPIED HEATING SETPOINT (ADJ.), THE UNIT SHALL TRANSITION TO THE
OCCUPIED MODE.
DAYTIME WARM-UP CONTROL:
DURING OCCUPIED PERIODS, WHEN THE SPACE TEMPERATURE IS BELOW THE DAYTIME WARM-UP INITIATE SETPOINT, A DAYTIME WARM-UP SEQUENCE SHALL BE ACTIVATED. THE OUTSIDE AIR DAMPER SHALL MODULATE TO MAINTAIN MINIMUM VENTILATION REQUIREMENTS, AND THE HEATING SHALL ENABLE TO MAINTAIN THE DISCHARGE AIR TEMPERATURE HEATING SETPOINT. DAYTIME WARM-UP SHALL TERMINATE
WHEN THE AVERAGE SPACE TEMPERATURE REACHES THE OCCUPIED HEATING SETPOINT.
PRE-COOL MODE:
DURING OPTIMAL START, IF THE SPACE TEMPERATURE IS ABOVE THE OCCUPIED COOLING SETPOINT, PRE-COOL MODE SHALL BE ACTIVATED. WHEN PRE-COOL IS INITIATED THE UNIT SHALL ENABLE THE FAN AND COOLING OR ECONOMIZER. THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED, UNLESS ECONOMIZING. WHEN THE SPACE TEMPERATURE REACHES OCCUPIED COOLING SETPOINT (ADJ.), THE UNIT SHALL TRANSITION TO
THE OCCUPIED MODE.
SUPPLY FAN:
THE SUPPLY FAN SHALL BE OFF IN THE UNOCCUPIED MODE. WHEN THE CONTROLLER IS IN THE OCCUPIED MODE, THE SUPPLY FAN SHALL OPERATE CONTINUOUSLY. THE UNIT CONTROLLER SHALL VARY THE SUPPLY FAN SPEED TO OPTIMIZE MINIMUM FAN SPEED IN ALL COOLING AND HEATING MODES. IF THE SUPPLY FAN FAILS TO PROVE STATUS FOR 30 SECONDS (ADJ.), THE FAN SHALL BE COMMANDED OFF, THE OUTSIDE AIR DAMPER SHALL CLOSE, COOLING SHALL BE DISABLED, ALL HEATING SHALL BE DISABLED, AND AN ALARM SHALL
ANNUNCIATE AT THE BAS. A MANUAL RESET SHALL BE REQUIRED TO RESTART THE FAN.
A HARDWIRED, HIGH STATIC PRESSURE CUT-OFF SWITCH SHALL BE ELECTRICALLY INTERLOCKED WITH THE VARIABLE SPEED DRIVE. IF THE HIGH STATIC PRESSURE CUT-OFF SWITCH IS TRIPPED THE FAN SHALL BE COMMANDED OFF, HEATING SHALL BE DISABLED, COOLING SHOULD BE DISABLED, THE OUTSIDE AIR DAMPER
SHALL CLOSE,
AND AN ALARM SHALL ANNUNCIATE AT THE BAS. A MANUAL RESET OF THE HIGH STATIC PRESSURE CUT-OFF
SWITCH SHALL BE REQUIRED TO RESTART THE FAN.
LOW LIMIT TEMPERATURE CONTROL:
THE INITIAL DAMPER OPENING RATE SHALL BE LIMITED TO 2% PER MINUTE (ADJ.) UNTIL THE DAMPER HAS REACHED ITS MINIMUM VENTILATION POSITION. THE OUTSIDE AIR DAMPER SHALL MODULATE TO A POSITION LESS THAN THE MINIMUM DAMPER POSITION IF THE MIXED AIR TEMPERATURE DROPS BELOW 45.0 DEG. F (ADJ.).
IF THE MIXED AIR TEMPERATURE SENSOR FAILS AN ALARM SHALL ANNUNCIATE AT THE BAS AND THE OUTSIDE
AIR DAMPER SHALL CLOSE.
DISCHARGE AIR TEMPERATURE CONTROL: