The document is a set of construction design and engineering plans for the Brighton Area Schools (BAS) Transportation Building Fuel Tank Replacement project located in Brighton, Michigan. The project involves replacing two existing underground fuel storage tanks: Tank No. 01 with a 10,000-gallon capacity (10'-6" diameter x 17'-8" long) and Tank No. 02 with a 20,000-gallon capacity (10'-6" diameter x 39'-9" long). The plans detail comprehensive foundation specifications, including concrete pad designs, reinforcement requirements, soil bearing capacity assumptions, and specific construction notes for tank mounting and installation.
The project plans specify technical requirements for concrete mixing, reinforcement, and installation, with detailed notes on concrete class, air content, maximum water-to-cement ratios, and 28-day strength specifications. The design includes precise measurements for concrete footings, piers, and support structures, with specific instructions for anchor placement, reinforcement bar configurations, and foundation preparation. The plans are dated 05-06-2025 and are prepared as bidding and permit drawings by Lindhout Associates, with consulting work by Paradis Associates, Inc. The documents provide comprehensive technical guidance for contractors to ensure proper tank replacement and foundation construction at the BAS Transportation Building site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BAS Transportation Fuel Tanks RFP Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BORDERLINE DRIVE
EXIST. BLDG.
EXIST. BLDG.
EXIST. BLDG.
EXIST. BAS
TRANSPORTATION BLDG
- TRANSPORTATION BUILDING -
BRIGHTON AREA SCHOOLS (BAS)
FUEL TANK REPLACEMENT
PROJECT LOCATION:
BAS TRANSPORTATION BUILDING
5800 BORDERLINE DRIVE
BRIGHTON, MI 48116
PRIVATE DRIVEWAY
PR
IV
AT
E
DR
IV
EW
AY
PARCEL NO.:
4718-32-300-022
6'-3"
'-1
01 2"
'-1 01 2"
CL
'-1
01 2"
'-1 01 2"
CENTERLINE
OF TANK
CL
LINE OF 4" THK.
CONC. PAD SLAB
w/THK. PERIMETER
6" PIPE BOLLARD
EMBEDDED IN
24" DIA. CONC. FTG.
6' -1
0" 6'
-1 0"
2' -3
2'
-3
1' -0
1'
-0
12'-6"
OUTLINE OF
TANK ABOVE.
CL
6'-3"
CENTERLINE OF
TANK & SADDLE,
PIER & FTG.
8'-0" 8'-0"
CENTERLINE OF
SADDLE MOUNT,
PIER & FTG.
2'-0"x12'-6" FORMED CONC. PIER.
TYP. OF (4) - SEE SEC. DETAILS
4'-6"x16'-0" x 12" THK. CONC. FTG.
TYP. OF (4) - SEE SEC. DETAILS
TANK No. 01 - 10,000 Gal. Cap.
± 10'-6" DIA. x 17'-8" LONG.
CL
CENTERLINE OF
TANK & SADDLE,
PIER & FTG.
6'-3" 6'-3"
8'-0" 8'-0"
6'-3"28'-0" N.T.S.
'-5
'-5
CL
CENTERLINE
OF TANK
CL
6'-3"
CL
CL
'-4
1 2"
'-4 1 2"
1' -0
1'
-0 " 6'-3" 6'-3"
2' -3
2'
-3
8'-0" 8'-0"
TANK No. 02 - 20,000 Gal. Cap.
± 10'-6" DIA. x 39'-9" LONG.
CENTERLINE OF
TANK & SADDLE,
PIER & FTG.
CENTERLINE OF
SADDLE MOUNT,
PIER & FTG.
CLCL
CENTERLINE OF TANK
CENTERLINE OF
SADDLE MOUNT,
PIER & FTG.
6'-10" (TANK 01)
15'-4 1/2" (TANK 02)
BELLY BANK PLATE
REINFORCEMENT
BY MANUF.
SADDLE MOUNT BY MANUF.
2'-0"
(PROPOSED)
END OF TANK.
G.C. TO VERIFY PROPOSED SUPPORT SPACING
& TANK END DISTANCE w/MANUF. FINAL DRWGS.
PRIOR TO COMMENCING FOUNDATION WORK
'-6
2'-3" 2'-3"
LOWEST POINT OF
FINISH PAVEMENT GRADE
ADJACENT TO
THIS TANK BASE.
VERIFY w/CIVIL
4" 3'
-8 " M
IN
BASE FTG.: (3000 psi CONC.)
4'-6" WIDE x 16'-0" LONG x 12" THK.
FORMED CONC. PIER:
(4500 psi MIX / MAX. 0.45 w/c / 4% - 5% A.E.)
2'-0" WIDE x 12'-6" LONG x 3'-0" TALL.
3' -0
1'
-0
M
IN
(2) #4 BAR DOWELS
w/8" J-HOOK EMBEDMENT
& 2'-9 1/2" PROJ.
2' -9
1 2" 8"
3"
3"
(6) #4 CONT. HORZ. BARS
EACH FACE. LAP w/TIES TYP.
(4) #4 BAR TIES 18"x18" IN PIER
SURROUNDING (4) DOWELS TYP.
@ 6" / 12" c/c + (1) AT BOTT. IN FTG.
EACH SADDLE ANCHORED TO CONC. PIER
w/(2) 7/8" DIA. FULLY THREADED RODS EACH END OF SADDLE.
w/12" EMBEDMENT & 4" PROJECTION.
w/SET IN PLACE w/SIMPSON "SET-3G" EPOXY ADHESIVE
CENTER SADDLE ON PIER EACH WAY
& VERIFY ANCHOR LOCS. w/MANUF. SPECS.
4" 1'
-0
4" CONC. SLAB ON GRADE RAISED PAD.
(4500 psi MIX / MAX. 0.45 w/c / 4% - 5% A.E.)
w/#4 BARS @ 12" c/c E.W. w/2-1/2" TOP COVER TYP.
MATCH 12'-6" LENGTH OF CONC. PIERS & POUR
FLUSH TO TOP OF PIER w/EXPANSION JOINT MAT.
TO FACE OF PIER TYP.
HAUNCH FULL PERIMTER OF SLAB DOWN TO
MATCH BOTT. OF ADJACENT CONC. PAVEMENT
w(2) CONT. #4 BARS IN FACE w/2-1/2" COVER TYP.
6" 6"
SAND FILL COMPACTED
TO 95% IN MAX. 6" LIFTS.
6" THK. 21AA SUBBASE
COMPACTED & PROOFROLLED.
da te is su ed fo r dr ck 'd ap p' d:
cit at io n dr ive b rig ht on , m ich ig an
-9 ww w.
lin dh ou t.c om
(8
)2
-5 fa x:
(8
)2
-5
S-01
FO
U
N D
AT
IO
N P
LA
N
N
O
TE
S
25006 co ns ul ta nt
Pa ra di s
A ss oc
In c.
ASSUMED ALLOWABLE SOIL BEARING CAPACITY = MIN. 1500 psf
CONTRACTOR TO FIELD VERIFY SOIL BEARING CAPACITY
PRIOR TO PLACING FOOTINGS.
-0
6-
B
ID
D
IN
G
PE
R M
IT
D
R
AW
IN
G
25.106.19
BR
IG
H
TO
N A
R
EA
S C
H O
O
LS
SECTION
S-01
SCALE : 3/4" = 1'-0"
S-01
(T R
AN
SP
O R
TA
TI
O N
B
LD
G
SCALE : 1/4" = 1'-0"
N O
R
TH
(2X) TANK BASE
FOUNDATION PLANS.
SECTION
S-01
SCALE : 3/4" = 1'-0"
S-01
CONCRETE NOTES:
4-5
AIR
CONT.
0.45
CEMENT
HOH/LB.
MAX. W/C
RATIO LBS.
0.55
MIN. 28
STRENGTH
28 DAY
(PSI)
CONCRETE MIX GUIDE
EXPOSED
CONCRETE
CONCRETE
STANDARD
FOUNDATION
STANDARD
CONCRETE
CLASS OF
Contractor & all sub-trades are responsible for reviewing & complying with all applicable specifications contained herein. Where discrepancies occur between design drawings and these notes, design drawing specifications are to supersede.
A: Measuring, mixing and placing of concrete shall be in accordance with ACI 304.
B: Protection and curing of concrete shall be in accordance with ACI 305, 306 and 308.
C: All pertinent sections of ACI 318 shall apply.
D: Reinforcing steel shall be fabricated and placed in accordance with the ACI 315.
E: All reinforcing steel shall be ASTM A615 Grade 60, deformed in accordance with ASTM 305, unless otherwise noted.
F: Step all footings at a ratio of (2) horizontal to (1) vertical.
G: All footings to rest on undisturbed soil.
H: U.N.O. In concrete piers provide (8) #7 vert. bars [(3) each face] w/#4 ties @ 12" c/c max. Ties to be 2" from top & bott. of pier.
I: All columns & baseplates are to be fully encased in concrete from fin. floor to top of footing. Provide isolation joint encompassing entirity of base plate btwn. column pour & fin. floor slab.
1-2
EXIST. BAS
TRANSPORTATION BLDG
EXIST. BAS
TRANSPORTATION BLDG
| Sheets and Views |
| 25006 C1 Site & Cover-24x36 |
| BAS Fuel Tank_S-01_05-06-2025.pdf |
| Sheets and Views |
| S-01 |
| 25006 A1.1 Plans.pdf |
| Sheets and Views |
| 25006 A1.1 Plans-24x36 |
| 25006 A2.1 Details.pdf |
| Sheets and Views |
| 25006 A2.1 Details-24x36 |
| 25006 A2.1 Details.pdf |
| Sheets and Views |
| 25006 A2.1 Details-24x36 |
File details come from the government source that posted it. Updated .