This is a Project Manual from the Maryland Department of General Services for upgrading the Building Automation System (BAS) and controls at the Essex/Rosedale District Courthouse/Multi-Service Center. The project involves converting the existing pneumatic HVAC control system to a Direct Digital Control (DDC) system, including upgrades to the chiller, boiler, and 22 Variable Air Volume boxes. The scope includes demolition of existing pneumatic controls, installation of new DDC controllers, sensors and actuators, system programming, graphics interface setup, testing, and staff training. The project duration is 120 calendar days, with work hours from 7:30 AM to 4:00 PM Monday through Friday. A pre-bid site visit is encouraged, and contractors must coordinate with the DGS Project Manager Charles Clark or Building Manager James Roberts.
This is a Small Business Reserve (SBR) solicitation with a 10% MBE participation requirement. The contractor must have five years of experience within the last five years providing similar services. Liquidated damages are set at $350 per day. The contract will be awarded to the responsible and responsive bidder submitting the lowest total bid. The contractor must provide a two-year warranty on all labor and materials from the date of final acceptance. Background checks are required for all employees working on site, with additional checks required for those working in District Court areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of General Services
Project Manual
To
Upgrade BAS System and Controls at
Essex/Rosedale District Courthouse/Multi-Service Center
8914 Kelso Dr
Essex MD 21221
For The
Department of General Services
Project Number: BC-764-250-003(SBR)
THIS IS A SMALL BUSINESS RESERVE (SBR) ONLY SOLICITATION
Project Classification B
Date January 23, 2025
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS SOLICITATION
10% MBE Participation Required
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS
Atif Chaudhry, Secretary Wes Moore, Governor
State Office Building Brooke E. Lierman, Comptroller
301 West Preston Street Dereck E. Davis, Treasurer
Baltimore, Maryland 21201
DIVISION 0 - PROCUREMENT & CONTRACTING REQUIREMENTS
• Notice To Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)
• Instructions to Bidders for Construction Projects (July 1, 2022) (eMaryland Marketplace Advantage attachment)
• General Conditions for Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)
• Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment)
• Payment of Employee Health Care Expenses Certification (eMaryland Marketplace Advantage attachment)
• Contractors Questionnaire (eMaryland Marketplace Advantage attachment)
• Bid Bond, if applicable (eMaryland Marketplace Advantage attachment)
• Minority Business Enterprise Forms Attachment D (February 5, 2021), if applicable (eMaryland Marketplace Advantage attachment)
• Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022), if applicable (eMaryland Marketplace Advantage attachment)
• List of Prevailing Wage Rates, if applicable (eMaryland Marketplace Advantage attachment)
• Corporate Diversity Addendum, if applicable (eMaryland Marketplace attachment)
• Addenda, if any (eMaryland Marketplace Advantage attachment)
• List of Drawings (eMaryland Marketplace Advantage attachment)
• Pre-Bid Conference/Site Visit – Refer to: State Finance and Procurement Article §14-
302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).
Table of Contents
Division I. Scope of Work
Division II. Site Conditions
Division III. Qualifications of the contractor
Division IV. Standards & Codes
Division V. Materials
Division VI. Workmanship and Prosecution of the work
Division VII. General Requirement
Division VIII. Warranty& Guarantee
Division IX. Environmentally Hazardous Materials
Division X. Liquidated Damages/ Bids – Submittals
Division XI. Work Hours and Point of Contact
I. Scope of Work
The scope of work covered by this contract shall include the furnishing and installation of all materials, parts, supplies, tools, equipment, permits, labor, supervision, training, and testing of the complete BAS system in the Essex/Rosedale District Courthouse/MSC, 8914 Kelso Dr Essex MD
21221.
2. The project shall include but is not limited to:
The conversion of the existing pneumatically controlled HVAC system to a Direct Digital Control
(DDC) system. The scope covers a new nonproprietary Tridium web based BAS system and complete upgrade of control systems for the complete HVAC system including but not limited to the chiller, boiler, and 22 Variable Air Volume (VAV) boxes to improve energy efficiency, system control, and monitoring capabilities.
1. Demolition and Removal
• Disconnect and remove all existing pneumatic control devices, including actuators, thermostats, control valves, and associated pneumatic tubing.
• Safely cap and remove existing air compressor systems used for the pneumatic controls.
• Remove any obsolete sensors and wiring that will be replaced by digital sensors.
• Disposal of any and all material or debris from this project shall be the responsibility of the contractor unless otherwise stated herein. All such disposal shall be in accordance with all applicable statutes, laws, and ordinances governing the same.
• The Contractor shall repair and patch all penetrations to original condition.
• Prior to disposal the contractor and the facilities Building Manager shall agree whether any items are desired to be retained by the facility.
2. Direct Digital Control (DDC) System Installation
• Install new DDC controllers for the chiller, boiler, and 22 VAV boxes. Ensure compatibility with the building’s new BAS as required.
• Integrate control of the following equipment into the DDC system:
o Chiller: Install DDC controls for start/stop functions, load/unload modulation, and temperature control.
o Boiler: Install DDC controls for boiler operation, temperature setpoints, and safety interlocks.
o VAV Boxes: Install DDC controllers on 22 VAV boxes for airflow control and temperature regulation.
3. Sensors and Actuators
• Replace temperature sensors, humidity sensors, and CO2 sensors in relevant spaces for real-time environmental monitoring.
• Install new modulating actuators for dampers and valves to replace the pneumatic controls on VAV boxes, chiller, and boiler.
• Ensure all sensors and actuators are properly calibrated and configured within the DDC system.
4. Wiring and Networking
• Install communication wiring and network infrastructure to integrate the DDC controllers into the central Building Automation System (BAS). This may include:
o Ethernet wiring or wireless communication where applicable.
o Establish a secure and reliable communication protocol (e.g., BACnet, LonWorks) between controllers and the BAS.
5. System Programming
• Program the DDC controllers for each piece of equipment, including the chiller, boiler, and VAV boxes, to ensure proper sequencing of operations.
• Configure setpoints, control loops, and alarms for each system (e.g., temperature, humidity, airflow).
• Create energy-saving control strategies, such as demand-based ventilation, night setback, and scheduling of equipment operation.
6. Graphics and Interface Setup
• Develop a user-friendly graphical interface for the DDC system, providing operators with real-time data and controls for the chiller, boiler, and VAV boxes.
• Configure the BAS to display key system metrics such as:
o Chilled water and hot water temperatures.
o Supply air temperatures from the VAV boxes.
o Airflow rates, room temperatures, and any alarms or system alerts.
7. Testing and Commissioning
• Perform functional testing of all DDC controllers, sensors, and actuators to ensure proper operation.
• Conduct system-wide commissioning, including verification of temperature control, airflow regulation, and equipment coordination.
• Ensure system integration with the existing BAS is functional, and that the facility staff can monitor and control all relevant components.
8. Training
• Provide comprehensive training for the facility’s maintenance and operations staff on the operation and troubleshooting of the DDC system. (8 hours minimum)
• Supply documentation, including control schematics, user manuals, and setpoint configurations.
Disclosure
The State assumes no responsibility for the accuracy of any measurements given herein for figuring labor, ordering materials, and equipment to accomplish the work. The contractor shall visit the site, take their own measurements, and examine the conditions under which the work must be performed. No claim for additional cost will be allowed from the submitted bid based upon claimed unknown work quantities or site conditions under which the work must be performed.
II. Site Conditions
1. Site conditions that may affect the prosecution of the work are outlined herein. Additionally, it is requested that the contractor visit the job site and observe the conditions that will affect the specified work prior to submitting a proposal.
a. This is the Essex District Courthouse/MSC which operates Monday Thru Friday.
b. The building will remain occupied during construction.
c. Work may be conducted in occupied areas.
d. Work will be coordinated in certain areas during downtime or unoccupied times.
e. The work schedule must be coordinated with facility personnel and DGS preferably during normal workday hours Monday through Friday 7:30 am to 4:00 pm.
f. Any other hours must be approved and coordinated with the Facility Representative in advance.
2. Site Visit
Each bidder is encouraged to attend the pre-bid walk-through. Additional site visits must be arranged with the:
• DGS Project Manager: Charles Clark – (410) 767-6004
Email: charles.clark@maryland.gov
• Building Manager: James Roberts – M: (443) 610-8581 O: (410) 238-5550
Email: james.roberts@maryland.gov
a. At the scheduled site visit, each bidder will be permitted to examine the facility and familiarize themselves fully with the facility and the contents of those specifications.
b. Failure to do so does not relieve the successful bidder from their obligations to comply with all aspects of the contractor and/or the invitation to bid. (for the amount submitted in the base bid)
III. Qualifications of the contractor.
a. The contractor shall be authorized by the respective Manufacturer(s) to supply, install, service and provide the owner with all warranties required by this specification and the DGS General Conditions.
b. The bidder shall, prior to submitting a bid for the work covered by this specification have no less than five (5) years’ experience in providing the services of the type(s) required by the specifications. The experience must have been within the last five (5) years. And the contractor must be able to produce proof of experience upon request.
c. The project Superintendent assigned to the project must submit a resume showing sufficient qualifications and experience.
d. The contractor will be required to have all employees working at the site to have a background check
($20 fee per employee may be applicable). A second background check will be required for those employees working within the District Court areas (no fee required).
2. Licensing
a. The contractor shall be licensed and insured in the State of Maryland in accordance with all requirements of the Annotated Code of Maryland.
b. The contractor shall comply with all requirements of the Annotated Code of Maryland (Latest revisions and Supplements) any and all bulletins, policies, directives, etc. issued by the Department of Labor, Licensing and Regulation (DLLR).
IV. Standards & Codes
1. Compliance with local requirements, comply with current applicable building codes, local ordinances and regulations and the requirements of the authority having jurisdiction.
mailto:charles.clark@maryland.gov mailto:james.roberts@maryland.gov
2. Comply with current International Building Code and International Mechanical Code.
3. Listing & Labeling: Provide systems and equipment that are UL-Listed and Labeled.
4. ADA Compliance: Provide systems and equipment that comply with the guidelines of the Americans with Disabilities Act. (ADA)
V. Materials
1. General
a. Once the project is awarded and prior to ordering any materials, the contractor shall submit to the State
Representative for approval, material submittals, drawings etc. in accordance with requirements outlined in the Department of General Services “Instructions to bidders for construction projects and general conditions of the contract between the Owner and Contractor” Which is part of this contract.
b. All materials shall be as specified. In the event the contractor chooses to substitute materials other than those specified, the contractor shall provide to the State Representative informational data necessary to determine the “or equal” rating. The State Representative will make the decision and notify the contractor in writing as to the: as equal: status. It will be the contractor’s duty to PROVE a product is equal and not the State’s duty to DISPROVE.
c. All materials shall be new and where applicable shall be delivered to the job site with labels intact and legible. All materials in the performance of this contract shall comply with all standards given herein.
d. All materials delivered to and stored on the job site shall be stored indoors, above grade, and in a secure area.
• The contractor shall coordinate with the States Representative to determine location of storage at the facility.
• Handling of all materials shall be in accordance with the written directions and/or recommendations of the manufacturer.
• All material stored is the responsibility of the contractor and any on-site storage must be coordinated with the Building Manager.
2. Specifics: All parts and materials called for or referred to in Scope of Work.
a. HVAC systems-equipment, components and devices
• control system to be an open protocol type and approved by the State.
• All equipment, components and devices shall be supplied by, and/or recommended for usage by, the manufacturer.
• All products and/or materials shall be UL-Listed, meeting all current standards.
• All Controllers, panels, boards or programmable equipment must be of an open protocol type.
b. All electrical work to be inspected by an independent, third party inspection service.
c. All materials required for the completion of this project that are not herein specified shall be as conforming to the written requirements of the manufacturer of the component or equipment served, and/or as required to meet the standards specified, and/or as required to meet the needs for successful completion of the project.
VI. Workmanship and Prosecution of the work.
1. General
a. All work shall be performed to the standards outlined herein and to any and all standards or requirements as specified by all applicable laws, codes, and/or regulations. Where applicable, all materials, equipment, and supplies shall be installed in accordance with the manufacturers’ written instructions. All work shall conform to the best standards or workmanship and good trade policies. All work shall be performed in the best and most professional manner by tradesmen trained and skilled in their respective trades.
b. Work, once begun, shall be diligently prosecuted to its full completion. The time for completion is 120 calendar days.
c. The Contractor shall coordinate all work with the various trades and suppliers in order to complete the project expeditiously and within the time limits of the contract.
d. The contractor shall maintain the job site and a safe, neat and orderly manner throughout the entire project.
e. Throughout the project, the contractor shall take all steps required to ensure the safety of the building occupants and staff.
f. The contractor shall be responsible for the removal and legal disposal of all debris generated throughout the duration of this project. The construction and storage area shall be kept clear of accumulated debris daily.
g. The contractor is advised that all requisite materials be available before commencing any demolition
h. Wherever demolition or removal of existing equipment, components, devices etc. is called for in this contract, the contractor shall first consult with the Facility Representative to determine if such parts are to be retained by the facility or be disposed of by the contractor.
i. Any work that has not been specifically mentioned but is reasonably implied or necessary for the safe and satisfactory completion of this project, shall be performed by the contractor as if specified herein.
2. Specifics:
a. Where required, the installation shall be in accordance with all published requirements of NFPA -101
(Life Safety Code – Current approved Addition) and NEC (Electrical Code-Current Approved Addition)
b. Installation shall also be in accordance with all published requirements and recommendations of the manufacturer of the system equipment, components, and devices.
c. The contractor shall also plan and carry out the work of replacing the system components to ensure that the HVAC system shall not be disabled nor inoperative for any period greater than twenty-four (24) hours.
• The contractor shall have technicians actively working on the replacement of the HVAC system components at any and all times that the system is disabled or inoperative,
• The contractor shall notify the State’s Representative and the Facility Representative a minimum of forty-eight (48) hours prior to any outages.
d. Final systems must be accepted by the DGS Building Manager.
VII. General Requirements:
1. The Department of General Services “Instructions to Bidders for Construction Projects and General
Conditions of the Contract between Owner and Contractor” is hereby part of this contract.
2. All work shall be coordinated with the Facility Representative for the Maryland Department of General
Services.
3. Work shall be accomplished during normal working hours of 7am to 4pm Monday through Friday, unless written permission to do otherwise is given by the Facility Representative.
4. The completed work is subject to inspection and approval of:
• The Department of General Services Construction Inspection Division
• The Maryland Department of General Services Facilities Division
• All authorities having jurisdiction.
5. All electrical work required by the scope of this contract shall be inspected and approved by a non-governmental inspection company. All fees for said inspection shall be paid by the contractor. The contractor shall file for and secure all required electrical permits.
6. Upon completion of the project, the contractor shall remove all excess materials and debris and leave the project site in its pre-existing condition.
7. Any damage to existing buildings, grounds, etc. caused by the contractor shall be repaired to the satisfaction of the facility at no additional cost to the State.
8. Testing & Training
• Testing shall be in accordance with all applicable code requirements and respective national standards and with the written requirements of the manufacturer(s) of the equipment.
• Training shall include a thorough demonstration of operation for the facilities staff. The Facility
Representative will designate who will attend the training. The contractor will provide a written document of the train procedures including normal operation, testing and maintenance, activation and resetting, interpreting warning, trouble lights and troubleshooting in general. The contractor will provide a sign-in sheet for those attending the training and provide a copy to the State’s Representative.
VIII. Warranty & Guarantee
a. The contractor shall provide a complete warranty on all labor and materials for a period of two (2) years from the date of final acceptance. Any defects found within the warranty period shall be repaired or replaced by the contractor at no additional cost to the State.
b. Defects include faulty or imperfect material or equipment and any imperfect, careless, or unskilled workmanship.
c. The contractor shall submit to the State Representative, as part of the project close-out, all warranty information regarding materials and equipment on this project.
IX. Environmentally Hazardous Materials
Note: If any time during the performance of the work required by the contract, the contractor finds or has reason to suspect the presence in any work area of environmentally hazardous materials other than those that may be addressed in the drawings or documents, they shall immediately notify the using agency representative, Project Manager or Construction Inspector. This notification shall also be in writing, setting forth any observations/suspicions and requesting instructions. At the same time the contractor shall withdraw all their personnel from the potentially contaminated area.
X. Liquidated Damages/ Bids – Submittals
1. Liquidated damages are set at $350/day calculated after the start date.
2. Base Bid shall be the lump sum total for completion of the project herein described.
3. The contract shall be awarded to the responsible and responsive bidder submitting the lowest total bid.
XI. Work Hours and Point of Contact
1. The work hours of the facility are Monday through Friday, 7:30 AM to 4:00 PM.
2. All work must be completed before the end of the business of that workday.
3. The building is closed Saturday, Sunday, and State Holidays.
4. Point of Contact for DGS (Project Manager)
Charles Clark Office: (410) 767-6004 Cell: (443) 844-9536
Email: charles.clark@maryland.gov
5. The Building Point(s) of Contact shall be:
James Roberts Office: (410) 238-5550 Cell: (443) 610-8581
Email: james.roberts@maryland.gov
Michael Ireland Office: (410) 996-2840
Email: michael.ireland@maryland.gov mailto:charles.clark@maryland.gov mailto:james.roberts@maryland.gov mailto:michael.ireland@maryland.gov