This is a Performance Work Statement (PWS) for bathroom trailer lease services at Beale Air Force Base (AFB), California, effective May 2026.

The 9th Maintenance Group (MXG) at Beale AFB requires the lease, delivery, installation, and weekly maintenance of a gender-segregated, two-stall trailer-mounted restroom facility to comply with Executive Order 14183 mandating separate restroom facilities by gender. The contractor must deliver and set up the trailer by September 26, 2026, to Building 1319, 19100 Alert Drive, Beale AFB, CA 95903, with at least two weeks' prior coordination with the Contracting Officer Representative (COR). The trailer specifications include two separate stations (one per gender) with interior locking mechanisms, self-contained waste and potable water tanks, and electric-powered water heating. Each station requires one toilet, one sink with handwashing capabilities, one mirror, one shower, overhead lighting, and hot/cold water functions. The electrical system must support 120v/20amp connection with 100 feet of extension cord; all systems must be powered exclusively by electricity with no propane, gas, or other fuel sources permitted.

The contractor must provide weekly waste tank emptying services commencing within seven days of delivery and ensure unimpeded access to the facility throughout the lease term. Initial service scheduling requires submission of a cleaning schedule to the COR and Contracting Officer (CO) fourteen business days prior to service visits. The contractor must notify the COR before arrival on base and coordinate post-service verification with the COR at the job site. All waste professionals must possess proper licensing and certifications for handling, transporting, and disposing of waste materials at off-base locations in compliance with local, state, and federal regulations. The trailer must be removed within 30 days of lease termination. Standard operating hours are Monday through Friday, 7:00 AM to 4:00 PM PST, with no service required on federal holidays. The contractor is responsible for maintaining a clean, hazard-free work area, coordinating all phases with the COR, obtaining base access clearances via Entry Access Listing (EAL) submission, and complying with all AFOSH guidelines, applicable Department of War regulations, and traffic laws.

View the file

Other files

File Type Posted
Bathroom Trailer Lease - ROM.pdf PDF
Bathroom Trailer Lease - ROM.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

BATHROOM TRAILER LEASE

BEALE AIR FORCE BASE (AFB), CA

May 2026

1. BACKGROUND. The 9th Maintenance Group (MXG) at Beale AFB requires a trail mounted restroom rental in accordance with Attachment 1 � Specifications, and associated servicing.

Executive Order 14183 mandates the Armed Forces to have separate restroom facilities designated by gender. Currently, the Air Force Combat Ammunition Course (AFCOMAC) only posses a single restroom facility for the entire building. The rental of a trail mounted restroom allows Beale AFB to remain in compliance with Federal regulation.

2. SCOPE. The Contractor shall provide delivery, installation, lease, and weekly waste tank emptying services to Beale AFB, CA.

3. DESCRIPTION OF SERVICE. The Contractor shall provide delivery, installation, lease, and weekly waste tank emptying services to Beale AFB, CA.

4. DELIVERY AND SET-UP. The Contractor shall deliver the trailer in accordance with Attachment 1 � Specifications no later than 26 September 2026. Contractors are required to deliver and set-up the trailer to 9 MXG at the following address: BLDG 1319, 19100 Alert Drive Beale AFB, CA 95903. The Contractor shall coordinate delivery with the government point of contact listed in the inspect and accept section of the contract at least two weeks prior to anticipated delivery.

5. TRAILER LEASE. The Contractor shall ensure the 9th Maintenance Group (MXG) has unimpeded access to the restroom trailer for the duration of the lease.

6. SCHEDULED WASTE TANK SERVICES. The Contractor shall perform scheduled weekly waste tank services to ensure operational readiness and must be in compliance with AFOSH guidelines, standards, applicable Department of War regulations, and applicable safety standards. The Contractor shall submit a schedule of weekly cleanings for approval to the Contracting Officer Representative (COR) and Contracting Officer (CO) fourteen (14) business days prior to visit.

6.1 INITIAL WASTE TANK SERVICES. The Contractor shall commence initial service no later than seven (7) days following the restroom trailer delivery. The second service shall be no later than seven (7) days from the date of the first service. Subsequential servicing shall follow the scheduling guidelines outlined in paragraph 6.

6.2 PRE-SERVICE NOTIFICATION. Prior to commencing scheduled waste tank services, the Contractor shall notify the Contracting Officer Representative (COR) of their arrival on the installation.

6.3 POST-SERVICE VERIFICATION. Upon completion of services, the Contractor shall ensure the COR is at the job site to verify satisfactory service completion.

7. WASTE PUMPING AND OFFSITE DISPOSAL. The Contractor shall ensure waste professionals have all proper licensing and/or certifications for handling, removing, transporting and disposing of all waste materials at an off-base location according to all local, city, county, state, and federal regulations.

8. TRAILER DEMOBILIZATION. The Contractor shall coordinate pick-up/removal of the trailer with the Contracting Officer Representative (COR) to be removed within 30 days of the lease ending.

9. SERVICE SUMMARY. The Service Summary outlines the minimum standards with delivery methods and promotes continuous improvement in Contractor performance. The Contractor service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each performance objective. The SS provides information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in FAR 52.212-4(a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.

Performance Objective

PWS Reference Performance Threshold

PO-1 4. DELIVERY AND SET-UP The Contractor shall deliver and set-up the trailer no later than 26 September 2026.

PO-2 4. DELIVERY AND SET-UP The Contractor shall deliver and set-up the trailer to the following address:

BLDG 1319, 19100 Alert Drive Beale AFB, CA 95903

PO-3 4. DELIVERY AND SET-UP The Contractor shall coordinate with the Contracting Officer Representative (COR) for the delivery, at least two (2) weeks prior to delivery.

PO-4 5. TRAILER LEASE The Contractor shall ensure the 9th Maintenance Group (MXG) has unimpeded access to the restroom trailer for the duration of the lease.

PO-5 6. SCHEDULED WASTE

TANK SERVICES

The Contractor shall submit a schedule of weekly cleanings for approval to the Contracting Officer Representative (COR) and Contracting Officer (CO) fourteen (14) business days prior to visit.

PO-6 6. SCHEDULED WASTE

TANK SERVICES

The Contractor shall perform scheduled weekly waste tank services to ensure operational readiness and must be in compliance with AFOSH guidelines, standards, applicable Department of War regulations, and applicable safety standards.

PO-7 6.1 INITIAL WASTE TANK

SERVICES

The Contractor shall commence initial service no later than seven (7) days following the restroom trailer delivery.

PO-8 6.1 INITIAL WASTE TANK

SERVICES

The Contractor shall commence the second service shall be no later than seven (7) days from the date of the first service.

10. DELIVERABLES. The Contractor shall provide the following deliverables. Acceptance of final documents is subject to Government approval. All deliverables shall be submitted via email to the 9th Maintenance Group (MXG), Contracting Officer Representative (COR) and Contracting Officer (CO).

PO-9 6.2 PRE-SERVICE

NOTIFICATION

Prior to commencing scheduled waste tank services, the Contractor shall notify the Contracting Officer Representative (COR) of their arrival on the installation.

PO-10 6.3 POST-SERVICE

VERIFICATION

Upon completion of services, the Contractor shall ensure the COR is at the job site to verify satisfactory service completion.

PO-11 7. WASTE PUMPING AND

OFFSITE DISPOSAL

The Contractor shall ensure waste professionals have all proper licensing and/or certifications for handling, removing, transporting and disposing of all waste materials at an off-base location according to all local, city, county, state, and federal regulations.

PO-12 8. TRAILER

DEMOBILIZATION

The Contractor shall coordinate pick-up/removal of the trailer with the Contracting Officer Representative (COR) to be removed within 30 days of the lease ending.

PO-13 16. CLEAN-UP The Contractor shall keep the work area orderly and, in a hazard free condition. The Contractor shall be responsible for clean-up of the job site including removal of all waste from site areas. All debris and waste shall be properly disposed of properly at an off-base property.

Deliverable

PWS

Section

Frequency

Format

Submit To

Scheduled Cleaning Services

6 The Contractor shall submit a schedule of weekly cleanings for approval to the Contracting Officer Representative (COR) and Contracting Officer (CO) fourteen (14) business days prior to visit.

In writing via email.

COR and CO

Reports And Documentation

7 The Contractor shall provide proper waste handling licensing and/or certification upon the request of the CO.

Submit licensing and/or certification in writing via email.

COR and CO

Security 12 Entry Access Listing (EAL) (Attachment 3) shall be turned in within five (5) business days prior to the start of work on base.

Submit Attachment 1

- Entry Access Listing (EAL)

COR

11. GOVERNMENT FURNISHED SERVICES.

11.1 SERVICES. The Government will provide police and fire protection while on Beale AFB. In the event of a medical emergency, call �911� for transportation of an injured employee by civilian ambulance to a local hospital. The Government shall provide emergency medical treatment for life-threatening emergencies only until civilian ambulances arrive.

11.2 DAMAGE TO GOVERNMENT FACILITIES AND PROPERTY. The

Contractor shall reimburse the Government if details of formal investigation of fire or other related or unrelated structural damage result in pecuniary liability assessed to the Contractor. The Contractor shall replace all damaged or lost Government Furnished Facilities, Government Furnished Equipment and/or Government Furnished Materials at no cost to the Government.

12. GENERAL INFORMATION.

12.1 CONTRACTOR PERSONNEL. Contract personnel shall present a neat appearance.

Contract personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.

12.2 SAFETY. The Contractor shall follow all applicable AFOSH standards pertaining to the work being accomplished. The Contractor shall comply with all applicable local, city, county, state, and federal regulations pertaining to grease trap cleaning, waste handling, waste hauling and waste disposal.

13. SECURITY. The Contractor shall comply with all requirements and procedures IAW DAFFARS 5352.242-9000, Contractor Access to Department of the Air Force Installations. The Contractor shall obtain base identification and vehicle passes, if required, for all Contractor personnel who make frequent visits to or perform work on the Department of the Air Force installations cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished Contractor identification badges while visiting or performing work on the installation. An Entry Access Listing (EAL) (Attachment 3) shall be turned into the COR within five (5) business days prior to the start of work on base. The EAL will be sent to Security Forces who will conduct a background check on each employee. Upon clearance and approval, the Contractor will be notified and will have approximately ten days to get their base passes from Pass & ID. During the performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who has quit, been terminated, or no longer requires access to the work site.

13.1 BASE CLOSURES. Work scheduled, but not accomplished, during a base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening of the base.

13.2 TRAFFIC LAWS. The Contractor and their employees shall comply with all installation traffic regulations.

14. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of work with the COR.

15. RECOGNIZED FEDERAL HOLIDAYS. The 9 MXG�s standard operating hours are Monday � Friday, between the hours of 7:00AM-4:00 PM, PST. The Contractor is not required to provide service on federal holidays. If any holiday falls on Saturday, the preceding Friday will be observed. If any holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance. The following Federal holidays are observed:

New Year's Day 1 January

Martin Luther King�s Birthday Third Monday of January

President's Day Third Monday of February

Memorial Day Last Monday in May

Juneteenth 19 June

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

16. CLEAN-UP. The Contractor shall keep the work area orderly and, in a hazard free condition. The Contractor shall be responsible for clean-up of the job site including removal of all waste from site areas. All debris and waste shall be properly disposed of properly at an off-base property.

17. ENVIRONMENTAL CONTROL. The Contractor shall comply and assure that all subcontractors comply with all applicable federal, state, and local laws, regulations, ordinances, policies, and standards related to environmental matters.

18. HAZARDOUS MATERIALS AND WASTE. The Contractor is responsible for cleanup of any hazardous materials, spills or waste. The Contractor shall clean-up, containerize, and properly dispose of any spills caused by the Contractor�s employees such as any liquid spills they cause at the work site that might degrade environmental quality. The Contractor shall contact the Hazardous Waste Manager, 9 CES/CEIER, 530-634-2644 for further guidance. All clean up procedures shall follow all Federal, State, and County laws and regulations.

19. GOVERNMENT RESOURCES. Spill cleanup using government resources will be charged to the Contractor at an amount determined by the CO based on actual cost for manpower, supplies, equipment, and any resulting fines levied for the spill clean-up and testing.

Attachment 1

Specifications

BASIC CONFIGURATION

Maximum of two (2) stall trailer. Two separate stations [one (1) for each gender].

Interior locking mechanisms for each station.

Self-contained waste tank.

Self-contained potable water tank.

Water heater powered by electricity.

ELECTRICAL REQUIREMENTS

120v/20amp electrical connection with 100 feet of extension on power cord.

All systems (including hot water) shall be powered solely by electricity. No propane, gas, or other fuel sources are acceptable.

STATION AMMENITIES (REQUIRED FOR EACH OF THE TWO STATIONS)

One (1) toilet.

One (1) sink with handwashing capabilities.

One (1) mirror above sink.

One (1) shower.

Overhead lighting.

Hot and cold water functions.

Attachment 1

Contractor Entry Authorization List (EAL)

CONTRACTOR ENTRY ACCESS LIST FORM

Effective 15 Aug 2016 the USAF will implement REAL ID Act requirements IAW Public Law 109-13 and the Code of Federal Regulations (CFR) Title 6, Part 37

Note: Personnel will be placed on an EAL for no longer than 29 Days and 15 Business days to receive there DBIDS Card. Any longer will require an 1172 form to get a base pass or a memo from contracting. Handwritten/PDF submittals will not be processed.

NOTE: SSN is used to positively identify individuals. Failure to identify individuals is automatic denial to Beale AFB.

Employee's LEGAL Last Name

Employee's LEGAL First Name DOB Drivers License

Number Issuning State Start Date Expiration Date Sponsor Name/DOB Sponsor Phone Number Sponsors DOD ID/

EDIPI Destination Company Name Authorized Entry Times/ Days Contract Number SSN

Attachment 2

Site Map

File details come from the government source that posted it. Updated .