Base Offer Price Breakdown - 1 page.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24825R0116
About this file
The document is a Base Offer Price Breakdown template for a VA construction project at James A. Haley VA Hospital in Tampa, FL. The excel spreadsheet provides a detailed cost breakdown template organized by 34 construction divisions, allowing offerors to input labor and material costs for each division. The template includes sections for calculating overhead, profit, and bond percentages, with a final total base offer cost calculation.
This price breakdown corresponds to Solicitation Number 36C24825R0116 for a sanitary riser upgrade project (Project 673-21-154) valued between $1-2 million. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with proposals due by 07/21/2025. Key requirements include a site visit on 06/27/2025, submission of a payment and performance bond, compliance with Davis-Bacon wages, and demonstration of past performance in healthcare construction environments. Offerors must show at least 15% of contract costs will be performed by their own employees, and must have an Experience Modification Rate (EMR) not exceeding 1.0.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_BB Sanitary Riser-Responses.docx | DOCX document | |
| 36C24825R0116 0002.docx | DOCX document | |
| 36C24825R0116 0001.docx | DOCX document | |
| 673-21-154-Bid-CD Drawings_Stamped-TMM2211.pdf | ||
| 36C24825R0116_1.docx | DOCX document | |
| Past Performance Questionnaire - 4 Pages.docx | DOCX document | |
| WD FL20250208 05232025.pdf | ||
| 7b Vol2 Specifications.pdf | ||
| 7a Vol1 Specifications.pdf | ||
| EMR 1 page.pdf | ||
| 7 Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | - 0 | |
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | - 0 | |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .