RFI_BB Sanitary Riser-Responses.docx

DOCX document 141 KB Posted

Attached to
Y1DA--FY25: NRM (PROJ: 673-21-154) BB Upgrade Building One Sanitary Riser
Solicitation number
36C24825R0116
Issued by

About this file

This document is a Request for Information (RFI) for the VA's Building One Sanitary Riser Upgrade project at James A. Haley VA Hospital in Tampa, Florida. The RFI contains 81 detailed questions and answers covering various aspects of the project, including construction requirements, safety protocols, asbestos abatement, electrical and plumbing specifications, work scheduling, and administrative details. Key clarifications include confirmation of work hours flexibility, acceptance of second shift work, use of Procore for project documentation, and specific guidelines for asbestos removal with a $100,000 allocated allowance.

The associated federal contract opportunity is a solicitation (36C24825R0116) for a Bid Build Upgrade of Building One Sanitary Riser, with a project value between $1,000,000 and $2,000,000. The project is 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with proposals due by 07/21/2025. The VA seeks a contractor to replace and upgrade the existing Sanitary Riser #5 in building one, with evaluation criteria focused on past performance, technical approach, and project experience, where technical factors are significantly more important than price. The contract will be awarded using a best value tradeoff approach.

View the file

Other files

File Type Posted
36C24825R0116 0002.docx DOCX document
36C24825R0116 0001.docx DOCX document
673-21-154-Bid-CD Drawings_Stamped-TMM2211.pdf PDF
36C24825R0116_1.docx DOCX document
Past Performance Questionnaire - 4 Pages.docx DOCX document
WD FL20250208 05232025.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
7b Vol2 Specifications.pdf PDF
7a Vol1 Specifications.pdf PDF
EMR 1 page.pdf PDF
7 Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER: 673-21-154; BID BUILD UPGRADE BUILDING ONE SANITARY RISER

1
Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
KEE
07/07/25
VA Response
Yes
2
If no to the question above, will the SSHO need to be full-time for this project?
KEE
07/07/25
VA Response
N/A
3
The adjacent areas are going to be active with Gov't Staff, is there any recommendation that the GC should keep in mind during pricing for the duration of the project?
KEE
07/07/25
VA Response
Recommend working the second shift
4
Will the Gov't provide the proper badging to the GC & subcontractors or as long as they have a chaperone with an approved ID badge will be okay?
KEE
07/07/25
VA Response
Badging GC only.
5
The project's SOW states that the working hours would be regular hours. Can this work be performed during not regular hours (afterhours, nighttime or weekends)?
KEE
07/07/25
VA Response
Yes
6
Would the VA be okay to use Procore as a project record system for all project documents (Submittals, RFIs, daily reports, Correspondence, etc.)
KEE
07/07/25
VA Response
Yes
7
What would be the hours that the contractor can do noise, such as demolition and other tasks, since there is a lot of activity around the work area.
KEE
07/07/25
VA Response
Coordination during the project’s progress and specific areas.
8
Is there any other on-going contract/project active in project's area or surrounding areas? Is there going to require coordination anyone (if required)?
KEE
07/07/25
VA Response
No
9
Phasing Requirements: Phasing will be refined with the VA. Please clarify the expected number of phases and if any areas will remain occupied during work.
KEE
07/07/25
VA Response
A/E recommends in the 6-phase see drawing PH101 to PH209, but VA doesn’t decide the meet and method GC uses.
10
Existing Asbestos: SOW mentions known areas of asbestos—please confirm if abatement is part of the contractor's scope or will be handled separately by the VA, if it is going to be handle by the GC, how we should quantify it, for quoting purposes, with the acknowledgment that once work commences, whatever quantity was estimated, can be less or more.
KEE
07/07/25
VA Response
The abatement for this project is intended to focus on surgical scrape abatement as necessary. If a significant decision is required for removing a large area, it will need to occur during the demolition phase, as specs 02 82 13.13. According to the specifications, please provide a unit price for each type of abatement material. Additionally, we request that you allocate an allowance of $100,000 for asbestos removal.
TCS
07/11/25
11
Bypass Pumping Plan: Is the contractor required to submit a bypass plan for approval prior to tie-ins? Are there specific VA standards for acceptable temporary waste routing?
KEE
07/07/25
VA Response
Yes, the contractor is to provide a pumping plan.
CN
7/11/25
12
Conduit Support Responsibility: For electrical rooms, is contractor responsible for designing and providing temporary conduit supports during riser replacement?
KEE
07/07/25
VA Response
Yes
13
Ceiling Material Reuse: If acoustical ceiling tiles are removed and not reusable, should contractor include replacement in pricing?
KEE
07/07/25
VA Response
Yes
TCS
14
Site Restoration Requirements: For exterior sewer replacement and paving, are there specific FDOT finish standards to comply with?
KEE
07/07/25
VA Response
Broom finish per FDOT Section 522-7.2
CG
07/11/25
15
Fixture Reinstallation: Are any plumbing fixtures to be upgraded or are all to be reinstalled as-is?
KEE
07/07/25
VA Response
Replace fixtures as shown on contract drawings.
CN
7/11/25
16
ADA Plumbing Requirements: Are all bathrooms where work is occurring required to meet current ADA compliance for all fixtures and clearances?
KEE
07/07/25
VA Response
As shown on the contract documents, 3rd floor – yes, 4th floor – yes, 5th floor – to remain as is, 6th floor – yes
TCS
07/11/25
17
Manhole SM#11 Replacement: SOW states a new manhole is to be installed. Please confirm if a new precast manhole is to be VA-furnished or contractor-provided.
KEE
07/07/25
VA Response
Contractor provided.
CG
07/11/25
18
Material Specifications: Confirm if alternate materials to cast iron (e.g., PVC for vent piping) are acceptable in non-patient areas or must all above/below-grade piping be cast iron?
KEE
07/07/25
VA Response
Provide materials as listed in the contract documents and specifications.
CN
7/11/25
19
Access to Electrical Rooms: Will the contractor have unrestricted access to electrical rooms during working hours, or must coordination with VA Electrical Department be scheduled in advance?
KEE
07/07/25
VA Response
The door core will be changed during the construction period to a construction core.
20
Correlating Code Versions: Some codes listed (e.g., 2018 IBC) differ from Florida Building Code 2020 references. Please clarify which version prevails where differences exist.
KEE
07/07/25
VA Response
Use the most current and strictest code between Florida and Federal.
21
Owner-Furnished Items: SOW says none expected but may include bathroom accessories. Please confirm if contractor should carry allowance for potential owner-furnished equipment.
KEE
07/07/25
VA Response
VA will provide and install the paper tower, sanitary paper, and soap dispenser.
22
Light Fixture Specification: What LED fixture model or specs are required to replace the existing vanity lights?
KEE
07/07/25
VA Response
See contract documents, E-002, Luminaire Schedule.
CB
7/11/25
23
Fire Protection Coordination: For sprinkler modifications, is VA’s fire protection contractor required to be involved, or will contractor handle all changes directly?
KEE
07/07/25
VA Response
Contractor to provide.
TCS
07/11/25
24
Work in Occupied Areas: Are infection control barriers (ICRA) required in all work zones or only patient-adjacent areas?
KEE
07/07/25
VA Response
Yes. See GI001 through GI010.
TCS
07/11/2025
25
Access to Site Utilities: Will the VA provide updated utility as-builts (electrical, water, sewer, data) prior to excavation and routing?
KEE
07/07/25
VA Response
Contractor responsibility
26
Warranty Requirements: Please confirm required warranty period for installed riser system and replaced finishes.
KEE
07/07/25
VA Response
See contract documents, 1 year minimum.
TCS
07/11/25
27
During the site visit, it was observed that there was an active project in the 5th Floor, having the work required under this project's SOW in a Electrical/Data Room, at the time of the walk this room was not finished, but it might be once the project commences, please advise how to proceed on this floor's SOW.
KEE
07/07/25
VA Response
The 5th floor project will be completed when this project gets an award.
28
During the site visit a lot of activity was observed on several floors, please advise the best time to work on each floor would be, to price accordingly.
KEE
07/07/25
VA Response
We can coordinate during the construction period.
29
It was suggested that all work be performed in the 2nd shift, but in the SOW states the hours of work as "Standard Hours" meaning "work hours for this site are 7:30 AM to 5:00 PM Monday through Friday except for Federal Holidays." please advise how to proceed for quoting purposes.
KEE
07/07/25
VA Response
Please see question #5
30
Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?
BLUE CORD
07/07/25
VA Response
Yes
31
If no to the question above, will the QA/QC need to be full time for this project?
VA Response
N/A
32
Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?
VA Response
Yes
33
Please confirm the issued drawing set is the latest and complete set.
VA Response
Yes
TCS
7/11/25
34
Please confirm the current design documents meet current VA TIL guidelines.
VA Response
Yes
TCS
7/11/25
35
Please provide the latest wage determination for this project’s county.
VA Response
WD FL20250208 05232025
36
Past Performance: If we have a PPQ, requested for another opportunity, that is less than 12 months old, can we use it within our proposal? Or will a new PPQ need to be requested?
VA Response
Yes
37
Is the use of temporary plastic wall panels (such as STARC panels) acceptable?
VA Response
Yes
38
Who is responsible for the terminal cleaning of the project area?
VA Response
GC
TCS
7/11/25
39
Who is responsible for contracting the commissioning agent?
VA Response
GC
TCS
7/11/25
40
Please confirm order of precedence for the contract documents. Does SOW prevail over the specifications and construction drawings?
VA Response
Spec and Drawing
41
Please confirm that Rooms 2A-214a and 7A-722 don’t get new ACT ceilings per Drawing AE601 Room Finish Schedule.
VA Response
See Floor Plan Notes, which require cut/patch of finishes.
TCS
7/11/25
42
Please confirm that Fire Treated Wood Blocking is allowed per Drawing AE501 Details 8 and 9/A502. This drawing set does not have a sheet A502.
VA Response
The FRT Wood blocking is called for in the referenced details on A501.
TCS
7/11/25
43
Please confirm if the existing supply diffusers and return air grilles are to be reused.
VA Response
Yes
TCS
7/11/25
44
Please confirm the standard work hours for this site are 7:30 AM to 5:00 PM Monday through Friday except for Federal Holidays
VA Response
Please see question #5
45
Please provide an electrical lighting schedule for this project.
VA Response
See contract documents, E-002, Luminaire Schedule
CB
7/11/25
46
Please provide a division 10 schedule including manufacture and model numbers instead of the VA TIL numbers.
VA Response
GC responsibility
47
Please confirm that the floor-mounted toilet carrier in rooms 4A-421a and 6A-621a will remain.
VA Response
Floor-mounted floor outlet water closets do not have carriers.
CN
7/11/25
48
Please confirm that the wall-mounted toilet carrier in room 3A-322a will remain.
VA Response
Fixture connection schedule on construction documents state to provide a wall-mounted carrier.
CN
7/11/25
49
Please confirm that the SOW Chicago Metallic SL Square Lay in Grid 15/16" is the correct grid per VA TIL.
VA Response
This is basis of design.
50
Please confirm that the SOW Rockfon, Koral White SL 1600 tiles are the correct tiles per VA TIL.
VA Response
This is basis of design.
51
The 3rd floor electrical room 3A-314 is not part of the SOW areas but has been identified for asbestos fireproofing. The SOW calls out rooms 3A-322a and 3A-322b which are adjacent to this room.
VA Response
Yes. NOTE: The AHERA reports from February 24, 2023, by OHC, and June 2024, by Castle Hill Associates, should be used for additional reference and information.
TCS
7/11/25
52
The positive stop PLM analysis for asbestos fireproofing in Rooms 1A-114, 3A-314, 4A-421a, 5A-521a and 6A-621a from 02 82 13.13 Glovebag Asbestos Abatement specifications solicited 7a_Vol1_Specifications on page 372 could create the VA asbestos fireproofing abatement and air monitoring on this project in turn is more money.
VA Response
Yes
TCS
7/11/25
53
Please confirm that asbestos fireproofing is not present above the ceiling or in the wall cavities in rooms 3A-322a, 3A-322b, 4A-421, 5A-521 and 6A-621 were not sampled but presumed asbestos fireproofing based off positive stop PLM analysis from homogenous areas.
VA Response
That is what is shown in the reports
TCS
7/11/25
54
Please confirm that asbestos is not present in the drywall joint compound hard ceilings for the following rooms 3A-322a and 3A-322b, 4A-421, 4A-421a, 6A-621 and 6A-621a. The asbestos survey does not identify these scoped areas as sampled.
VA Response
Yes, that statement agrees with the AHERA report
TCS
7/11/25
55
Please confirm that asbestos is not present in the ACT ceilings for the following rooms GA-008, 2A-114a, 4A-421, 4A-421a, 6A-621, 6A-621a and 7A-722. The asbestos survey does not identify these scoped areas as sampled.
VA Response
Per the report, GA-008 – Tan fireproofing above ACT, 2A-214a - none, 4A-421 – none, 4A-421a – none, 6A-621- none, 6A-621a, 7A-722 – none. No ACT is identified anywhere to contain asbestos.
TCS
7/11/25
56
Please confirm that room 2A-214 identifies asbestos fireproofing as present per the OHC PLM solicited report and the VA’s Tampa VA Building 1 2018 AHERA Report hazardous material drawings, if confirmed then an asbestos abatement would be required for this work area to establish a clean work area for other trades.
VA Response
Follow the drawings and specs and consult with the COR.
TCS
7/11/25
57
If question #56 is agreed with, then 02 82 11 Traditional Asbestos Abatement and 07 81 00 Applied Fireproofing specifications are missing from this project. This would then create an asbestos fireproofing abatement and air monitoring for this project
VA Response
This work is covered in specs as needed. Cut and patch any damaged fireproofing as necessary.
TCS
7/11/25
58
Room GA-008 identifies asbestos fireproofing present above the ceiling, in the wall cavity and in the pipe chase per the VA’s Tampa VA Building 1 2018 AHERA Report hazardous material drawings.
VA Response
Yes.
TCS
7/11/25
59
Room 1A-114 identifies as NO asbestos fireproofing present, but what about the wall cavity and pipe chase per the VA’s Tampa VA Building 1 2018 AHERA Report hazardous material drawings
VA Response
Please see question #10
TCS
7/11/25
60
Please confirm that the stored information in small file boxes will be moved by the VA in rooms GA-008.
VA Response
Yes
61
Please confirm a timeframe for when the current 5 South project will be completed. This will help with the scheduling to gain access to the new IT room being built in place of the scoped 5A-521a bathroom.
VA Response
Mid-November.
62
Please confirm the minimum sizes of the duplex grinder pump system with basin and second pump system with basin required for the project on sheet P-501 since this is a bid build SOW
VA Response
Minimum size is based on the minimum performance listed on drawing P-501. Contractor bidding on the project should provide the pump size and the pumping plan for comparison purposes.
CN
7/11/25
63
Please clarify Item A5082 paper towel dispenser will be Battery only or will the hospital require power for this device?
VA Response
Battery only.
TCS
7/11/25
64
What are the power and amps necessary for duplex grinder pump system with basin and second pump system?
VA Response
Pump system electrical requirements should be based on the pump selected by the contractor and coordinated with the building systems contractor as stated on the contract documents.
CN
7/11/25
65
Will Nurse Call just be a reuse existing pull stations or will more need to be added? If so, we need a layout for any bathrooms effected.
VA Response
Reuse as currently installed.
CB
7/11/25
66
The use of ceiling mounted Fire Alarm Strobe is usually not permitted at the hospital. Can these get moved to the wall?
VA Response
Reuse as currently installed.
CB
7/11/25
67
Please clarify on sheet AE 107 it appears there is a missing ceiling mounted Fire Alarm Strobe in the patient shower area 6A-621.
VA Response
Reinstall all existing fixtures.
CB
7/11/25
68
Please clarify the existing lockers that are noted on the drawings to be Removed, relocated and store existing lockers too and approved COR location for reinstallation in rooms 3A-322a, 3A-322b, 4A-421, 4A-421a, 6A-621, and 6A-621a. No lockers were present on the walk through.
VA Response
Rooms 3A-322a and 3A-322b have a locker (see Picture).
69
Do any of the returned FAR or VAAR clauses count towards the Price or Technical proposal page limits?
VA Response
NO
70
Do TAB pages count towards the Price or Technical proposal page limits?
VA Response
NO
71
Do stylized key personnel resumes count towards and of the Technical Proposal page limits?
VA Response
YES
72
FAR 52.204-8 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal
VA Response
YES, tech proposal
73
FAR 52.204-24 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal?
VA Response
YES, tech proposal
74
FAR 52.209-7 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal?
VA Response
YES, Tech Proposal
75
FAR 52.209-13 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal?
VA Response
YES, Tech Proposal
76
FAR 52.219-28 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal?
VA Response
YES, Tech Proposal
77
FAR 52.225-9 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal?
VA Response
YES, Tech Proposal
78
VAAR 852.219-75 is included within the RFQ but is not specifically requested to be signed and returned, would the VA like this completed and returned? If so, does the VA want it returned in the Price or Technical proposal?
VA Response
YES, Price Proposal
79
Past Performance: If we have a previously completed PPQ, requested for another opportunity, or an available CPARS, can we use it within our proposal in lieu of requesting new PPQs, using the document that was provided with this solicitation?
VA Response
Please see question #36
80
Do completed PPQs and/or CPARS count towards any of the Technical Proposal page limits?
VA Response
NO
81
Does the EMR form (and additionally provided OSHA forms) count towards any of the Technical Proposal page limits?
BLUE CORD
VA Response
NO

NOTE: The AHERA reports from February 24, 2023, by OHC, and June 2024, by Castle Hill Associates should be used for additional reference and information.

image1.emf image2.emf image3.emf image4.jpeg