About this file

Solicitation Amendment BEP-RFP-15-0368-A0001

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

BEP-RFP-15-0368-A0001

Summary of Changes

The purpose of this amendment is the following:

1. To post answers to questions received on 19 August 2015.

2. To incorporated a Revised Performance Work Statement (PWS) dated 21 August 2015 that revises the POP under Section 5.0, Work Requirement, from a base period + three (3) option periods to a base period + two (2) option periods.

3. To delete CLIN0003 (Option Year 3 CLIN).

4. To add a conform copy of the Solicitation incorporating changes from this amendment.

5. To extend the solicitation close date from Friday, 21 August 2015 at 4:00PM ET to Wednesday, 26 August 2015 at 4:00PM ET.

All other terms and conditions remain unchanged.

Revised Perforamance Work Statement 21 August 2015:

ISO Registrars

PERFORMANCE WORK STATEMENT

Revised 21 August 2015

1.0 Background

The Bureau of Engraving and Printing (BEP) is responsible for the design, engraving, and printing of all United States paper currency.

The BEP operates two printing facilities, the main facility in Washington, D.C. (DCF), and a second facility located in Fort Worth, Texas (WCF). The major industrial operations at the facilities includes 1) the printing and processing of U.S. currency, and other securities, 2) printing ink production, 3) engraving and electrolytic plate production, 4) photo processing, and 5) other ancillary support services; laboratory facilities, maintenance, product development, procurement, information technology, administrative functions, etc. Major printing equipment components operated by BEP include both sheet fed and web presses, which utilize intaglio, offset, letter press, and gravure printing processes.

The BEP is committed to maintaining certification of its Environmental Management System (EMS) and Quality Management System

(QMS).

Both facilities maintain separate registrations to ISO14001:2004 through TUV:SUD America and UL-DQS. The DCF most recently completed a surveillance audit in April 2015 and is due for a full ISO14001 re-assessment in 2016; WCF completed a full EMS reassessment in September of 2012 and is due for a surveillance audit in September 2015. Both DCF and WCF will require their existing TUV:SUD and UL-DQS ANAB registrations to be honored.

The BEP maintains registration to ISO9001:2008 through UL-DQS. A single registration covers both DCF and WCF. The BEP last underwent full recertification assessment in April 2012. The most recent registration reassessment took place in May/June 2015. The BEP will require the existing UL-DQS registration to be honored.

The objective of this procurement is to secure the services of an accredited registrar to maintain registration of the Bureau's Environmental Management System(s) under the ISO14001standard and QMS under the ISO 9001:2008 standard or current version of the ISO 9001 standard (potentially, it is anticipated that the standard(s) will be updated during the contract period).

2.0 Scope

The scope of the Bureau's EMS and QMS for all security printing and packaging activities at the DCF facility and the WCF facility which are under the control of the Director of the Bureau of Engraving and Printing. This includes, but is not limited to, the major processes and operations associated with the design and production of currency for the United States of America.

Both facilities have wastewater pre-treatment plants that are permitted by a local POTW. The pre-treatment plant treats waste streams from the presses and from the nickel and chromium plating operations. Both facilities are large quantity generators. DCF is beginning major construction on a new wastewater pre-treatment facility.

The BEP requires separate certificates for the EMS each facility (WCF and DCF) due to the differences in environmental regulations between the jurisdictions. The BEP requires a single certificate for the QMS covering BOTH facilities.

Miscellaneous Information

•The DCF has two buildings:
o~1.6 million square ft.
o1300 employees and contractors
oOperating on three shifts
•WCF has one building
o~630,000 square ft.
o600 employees and contractors
•Applicable Scope: 09 Printing
•Clearance is not required. Auditors will be escorted by BEP employees at all times.

3.0 Contractor Requirements:

3.1Scheduling of Audits
3.1.1Audit dates, times of opening and closing meetings, and number of auditors, shall be set and agreed upon by the contractor, the

COR, and the respective Facility Representative(s).

3.1.2Changes to audit dates must be approved by the COR and the respective Facility Management Representative(s).
3.1.3All auditors, who are scheduled to perform work at the Bureau of Engraving and Printing, shall be approved by the COR prior to

the start of the audit.

3.1.4 The contractor shall provide information regarding the qualification of auditors (i.e. bios, resumes, specific work history in the printing industry) upon request from the COR.

3.1.5 The contractor shall plan, perform, and report on audits in conformance with the requirements of the most current revision of

ISO19011.

3.1.6When interpreting the requirements of ISO19011, the following cross-references shall be used:
3.1.6.1The "client" shall be the Bureau of Engraving and Printing's Office of Environment, Health and Safety located at the DCF and

the Office of Quality (also located at the DCF);

3.1.6.2The "auditor" shall be the contractor or contractor's representative; and,
3.1.6.3The "auditee" shall be the specific facility (DCF or WCF) being audited.
3.2Audit Planning
3.2.1The contractor shall deliver a draft audit schedule to the COR and the Facility Management Representative, at least twenty-five

working days prior to the start of the audit.

3.2.2Weekends, federal holidays, and dates of the BEP's annual shut-down shall not be considered working days.
3.2.3The contractor shall respond to any suggested revisions to the audit schedule within four working days from date of suggested

revision.

3.2.4Final audit plans shall be approved by the COR and Facility Management Representative.
3.2.5The auditor and Facility Management Representative may modify the audit plan during the audit provided the modification does

not increase or decrease the number of planned audit days and no increase in travel expenses are incurred.

3.2.6Modification to the number of planned audit days must be approved by the Contract Officer.
3.3On-site audit activities
3.3.1The contractor is responsible for producing the identification necessary to gain admittance to the Bureau of Engraving and

Printing's operations.

3.3.2Contractors shall be admitted as visitors and shall be escorted at all times.
3.3.3Contractors shall follow BEP's security requirements while inside the buildings.
3.3.4Violations of BEP's security requirements or failure to follow instructions from BEP escorts may result in the contractor being

removed from the premise and barred from re-admittance.

3.3.5The contractor is responsible for all travel expenses related to the removal of an auditor due to security violations.
3.3.6The contractor shall schedule and attend a meeting at the end of each audit day for the purpose of informing the BEP as to the

progress of the audit.

3.4Reporting
3.4.1The auditor shall submit a final audit report that conforms to the requirements of ISO19011.
3.4.2The final audit report is due no later than 25 calendar days after the last scheduled audit day or after satisfactory responses to

audit nonconformities have been received by the registrar.

3.4.3When audit nonconformities are part of the final audit report, the nonconformities shall be clearly written and include:
3.4.3.1Description of audit evidence found;
3.4.3.2source (i.e. location, date) of the evidence
3.4.3.3requirement statement
3.4.3.4source of the requirement
3.4.4Audit reports that contain nonconformity statements considered to be unclear will be returned and requested to be recomposed.

4.0 Contractor Qualification

1.The Contractor shall be an ANAB accredited ISO 14001 and ISO 9001 Registrar.
2.Lead Auditors and auditors must be approved by the COR prior to participating on the audit.
3.Audit observers shall obtain written permission from the COR prior to being allowed on-site.
4.Contractors must be accredited to the Printing scope (09) on the ANAB web site (anab.org).

5.0 Work Requirement

1. The Contractor shall provide ISO14001 and ISO 9001 separate assessment and registration services (by contract line item numbers) for each facility which shall include the following:

i.Registration assessment
ii.Annual surveillance audits;
a.Base year
b.Option year 1
c.Option year 2

2. The Contractor shall provide assessment services in the Washington, DC and Fort Worth, TX facilities for the number of employees as follows:

i.Washington, DC facility 1,300 employees (approximate number).
ii.Fort Worth, TX facility, 600 employees (approximate number).

3. The Contractor shall submit a report in electronic format. Reports shall be provided to the Contracting Officer and Contracting Officer's Representative (COR).

4. The Contractor shall provide assessment services to the Bureau of Engraving and Printing at the Washington, DC, and Fort Worth, Texas facilities for a base period, with option for two (2) one-year option periods to include surveillance audits as noted below:

Base Period:21 September 2015 to 20 September 2016
Option Period 1:21 September 2016 to 20 September 2017
Option Period 2:21 September 2017 to 20 September 2018

5. For the purposes of reducing cost and travel, a contractor may combine the ISO14001 audit with an ISO9001 audit held at the same location.

Text52:
Text54: 1
Check Box91: Yes
Check Box92: Off
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
CUST_PROJ_CODE:
NO_OF_COPIES: 1
TOTAL_NO_OF_PAGES: 4
Text1: AMENDMENT CONTROL NUMBER :
AMENDMENT_DESCRIPTION: See summary of changes.
Text134: SUMMARY OF CHANGES :
SOL_DOCUMENT_NUMBER: BEP-RFP-15-0368
OPEN_BIDDING_DATE: 08/12/2015
Text2: Same As Issuing Office
SOL_OPEN_BID_DATE: 08/12/2015
AMD_ISSUING_OFFICE_LADDR: BEP-ACQUISITION

Bureau of Engraving and Printing, Office of Acquisition, 301 14th Street SW Washington, DC, 20228-0001, US

AMD_ISSUING_OFFICE_LOCCODE: EP001
CLOSE_DATE_EXTEND_FLAG: Y
HDR_DOCUMENT_NUMBER: BEP-RFP-15-0368-A0001

File details come from the government source that posted it. Updated .