This document is a Questions and Answers (Q&A) compilation for the BATDOK Family of Systems (FoS) Operations and Sustainment Request for Information (RFI), issued by the Defense Health Agency (DHA) under the Joint Operational Medical Information System (JOMIS) Program Management Office. The RFI seeks market research on contractor capabilities to develop and sustain the BATDOK software ecosystem, which comprises three components: BATDOK-J (iOS/Android mobile applications), BATDOK Link (Windows application), and BAT-TAK (ATAK plug-in for tactical awareness). No incumbent DHA contract exists; BATDOK is currently developed by the Air Force Research Laboratory (AFRL) with BAE Systems contractor support. The Government does not intend to maintain two developers and expects a single prime contractor or team to assume full responsibility post-October 1, 2027.

Respondents must address Capabilities of Interest including mobile application sustainment, tactical radio integration, medical sensor integration, automated testing, and risk management framework (RMF) compliance. All technical details, source code, build scripts, test suites, and the existing ATO package will be provided as Government-furnished information during transition; timing will be determined through transition planning. The Government anticipates providing representatives' device and sensor information with future technical documentation and will conduct Contractor Integration Testing (CIT) monthly at the PAE METIC Lab in Chantilly, Virginia, following three-week development sprints. No security clearances, facility clearances, or classified environment access are currently required. The acquisition approach, contract vehicle (GSA MAS, DHA/DoW IDIQ, or standalone), small business set-aside determination, and contract structure have not been determined and will be informed by market research. Respondents are encouraged to recommend hardware procurement approaches, transition duration and methodology, development environment hosting (Government-furnished or contractor-hosted), CLIN structure, and phased testing strategies. Responses addressing only selected outcomes or subcontractor roles are welcome for market research. The 15-page response limit applies to narrative sections; Attachment 2 (company information) does not count toward the limit. Teaming arrangements, including joint ventures and combined prime-subcontractor experience, are permitted and encouraged.

View the file

Other files

File Type Posted
Atch 1_RFI_BATDOK FoS.docx DOCX document
Atch 2_CompanyInfo.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Reference Question Answer

1 BATDOK001

Is there an incumbent contract or contractor associated to the requirement. If any, please provide the contractor's name and contract number

No. There is no incumbent DHA contract for this requirement. BATDOK is currently developed by the Air Force Research Laboratory (AFRL), 711th Human Performance Wing, under a Memorandum of Agreement with the JOMIS Program Management Office and Program Acquisition Executive (PAE) Medical Digital Systems (MDS). AFRL contracts directly for its development support currently with BAE Systems AFRL contract numbers

Would a capability response focused on a prospective mobile-development subcontracting role be useful, and should it follow the full C.1–C.7 response format?

Yes. Responses from prospective subcontractors are useful market research. Respondents should complete Section C.1 and Attachment 2, clearly state the intended role (prime or subcontractor), and address the sections of C.2–C.7 relevant to their proposed workshare.

Sections that do not apply may be noted as not applicable. The 15-page limit still applies.

Could a defined development/testing work package be performed entirely from a U.S.-based contractor office using approved environments, with the prime covering required field testing and onsite activities? What personnel security or facility requirements would apply to that workshare?

Yes, the Government expects that development and testing work can be performed from U.S.-based contractor facilities, with on-site participation for CIT and other events as required (see Q12). Security clearances and a facility clearance are not required at this time (see Q18). Personnel with access to Government systems will need a favorable background investigation appropriate to their position, and contractors must be able to safeguard CUI in accordance with DFARS 252 204 7012 and applicable CMMC

Is there a vendor list or upcoming industry event where we could connect with companies planning to bid as prime contractors?

Not at this time. Any future industry engagement will be announced on SAM.gov.

Codebase Architecture & Baseline:

What are the primary programming languages, frameworks, and build systems currently used across BATDOK-J (iOS/Android), BATDOK Link (Windows), and BAT-TAK (ATAK plug-in)? Will full source code, build scripts, and test suites be fully accessible on Day 1 of transition?

Technical details of each component will be provided with technical documentation at a future date. The Government intends to provide source code, build scripts, and available test suites as Government-furnished information; timing will be set in the transition plan.

Respondents should describe their experience with native and cross-platform mobile development, Windows applications, and ATAK plug-ins, and recommend what access they need at transition start.

Technical Parity

& UI/UX

Standards

Is functional and user-interface parity between the iOS and Android versions expected down to pixel-level UI components, or is native platform styling acceptable provided workflows match?

Pixel-level parity is not required. The priority is consistent workflows across mobile operating systems (for example, TCCC and MARCH PAWS) to reduce the training burden for users who move between devices. Native platform styling is acceptable when it supports that goal. Respondents should recommend their approach.

Interoperability & Mock Environments

Are formal ICDs and FHIR/HL7 implementation guides readily available for MedIX, MedHub, and MHS GENESIS Theater?

Additionally, does the Government provide sandbox environments or mock APIs for multi-vendor Contractor Integration Testing (CIT)?

Yes. The JOMIS PMO maintains the DoDAF, ICDs, and technical documentation for BATDOK, including the SIG, SAM, and SUM. These documents are CUI and will be provided at a future date (see Q25). The Government conducts CIT in a Government Approved Lab (GAL), PAE MDS Medical Experimentation and Technology Innovation Center (METIC) Lab, in Chantilly, VA. Remote access is limited due to .MIL restrictions. Respondents may propose the use of emulators or mock services for development-stage testing ahead of

CIT.

Tactical Radio & Network Testing

Will the Government provide access to existing radio testbeds, network emulators, or Government test facilities during contract execution, or is the contractor expected to procure physical tactical radios and build an emulation lab from scratch?

The PAE METIC Lab provides a .MIL environment only; it does not have radio testbeds or Service network access. Respondents should propose an approach to successfully develop and test the software under these conditions with Gov't test performing independent verfication and validation (IV&V).

Hardware Procurement & Award Requirements

Regarding development and test hardware (mobile devices, Windows systems, and medical sensors), if our proposal is selected and the contract/RFQ is awarded, will we be required to procure all representative hardware upfront as part of performance start, or will the procurement schedule be phased during the 90-day transition period? Additionally, is the Government's preference to handle this hardware procurement under an ODC CLIN or as Contractor-Furnished Equipment (CFE)?

These decisions have not been made. The Government is interested in all approaches to successfully transition development of the BATDOK software, and this market research will inform the transition and procurement plans. Respondents should recommend a hardware approach, including timing and pricing structure. Note that existing development and test hardware will not transfer (see Q16).

10 Section C.4

Section C.4 of RFI BATDOK001 asks respondents to propose performance measures with reference to the draft Performance Requirements Summary in Technical Exhibit 1. We did not find Technical Exhibit 1 among the attachments posted on SAM.gov (Atch 1 and Atch 2). Could the Government please post Technical Exhibit 1 or confirm that respondents should base C.4 on the RFI text alone?

Technical Exhibit 1 was not released with this RFI. Respondents should base C.4 on the outcomes described in the RFI and Draft PWS and propose the performance measures, standards, and surveillance methods they recommend.

11 Part I, Section B

Does DHA expect to award this requirement through an existing vehicle (for example, a DHA or other DoW IDIQ, or the GSA Multiple Award Schedule) or as an open-market contract? Is a small business or SDVOSB set-aside under consideration?

These decisions have not been made and will be shaped by market research. Respondents are encouraged to identify the contract vehicles they hold and their socioeconomic status in Attachment 2.

BATDOK FoS RFI Q&A

Part II, Section 3.2, Testing

Part II states that CIT may be performed on site at the Government test lab as required. Where is the PEO METIC test lab, and how often does the Government expect on-site participation? Can the remaining work be performed remotely?

The PAE METIC Lab is in Chantilly, VA. CIT is conducted monthly; JOMIS operates three-week development sprints followed by one week of testing, including any required integration testing. Work outside of on-site CIT and any other Government-directed on-site events may be performed remotely from contractor facilities.

Part II, Current State and Section 3.1

The RFI refers to the current development team without naming

it. Public sources indicate that BAE Systems supports BATDOK development for AFRL, including under the FORGE-IT program.

Who is the current development team, will it be available for knowledge transfer during the transition-in period, and how long does the Government expect transition-in to last? Will AFRL development efforts such as FORGE-IT continue after October 1, 2027, and if so, how will responsibility for the BATDOK baseline be divided between those efforts and the O&S contractor?

The current developer is identified in Q1. Knowledge transfer will be provided through the JOMIS PMO team responsible for managing the current development team, and the Government will provide all artifacts needed for continuity. The length of the transition period has not been determined; respondents are encouraged to recommend a transition approach and duration. The Government does not intend to maintain two developers of BATDOK. This potential solicitation is to develop and sustain the BATDOK SW baselines.

Part II, Section 3.1

Will the following be in Government-owned repositories or accounts and transfer to the incoming contractor: source code with full commit history, build and release pipelines, Apple and Google developer and distribution accounts, code-signing certificates and keys, automated test suites, and the RMF body of evidence for the current ATO?

The Government will provide all source code and technical documentation, including the existing ATO and supporting artifacts, as necessary to develop BATDOK. Details on repositories, pipelines, distribution accounts, and signing credentials will be addressed in transition planning. Respondents should propose the best method to receive and deliver this capability, including any risks they see in transferring these items.

Part I, Section C.7

To support planning and pricing, can the Government share, in the RFI answers or a future solicitation: the technology stack of each component (for example, native Kotlin and Swift or a cross-platform framework), the ATAK versions currently supported, approximate code size, the list of supported medical sensors and device models, the open defect and enhancement backlog, recent release frequency, and the approximate size of the current team?

The Government will consider providing additional information that respondents identify as necessary to plan and price the outcomes; respondents are encouraged to list those items in their response. The JOMIS PMO currently releases the Android software monthly to the Services and is in the early stages of releasing the iOS variant.

Part II, Section 3.1, Development and test hardware

Will any AFRL development and test hardware transfer to the incoming contractor as Government-furnished property, or should respondents assume a complete new inventory? Can the Government share the representative fielded configuration (device models and approximate quantities, Windows systems and supported sensors)?

No. Existing hardware and GFE belong to AFRL and will not transfer to a new developer.

Respondents should assume a new inventory. BATDOK is in the early stages of fielding, and device availability currently limits use across the Services. Current users number fewer than 100 in the Air Force, with Army expansion to more than 25,000 potential users. The JOMIS PMO is currently planning fielding and deployment of its ecosystem following several SW pilots in 2026.

Part II, Section 3.2, Tactical radio and operational network testing

Which tactical radios and operational networks does the Government expect to designate first? Would the Government consider loaning radios as Government-furnished equipment and sponsoring contractor access to Service test facilities and exercises?

The JOMIS PMO does not have radios or tactical radio network access. Respondents should propose how they would develop and test this capability with limited access to devices and networks.

Part I, Sections C.1 and C.5

Does the Government expect any contractor positions to require a security clearance or a specific investigation tier, or a facility clearance at award? Will the development team need access to SIPR or other classified environments?

Not at this time. BATDOK is not a mission system, and the current development team is not required to hold a Secret or higher clearance or access classified environments.

Part I, Section C.4

Section C.4 refers to the draft Performance Requirements Summary in Technical Exhibit 1, which does not appear among the posted attachments. Can the Government post it?

Technical Exhibit 1 was not released with this RFI. Respondents should base C.4 on the outcomes described in the RFI and Draft PWS and propose the performance measures, standards, and surveillance methods they recommend.

Part I, Section C.1 and Attachment 2

Attachment 2 has no columns for the point of contact's phone number, facility clearance level, or anticipated teaming partners and their roles, which Section C.1 requests. Should respondents add columns to the spreadsheet, or address these items in the Word or PDF response? If the latter, will that content count toward the 15-page limit?

Attachment 2 has been accepted "as is" by all who responded.

RFI Section B.1 and C.

Because BATDOK has been developed by AFRL, few firms will hold DoW experience sustaining this specific code base. Will the Government consider relevant commercial or company-funded work (for example, ATAK plug-in development through the TAK.gov third-party pipeline, mesh transport in disconnected environments, and Bluetooth sensor integration) alongside prior DoW contracts? And will the experience of a prime and its subcontractors be considered together as a team?

Yes. Respondents may describe relevant commercial and company-funded work (for example, ATAK plug-in development, mesh transport in disconnected environments, and Bluetooth sensor integration) in addition to DoW contracts. Respondents may also describe the combined experience of a proposed team, provided the role of each team member is identified. The Government is interested in all approaches to successfully transition the development of the BATDOK software.

RFI Section C.3;

Draft PWS paragraph 8

Would the Government consider scoping this capability as a distinct task or line item that a specialized small business could perform as a subcontractor or under a separate award? Can the Government identify the radio families and operational networks it expects to designate, and say whether it would provide radios as GFE or arrange access to Service test facilities and exercises?

The Government has not determined how this capability will be structured and welcomes recommendations, including a separable task or subcontracted workshare. Specific radio families and operational networks have not been designated. The JOMIS PMO does not have radios or tactical network access to provide as GFE (see Q17). Respondents should describe how they would develop and test this capability under those constraints.

Draft PWS paragraphs 4 and

The Draft PWS calls for demonstrations under degraded-network and emissions control scenarios. Will the Government define those emissions control conditions (for example, required transmit-silent periods and store-and-forward behavior when emissions resume) in the future solicitation?

BATDOK must operate in denied, disrupted, intermittent, and limited (DDIL) environments and already includes no-emission data transfer methods, such as QR codes. Emissions control conditions are defined by each Service and its network owners. Respondents should describe how they would design and demonstrate store-and-forward and emissions-control behavior under those constraints.

Draft PWS paragraph 8, New integrations and sensors

Can the Government list the medical sensors and devices, and the Bluetooth or Bluetooth Low Energy profiles, that BATDOK-J supports today?

BATDOK supports more than 30 sensors in developmental environments. These sensors are not fielded and are used for experimentation until the Services procure and field sensors. A list will be provided with technical documentation at a future date. End User Device policies across the Service govern and manage how BATDOK can transmit data within these constraints.

25 Interfaces

Will the Government share the current BAT-TAK interface control documents and message formats (including any Cursor on Target schema) during the one-on-one sessions or with a future solicitation?

The current BATDOK DoDAF and ICD documents are Controlled Unclassified Information (CUI) and will not be released with this RFI or posted publicly with a solicitation. Technical documentation will be provided at a future date.

26 RFI Section C

Will a response that addresses only selected outcomes in depth, such as tactical radio testing, DIL transport and sensor integration, from a prospective subcontractor be included in market research?

Yes. Responses that address selected outcomes in depth will be included in market research. Respondents should identify which outcomes are addressed and their intended role (see Q2).

Teaming and Subcontractor Experience Credit (RFI Section B.1):

Under a small-business set-aside or full-and-open solicitation, will the Government evaluate and credit Section B.1 Capabilities of Interest (such as DoW mobile application sustainment, ATAK plug-in development, tactical radio integration, and DoW RMF/ATO experience) across a prime-subcontractor team or joint venture, and consider commercial automated physical-device test lab experience toward Outcome 3.1/3.2 hardware and regression requirements?

Evaluation criteria have not been developed and will be stated in any future solicitation.

For this RFI, respondents may describe the combined experience of a proposed team or joint venture, provided each member's role is identified (see Q21). Relevant commercial experience, including automated physical-device test labs, may be described and will inform market research.

Draft Performance Requirements Summary — Technical Exhibit 1 (RFI Section C.4):

RFI Section C.4 references a draft Performance Requirements Summary in Technical Exhibit 1, which was not included in Attachment 1 on SAM.gov. Will the Government publish Technical Exhibit 1 with the Q&A responses so respondents can align Section C.4 outcome measures and acceptable quality levels?

See Q10 and Q19.

Separate CLINs and Phased Tactical-Radio Testing (RFI Sections C.3 & C.6):

Would the Government consider structuring (a) the Outcome 3.1 development, test hardware, and medical sensor inventory as a separately priced Government-Owned, Contractor-Held (GFP/CAP) cost-reimbursable line item, and (b) Outcome 3.2 tactical-radio verification as a phased milestone (CI network emulation by the end of transition, followed by live tactical-radio verification at Government-sponsored test events during Year 1)?

The Government is considering all approaches and welcomes both recommendations, including their rationale and the risks they address. Contract structure has not been determined. Respondents should not assume Government-sponsored test events will be available (see Q17).

Authorized Development Enclaves, CUI/CMMC, and AI Coding Assistants (PWS Section 3.2):

Does JOMIS anticipate providing a Government-furnished development and build enclave (or authorizing contractor-hosted environments), what CMMC level and CUI handling requirements will apply at award, and does JOMIS permit the use of AI-assisted software engineering and automated test-generation tools inside an authorized enclave when all changes undergo human engineer review prior to merge?

Whether development and build environments will be Government-furnished or contractor-hosted has not been determined; respondents should recommend an approach. CUI handling and CMMC requirements will be stated in any future solicitation (see Q3). For AI-assisted tools, see Q69.

Baseline Workload Metrics for Pricing and Teaming (RFI Section C.7 & D):

With any future draft RFP, will the Government provide baseline sizing metrics (lines of code, build toolchains, supported device/medical-sensor models, historical release frequency, open defect backlog, and monthly Tier 3 ticket volume), and will JOMIS publish an interested-vendors list or host an Industry Day to facilitate prime-subcontractor teaming?

The Government will consider providing sizing metrics with a future solicitation (see Q15);

respondents are encouraged to list the metrics that matter most to their pricing. There are no plans for an interested-vendors list or Industry Day at this time (see Q4).

Section B.1 states that DoW mobile application experience is essential. For purposes of identifying sources and the small business set-aside determination, will the Government also consider relevant Android and iOS application experience from non-DoW federal civilian or commercial customers?

Yes. Respondents may describe relevant non-DoW federal and commercial Android and iOS experience, and it will be considered in market research. Respondents should clearly distinguish DoW experience from other experience.

Please identify the languages, frameworks and build tooling used for BATDOK-J (Android and iOS), BATDOK Link and BAT-TAK (for example, native or cross-platform), and the ATAK release or releases that BAT-TAK currently targets.

See Q5. Technical details will be provided with technical documentation at a future date.

Respondents should describe their experience across native and cross-platform development and multiple ATAK releases.

Who currently holds the Apple Developer and Google Play accounts, code-signing keys and distribution arrangements for BATDOK-J, and will these transfer to the Government or to the incoming contractor?

Signing credentials and distribution arrangements will be addressed in transition planning (see Q14). The JOMIS PMO releases BATDOK to the Services (see Q15).

Will the Government make the source repositories, Interface Control Documents and current SIG, SAM and SUM available to respondents before a solicitation, or only after award during transition-in?

See Q117. These documents are CUI (see Q25).

Please provide the list of devices (models and quantities) and medical sensors that AFRL currently uses for BATDOK development and test, and state whether any of that inventory is expected to transfer to the incoming contractor.

AFRL's inventory will not transfer (see Q16). The supported sensor list will be provided with technical documentation at a future date (see Q24).

Which tactical radios and operational networks does the Government expect the contractor to test against, and will Government or Service test facilities and exercises be made available for that testing?

Specific radios and networks have not been designated, and the JOMIS PMO does not have radios or tactical network access (see Q17). Respondents should not assume access to Service test facilities or exercises, and should propose how they would develop and test this capability under those constraints.

What is the current ATO status for the BATDOK FoS (authorization boundary, expiration date and the entity that holds it), and is the incoming contractor expected to inherit it?

BATDOK operates under an existing ATO. The authorization boundary, status, and supporting artifacts will be provided as Government-furnished information (see Q14). The incoming contractor will support maintaining the authorization.

Does the Government anticipate any key personnel or positions requiring security clearances, or a facility clearance for the prime contractor?

No, not at this time. See Q18.

Does the Government expect a single prime contractor, and will it consider responses that describe subcontract teaming arrangements?

The Government does not intend to maintain two developers of the BATDOK baseline (see Q13). Responses describing teaming arrangements are welcome; respondents should identify each team member's role.

Atch 1, RFI BATDOK FoS Part I, C.4 Measuring Success

C.4 refers to the draft Performance Requirements Summary in Technical Exhibit 1, which is not posted with the RFI. Would the Government provide Technical Exhibit 1?

Technical Exhibit 1 was not released with this RFI. Respondents should base C.4 on the outcomes described in the RFI and Draft PWS and propose the performance measures, standards, and surveillance methods they recommend.

Atch 2, CompanyInfo Company Information tab; Atch 1 Part I, C.1

C.1 asks for POC phone, facility clearance level and teaming partners, which Atch 2 has no columns for. Should respondents add those columns to Atch 2 or give them in the Word response?

See Q20.

Atch 1, RFI BATDOK FoS Part II, Background, Current State

Is there an incumbent contract number for this requirement, and would the Government share it? See Q1.

Code signing and distribution.

Are the Apple and Google developer accounts, code-signing certificates and distribution arrangements for the BATDOK FoS held by the Air Force Research Laboratory (AFRL), the current development team or the Government, and will they transfer to Government ownership before transition-in?

See Q34.

45 Authorization.

Is the BATDOK FoS authorized as a single authorization boundary or per component (BATDOK-J, BATDOK Link, BAT-TAK)? Is it on a continuous Authority to Operate (ATO) path, and will the current Risk Management Framework (RMF) body of evidence and plan of action and milestones be provided as Government-furnished information at transition?

See Q38. The RMF body of evidence, including POA&M, will be provided as Government-furnished information. Respondents may recommend an approach to continuous authorization.

Service device baselines and enclaves.

Because each Military Service fields the BATDOK FoS on its own devices with its own device management, will the Government provide the Services' device security baselines and mobile device management configurations, and identify the enclaves and transports (for example, commercial cellular, Wi-Fi and tactical radio) the applications must operate within, so that the development and test inventory and the ATO reflect the fielded configuration?

Device baselines and MDM configurations are owned by each Service. The Government will coordinate access to applicable baselines as they are available. BATDOK is expected to operate across the transports available to each Service, as well as offline and no-emission methods (see Q23).

Build environment.

Which Government-provided or Government-approved environment will host the automated build and release tooling, and does it support iOS builds, which require macOS build hosts?

See Q30. Respondents should address iOS build hosting in their recommended approach.

Current development team.

Is the BATDOK FoS currently developed by AFRL personnel or by a contractor, and will the current team be available for a transition overlap? If so, for how long?

BATDOK is developed by AFRL with contractor support (see Q1). Knowledge transfer will be provided through the JOMIS PMO, and the transition period has not been determined (see Q13).

Tactical radios and test facilities.

Which tactical radios, waveforms and operational networks does the Government expect to designate for testing? Can the Government provide their link characteristics (for example, data rate, latency, loss and duty cycle) so that the contractor can emulate them in automated testing, and will Service or Government test facilities and exercises be made available through the Government for confirmation on the radios themselves?

See Q37. Respondents should state the link characteristics they would emulate and how they would validate those assumptions.

50 Workload.

To inform staffing and the optional rough order of magnitude (ROM) cost, can the Government share the current release frequency, the size of the open defect and enhancement backlog, the number of supported medical sensor models, and the approximate user population?

See Q15 (release frequency), Q24 (sensors), and Q16 (user population). Backlog data will be considered for a future solicitation (see Q31).

Company information sheet.

Attachment 2 has no columns for the point of contact's phone number, facility clearance or teaming partners, which Section C.1 requests. Should respondents add columns to the sheet, or provide that information in the narrative?

The Government is revising Attachment 2 to add these columns, and the revised version will be posted on SAM.gov. Respondents should provide this information in the revised Attachment 2; content in Attachment 2 does not count toward the 15-page limit.

Please provide the fielded device matrix by Service (device models, OS versions and MDM in use) so respondents can size the development and test inventory to the fielded configuration.

Fielding is in early stages, and device configurations vary by Service (see Q16). The Government will consider providing representative device information with technical documentation at a future date.

Please list the medical sensors and devices BATDOK supports today, with model numbers, and state whether any must be bought through a specific medical channel.

See Q24. Procurement channels for sensors will be addressed with the sensor list.

Which tactical radios, waveforms and networks does the Government expect to designate for BATDOK testing in the first two years (for example, specific handheld and manpack radios, MANET radios, the TAK network and NGC2)?

See Q37.

Will the Government furnish Type 1 radios, COMSEC keying material and access to Service test facilities or exercises, or should respondents plan on contractor-owned equipment and emulation as the baseline?

Respondents should plan on contractor-provided equipment and emulation as the baseline. The JOMIS PMO does not have radios, COMSEC material, or tactical network access to provide (see Q17).

Does the Government intend to take title to the development and test hardware as Contractor-acquired property, or should respondents plan on contractor-owned hardware?

This has not been determined. Respondents should recommend an approach and describe the cost and transition implications of each option (see Q9).

Will any AFRL-provided development and test hardware be transferred to the incoming contractor at transition?

No. See Q16.

Can the referenced Technical Exhibit 1 (draft Performance Requirements Summary) be posted on sam.gov?

Technical Exhibit 1 was not released with this RFI. Respondents should base C.4 on the outcomes described in the RFI and Draft PWS and propose the performance measures, standards, and surveillance methods they recommend.

What personnel security clearance levels and Facility Clearance Level (FCL) will be required for contractor personnel performing tactical radio testing, operational network validation, or integrations with C2 systems (e.g., NGC2, MEDIBRIDGE)?

Additionally, will any testing require access to SIPRNet, or require contractors to maintain COMSEC account handling, Type 1 keying, and approved secure/closed storage facilities at contractor test sites?

No clearances, facility clearance, or SIPRNet access are anticipated at this time (see Q18).

The Government does not furnish COMSEC material (see Q55). If a specific integration requires otherwise, it will be stated in any future solicitation.

Regarding the requirement for the Contractor to establish the development and test hardware inventory (PWS 3.1): Does the Government anticipate providing a dedicated Cost-Reimbursable or Other Direct Costs (ODC) CLIN for Contractor-Acquired Property (CAP), or does it expect offerors to absorb/capitalize hardware outlays within fully burdened labor rates? Additionally, can the Government provide a baseline Bill of Materials (BOM) or hardware inventory in the forthcoming solicitation?

See Q56. The Government will consider providing representative hardware information with a future solicitation (see Q15). Respondents may propose a representative inventory.

Will the Government provide the current baselines of the Software Installation Guide (SIG), System Administration Manual (SAM), and Software User Manual (SUM) as Government Furnished Information (GFI) either during the RFI process (in a technical library) or with the formal RFP release to assist in scoping sustainment and Tier 3 requirements?

The Government will provide all source code and technical documentation, including the existing ATO and supporting artifacts, as necessary to develop BATDOK. Details on repositories, pipelines, distribution accounts, and signing credentials will be addressed in transition planning. The current BATDOK DoDAF and ICD documents are Controlled Unclassified Information (CUI) and will not be released with this RFI or posted publicly with a solicitation.

As Military Services adopt and field new EUDs, tablets, operating system versions, and medical sensors across the 5-year period of performance, will the Government fund ongoing hardware refreshes and lab inventory expansions via a separate, incrementally funded Tech Refresh / Material CLIN?

This has not been determined. Respondents should recommend how to keep the development and test inventory aligned with Service fielding over the period of performance.

Given commercial and defense OEM lead times for Type 1 tactical radios (such as L3Harris or Thales) that frequently exceed 9 to 12 months, will the Government provide these radios as Government Furnished Equipment (GFE) at transition to prevent lead-time constraints from creating barriers to fair competition and risking transition milestones?

See Q55. Respondents should describe how their approach accounts for equipment lead times.

What specific transition artifacts and timelines will the Government mandate from the incumbent developer (AFRL / BAE Systems)? Specifically, will the Government furnish working CI/CD pipeline definitions, automated test suites/scripts, build containers, and historical defect backlogs prior to the conclusion of the 90-day transition period?

The Government will provide source code, technical documentation, and ATO artifacts necessary to develop BATDOK (see Q14). The specific artifacts and their timing will be defined in the transition plan, which this market research will inform. Respondents should list the artifacts they consider essential and when they need them.

Does the Government or the respective Military Services manage the mobile application code-signing certificates and distribution portals (e.g., MilAppStore, Service MAM/MDM enterprise app catalogs), or will the Contractor be responsible for establishing and maintaining independent signing and distribution infrastructure?

The contractor will deliver releases to the JOMIS PMO, and the Government releases them to the Services for distribution through their own device management. The Government does not anticipate the contractor establishing independent distribution.

Signing arrangements will be addressed in transition planning (see Q34).

Is the current BATDOK-J codebase built on a cross-platform framework (e.g., Flutter, React Native), or is it maintained as separate native codebases (Kotlin/Java for Android and Swift/Objective-C for iOS)? See Q5 and Q33. For workload data, see Q15.

For multi-vendor Contractor Integration Testing (CIT) conducted at the PEO METIC test lab or with JOMIS test endpoints (e.g., MedIX, MHSG-T stubs), will remote VPN/tunnel access be available to contractor facilities (such as iGov's integration lab in Tampa, FL), or is physical presence on-site at the Government test lab required for each Sprint and Program Increment?

Remote access to the lab is limited due to .MIL restrictions (see Q7). CIT is held on site monthly, after every sprint (see Q12).

Can you provide a list of controls or other conditions required by DoW to obtain and sustain an ATO for the BAKDOK program?

BATDOK follows the DoW Risk Management Framework. The applicable controls are documented in the ATO artifacts, which are CUI and will be provided as Government-furnished information (see Q38).

Would any level of AI-assisted code generation, code review, test generation or documentation generation be approved for BATDOK development and sustainment, if executed in an environment approved for CUI or higher levels of controlled data, and if implemented with a rigorous and documented human-review component?

The Government has not established a position for this effort. Any use will be subject to DoW and DHA policy in effect at award. Respondents may describe proposed tools, the environment they would run in, and their human-review controls.

Regarding integrations: a) of the listed sensors and systems to integrate (PWS Section 8) can the Government list out which are currently integrated and require sustainment, vs which would be new integrations, and b) Is there a defined timeline for everything listed as a new integration (phased by year, all up front in base year, etc.)

Integration status will be provided with technical documentation (see Q24). New integrations will be prioritized by the Government through JOMIS increment planning based on Service requirements; there is no fixed timeline. Respondents should describe how they would plan and absorb new integrations over the period of performance.

Will the Government consider an extension through 11/27 to address feedback received from Q&A?

Yes

We noted that the RFI requests industry input on the Draft Performance Work Statement (PWS); however, only Attachments 1 and 2 are currently available on SAM.gov. Could you please provide a copy of the Draft PWS or clarify if specific vetting procedures are required to access it?

The Draft PWS is Part II of Attachment 1. No separate access procedure is required.

Code base profile.

To support sizing and the optional rough order of magnitude (ROM) estimate, can the Government share a high-level profile of the Battlefield Assisted Trauma Distributed Observation Kit (BATDOK) Family of Systems (FoS)? Specifically: primary languages and frameworks for BATDOK-J on Android and iOS (for example native Kotlin/Swift or a shared cross-platform layer), approximate code size per component, supported Android Team Awareness Kit (ATAK) versions for BAT-TAK, and the number of open defects?

Technical details of each component will be provided with technical documentation at a future date. The Government intends to provide source code, build scripts, and available test suites as Government-furnished information; timing will be set in the transition plan.

Respondents should describe their experience with native and cross-platform mobile development, Windows applications, and ATAK plug-ins, and recommend what access they need at transition start.

Current team and cadence.

What is the approximate size of the current Air Force Research Laboratory (AFRL) development team, and how many releases per year does each component currently ship?

See Q15. Team size is not released as part of this RFI; respondents should propose staffing based on the outcomes.

Distribution and signing.

Who holds the Apple and Google developer, enterprise distribution and code-signing accounts for BATDOK-J, and does the Government intend to transfer those accounts to Government ownership before transition-in?

See Q34.

76 Hardware.

Will any AFRL development and test hardware, including medical sensors, be transferred or loaned during transition? Can the Government provide the list of currently supported medical sensors and devices?

No. See Q16 and Q24.

Tactical radios and networks.

Which tactical radios and operational networks does the Government expect to designate for testing (for example, specific mobile ad hoc network (MANET) radios or TAK Server configurations)? Is Government-facilitated access to Service test events or Joint Interoperability Test Command (JITC) facilities anticipated?

See Q37.

Authority to Operate (ATO).

What is the current ATO status and authorization boundary for each BATDOK FoS component, and will the Risk Management Framework (RMF) body of evidence be provided at transition?

See Q38 and Q45.

Acquisition approach.

Is the Government considering a small business set-aside, and would teaming arrangements (for example, an SBA Mentor- Protégé joint venture) be considered for this requirement?

See Q11. Respondents may describe any teaming arrangement, including joint ventures, and should note it in Attachment 2.

80 Page limit.

Does the 15-page limit include tables, such as the Section B.1 capability-by-role matrix requested in C.2?

Yes. Tables and graphics count toward the 15-page limit. Attachment 2 does not (see Q20).

81 Current developer and vehicle:

Is the BATDOK FoS currently developed and sustained under a contract or task order you can identify (contract number, vehicle, and period of performance), and will the incumbent remain available to support transition?

See Q1 and Q13.

82 Scale of effort

Can the Government share the approximate current annual level of effort or funding for BATDOK FoS development and sustainment, and the approximate size of the user base, so respondents can size the staffing and ROM requested in C.5 and C.6?

Funding and level of effort are not released as part of this RFI (see Q92). For the user base, see Q16. Respondents should state the assumptions behind their staffing and ROM.

Acquisition strategy:

Is the Government considering a small business set-aside, and is there a preferred vehicle (e.g., GSA MAS, a DHA or DoW IDIQ, or a stand-alone award)?

See Q11.

Teaming and experience:

For the "DoW mobile application experience is considered essential" statement in B.1, will the Government consider experience held by a teaming partner or joint venture member, as opposed to the prime alone?

See Q27.

Code base and pipeline:

Is the current source code, CI/CD pipeline, and test automation Government-owned and hosted in a Government environment (and if so, which), or will these transfer from the current developer at transition?

The Government will provide all source code and technical documentation (see Q14). Post-transition hosting has not been determined; respondents may recommend an approach (see Q30).

86 ATO:

Does the BATDOK FoS currently hold an ATO under RMF, and which organization is the authorizing official? Will the contractor be expected to own ATO package maintenance, or support a Government-led process?

See Q38. The Government anticipates the contractor will support a Government-led RMF process by producing and maintaining required artifacts, scans, and remediation. Final responsibilities will be stated in any future solicitation.

87 Security:

Are any personnel security clearances or a facility clearance anticipated for the O&S effort, or is the requirement unclassified at the Public Trust level?

See Q18 and Q3.

88 Code base.

For each component (BATDOK-J Android, BATDOK-J iOS, BATDOK Link, BAT-TAK), what are the primary languages and frameworks (for example native Kotlin and Swift, or a cross-platform framework), the approximate size, and the build system?

Devices and sensors.

Can the Government share the device models and medical sensors BATDOK currently supports, and the quantities AFRL uses for development and test?

See Q16 and Q24.

Transition support.

Is the current development team expected to remain available to support transition-in, and for how long? Could AFRL's development and test hardware be loaned during transition?

See Q13 and Q16.

91 Clearances.

Does the Government expect any position or activity, such as testing over tactical radios at Service exercises, to require a personnel or facility clearance? See Q59.

92 Could you let us know what the budget is for this work?

The Government does not release budget information as part of this RFI. Respondents are encouraged to provide the optional rough order of magnitude (ROM) requested in the RFI.

Could you let us know if you have a local preference or are you open to a Canadian agency that has done similar work with clients across the United States, with some currently being the States of California, Hawaii, Michigan, Virginia, Colorado and Wyoming?

There is no local preference within the United States. Work will involve CUI and access to DoW systems, and the Government anticipates it will be performed in the United States by personnel who meet DoW access requirements (see Q3). Foreign firms may respond and should describe how they would meet those requirements, including any export control or U.S.-person considerations.

94 Teaming (C.2).

C.2 asks whether "your company" has performed each Capability of Interest. May a respondent cite the experience of a named teaming partner or subcontractor for a capability, and will the Government count it in its market research?

Yes. Respondents may cite a named teaming partner's or subcontractor's experience, provided it is clearly attributed to that partner. See Q27.

Technology stack

What languages and frameworks are BATDOK-J (Android and iOS), BATDOK Link and BAT-TAK written in? Do the Android and iOS apps share a code base, or are they separate native code bases?

Technical details of each component will be provided with technical documentation at a future date. The Government intends to provide source code, build scripts, and available test suites as Government-furnished information; timing will be set in the transition plan.

Respondents should describe their experience with native and cross-platform mobile development, Windows applications, and ATAK plug-ins, and recommend what access they need at transition start.

Security clearances (C.1, C.5).

Does the Government expect to require a facility clearance or cleared personnel for this work? If so, at what level and for which functions?

See Q18 and Q3.

Tactical radios and networks (Outcome 3.2).

Which tactical radios and operational networks does the Government expect to designate for testing? Will the Government sponsor contractor access to Service test facilities or exercises, or provide any radios as Government-furnished equipment?

See Q37.

Transition (Outcome 3.1).

Will the current AFRL development team be available to the incoming contractor during transition-in, and for how long? Do automated test suites and current build documentation exist for all three components?

See Q13. Available test suites and build documentation will be provided as Government-furnished information (see Q5 and Q14).

Work location (C.5, Testing).

Where is the PEO METIC test lab, and how often does the Government expect contractor staff on site for Contractor Integration Testing?

See Q12.

This vendorwould like to request a one-week extension to 25 Nov 2026 for the Battlefield Assisted Trauma Distributed Observation Kit (BATDOK) Family of Systems (FoS) Operations and Sustainment (O&S) Request for Information (RFI).

See Q71.

Does the government anticipate making multiple awards for covering different specialized capabilities of interest? Or does the government anticipate a single awardee (or team) covering all of the capabilities

No acquisition approach has been selected. Respondents may recommend any approach, including existing vehicles, CSOs, or OTAs, and explain why it fits this requirement (see Q11).

Is the Government considering an existing contract vehicle, such as GSA MAS, or alternative acquisition approaches such as a Commercial Solutions Opening (CSO) or Other Transaction Authority (OTA)?

No acquisition approach has been selected. Respondents may recommend any approach, including existing vehicles, CSOs, or OTAs, and explain why it fits this requirement (see Q11).

What programming languages, frameworks, and development tools are currently used across the three BATDOK applications?

See Q5. Technical details will be provided with technical documentation at a future date.

Respondents should describe their experience across native and cross-platform development and multiple ATAK releases.

What development environments, CI/CD pipelines, and testing infrastructure will the Government provide to the incoming contractor?

See Q30. The Government provides the PAE METIC Lab for CIT (see Q7).

Which medical sensors and devices are currently integrated with BATDOK, and what additional integrations are anticipated?

See Q24 and Q70.

Which specific tactical radios and networks are currently supported by BATDOK, and which additional integrations are anticipated? See Q37.

Does the Government anticipate requiring contractor personnel to work on-site regularly, or will remote performance be permitted outside of scheduled testing and integration activities?

Remote performance is permitted outside of on-site CIT and other Government-directed events. See Q12.

C.3 / Development and Test Hardware; PWS 3.1 Development and Test Hardware

Who holds the code-signing certificates and app distribution or MDM accounts today, and will they transfer during transition?

Signing credentials and distribution arrangements will be addressed in transition planning (see Q14). The JOMIS PMO releases BATDOK to the Services (see Q15).

PWS Outcome

3.1 Seamless

Transition

What is the current ATO status and expiration, and how large is the open defect and vulnerability backlog?

See Q38 and Q31.

PWS

Sustainment and Enhancement / Code Maintenance

Is iTAK (iOS) integration in scope, or only ATAK? How many ATAK versions must be supported at once?

The current plug-in, BAT-TAK, supports ATAK. With iOS use expanding (see Q16), the Government welcomes recommendations on iTAK support. The ATAK versions to be supported will depend on Service fielding; respondents should describe how they would support multiple versions at once.

PWS Code Maintenance;

Current State

BAT-TAK

Will the Government provide repositories, build environments, documentation, open defects, dependencies, release procedures, and technical debt inventories as Government-furnished information? See Q30.

PWS Outcome

3.1 Seamless

Transition

To establish a current baseline understanding, can the Government provide the current technical and operational baseline for BATDOK FoS, including historical defect volumes, backlog size, support ticket volumes, sprint velocity, release metrics for the last three years, and an inventory of interfaces, ICDs, external dependencies, supported devices, sensors, operating systems, and test assets?

See Q31 and Q117.

C.3 Sustainment and Enhancement;

C.4 Measuring Success; New Integrations and

Which Government repositories, ALM tools, scanning tools, and CI/CD platforms will be provided?

See Q30.

PWS

Cybersecurity and Efficient Delivery

Access to Government facilities and exercises may significantly reduce proposed infrastructure costs . Will Government-sponsored exercises and test facilities be available to support tactical network validation or should the contractor price this into their response?

Respondents should include their testing approach in their pricing.