BCS Anderson Elementary Food Service Ventilation Hood Replacement Bid Package #2 - Addendum No. 1 - 2024.02.16.pdf

PDF 484 KB Posted

Attached to
Bronson CS Elementary Food Service Ventilation hood project
Solicitation number
RFP - BRC - 240000001107
Issued by
Branch County, Michigan

About this file

This document is an Addendum No. 1 for the Bronson Community Schools Anderson Elementary School Food Service Ventilation Hood Replacement Bid Package #2 project. The project is being managed by TowerPinkster on behalf of the Bronson Community Schools in Bronson, Michigan. This addendum includes changes to the original bidding documents, such as the pre-bid meeting minutes and sign-in sheet, and a template for Bidding Requests for Information (BRFI). The project schedule indicates that Addendum No. 1 was issued on February 16, 2024, all BRFIs are due on February 21, 2024, the final addendum will be issued on February 23, 2024, and bids are due on February 28, 2024 with a public bid opening on the same day. The project is scheduled to be substantially complete by August 16, 2024.

The project involves the replacement of the food service ventilation hood at the Anderson Elementary School. The bid package is the second of three, with the first package already awarded to Great Lakes West for the Anderson Elementary School, Ryan Elementary School, and JR/SR High School. This addendum does not include any changes to the bidding requirements, contract conditions, specifications, or drawings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nurturing curiosity through design since 1953 • towerpinkster.com

©2024 Tower Pinkster Titus Associates, Inc.

ADDENDUM NO. 1

DATE OF ISSUANCE: February 16, 2024

PROJECT: Bronson Community Schools

Anderson Elementary School Food Service Ventilation Hood

Replacement BP #2

335 E. Corey St.

Bronson, MI 49028

OWNER: Bronson Community Schools

ARCHITECT’S PROJECT NO.: 023-158.00

ORIGINAL BID ISSUE DATE: February 13, 2024

SCOPE OF WORK

This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract

Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the

Bid Form. Failure to do so may result in disqualification of the Bid.

DOCUMENTS INCLUDED IN THIS ADDENDUM

This Addendum includes two pages of text and the following documents:

• Pre-Bid Meeting Minutes and Sign-In Sheet

• Bidding Requests for Information (BRFI) Template (enclosed as PDF file within this addendum and will be distributed as a Microsoft Word document file within email distribution of Addendum No. 1)

• Bidding Documents: None

• Contract Conditions: None

• Specification Sections: None

• Drawings: None

CHANGES TO PREVIOUSLY ISSUED ADDENDA

None.

CHANGES TO BIDDING REQUIREMENTS

None.

2.16.2024 Addendum No. 1 // Project No. 023-158.00 2

CHANGES TO CONTRACT CONDITIONS

None.

CHANGES TO SPECIFICATIONS

None.

CHANGES TO DRAWINGS

None.

END OF ADDENDUM.

Nurturing curiosity through design since 1953 • towerpinkster.com

MEETING MINUTES

PROJECT: Bronson Community Schools

Anderson Elementary School Food Service Ventilation Hood Replacement BP #2

Ryan Elementary School Food Service Ventilation Hood Replacement BP #2

JR/SR High School Food Service Ventilation Hood Replacement BP #2

PROJECT NO.: 023-158.00

DATE: February 16, 2024

LOCATION: Bronson Community Schools Ryan Elementary School (pre-bid meeting / walkthrough)

Bronson Community Schools Anderson Elementary School (walkthrough)

Bronson Community Schools JR/SR High School (walkthrough)

PRESENT: Sign-In Sheet Attached

PURPOSE: Pre-Bid Meeting BP2

1. Project Contacts:

a. Owner:

i Kate Wall, Interim Superintendent

• (517) 369-3347

• WallK@bronsonschools.org ii Neil Kline, Maintenance (contact for additional site visits)

• (517) 677-3527

• Klinen@bronsonschools.org

b. Architect / Engineer i Doug Milburn, Project Manager

• (269) 343-6133

• dmilburn@towerpinkster.com

2. Documents:

a. Construction Drawings: Dated February 13, 2024

b. Project Manual: Dated February 13, 2024

c. Bid Package #1 documents provided for reference. This Bid Package has already received bids and been awarded.

i Anderson Elementary School – Great Lakes West ii Ryan Elementary School – Great Lakes West iii JR/SR High School – Stafford Smith mailto:WallK@bronsonschools.org mailto:Klinen@bronsonschools.org mailto:dmilburn@towerpinkster.com

2.16.2024 Meeting Minutes // Project No. 023-158.00 2

3. Project Schedule:

a. February 16, 2024 – Addendum #1 Issued

b. February 21, 2024 (2:00 PM) – All BRFIs Due

c. February 23, 2024 (4:00 PM) – Final Addendum Issued

d. February 28, 2024 i Bids Due by 10:00 AM ii Public Bid Opening 10:01 AM

e. March 4, 2024 – Recommendation to Bronson Community Schools Board of Education

f. August 16, 2024 – Project Substantially Complete Date

4. BRFI Process:

a. BRFI Form to be distributed electronically to all in attendance

b. BRFI # to be assigned by architect

5. Addenda

a. Addendum #1 i Pre-Bid Meeting Sign In Sheet / Pre-Bid Meeting Minutes ii BRFI Form

• The BRFI form will be distributed in Addendum #1

6. Site Walkthrough

a. Neil and Doug walked contractors through the project scope and associated project spaces.

The foregoing constitutes our understanding of matters discussed and conclusions reached. Other participants are requested to review the items and advise the undersigned in writing of any errors and/or omissions.

Respectfully submitted, TowerPinkster

Douglas L. Milburn

Project Manager

DM

BRFI FORM

To:

Doug Milburn Project Manager dmilburn@towerpinkster.com TowerPinkster 242 E. Kalamazoo Avenue Suite 100 Kalamazoo, MI 49007 Phone: 269.343.6133 Fax: 269.343.6633

Project Number: 023-158.011

Project:

Bronson Community Schools Anderson Elementary School Food Service Ventilation Hood Replacement BP #2

BRFI #: (to be assigned by architect)

Date:

RFI Subject:

From: (Individual)

Contractor: (Contractor) Spec Section:

Phone: Dwg(s):

Fax: Detail #:

E-Mail: Cost Impact:

Bid Package#: Time Impact:

Request:

Possible Solution:

Response:

Answered by: Date:

File details come from the government source that posted it. Updated .