This Invitation for Bids (ITB) is issued by the City of Bay City, Texas, for a two-year contract to provide on-site wood chipping and grinding services at the City's Brush Site located at 5261 CR 106 on Skelly Road. The contractor shall furnish all labor, equipment, fuel, supervision, grinders, loaders, excavators, support equipment, tools, and safety controls necessary to process accumulated tree limbs and brush, move finished chips to designated stockpiles, and complete site cleanup and incidental restoration. The City will authorize services through work orders as brush accumulates, generally every six to twelve months, with no guaranteed schedule or quantity. Finished chips shall not exceed four inches in length and one-half inch in diameter and remain the City's property. Bids are due November 12, 2026, at 2:00 p.m. Central Time, submitted electronically through BidNet Direct or in a sealed envelope to the City Secretary at 1901 Fifth Street, Bay City, Texas 77414. Bids will be publicly opened immediately after the deadline. The contract term is 24 months following the effective date, divided into Year 1 (first 12 months) and Year 2 (following 12 months), with no automatic extension or renewal option. The City may close the brush site for up to 10 consecutive calendar days per event, and the contractor must mobilize and begin productive grinding within 10 business days of the notice to proceed and complete each event within 30 calendar days.
Bidders shall submit four unit prices on the Bid Pricing Form: a grinding price per cubic yard for Year 1, a grinding price per cubic yard for Year 2, a mobilization and demobilization price per event for Year 1, and a mobilization and demobilization price per event for Year 2. The City will evaluate all bids using 50,000 cubic yards of grinding and two mobilization events per year for each contract year to compare total evaluated prices. Grinding is paid by the bulk cubic yard of unprocessed brush measured and approved jointly before processing; finished-chip volume and weight conversions are not used for payment. The mobilization charge is paid once per authorized, completed event and includes all delivery, setup, support equipment, and demobilization costs. All quoted prices must include labor, equipment, fuel, measurement, processing, chip handling and placement, loading City-arranged containers, ordinary contaminant disposal, cleanup, incidental site restoration, overhead, profit, insurance, and legally required bonds. The contractor must obtain and maintain commercial general liability coverage with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability coverage with a combined single limit of $500,000 per occurrence, and workers' compensation at Texas statutory limits. No bid bond is required; however, performance or payment bonds may be required by applicable Texas law before work begins. The City will award to the lowest responsible bidder whose bid conforms to the solicitation. Bids remain available for acceptance for 90 calendar days after opening, and the successful bidder must deliver the signed agreement and required post-award documents within 14 calendar days of written notice of award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brush Site Wood Chipping Services Two-Year Contract
Invitation for Bids
City of Bay City Texas
Issued October 28, 2026
BIDS DUE BY: November 12, 2026, at 2:00 p.m. Central Time
2 | P a g e
TABLE OF CONTENTS
1. Bid Requirements and Basis of Award 3
2. Scope of Work and Work Orders 4
3. Measurement Payment and Bid Pricing Form 7
- Bid Pricing Form 8
4. Proposed Contractor Agreement and Insurance 9
- Exhibit A — Scope of Work and Accepted Prices 14
- Exhibit B — Insurance Requirements 15
5. Required Forms and Submission Checklist 16
3 | P a g e
1. Bid Requirements and Basis of Award
Bids are due November 12, 2026, at 2:00 p.m. Central Time. Submit electronically through BidNet Direct or in a sealed envelope to the City Secretary, 1901 Fifth Street, Bay City, Texas 77414. Bids will be publicly opened and read aloud at that address immediately after the deadline.
1.1 Complete bid package Read the scope, pricing form, proposed agreement, insurance requirements, and addenda. Submit the signed Bid Pricing Form and the brief qualification information listed in Section
5. The proposed agreement is executed after award.
1.2 Electronic submissions Submit through the specific BidNet Direct solicitation. Complete the upload and final submission before the deadline. A saved draft or upload in progress is not a submitted bid. The designated receipt record controls timeliness.
1.3 Sealed paper submissions Deliver one signed original to the City Secretary at 1901 Fifth Street, Bay City, Texas 77414. Mark the envelope with the project title, bidder name, and opening date. The bidder is responsible for timely delivery to that office.
1.4 Late or replacement bids Late bids will not be considered. Submit through one method. A replacement submitted before the deadline must be clearly identified and the prior submission withdrawn.
1.5 Bid preparation Enter all four unit prices on the Bid Pricing Form. Enter zero when an item is included at no separate charge. Prices must cover the described service. A blank, conditional price, unapproved alternate, or separate minimum charge may make the bid nonresponsive.
1.6 Questions and site visits Send questions, requested clarifications, and requests for an optional site visit to glopez@baycitytx.gov promptly before the bid deadline. Only a written City-issued addendum changes the solicitation. Obtain documents and addenda through BidNet Direct or the City Bid Opportunities webpage at www.baycitytx.gov/688/Bid-Opportunities.
1.7 Bid revisions and withdrawal A bidder may revise or withdraw its bid before the deadline. Bids remain available for acceptance for 90 calendar days after opening, subject to applicable law governing withdrawal for a material mistake. An opened bid may not be changed to correct its price.
1.8 Bidder costs The City will not reimburse bid preparation or site-visit costs. This solicitation and staff discussions do not authorize work.
1.9 Award calculation The City will compare the total evaluated price for both years of the two-year contract using the same quantities for every bidder. Section 3 states the calculation. Estimated quantities do not guarantee purchases.
1.10 Lowest responsible bidder The intended award is to the lowest responsible bidder whose bid conforms to this solicitation. The City may verify suitable equipment, trained operators, insurance, any legally required bonds, comparable experience, and ability to meet the schedule.
1.11 Qualifications and clarification Provide the brief qualifications in Section 5. The City may verify responsibility or clarify an existing response without allowing a material change to price or bid requirements. Texas nonresident bidder requirements will apply when required by law.
1.12 Price calculation All prices are in United States dollars. The City will calculate the evaluated total from the four stated unit prices. An omission or ambiguity that cannot be resolved without a material bid change may result in rejection.
4 | P a g e
1.13 Contract execution Award is subject to City Council action and execution by authorized representatives. The successful bidder shall deliver the signed agreement and required post-award documents within 14 calendar days after written notice of award, unless the City sets a different written deadline. Work may begin only after insurance, any legally required bonds, and the City's written authorization are in place.
1.14 Bonds and insurance No bid bond is required with the bid. Before work begins, the successful bidder shall provide the insurance evidence required by Exhibit B and any performance or payment bonds required by applicable Texas law, as provided in Article 8 of the agreement. Include applicable premiums and related costs in the bid prices.
1.15 Scope and exceptions Award covers the complete routine brush-site service. An exception to a material requirement may cause rejection. A vendor quotation, invoice, or standard commercial term does not modify the City agreement unless lawfully accepted in writing.
1.16 Public records Bids and contract records are subject to the Texas Public Information Act. Identify any claimed confidential material and its legal basis; the City cannot promise withholding contrary to law.
Do not include tax identification numbers or banking information with the public bid.
2. Scope of Work and Work Orders
2.1 Purpose and location Provide recurring on-site chipping or grinding of accumulated tree limbs and brush at the City of Bay City Brush Site, 5261 CR 106 on Skelly Road, approximately one mile north of Golden Avenue. The City will call for service as brush accumulates, generally every six to twelve months, but does not guarantee a schedule or quantity. The location map is for access reference.
2.2 Complete service Furnish all labor, supervision, transportation, grinders, loaders, excavators, support equipment, fuel, maintenance, tools, safety controls, and other items necessary to grind the authorized material, move the chips to designated stockpiles, clean the work area, and complete the required incidental work. The City is not furnishing equipment or fuel under this bid.
2.3 Material to be processed Process the accumulated tree limbs and brush normally received at the site. An optional pre-bid visit is available through the City contact. Identify the grinder and its maximum limb or log diameter in the bid. Raise any equipment limitation affecting the described service before bidding so the City can address it by addendum.
2.4 Finished chips All authorized limbs and brush must be processed on site. Finished chips shall generally not exceed 4 inches in length and one-half inch in diameter, consistent with the City's established scope. Furnish sufficient equipment and processing to meet that target. The City will inspect the finished material and may require correction of material that does not meet the specified service.
2.5 Chip ownership and placement Finished chips remain the City's property. Place them in the areas designated by the City in stockpiles no higher than 15 feet, or load them into third-party containers supplied or arranged by the City. Loading available containers within the work area is included. Do not remove, sell, give away, or claim a credit for chips without separate written City authorization.
2.6 Incidental contaminants Separate ordinary nonvegetative contaminants encountered during processing, including visible metal, plastics, furniture debris, and similar waste that cannot safely be ground. The contractor is responsible for lawful disposal of these ordinary contaminants and associated fees as part of the grinding price. Do not mix them into the finished chips.
5 | P a g e
2.7 Suspected hazardous material Stop work in the affected area, protect the area, and notify the City immediately if suspected hazardous material, leaking containers, or another condition requiring specialized handling is discovered. Do not grind, transport, or dispose of that material without the required qualifications and written City direction. The City will determine the appropriate response before affected work resumes.
2.8 Written authorization The City will authorize each event by a work order, purchase order, or email from its authorized representative. The authorization will identify the material and work limits, applicable prices and authorized amount, start and completion dates, chip placement, and City contact. It serves as the notice to proceed unless a later notice date is stated. Both parties must approve the pre-grinding quantity in writing before processing begins; that approval becomes part of the event record.
2.9 Response and completion Mobilize and begin productive grinding within 10 business days after the notice to proceed, unless the work order expressly sets a later agreed start date. Complete the event within 30 calendar days after that notice. A business day is a Monday through Friday that is not an observed City holiday. Begin only after measurement approval and the City's written authorization.
2.10 Event and mobilization One event is one authorized assignment to process a defined accumulation of brush. Mobilization and demobilization are paid once for that event. Normal equipment repairs, weather interruptions, overnight shutdowns, or the contractor's decision to move equipment do not create another mobilization charge. A later, separately authorized pile-clearing assignment is a new event.
2.11 Work area and public access Coordinate operations with the City representative. The City may close the brush site for up to 10 consecutive calendar days for an event. The contractor shall not close the site or extend a closure without written City approval. Establish a safe exclusion area, barriers, warning signs, and traffic controls appropriate to the equipment and public access conditions.
2.12 Prestart coordination Before mobilizing, coordinate the start date, working hours, access, safe work limits, and chip placement with the City representative. Keep emergency access and designated routes open. The contractor remains responsible for safe methods and equipment operation.
2.13 Site restoration Remove contractor-generated rubbish, incidental contaminants, equipment, and unused supplies. Level and smooth the processed work area and repair ruts or damage caused by operations to the City representative's satisfaction. This incidental restoration is included in the grinding rate. Excavation, imported fill, or unrelated site improvements require separate written authorization.
2.14 Delays and changed conditions Notify the City promptly of unsafe conditions, access restrictions, weather impacts, equipment failures, or anticipated delay. Submit any requested time extension in writing with its reason and effect on the schedule. Only the City may approve an extension. An approved extension alone does not authorize additional payment or another mobilization fee.
6 | P a g e
Brush Site Location and Access
City of Bay City Brush Site
5261 CR 106 on Skelly Road Bay City, Texas 77414
7 | P a g e
3. Measurement Payment and Bid Pricing Form
3.1 Pay quantity Grinding is paid by the bulk cubic yard of authorized, unprocessed brush measured before grinding. One cubic yard equals 27 cubic feet. Payment is not based on finished-chip volume, equipment production estimates, or an assumed weight conversion.
3.2 Measure before grinding The City and contractor shall jointly measure the brush before moving, compacting, or grinding it. Record pile limits, dimensions, calculations, and photographs. Divide irregular piles into measurable sections using the actual profile; divide cubic feet by 27 to obtain cubic yards. A survey or drone may be used by prior written agreement but is not required.
3.3 Pile limits and approval Exclude gaps between separate piles and space outside the actual brush profile. Include ordinary spaces between limbs; do not apply an undocumented compaction or reduction factor. Both representatives shall approve the calculation and cubic yards by signature or email before grinding.
3.4 Additional material Keep incoming brush outside the measured limits. Added brush is payable only when the City authorizes it and both parties measure and approve it before processing. The City may change an event only within the contract's scope, pricing, funding, and legal limits.
3.5 Grinding price The price per cubic yard includes labor, equipment, fuel, measurement, processing, chip handling and placement, loading City-arranged containers within the work area, ordinary contaminant disposal, cleanup, incidental restoration, overhead, profit, insurance, and any legally required bonds. Only the separately quoted mobilization charge is paid in addition.
3.6 Mobilization price The event charge includes delivery, setup, support equipment, and demobilization. It is payable once for each authorized, completed event. No separate standby charge, fuel surcharge, environmental fee, cleanup fee, or unbid minimum charge is payable.
3.7 Invoice and payment Submit one invoice after each completed event. Identify the work order or other written authorization, service dates, approved pre-grinding cubic yards, applicable unit prices, grinding amount, and one mobilization charge. Include the approved measurement record. Provide disposal receipts if requested. The City will review and pay proper invoices under Texas Government Code Chapter 2251.
3.8 Event acceptance The City will verify processing, chip size and placement, cleanup, and restoration before accepting the event. Correct deficient work at no additional cost. Acceptance of one event does not authorize another.
3.9 Evaluation quantities The City will use 50,000 cubic yards of grinding and two mobilization events for each year solely to compare bids. These are evaluation estimates, not a measured current pile or a guaranteed annual purchase. Actual quantities and visits will depend on written City authorizations and approved pre-grinding measurements.
3.10 Two-year prices Quote separate prices for Year 1 and Year 2. Year 1 is the first 12 months after the effective date; Year 2 is the next 12 months. Each year's prices remain fixed for that year. Both years are included in the award. Purchases remain subject to authorized funds and the agreement's termination provisions.
3.11 Total evaluated bid The City will calculate: (50,000 × Year 1 grinding price) + (2 × Year 1 mobilization price) + (50,000 × Year 2 grinding price) + (2 × Year 2 mobilization price). This comparison total is not a guaranteed contract payment or authorization to perform work.
8 | P a g e
Bid Pricing Form
Bidder legal name_________________________________________________________________
Enter all four unit prices below. You may quote different prices for Year 2. Enter zero if an item is included at no separate charge. The City will calculate the evaluated total using Section 3.11. No additional minimum charge or separate fee is permitted.
Service Unit Evaluation quantity per year
Year 1 unit price
Year 2 unit price
Grinding unprocessed brush CY 50,000 CY $____________ $____________
Mobilization and demobilization Event 2 events $____________ $____________
Bid Offer and Signature
Offer The undersigned offers to perform the complete services under this Invitation for Bids, its acknowledged addenda, and the proposed agreement at the four unit prices quoted above. The signer has authority to bind the bidder.
Availability The bidder can provide suitable equipment and operators and meet the stated response and completion requirements. The bid remains available for acceptance for 90 calendar days, subject to applicable law.
Independent bid This bid was prepared without collusion or an agreement to restrict competition. No prohibited benefit has been offered to influence the procurement.
Addenda acknowledged by number and date __________________________________________
[ ] No addenda issued. Check the City posting before submitting the bid.
Authorized signature ___________________________________________________
Printed name _____________________________ Title ____________________________________
Date _______________________ Telephone ________________________________
Email ___________________________________________________________________________
Business address
9 | P a g e
4. Proposed Contractor Agreement and Insurance
Agreement for 2026 Brush Site Wood Chipping Services
City City of Bay City, Texas City address 1901 Fifth Street, Bay City, Texas 77414 Contractor __________________________________________________________ Contractor address __________________________________________________ Project site 5261 CR 106, Skelly Road, Bay City, Texas 77414
Article 1 Work of This Contract
The contractor shall perform the on-site brush chipping or grinding, chip placement, ordinary contaminant disposal, cleanup, and incidental restoration described in Exhibit A and the incorporated Contract Documents.
Each event requires written City authorization as provided in Section 2.8 of the Invitation for Bids. More than one work order may be issued during an active term, or no work orders may be issued. An evaluation quantity does not authorize work or guarantee a minimum payment. The contractor shall not incur costs on the City's account before written authorization.
Article 2 Contract Term and Event Completion
2.1 This agreement becomes effective on the date of the last signature by the parties’ authorized representatives, following required City approvals (“Effective Date”), and continues for 24 months unless terminated earlier under this agreement. Year 1 is the first 12 months beginning on the Effective Date.
Year 2 is the following 12 months. The corresponding accepted unit prices apply to each year.
2.2 Both years are included in this award. There is no automatic extension or additional renewal option.
Continued use or an invoice does not extend the term. Obligations for a future fiscal year remain subject to lawful appropriation.
2.3 Each event requires written City authorization under Section 2.8. Unless that authorization sets a later agreed start, begin productive grinding within 10 business days and complete the event within 30 calendar days after the notice to proceed. The parties shall coordinate the event schedule within the contract term.
2.4 The City shall not issue a work order that commits funds beyond an authorized term or available appropriation. A work order does not extend the agreement. Any extension of time or work beyond an expiration date requires a written, lawfully authorized instrument and applicable insurance and bond coverage.
Article 3 Contract Prices and Work Authorization
3.1 The City will pay the accepted grinding unit price for approved pre-grinding cubic yards and the accepted mobilization and demobilization price once for each completed event. The applicable Year 1 or Year 2 prices on the accepted Bid Pricing Form govern payment.
3.2 Each event requires written City authorization at the accepted unit prices and within available funding. A contractor-requested change is not authorized until approved in writing by the proper City authority. No oral direction, invoice notation, or equipment operator's request authorizes additional work or payment.
10 | P a g e
3.3 Contract quantities may vary. Amendments to the awarded scope or contract terms must satisfy applicable law, including Texas Local Government Code Section 252.048 when applicable. An amendment may not be used to avoid a required competitive procurement.
Article 4 Payments and Event Acceptance
4.1 Payments and interest, if any, are governed by Texas Government Code Chapter 2251. Submit invoices and support described in Section 3. The City may identify a good-faith billing dispute and withhold the disputed amount as permitted by law without treating an unsupported invoice amount as approved.
4.2 Submit one invoice after completing each event. The City will accept the event after the authorized brush is processed, chips are properly placed, cleanup and required restoration are complete, and deficiencies are corrected.
4.3 The contractor shall promptly pay its employees, subcontractors, and suppliers. Payment does not waive rights concerning defective work, concealed damage, fraud, or an incorrect quantity.
Article 5 Contractor Duties
5.1 Furnish all items necessary to complete the incorporated scope and required incidental work. Review site access, equipment needs, transport, handling, disposal, ground conditions observable at the site, labor availability, and operating constraints. A site inspection does not transfer responsibility for undisclosed hazardous material to an unqualified contractor.
5.2 Keep the site and surrounding access areas free of contractor-generated rubbish. Follow the contaminant, restoration, and safety requirements in Section 2. Obey applicable laws, permits, and lawful City directions. Correct a violation or defective service promptly at the contractor's expense.
Article 6 Insurance
6.1 Obtain and maintain the insurance required by Exhibit B at the contractor's expense throughout performance. Furnish certificates and required endorsements before any site work. A certificate does not replace an endorsement required by this agreement or limit the contractor's responsibility.
6.2 Required insurance and surety bonds must be issued by companies authorized to provide the applicable coverage or bond in Texas. Do not permit a subcontractor to perform without the insurance and qualifications required for its work. The contractor remains responsible for subcontractor performance.
11 | P a g e
Article 7 Indemnification
CONTRACTOR WILL INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY, ITS OFFICERS,
EMPLOYEES, AND REPRESENTATIVES, FROM AND AGAINST ALL LIABILITY FOR ANY AND ALL
CLAIMS, SUITS, DEMANDS, OR ACTIONS TO THE EXTENT ARISING FROM OR BASED UPON THE
NEGLIGENT OR OTHER WRONGFUL ACTS ON THE PART OF CONTRACTOR, ITS AGENTS,
REPRESENTATIVES, OR EMPLOYEES WHICH MAY ARISE OUT OF OR RESULT FROM
CONTRACTOR'S OPERATIONS UNDER THIS CONTRACT.
THIS INDEMNITY PROVISION, INCLUDING CONTRACTOR'S DUTY TO DEFEND AND HOLD
HARMLESS, EXTENDS TO SUCH CLAIMS, SUITS, DAMAGES, OR ACTIONS REGARDLESS OF THE
TYPE OF RELIEF SOUGHT, INCLUDING DAMAGES, JUDGMENTS, COSTS, REASONABLE
ATTORNEY FEES, AND EXPENSES. IT APPLIES TO THE EXTENT THE BASIS FOR THE CLAIM IS
ATTRIBUTABLE IN WHOLE OR IN PART TO CONTRACTOR OR ITS AGENTS, REPRESENTATIVES,
OR EMPLOYEES, AND ONLY TO THE EXTENT PERMITTED BY LAW.
Article 8 Performance and Payment Bonds
8.1 The contractor shall furnish performance or payment bonds when required by applicable Texas law, including Texas Government Code Chapter 2253 when applicable. Any required bonds shall be furnished before work begins, in the amounts and forms required by law, payable to the City, and issued by a surety authorized to provide the bonds in Texas.
8.2 Maintain any required bond coverage for the authorized work. Before a contract increase takes effect, provide any continuation, rider, or replacement bond required by applicable law.
Article 9 Contract Documents
The Contract Documents are this agreement, Exhibit A, Exhibit B, Sections 1 through 5 of the Invitation for Bids, City-issued addenda, and the accepted signed bid. Lawful amendments and authorized event records become part of the agreement. City-issued addenda control the provisions they expressly modify, with the latest addendum controlling. Otherwise, the agreement and its exhibits control, followed by the solicitation and the accepted bid. Read complementary requirements together. Unaccepted bidder exceptions and standard commercial terms are excluded.
Article 10 Safety and Protection of Property
10.1 Perform the work safely and take reasonable precautions to protect employees, City personnel, visitors, stored material, structures, utilities, roads, and other property at or near the site. The contractor is responsible for its means, methods, equipment guarding, operating clearances, and exclusion zones.
10.2 Inspect the work area and equipment throughout the event. Develop and enforce a safety program complying with applicable law and Occupational Safety and Health Administration requirements. Provide trained operators, appropriate personal protective equipment, fire prevention measures, and first-aid and emergency arrangements.
10.3 Notify the City promptly of injuries, fires, spills, public-safety incidents, and property damage. Stop affected work when an unsafe condition threatens persons or property. Restore damage caused by the contractor or its subcontractors at the contractor's expense. City observation does not assume responsibility for contractor safety.
12 | P a g e
Article 11 Successors Assignment and Subcontracting
This agreement binds the parties and their lawful successors. The contractor shall not assign the agreement or subcontract any portion of the work without prior written City consent. Submit the proposed firm's name, qualifications, work role, and insurance information for review. Approval does not release the contractor from any obligation.
Article 12 Administration and Termination
12.1 The contractor is an independent contractor and is responsible for its employees, equipment, payroll obligations, and taxes lawfully imposed on its operations. The City will provide an applicable tax-exemption certificate upon request. The exemption does not excuse taxes owed by the contractor on purchases that are not legally exempt.
12.2 The City may terminate the agreement or a work order for convenience by written notice at least 30 calendar days before termination. Follow the notice concerning protection of the site and cessation of work. The contractor is entitled only to payment for authorized, satisfactorily performed services through termination and other amounts expressly required by law. No payment is due for unperformed estimated quantities or anticipated future profit.
12.3 If the contractor materially defaults, the City may give written notice identifying the failure and a reasonable cure period stated in the notice. The City may suspend unsafe work immediately. If the failure is not timely cured, or cannot reasonably be cured, the City may terminate affected work and pursue remedies available under the agreement and law, subject to applicable notice requirements.
12.4 Obligations for a future fiscal year are subject to lawful appropriation. The agreement does not create a debt payable from future taxes without lawful authorization. The City may terminate future unfunded work by written notice. The City remains responsible for amounts lawfully owed for authorized, accepted work.
12.5 Texas law governs this agreement. Venue for an action concerning it is Matagorda County, Texas, to the extent permitted by law. No provision waives the City's governmental immunity or a defense or limitation provided by law. A waiver of one breach is not a waiver of another breach.
Article 13 Entire Agreement and Notices
13.1 This agreement and the incorporated Contract Documents state the complete agreement and supersede prior oral or written discussions about this work. Modifications must be written and executed by authorized representatives, within applicable procurement and funding limits. An invoice, email from an equipment operator, or unapproved field direction does not amend the agreement.
13.2 The following verifications apply only when legally required and enforceable under the cited Texas Government Code chapter, including its company definition, employee and contract-value thresholds, and exceptions. Under Chapter 2271, the contractor verifies that it does not boycott Israel and will not boycott Israel during the term. Under Chapter 2274, it verifies that it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association and will not so discriminate during the term. Under Chapter 2276, it verifies that it does not boycott energy companies and will not boycott energy companies during the term. The contractor must not be a person with whom the City is prohibited from contracting under applicable law, including Chapter 2252, Subchapter F. Provide applicable disclosures listed in Section 5 and supporting information when requested.
13 | P a g e
13.3 Deliver formal notices to the City Manager at City Hall, 1901 Fifth Street, Bay City, Texas 77414, with a copy to the City Secretary, and to the contractor at its notice address below. The parties may designate work-order contacts by email. A contact change takes effect after written notice.
13.4 An invalid provision will be severed to the extent this can be done without defeating the agreement's lawful purpose. Counterparts and legally valid electronic signatures may be used.
Contractor
Legal name __________________________________________________________
By ______________________________________ Date _______________________
Printed name ______________________________ Title _______________________
Notice address _______________________________________________________
Notice email _________________________________________________________
City of Bay City Texas
By ______________________________________ Date _______________________
Printed name ______________________________ Title _______________________
Authorized City representative
Attest ___________________________________ Date _______________________
City Secretary
14 | P a g e
EXHIBIT A
SCOPE OF WORK AND ACCEPTED PRICES
1. Scope of work Provide recurring on-site chipping or grinding of accumulated tree limbs and brush at the City of Bay City Brush Site, 5261 CR 106 on Skelly Road, Bay City, Texas. Furnish the labor, equipment, fuel, chip handling and placement, ordinary contaminant disposal, cleanup, and incidental restoration required by Section 2 of the Invitation for Bids. Section 2 is incorporated into this exhibit in full.
2. Measurement and payment Measure and approve the bulk cubic yards of unprocessed brush before grinding. Pay the accepted grinding price per approved cubic yard and one accepted mobilization and demobilization charge for each authorized event. The measurement, included costs, invoicing, and acceptance provisions of Section 3 are incorporated into this exhibit in full.
3. Accepted prices The contractor’s completed Bid Pricing Form, accepted by the City and attached to this exhibit, is incorporated into this agreement. It establishes the grinding price per cubic yard and the mobilization and demobilization price per event for Year 1 and Year 2. Each year’s accepted unit prices remain fixed for that year.
4. Event authorization Perform each event only under written authorization from the City under Section 2.8. Actual quantities, event schedules, chip placement, and authorized amounts are established through those authorizations and the approved pre-grinding measurements. Evaluation quantities do not guarantee purchases or authorize work.
15 | P a g e
EXHIBIT B
INSURANCE REQUIREMENTS
1. Coverage and evidence The contractor shall procure and maintain, at its sole cost and expense for the duration of the agreement, insurance against claims for injury or property damage arising from the work of the contractor, its agents, representatives, volunteers, employees, or subcontractors. Furnish certificates of insurance and required endorsements for City approval before work begins. Subcontractor coverage is subject to the same requirements.
2. Commercial general liability Maintain occurrence coverage with minimum limits of $1,000,000 per occurrence for bodily injury and property damage, $2,000,000 general aggregate, and $2,000,000 products-completed operations aggregate. The general aggregate limit shall apply separately to the project. Do not delete standard policy coverage without submitting the individual exclusions for City review and acceptance.
3. Automobile liability Maintain a minimum combined single limit of $500,000 per occurrence for bodily injury and property damage for owned, hired, and nonowned vehicles used for the work.
4. Workers compensation and employers liability Maintain workers' compensation coverage at Texas statutory limits and employers' liability coverage with limits as required by Texas law.
5. Protection of the City The contractor's coverage shall be primary to insurance or self-insurance maintained by the City, its officials, employees, and volunteers. City coverage shall be excess and shall not contribute. Name the City, its officials, employees, and volunteers as additional insureds under the general liability policy, affording the same coverage as the named insured with no special limitation on their protection. Provide a waiver of subrogation in favor of the City for all required coverages.
6. Insurers and policy conditions Use insurers licensed or admitted to do business in Texas. General liability and automobile liability insurers shall have an A.M. Best rating of A:VIII or better. Claims-made policies are not acceptable. List deductibles and self-insured retentions on the certificate; they are acceptable only on a per-occurrence basis for property damage. The contractor is responsible for deductibles and retentions. Furnish certified policy copies upon request.
7. Coverage changes and notices Each policy shall be endorsed to provide the City 30 days' prior written notice of a material coverage change. The contractor and each subcontractor shall also notify the City by certified mail, return receipt requested, within three days after receiving actual notice of a material change, including suspension, cancellation, voiding, or reduction in coverage or limits.
8. Certificates and endorsements Certificates shall be prepared and signed by the insurer or its authorized agent and identify the insurer's Texas authorization, the required coverages and limits, and the applicable cancellation, termination, and coverage-change notice provisions. Policies shall use forms approved for use in Texas or ISO forms.
Furnish the original endorsements affecting required coverage with the certificates.
16 | P a g e
5. Required Forms and Submission Checklist
Submit with the bid
Submit the completed pricing page, signed offer, addenda acknowledgment, and the brief qualifications below. You may provide these qualifications on this page or on your own sheet.
Business type ___________________ State of principal place of business ___________________
Grinder make and model __________________________________________________ Maximum limb or log diameter _____________________________________________ Primary loading or support equipment ________________________________________
Comparable work references
Provide two recent customers for comparable brush grinding. Municipal work is not required.
1. Customer or project ____________________________________________________ Contact and telephone or email ______________________________________________
2. Customer or project ____________________________________________________ Contact and telephone or email ______________________________________________
Bid submission checklist
[ ] All four unit prices entered [ ] Offer signed and contact information provided [ ] Addenda acknowledged [ ] Equipment description and two references provided [ ] Form CIQ filed or included if disclosure is required
Conflict disclosure
File Texas Ethics Commission Form CIQ when required by Local Government Code Chapter 176, within the statutory deadline, and update it as required. Submit a copy with the bid if available; this does not replace filing with the City's records administrator. A separate no-conflict affidavit is not required by this package.
Link to Official Form CIQ and instructions: Texas Ethics Commission Form CIQ
Successful bidder before execution or work
Provide the signed agreement and completed online Form 1295 with its certificate number when required for contract approval. Provide insurance certificates and required endorsements, and any legally required bonds, before work. Supply vendor information and a current IRS Form W-9 through the City's vendor setup process; do not include tax or banking information in the public bid.
https://www.ethics.state.tx.us/data/forms/conflict/CIQ.pdf