This is a Statement of Work (SOW) for the design, procurement, and installation of one T-shaped floating dock system at Bass Lake, Wright Patterson Air Force Base, Ohio, prepared by 88 FSS/FSW with a completion deadline of 30 June 2026.

The contractor must design and install a floating dock meeting specific dimensional and accessibility requirements: minimum 5' wide by 10' long with a 5' wide by 20' long walkway in a T-shaped configuration. The dock shall feature an aluminum/plastic frame with non-slip, handicap-accessible surfaces and include eight cleats for securing watercraft, plus an integrated canoe/kayak launch and rollup mechanism. The floating dock system must accommodate a minimum load capacity of 8-10 individuals and 6 kayaks or canoes. Critical to the design is a post-anchoring floatation system that allows vertical adjustment of up to 4 feet while maintaining minimal lateral movement (no more than 3 inches) as water levels fluctuate. The dock structure shall utilize marine-grade materials including aluminum, treated wood, composite decking, or fiberglass, all resistant to corrosion and UV degradation. The contractor must comply with local building codes and ADA accessibility standards, obtain all required permits, and provide design plans and a floatation system report to the Contracting Officer within 30 days of contract award. Installation shall occur at Bass Lake with specific placement to be determined post-award based on water depth. The performance period shall not exceed 60 days from contract award, and the contractor must provide a 10-year warranty on all dock and gangway materials. The contractor must demonstrate prior experience in floating dock design and installation, marine construction, and ADA compliance.

View the file

Other files

File Type Posted
ATTACHMENT 1 - Instructions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Floating Dock Project at Bass Lake

Wright Patterson Air Force Base, Ohio

30 June 2026

PREPARED BY:

88 FSS/FSW

Project Title: Installation of one (1) T-Shaped Floating Dock At Bass Lake WPAFB

1. Scope of Work:

The scope of this project is to design, procure, and install one (1) floating dock in a lake providing a safe, stable, and accessible structure for tying up and launching canoes, kayaks, and other self-propelled watercraft. The dock shall be handicap accessible, allow customers to safely enter and exit their watercraft, and watercraft shall be able to be tied off using a system of cleats, when not actively being used. The dock shall be able to adjust as water levels rise and fall, maintaining stable and safe use.

2. Minimum Requirements

At a minimum, the contractor shall meet or exceed all of the following requirements:

2.1. Dimensions and Design

2.1.1. The dock shall be designed in a T-shape. Dock shall be at a minimum 5’ wide by 10’ long with a minimum 5’ wide by 20’ long walkway.

2.1.2. The dock shall have an aluminum/plastic frame and all surfaces that will be walked on shall be non-slip and handicap friendly.

2.1.3. Deck shall be installed using a post anchoring system that adjusts up and down for water level that can increase up to 4 ft and decrease by 4 ft. There shall be minimal lateral (no more than 3 inches) movement allowing the structure to remain secure to the anchor.

2.2. Watercraft Accessibility

2.2.1. The dock shall allow customers to enter and exit watercraft safely, with a design that minimizes the risk of tripping or falling.

2.2.2. The dock shall include 8 cleats for securely attaching canoes, kayaks, and similar vessels.

2.2.3. The dock shall have a canoe/kayak launch and roll up built into the side of the dock.

2.3. Floatation Mechanism

2.3.1. The dock shall be equipped with a floatation system that allows the dock to remain stable and functional as water levels rise and fall.

2.3.2. The floatation system shall be designed to maintain the dock’s stability and accessibility even at varying water depths, particularly during times of high-water levels (e.g., flood or seasonal changes).

2.3.3. Dock shall have zero to minimal lateral movement (no more than 3 inches).

2.4. Anchoring system and Structural Support

2.4.1. To ensure the dock can adjust to increasing/decreasing water levels, piers or anchors will be set into the bottom of the pond or in the anchor blocks that will be installed on the bank to maintain the floatation and stability of the dock as water levels change.

2.4.2. Piers shall be installed in such a manner that they do not impede the flow of water or disrupt the environment and will be manufactured from material that is commonly used in marine environments.

2.5. Material Specifications

2.5.1. The dock structure shall be constructed using materials suitable for light commercial marine environments. These materials shall be resistant to corrosion, UV degradation, and other environmental factors typical of pond or lakefront settings.

2.5.2. Suitable materials include, but are not limited to, aluminum, treated wood, composite decking, marine-grade plastics, or fiberglass. The contractor will specify the exact materials to be used, ensuring they meet durability and safety standards.

2.5.2.1. If using metal material, material shall be no slip.

2.6. Accessibility Features

2.6.1. The dock shall incorporate features that ensure easy access for people with disabilities, including, but not limited to, a gentle slope, non-slip surfaces, and appropriate handrails or grab bars as well as canoe or kayak stabilizers.

2.6.2. The entry/exit area for watercraft shall have a stable and smooth transition to allow users to board and disembark from their canoes or kayaks safely.

2.7. Load Capacity

2.7.1. The floating dock system shall be designed to support a minimum load capacity suitable for 8-10 individuals, as well as 6 kayaks or canoes. The load capacity shall be sufficient for the dock to function under normal usage conditions without compromising its structural integrity.

2.8. Clean up

2.8.1. Work area shall be kept clean of debris, at the end of workday area shall be clean.

2.8.2. All debris, including scrap material shall be disposed of at an off-base facility by the Contractor.

2.9. Place of Performance

2.9.1. Floating dock system shall be delivered to and installed at:

Bass Lake Wright Patterson AFB, OH 45433

2.9.2. Specific placement of dock and piers will be agreed upon by the Government following contract award, water depth will need to be taken into consideration.

2.10. Period of Performance

2.10.1. Period of performance shall be completed no later than 60 days from contract award.

2.11. Warranty

2.11.1. 10-year warranty on all dock and gangway materials.

3. Deliverables

3.1. The following shall be delivered via electronic email or usb flash drive to the

Contracting Officer no later than 30 days after the contract award:

3.1.1. Design plans of the floating dock, including dimensions, materials, and accessibility features.

3.1.2. A written report outlining the floatation system and how it will maintain stability at varying water depths.

4. Requirements and Standards

4.1. The floating dock shall comply with local building codes and Americans with

Disabilities Act (ADA) accessibility standards (or equivalent, where applicable).

4.2. The Contractor shall be responsible for obtaining any necessary permits or approvals required for construction in the lake area.

All materials used in the construction of the dock shall be suitable for marine environments and must be able to withstand the expected local weather and water conditions.

5. Contractor Qualifications

5.1. The contractor shall demonstrate experience in designing and installing floating dock systems and shall demonstrate familiarity with marine construction and ADA accessibility requirements. Relevant certifications or licensing for marine construction shall be provided upon request.

6. Acceptance Criteria

6.1. The project will be considered complete when:

6.1.1. The floating dock is installed and properly anchored.

6.1.2. The dock meets the specifications outlined above.

6.1.3. The dock is stable and accessible, allowing users to safely enter and exit watercraft.

6.1.4. The dock is functional across varying water levels and conditions.