Barracks PLA Request for Information.docx

DOCX document 36 KB Posted

Attached to
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation number
N4008526R0058
Issued by

About this file

This is a Request for Information (RFI) for a Project Labor Agreement (PLA) for a Design-Build construction project to replace Bachelor Enlisted Quarters at Marine Corps Base Camp Lejeune, North Carolina. The project involves demolishing five existing buildings and constructing 565 two-person rooms to support 1,130 personnel, with a total estimated construction value over $500 million and a performance period of approximately 1,460 calendar days. The Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic is seeking public input on potential use of a Project Labor Agreement, with responses due by 2:00 P.M. EST on January 26, 2026.

The RFI includes a detailed questionnaire for potential respondents, seeking input from government entities, unions, contractors (union and non-union), and small businesses on labor availability, project complexity, wage rates, and willingness to participate under a PLA. The project falls under NAICS Code 236220 for Commercial & Institutional Building Construction, and is subject to Executive Order 14063, which requires PLAs for federal construction projects exceeding $35 million. The government emphasizes that this is a planning-stage information gathering effort and not a solicitation, with all submitted information to be held confidentially.

View the file

Other files

File Type Posted
26R0058 Matrix.xlsx XLSX spreadsheet
Contractor Information Form.docx DOCX document
Project Information Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LABOR AGREEMENT (PLA) REQUEST FOR INFORMATION (RFI)

FOR CONSTRUCTION PROJECT TO REPLACE BACHELOR ENLISTED QUARTERS, MARINE CORPS BASE IN THE STATE OF NORTH CAROLINA

This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for construction project to replace Bachelor Enlisted Quarters (BEQ) located at the Marine Corps Base (MCB) in Camp Lejeune, North Carolina.

This Design-Build project includes the demolition of five Bachelor Enlisted Quarters Buildings and will provide by replacement billeting capacity of 565 two-person rooms to support 1,130 personnel at Marine Corps Base Camp Lejeune.

Project will be Design-Build (DB). NAICS Code: 236220 – Commercial & Institutional Building Construction. The magnitude of construction is anticipated to be over $500,000,000. General period of performance is anticipated to be approximately 1,460 calendar days.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction project with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.

Responses shall be submitted on the attached questionnaire via email to Mary Ann Pool at mary.a.pool3.civ@us.navy.mil no later than 2:00 P.M. EST on 26 January 2026.

ATTACHMENT 1 - PROJECT LABOR AGREEMENT (PLA) QUESTIONAIRE

Questions
Responses

1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?

2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.

3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors. Explain in detail.

4) As a qualified contractor for a project of this type, would you be interested in participating in this project?

If a PLA is required, would you still submit a proposal for this project? Yes/No and please explain in detail.

*Note: Answering “no” will not impact your ability to propose on the solicitation once issued.

5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas? Explain in detail.

6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute (formerly known as the Davis-Bacon Act). Explain in detail.

7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.

Rev.2 June 3, 2025 1