About this file
This is a bid package clarification document for Battle Creek Public Schools regarding security film installation for school facility windows, managed by ELITE Companies. The project involves installing 3M Scotchshield Safety & Security Window Film (Ultra S600 6mil and Ultra S800 8mil) across multiple school buildings, with a project timeline of June 3, 2019 to September 20, 2019. The scope includes installing 8mil film on all exterior glazed surfaces at entry areas (doors and storefront system windows) and 6mil film on all other exterior windows, along with BondKap trim installation. The project covers 11 facilities including Battle Creek Central High School, WK Kellogg Prep HS, Northwestern Middle School, and several elementary schools.
Bidders must provide base bid pricing for S600 film installation and alternate pricing for S800 film installation for each facility, along with per-square-foot costs for both film types. The bid package requires labor rates, equipment rates, and timeline estimates for shop drawing submittal, delivery, and installation. Contractors may submit voluntary alternates for equivalent products meeting the same criteria. The district will make award recommendations based on initial base bid costs, scope, and responsiveness of the low bidder, with alternate pricing to be utilized on a building-by-building basis. Weekend work and overtime may be required to maintain the schedule at no additional cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Secure Entry Window-Glass Film.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Battle Creek Public Schools: Secure Film for Facilities – Clarification #1
Project specific scope items
Given the quantities/sizes and overall count of windows make it difficult to quantify what is the extent of the entry areas and the balance of the building glass film required, we are making the following adjustment to your bid/scope:
1. Provide a BASE BID proposal for each building based on the Ultra S600 film. For all SF of all windows.
2. Provide an alternate proposal for each building based on the Ultra S800 film. For all SF of all windows.
3. Provide a SF cost for each of the S600 and S800 film applications.
See attached, revised SOW breakdowns.
The district will provide an award recommendation based on the initial base bid costs, scope and responsiveness of the low bidder. The alternate pricing will be utilized on a building-by-building basis related to the scope TBD by the district at the time of installation. We will work through this during submittals.
Bid Package No. 8.870: Safety & Security Film BCPS Secure Vestibules
PART I – TECHNICAL SPECIFICATIONS
The product design is based on the 3M Scotchshield Safety & Security Window Film Ultra 600 (6 mil) and Ultra 800 (8 mil). The below product documents are included for basis of design all from 3M:
3M Scotchshield Safety and Security Product Information and Details
Include all related drawing notes and specifications indicated within the contract documents.
PART II – WORK INCLUDED
The scope of work generally includes, but shall not be limited to the following:
1.1 ELITE General Scope Requirements unless noted otherwise below.
1.2 Prep all glazed openings (as noted in attached facility information document) above ground level for application of protective film
1.3 Furnish and install 8 mil 3M Scotchshield Safety and Security Window Film (or equivalent) film on all exterior glazed surfaces at all entry areas. Entry areas include the glass in the doors and the windows within the same storefront system.
1.4 Furnish and install 6 mil 3M Scotchshield Safety and Security Window Film (or equivalent) film on all exterior glazed surfaces at all windows not included in entry storefront systems.
1.5 Furnish and install the BondKap (or equivalent) to all frame surfaces where film is applied to secure it to the door/window frame. The intent for this installation is to be able to install the BondKap over the existing gasket/ sealant on the windows and not need to remove or agitate it.
1.6 Clean all glass and framing upon completion of the work and at the date of substantial completion (as directed by ELITE).
PART III – UNIQUE WORK ITEMS
3.1 The bidding documents for this project show each building window count, approx. location and size for bidding purposes.
3.2 This project must be complete and final billed prior to September 20th, 2019.
PART IV – LEED REQUIREMENTS
N/A
PART V – WORK EXCLUDED
N/A
PART VI – UNIT COSTS TO BE PROVIDED WITH BID
6.1 Provide a SF number for Ultra S600 installation SF/$______________
6.2 Provide a SF number for Ultra S800 installation SF/$______________
6.3 Labor rate for each category of worker on site per hour (per enclosed Labor Rates Sheet).
6.4 Provide equipment rates.
6.5 Provide the following:
Number of weeks from approval to shop drawing submittal:
Deliver in weeks from time of approved shop drawings:
Installation
PART VII – VOLUNTARY ALTERNATE
weeks weeks days
7.1 Base bid is based on the Scotchshield Safety and Security Film 6 mil and 8 mil products using the BondKap trim piece. If a contractor would like to submit an alternate bid product for a product / system that meets the same criteria provide an alternate price here and clarify in your bid.
Add/Deduct $
PART VIII – BID BREAKDOWN
8.1 Provide the following bid breakdown for each school (Note that base bid will be the 6 Mill with an alternate for the 8 Mill).
Battle Creek Central High School
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
WK Kellogg Prep HS
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Northwestern Middle School
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Springfield Middle School
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Ann J Kellogg
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Dudley STEM School
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Fremont International Academy
6mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
LaMora Park Elementary
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Post-Franklin Elementary
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Valley View Elementary
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Verona Elementary
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Battle Creek Math/Science Center
6 mill Security Film at All Glazing Excluding Entry Systems – BASE BID $
8 mill Security Film at All Glazing Excluding Entry Systems – ALTERNATE$
Performance and Payment Bond $
Total Base Bid $
Total Alternate Bid $
END BID PACKAGE NO. 8.870
H. PROJECT SCHEDULE
The proposed schedule for these Projects is June 3, 2019 – September 20, 2019. It is understood that time is of the essence on this Project and each Trade Contractor is responsible for completion of its Work in coordination with the Work of all other Subcontractors within the required sequence and time frame so that the established schedule is met.
a. The Proposed schedule includes “estimated” start dates for the construction activities. In the interest of the overall Project, ELITE reserves the right to alter the sequencing of activities in order to accommodate
Project conditions and/or Owner requirements. This bid package is responsible to meet any updated progress schedules. Bidders shall anticipate typical weather conditions in their base Bid Proposal.
b. If overtime hours, weekend work, and/or shift work will be required to achieve this and all updated schedules, all costs are included in the base Trade Contract.
c. There is no guarantee of continuous work. The Trade Contractor shall work in all areas of the Project as they become available and as directed by ELITE. Trade Contractor shall include supervision and manpower necessary to run separate and independent crews as necessary.
d. All construction activities are to be coordinated and performed in a manner to accommodate the dates set forth by BATTLE CREEK PUBLIC SCHOOLS and at no additional cost.
e. The proposed schedule durations include anticipated impacts due to normal weather. It is agreed that weekends shall be used as makeup days for time lost during the week to maintain the schedule.
| BCPS - Secure Film - Clarification #1_0 |
| Secure Film SOW Clarification 1_0 |
| PART I – TECHNICAL SPECIFICATIONS |
| PART II – WORK INCLUDED |
| PART III – UNIQUE WORK ITEMS |
| PART IV – LEED REQUIREMENTS |
| PART V – WORK EXCLUDED |
| PART VI – UNIT COSTS TO BE PROVIDED WITH BID |
| PART VII – VOLUNTARY ALTERNATE |
| PART VIII – BID BREAKDOWN |
| Battle Creek Central High School |
| WK Kellogg Prep HS |
| Northwestern Middle School |
| Springfield Middle School |
| Ann J Kellogg |
| Dudley STEM School |
| Fremont International Academy |
| LaMora Park Elementary |
| Post-Franklin Elementary |
| Valley View Elementary |
| Verona Elementary |
| Battle Creek Math/Science Center |
| END BID PACKAGE NO. 8.870 |