Banner Core BCDR OCI Specifications.pdf

PDF 275 KB Posted

Attached to
Business Continuity Environment for Banner ERP System
Solicitation number
OSUA&M-RFP-001872-2027
Issued by
Oklahoma

About this file

This is a Request for Proposal (RFP) issued by Oklahoma State University (OSU) and the Oklahoma Agricultural and Mechanical (A&M) System for the design, implementation, and support of a Business Continuity Environment for the Banner Enterprise Resource Planning (ERP) system. The solicitation (OSUA&M-RFP-001872-2027) seeks comprehensive labor, materials, and services to establish a disaster recovery and business continuity solution hosted on Oracle Cloud Infrastructure (OCI). The scope encompasses networking, security, storage, virtualization, database, and application components supporting Banner modules including Student, HR, Finance, Financial Aid, and Admissions, along with integrated systems such as Banner Document Management, DegreeWorks, and Ethos. The solution must achieve a Recovery Time Objective (RTO) of two hours and Recovery Point Objective (RPO) of fifteen minutes. The desired implementation start date is December 2026, with project go-live in February 2027. Initial failover testing is scheduled for June-July 2027, with additional testing in October 2027. The contract term is one year from the date of award with an option to renew for four additional one-year periods. OSU intends to make this contract available for cooperative procurement to other Oklahoma public institutions under authorization of 74 O.S. 1004.

Bidders must provide detailed cost proposals including professional services, implementation, training, maintenance, and support, with separate pricing for solutions utilizing the existing secondary Exadata Cloud@Customer environment, expanded Cloud@Customer resources, or OCI Public Cloud resources. All University data, including production, replicated, backup, and monitoring information, must remain within the continental United States with no storage or processing outside CONUS without prior written approval. The solution must include redundant network connectivity with an independent carrier path separate from OneNet to ensure business continuity operations during OneNet outages. Qualified bidders must demonstrate a minimum of five years of experience implementing Business Continuity and Disaster Recovery solutions for higher education institutions, with proven technical expertise in Banner ERP systems, OCI-based implementations, Oracle Active Data Guard, and integration with third-party systems. The evaluation will employ a "Best Value" methodology with qualitative criteria weighted as follows: Technical Capabilities (30%), Experience and Expertise (20%), Compliance and Security (20%), Support and Training (15%), Project Management (10%), and References (5%). Bidders must submit three professional references, a detailed project schedule, and all required documentation through the electronic bid system. The A&M System reserves the right to request demonstrations, conduct clarifications, and negotiate terms with selected bidders to obtain best value.

View the file

Other files

File Type Posted
Frequently Asked Questions.pdf PDF
1474645-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSUA&M-RFP-001872-2027 Business Continuity Environment for Banner ERP System

1. BACKGROUND

1.1. Oklahoma State University

Oklahoma State University (OSU) is a modern land-grant university that prepares students for success. OSU’s goal is to become the preeminent land-grant institution in the country through a recently released, bold new university strategy. Through leadership and service, OSU is preparing students for a bright future and building a brighter world for all. OSU improves the lives of people in Oklahoma, the nation, and the world through integrated, high-quality teaching, research, and outreach. OSU has more than 33,500 students across its five-campus system and more than 25,000 on its combined Stillwater and Tulsa campuses, with students from all 50 states and more than 100 nations.

Established in 1890, OSU has since graduated more than 260,000 students.

1.2. Oklahoma State University A&M System

The OSUA&M System falls under the governance of the Board of Regents (“Board”) for the Oklahoma Agricultural and Mechanical Colleges.

The Board was created in 1944 by Section 31a, Article 6, of the Oklahoma Constitution. It consists of nine members; eight members are appointed by the Governor by and with the advice of the senate, and the ninth member is the President of the State Board of Agriculture. The Board has the supervision, management, and control of five institutions outlined below.

Oklahoma State University campuses:

• OSU – Stillwater, OK (OSU Main campus)

• OSU – Oklahoma City, OK

• OSU – Tulsa, OK

• OSU Center for Health Sciences (CHS) – Tulsa, OK and Tahlequah, OK

• OSU Institute of Technology (OSUIT) – Okmulgee, OK

A&M College campuses:

• Connors State College – Warner, OK, and Muskogee, OK

• Langston University – Langston, OK, Oklahoma City, OK, and Tulsa, OK

• Northeastern Oklahoma A&M College – Miami, OK, and Grove, OK

• Oklahoma Panhandle State University – Goodwell, OK https://regents.okstate.edu/

2. PURPOSE

2.1. The Department of Information Technology for Oklahoma State University is seeking proposals for implementing a Business Continuity Environment for the Banner ERP system used by both Oklahoma State University and the A&M system. This environment will consist of networking, security, storage, VM, database, and application components.

This solution will serve a wide range of users across the system, including current and prospective students, faculty, and staff.

3. BID INQUIRIES

3.1. All questions regarding the solicitation and evaluation process should be directed to the

Buyer of Record:

Tara Alexander, CPO Buyer The Office of Central Procurement 1224 N. Boomer Road Stillwater, OK 74078 405-744-5984 (phone) 405-744-5187 (fax) tara.d.thomas@okstate.edu

3.2. Questions directly related to the specifications should be submitted using the Q&A

Board located in the “Tools” section of this e-bid. Questions must be submitted prior to the question’s deadline. Bidders are encouraged to continuously monitor the Q&A Board for all questions and answers related to this solicitation.

3.3. Any attempt to contact any end user or department other than The Office of Central

Procurement during the solicitation and evaluation process may result in the disqualification of your bid.

4. CONTRACT TERM

4.1. The contract term shall be from the date of award for one year with the option to renew for four (4) additional one-year periods upon mutual agreement.

4.2. Any resulting contract will be available for use by other OSU/A&M System units during this term.

mailto:tara.d.thomas@okstate.edu

5. TERMS AND CONDITIONS

5.1. It is important to note the general terms and conditions of the Oklahoma A&M System are attached as a separate document to this electronic bid event. The T&C apply to this procurement unless overruled within this set of specifications.

6. AUTHORIZED USERS

7.1. As authorized by 74 O.S. 1004, it is the intent of this solicitation and resulting contract(s) to allow for cooperative procurement. In the event a contract between the University and bidder(s) results from this RFP, the bidder (supplier) may offer the same prices, terms, conditions, and all other particulars herein to all other public institutions within the State of Oklahoma. As a result, in submitting a proposal, bidder(s) should consider proposing a pricing model and other commercial terms that take into account the higher volumes and other expanded opportunities that could result from the eventual inclusion of other institutions in the purchase contemplated by this RFP.

6.1.1. Bidders should be aware that if other Oklahoma public agencies elect to utilize the contract(s) awarded as a result of this solicitation they may have different administrative or delivery requirements. It will be the responsibility of the participating institutions to negotiate specific clauses with the bidder (supplier).

The modifications should not impair or substantially change the original contract.

6.1.2. If authorized by the supplier, the resultant contract may be extended to public entities to purchase at contract prices in accordance with contract terms. The Supplier shall notify the Oklahoma A&M Office of Central Procurement (OCP) in writing of any such entities accessing the contract.

6.1.3. The Contractor will provide annual usage reports for all entities accessing the

Contract. Participating entities shall place their own orders directly with the Contractor and shall fully and independently administer use of the contract to include contractual disputes, invoicing and payments without direct administration from OCP.

6.1.4. The Board of Regents for the Oklahoma Agricultural and Mechanical Colleges nor any of the agencies under its governance (A&M System) shall not be held liable for any costs or damages incurred by any other participating entity as a result of any authorization by the supplier to utilize the contract. It is understood and agreed that the A&M System is not responsible for the acts or omissions of any entity and will not be considered in default of the contract no matter the circumstances.

6.1.5. Use of this contract does not preclude any participating entity from using other contracts or competitive processes as they determine necessary. During the term of this contract, any State Entity, or Interlocal Entity, may utilize this contract. Under this contract, the Oklahoma A&M System bears no liability for the State or Interlocal Entities actions and the privies of contract exist solely between the Supplier and the State or Interlocal Entity.

7. SCOPE OF WORK

Requirements Please provide details on how your proposed solution will meet the requirements listed. Please address each section, numbered in order for ease of the evaluation process.

7.1. Architecture:

7.1.1. The selected vendor will implement a comprehensive Business Continuity

Environment for Oklahoma State University’s Banner ERP ecosystem, hosted on Oracle Cloud Infrastructure (OCI). The solution must be designed to operate within an OCI-based environment, which may include: OCI public cloud (Oracle-hosted) or a new or existing OSU OCI Cloud@Customer deployment.

7.1.2. The architecture must support high availability, rapid recovery, and secure replication of critical systems and data, with a Recovery Time Objective (RTO) of 2 hours and a Recovery Point Objective (RPO) of 15 minutes or less.

7.1.3. OSU requires that all proposed solutions leverage Oracle Cloud Infrastructure (OCI) technologies. However, vendors must design solutions that are flexible across OCI deployment models, including OCI public cloud and OCI Cloud@Customer environments.

7.1.4. For purposes of this RFP, "Business Continuity Environment" refers to the recovery environment used to restore and operate Banner ERP services following a disruption to the primary production environment.

7.1.5. Data Residency and Geographic Restrictions

7.1.5.1. The proposed solution shall ensure that all University data, including but not limited to production data, replicated data, backup data, recovery data, audit logs, monitoring information, diagnostic data, metadata, and support-related data associated with the Banner ERP Business Continuity Environment, remain within the continental United States (CONUS).

7.1.5.2. The Bidder shall not store, replicate, process, transmit, back up, archive, recover, or otherwise transfer University data outside the continental United States without the prior written approval of Oklahoma State University.

7.1.5.3. All primary, secondary, recovery, business continuity, backup, archive, monitoring, logging, and management infrastructure utilized by the proposed solution shall be located within the continental United States.

7.1.5.4. The Bidder shall identify all physical and logical locations where University data may reside, including production, replication, backup, disaster recovery, monitoring, logging, support, and temporary processing locations.

7.1.5.5. The Bidder shall disclose all subcontractors, cloud providers, support providers, managed service providers, and third parties that may have access to University data and identify the geographic location where such access may occur.

7.1.5.6. The proposed solution shall be designed such that recovery, failover, failback, backup restoration, and cyber recovery operations can be completed while maintaining compliance with all geographic residency requirements defined in this solicitation.

7.1.5.7. The Bidder shall provide documentation demonstrating how compliance with these geographic residency requirements will be maintained throughout the contract term.

7.1.6. The selected vendor shall design the solution to operate within an OCI environment.

OSU will determine the specific OCI deployment model and associated infrastructure (e.g., OCI tenancy, OCI Cloud@Customer resources) in coordination with the selected vendor.

7.1.7. Oklahoma State University currently operates two Oracle Exadata

Cloud@Customer environments. One Exadata Cloud@Customer environment currently supports production operations. A second Exadata Cloud@Customer environment is located at a geographically separate location and may be available for use as part of the proposed Business Continuity solution.

7.1.7.1. The Bidder shall evaluate the suitability of existing Oracle Cloud Infrastructure resources, including the secondary Exadata Cloud@Customer environment, and recommend whether those resources should be utilized as part of the proposed Business Continuity architecture.

7.1.7.2. The Bidder shall identify any additional OCI, Exadata, network, storage, licensing, compute, security, or third-party resources required to implement the proposed solution.

7.1.8. OSU shall acquire, maintain, and retain ownership or contractual control of the OCI tenancies, Cloud@Customer resources, Oracle licensing, infrastructure subscriptions, and other infrastructure resources required for the final selected solution.

7.1.9. The Business Continuity environment is intended to provide rapid recovery and short-term operational continuity following a disruption. The proposed architecture shall include documented procedures and capacity expansion options to enable the environment to support sustained operations if the primary production environment remains unavailable for an extended period. The Business Continuity environment is not intended to operate as a permanently provisioned secondary production environment.

7.1.9.1. The Bidder shall identify estimated timelines, prerequisites, dependencies, and operational impacts associated with expanding the Business Continuity environment from initial recovery capacity to sustained operations capacity.

7.1.10. OSU has completed a Business Impact Analysis and dependency mapping exercise for the Banner ERP environment, and the following applications and integrations have been determined to be required for the BC environment:

7.1.10.1. Implement Business Continuity capabilities for Banner ERP modules:

Student, HR, Finance, Financial Aid, and Admissions.

7.1.10.2. Include dependencies: Banner Document Management (BDM), Degreeworks, Ethos.

7.1.10.3. Integrate with third-party systems: Including but not limited to Touchnet, StarRez, Jaggaer.

7.1.11. The current production environment consists of:

7.1.11.1. 56 Linux-based application servers.

7.1.11.2. 7 Windows servers for BDM and SQL Server.

7.1.11.3. Exadata environment for 5 production Oracle databases.

7.1.12. The Bidder shall identify the minimum Business Continuity capacity required to satisfy the stated RTO and RPO objectives and document any phased capacity expansion approach proposed for sustained operations.

7.1.13. Utilize Oracle Active Data Guard for database replication.

7.1.14. Utilize Palo Alto Firewalls in the network security design.

7.1.15. Ensure compliance with the system's authentication requirements.

7.1.16. Ensure compliance with applicable data protection regulations (e.g., FERPA).

7.1.17. Implement encryption (at rest and in transit), access controls, and vulnerability management.

7.1.18. The Bidder shall review the University's BIA and dependency mapping documentation and identify any assumptions, risks, gaps, technical constraints, recovery limitations, or undocumented dependencies affecting the proposed solution.

7.1.18.1. The Bidder shall identify any recovery requirements documented within the

University's BIA or dependency mapping artifacts that cannot be fully satisfied by the proposed solution and shall provide recommended mitigation strategies.

7.1.19. The proposed solution shall provide a complete Business Continuity capability for the Banner ERP environment, including all infrastructure, applications, databases, network connectivity, security, authentication, integrations, and supporting services required to restore business operations.

7.1.20. The Bidder shall provide a detailed architecture diagram identifying the production environment, business continuity environment, network connectivity, security controls, replication paths, application dependencies, and points of failure.

7.1.21. The proposed architecture shall eliminate or minimize single points of failure and identify any remaining ones, along with their associated mitigation strategies.

7.1.22. The Bidder shall document all identified assumptions, dependencies, exclusions, licensing requirements, third-party products, and services within a Recovery Dependency Matrix.

7.1.23. The solution shall support a Recovery Time Objective (RTO) of no more than two (2) hours and a Recovery Point Objective (RPO) of no more than fifteen (15) minutes.

The required Recovery Time Objective (RTO) and Recovery Point Objective (RPO) are based upon the University's business continuity planning and Business Impact Analysis activities and shall be considered mandatory requirements.

7.1.23.1. Recovery Time Objective (RTO) is defined as the maximum allowable time between formal declaration of a production outage and successful validation of critical Banner business functions by designated OSU functional users.

7.1.23.2. Recovery Point Objective (RPO) is defined as the maximum allowable amount of production data loss measured as elapsed time between the disruption event and the most recent recoverable data.

7.1.24. RTO shall be measured from the formal declaration of a disaster or production outage until designated OSU functional users have successfully authenticated, completed predefined business transactions, and validated operation of critical Banner functionality and required integrations.

7.1.25. RPO shall be measured by the maximum acceptable time-based data loss that can occur between a disruption and the last recoverable copy of the data.

7.1.26. The Bidder shall assist with configuring automated monitoring and alerting when replication performance approaches or exceeds the fifteen (15) minute RPO requirement.

7.2. Cyber Security Requirements:

7.2.1. The proposed solution shall address recovery of the Banner environment in the event of a cybersecurity incident, including ransomware, malware, compromised administrative credentials, unauthorized changes, or compromise of the production environment.

7.2.2. The Bidder shall describe how the University can recover from a cybersecurity event if both the production environment and replicated business continuity environment are compromised.

7.2.3. The solution shall support immutable or otherwise protected backups that cannot be modified or deleted by standard administrative accounts.

7.2.4. The Bidder shall describe recovery-point selection capabilities that allow OSU to select a known-good recovery point following a cybersecurity incident.

7.2.5. The Bidder shall identify security controls protecting backup, replication, and recovery infrastructure from unauthorized access or modification.

7.2.6. The Bidder shall provide procedures for recovery from a cybersecurity incident and include these procedures in the final Business Continuity and Cyber Recovery playbooks.

7.2.7. Administrative access to the Business Continuity environment shall be logically segregated from production administrative access whenever technically feasible.

7.2.8. Administrative Access Restrictions:

7.2.8.1. The Bidder shall identify all locations from which administrative, operational, maintenance, monitoring, or support activities may be performed. Administrative access to systems containing University data shall be limited to personnel located within the continental United States unless specifically approved in writing by Oklahoma State University.

7.2.8.2. The Bidder shall document controls used to prevent unauthorized remote administration or support access originating from outside the continental United States.

7.2.9. The Bidder shall identify controls that prevent unauthorized, malicious, or compromised changes within the production environment from automatically propagating to the Business Continuity environment.

7.2.10. The Bidder shall identify how backup, replication, and recovery administrative accounts are protected through role separation, least-privilege principles, and multi-factor authentication.

7.2.11. Backup, recovery, and audit logs shall remain available following failover and cybersecurity recovery events.

7.3. OCI Environment Design and Configuration:

7.3.1. Design and configure:

7.3.1.1. Identity domains

7.3.1.2. Compartments and policies (Logical containers for resources and the access policies for them.)

7.3.1.3. Virtual networking (including load balancers)

7.3.2. The design must support deployment in OCI public cloud or OCI Cloud@Customer environments.

7.3.3. The Bidder shall provide an assessment of the advantages, disadvantages, costs, risks, capacity considerations, operational impacts, and recovery capabilities associated with each of the following deployment options:

7.3.3.1. Existing secondary Exadata Cloud@Customer environment

7.3.3.2. OCI Public Cloud

7.3.3.3. Hybrid deployment utilizing both OCI Public Cloud and Cloud@Customer resources

7.3.3.4. Identify a single recommended deployment option and provide justification based on cost, recoverability, cybersecurity resilience, operational complexity, scalability, and long-term supportability.

7.3.4. Collaborate with OSU staff for cloud configuration and connectivity to on-prem

Banner systems where applicable.

7.3.5. Establish secure Identity and Access Management (IAM) controls.

7.3.6. Document OCI architecture and configuration for OSU reference.

7.3.7. Conduct performance, security, and load testing of the OCI environment.

7.3.8. Support customer acceptance testing.

7.3.9. The Bidder shall provide a detailed bill of materials identifying all required storage, compute, OCI services, subscriptions, licenses, network connectivity and bandwidth, security services, support agreements, third-party products, and professional services necessary to implement the proposed solution.

7.3.9.1. The bill of materials shall clearly indicate whether each item is:

a.) Existing and assumed to be provided by OSU.

b.) To be purchased directly by OSU.

c.) To be supplied by the Bidder.

d.) Optional.

7.3.10. The Bidder shall provide separate pricing for:

7.3.10.1. Solution utilizing the existing secondary Exadata Cloud@Customer environment.

7.3.10.2. Solution requiring expansion of existing Cloud@Customer resources.

7.3.10.3. Solution utilizing OCI Public Cloud resources.

7.3.10.4. Optional sustained-operations expansion scenarios.

7.3.11. For each option, include pricing for:

7.3.11.1. Baseline Business Continuity environment

7.3.11.2. Expansion of the Business Continuity environment for sustained operations.

7.3.11.3. Additional OCI resources required during an extended disruption.

7.3.11.4. Optional production-equivalent capacity.

7.3.12. The Bidder shall identify the responsibilities of OSU, the Bidder, Oracle, and other third parties for implementation, operation, maintenance, support, and troubleshooting.

7.3.13. The Bidder shall provide a detailed network architecture including connectivity between OSU's production environment and OCI, routing, redundancy, firewalls, load balancing, DNS, authentication, and management access.

7.3.14. The proposed network architecture shall include redundant connectivity where required to support the stated RTO and availability requirements.

7.3.15. The proposed Business Continuity architecture shall not rely solely on OneNet for network connectivity between OSU and the Business Continuity environment. In addition to OSU’s existing OneNet connectivity, the proposed architecture shall include or support at least one connectivity path provided by a telecommunications carrier or service provider independent of OneNet.

7.3.16. The independent connectivity path shall be designed to permit activation and operation of the Banner Business Continuity environment if OSU’s OneNet services are unavailable. Loss of OneNet connectivity shall not, by itself, prevent designated OSU users, administrators, required third parties, or critical integrations from securely accessing and operating the Business Continuity environment.

7.3.17. The Bidder shall:

7.3.17.1. Assess OSU’s existing OneNet connections and identify shared infrastructure, carrier, routing, facility, or geographic dependencies that could create a common point of failure.

7.3.17.2. Provide a recommended architecture that includes carrier diversity and, to the extent commercially and technically feasible, physical path diversity.

7.3.17.3. Identify the proposed independent carrier, connection type, bandwidth, routing design, termination locations, cloud connectivity method, and any required equipment or services.

7.3.17.4. Identify whether the proposed connections share any conduit, fiber facilities, building entrances, central offices, points of presence, aggregation facilities, upstream providers, cloud interconnection facilities, or other infrastructure that could result in a common-mode failure.

7.3.17.5. Describe the routing and failover method, including whether failover is automatic or manual, the expected convergence or activation time, and any dependencies upon DNS, BGP, VPN, OCI FastConnect, internet connectivity, firewalls, identity services, or other supporting components.

7.3.17.6. Demonstrate that the proposed independent connection provides sufficient bandwidth, latency, security, and availability to support the required Banner workloads, replication activities, administrative access, critical integrations, and the stated RTO and RPO.

7.3.17.7. Identify all costs, lead times, contractual commitments, cross-connects, construction requirements, equipment, licenses, and recurring charges associated with the independent connectivity path.

7.3.17.8. Clearly identify responsibilities assigned to OSU, the Bidder, Oracle, OneNet, the independent carrier, and any other participating third party for procurement, implementation, monitoring, support, escalation, testing, and restoration.

7.3.18. Carrier diversity alone shall not be considered sufficient when the proposed connections rely upon the same physical fiber, conduit, entrance facility, point of presence, upstream network, or other infrastructure whose failure could disrupt both connections. The Bidder shall document known shared dependencies and recommend appropriate mitigations when complete physical separation cannot be achieved.

7.3.19. Geographic Location Disclosure

7.3.19.1. The Bidder shall provide a geographic location matrix identifying:

a.) OCI regions utilized by the solution b.) Data storage locations c.) Replication target locations d.) Backup locations e.) Log storage locations f.) Monitoring service locations g.) Support service locations h.) Administrative access locations i.) Third-party service locations

7.3.19.2. The Bidder shall clearly identify any component that may process, transmit, store, or access University data outside the continental United States.

7.3.20. The final architecture shall support periodic testing of Business Continuity activation and operation under a simulated loss of all OneNet connectivity.

7.4. BCP Implementation:

7.4.1. Implementation and testing will be conducted in conjunction with the OSU staff.

7.4.2. Provision the OCI resources and configure the business continuity environment (e.g., VM servers, network shares).

7.4.3. Implement secure data replication from the primary Banner environment to the

OCI-based business continuity environment, regardless of OCI deployment model (public cloud or Cloud@Customer).

7.4.4. The Bidder shall identify all automated and manual recovery activities and provide estimated execution times for each. The proposed solution shall maximize automation to achieve the stated RTO requirements.

7.4.5. Validate environment for performance, security, and compliance.

7.4.6. Document changes during implementation.

7.4.7. Support acceptance testing of the environment by IT Staff.

7.4.8. Include rollback procedures for failed failover attempts.

7.4.9. Implement snapshot and/or backup retention policy for the OCI environment.

7.4.10. Business Continuity runbooks, failover procedures, failback procedures, escalation procedures, communication plans, and operational recovery procedures shall be completed and approved by OSU prior to formal acceptance testing.

7.4.11. The Bidder shall develop and document procedures for reconstitution of the primary production environment following operation in the Business Continuity environment, including:

7.4.11.1. Data synchronization

7.4.11.2. Validation procedures

7.4.11.3. Cutover sequencing

7.4.11.4. Rollback procedures

7.4.11.5. Downtime estimates

7.4.11.6. Risk mitigation measures

7.5. Acceptance Testing and Validation:

7.5.1. OSU shall establish acceptance criteria for each major deliverable and implementation milestone.

7.5.2. The Contractor shall collaborate with OSU staff on the development of Business Continuity (BC) drills (e.g., network outage, database corruption, etc.).

7.5.3. The Contractor shall conduct BC drills in conjunction with EIT Staff and functional users, simulating multiple failure scenarios.

7.5.4. The project shall not be considered complete until OSU has successfully validated the following:

7.5.4.1. Required Banner applications and modules are operational.

7.5.4.2. Required databases are operational and replicating.

7.5.4.3. Required third-party integrations are operational.

7.5.4.4. Authentication and authorization services are operational.

7.5.4.5. Required network connectivity is operational.

7.5.4.6. The Contractor shall demonstrate successful activation and operation of the Business Continuity environment during a simulated loss of all OneNet connectivity. Testing shall validate the independent carrier path, routing and failover procedures, administrative access, designated functional-user access, critical integrations, monitoring, and continued achievement of the required RTO and RPO.

7.5.4.7. Security controls have been validated.

7.5.4.8. The RPO of fifteen (15) minutes or less has been demonstrated.

7.5.4.9. The RTO of two (2) hours or less has been demonstrated.

7.5.4.10. Failover has been successfully completed.

7.5.4.11. Failback has been successfully completed.

7.5.4.12. Designated OSU functional users have completed acceptance testing.

7.5.4.13. Required documentation has been delivered and accepted.

7.5.4.14. Required training has been completed.

7.5.4.15. Business Continuity procedures and runbooks have been successfully tested.

7.5.4.16. Recovery from a simulated cybersecurity incident, including ransomware or credential compromise, shall be successfully demonstrated.

7.5.4.17. Recovery from an immutable backup or known-good recovery point shall be successfully demonstrated.

7.5.4.18. The Contractor shall demonstrate recovery procedures that prevent reinfection or reintroduction of compromised configurations into the recovered environment.

7.5.4.19. The Contractor shall demonstrate and document the procedures, operational processes, and runbooks required to expand the Business Continuity environment to support sustained operations and increased workload demands.

7.5.4.20. Designated OSU technical personnel shall execute selected Business

Continuity expansion procedures under Contractor observation and successfully validate the associated runbooks.

7.5.4.21. The Contractor shall provide estimated execution times for all sustained-operations expansion activities, including compute, storage, networking, application, and database capacity expansion.

7.5.4.22. The Bidder shall conduct a tabletop exercise demonstrating the decision process, operational procedures, staffing requirements, timeline, and resource requirements associated with transitioning from the baseline Business Continuity environment to sustained operations.

7.5.5. Any failure to meet an established acceptance criterion shall be corrected by the

Contractor at no additional cost to OSU.

7.5.6. The Contractor shall be responsible for additional configuration, troubleshooting, and testing required to achieve the requirements specified in this RFP.

7.5.7. Geographic Residency Validation

7.5.7.1. Prior to final acceptance, the Contractor shall demonstrate and document that all production, replication, backup, monitoring, recovery, and support services associated with the Business Continuity Environment comply with the geographic residency requirements established within this solicitation.

7.5.8. Schedule:

7.5.8.1. Initial failover testing: June–July

7.5.8.2. Additional testing: Fall semester

7.6. Roles and responsibilities:

7.6.1. The Bidder shall provide a recommended roles and responsibilities matrix identifying the responsibilities of OSU, the Bidder, Oracle, and any other third parties involved in the solution. The matrix shall define proposed ownership and accountability for implementation, configuration, testing, cutover, operations, maintenance, monitoring, support, incident response, troubleshooting, and ongoing service management.

7.6.2. At a minimum, the responsibility matrix shall address:

7.6.2.1. OCI tenancy and configuration

7.6.2.2. Network connectivity

7.6.2.3. Firewall configuration

7.6.2.4. Identity and access management

7.6.2.5. Server provisioning

7.6.2.6. Database configuration

7.6.2.7. Oracle Active Data Guard

7.6.2.8. Banner application configuration

7.6.2.9. Third-party integrations

7.6.2.10. Backup and recovery

7.6.2.11. Monitoring and alerting

7.6.2.12. Security

7.6.2.13. Business Continuity testing

7.6.2.14. Failover

7.6.2.15. Failback

7.6.2.16. Documentation

7.6.2.17. Training

7.6.2.18. Ongoing support

7.6.3. The Bidder shall clearly identify all services, equipment, licenses, personnel, connectivity, and resources that must be provided by OSU for successful implementation and ongoing operation.

7.7. Training:

7.7.1. Provide training for IT staff and functional leads on BC procedures and OCI operations.

7.7.2. Training should include:

7.7.2.1. Hands-on sessions (virtual or in-person)

7.7.2.2. Post-training assessments

7.7.2.3. OSU staff shall successfully execute selected recovery procedures under Bidder observation prior to project acceptance.

7.8. Support and Maintenance:

7.8.1. Provide 12 months of 24x7x365 support assistance with incidents affecting the availability and recoverability of the Banner BC environment, including:

7.8.1.1. Issue resolution and advisory services

7.8.1.2. Banner replication and OCI monitoring

7.8.1.3. Assistance with system maintenance to ensure BC environment remains compatible with changes to Banner production environment

7.8.1.4. Maintenance shall include, as applicable, operating system updates, database updates, Banner updates, security updates, network changes, firewall changes, OCI changes, and application/integration changes.

7.8.1.5. The Bidder shall participate in scheduled BC testing at least twice annually.

7.8.1.6. Periodic review meetings

7.8.1.7. Support shall include assistance during actual failover, failback, cybersecurity recovery, and Business Continuity events occurring during the support period.

7.8.2. Provide defined Service Level Agreements for incident response, escalation, and resolution.

7.8.3. At a minimum, the Bidder shall provide:

7.8.3.1. P1 – Critical 15 minutes immediate

7.8.3.2. P2 – High 30 minutes within 1 hour

7.8.3.3. P3 – Medium 4 hours as required

7.8.3.4. P4 – Low 1 business day as required

7.8.4. The Bidder shall provide a documented escalation process, including technical, management, and executive escalation contacts.

7.8.5. The Bidder shall provide a cost model for optional support extensions.

7.9. Monitoring and Alerting:

7.9.1. The Bidder shall assist IT Staff with the integration and configuration of OSU’s existing monitoring, logging, security, and notification platforms with the Banner BC environment.

7.9.2. The Bidder shall recommend monitoring, logging, security, and notification platforms if existing platforms are inadequate.

7.9.3. Monitoring shall include, at minimum:

7.9.3.1. Server availability

7.9.3.2. CPU and memory

7.9.3.3. Storage capacity

7.9.3.4. Database availability

7.9.3.5. Database replication

7.9.3.6. Active Data Guard status

7.9.3.7. Replication lag

7.9.3.8. Network connectivity

7.9.3.9. Firewall availability

7.9.3.10. Load balancers

7.9.3.11. Backup status

7.9.3.12. Authentication

7.9.3.13. Application availability

7.9.3.14. Third-party integrations

7.9.3.15. OCI service health

7.9.3.16. Recovery readiness status

7.9.3.17. Immutable backup status

7.9.3.18. Recovery point age

7.9.3.19. Capacity utilization against expansion thresholds

a.) Capacity utilization shall be measured against the thresholds defined in the Business Continuity Expansion Plan

7.10. Transition and contract Completion:

7.10.1. At the conclusion of the contract, the Contractor shall provide reasonable assistance to OSU in transitioning the support of the BC environment to OSU or another service provider.

7.10.2. The Contractor shall provide all current architecture documentation, configuration information, runbooks, recovery procedures, scripts, automation, and other materials necessary to operate the environment.

7.10.3. The Contractor shall provide knowledge-transfer sessions to OSU personnel or a successor contractor.

7.10.4. No proprietary tool, process, or Contractor dependency shall prevent OSU from operating or transitioning the BC environment.

7.11. Deliverables:

7.11.1. Each deliverable shall include documented acceptance criteria, version history, review status, and approval status. Documentation must clearly identify compatibility across OCI deployment models (OCI public cloud and OCI Cloud@Customer).

7.11.2. Architecture:

7.11.2.1. Security Architecture Plan: Includes IAM roles (e.g. Identity domains, compartments, policies), encryption standards, and access controls.

7.11.2.2. Cloud Architecture Blueprint: Includes Virtual Cloud Networking Design, Dynamic Routing Gateway, VPN setup, Compute and Storage.

7.11.2.3. Recovery Dependency Matrix mapping all applications, databases, integrations, infrastructure components, authentication services, network services, and supporting systems to the proposed Business Continuity architecture and recovery procedures.

7.11.3. Cloud Environment:

7.11.3.1. Cloud Environment validation scenarios.

7.11.3.2. Provisioned OCI Resources: Compute (VMs), storage, networking.

7.11.3.3. Security Hardening Checklist: Firewall rules, private subnets, VPN tunnels.

7.11.3.4. Monitoring & Logging Framework: OCI Monitoring, Logging, and Audit Services.

7.11.3.5. OCI Connectivity Performance Report: OCI connectivity to the existing

Banner Environment.

7.11.3.6. Carrier and Path Diversity Report: Documentation of the primary and alternate carriers, logical and physical routes, termination points, shared infrastructure and common-mode risks, routing and failover configuration, bandwidth and latency validation, escalation procedures, and results of testing performed without OneNet connectivity.

7.11.3.7. Cloud Environment validation results.

7.11.4. BCP Implementation:

7.11.4.1. Implementation validation scenarios.

7.11.4.2. Application Server Replication Plan and Schedule: Timeline, cutover strategy, rollback procedures.

7.11.4.3. Data Migration Scripts and Tools.

7.11.4.4. Functional Testing Reports: Verifies Banner modules in OCI environment.

7.11.4.5. Performance Benchmarking Results: Compares on-prem vs. OCI performance.

7.11.4.6. Security Penetration Test Results: Validates cloud security posture.

7.11.4.7. First draft of operations procedures.

7.11.4.8. Implementation validation results.

7.11.5. Business Continuity Expansion Plan:

7.11.5.1. Plans needed to support sustained operations

a.) Capacity growth strategy b.) Staffing considerations c.) Estimated deployment timelines d.) Capacity thresholds that trigger expansion e.) Cost estimates for expansion scenarios f.) Estimated monthly operating costs associated with each sustained-operations scenario.

7.11.6. Acceptance Testing and Validation:

a.) Acceptance validation scenarios.

b.) Business Continuity Failover Test Plan: Simulates failover scenarios and validates RTO/RPO.

c.) Acceptance validation results.

d.) Final documentation for BC setup and BC operational procedures.

e.) Final OCI BC environment configuration.

7.11.7. Training and documentation:

7.11.7.1. Training materials

7.11.7.2. Technical Runbooks: For system administrators and support teams.

a.) Initial failover procedures b.) Extended operations procedures c.) BC environment scaling procedures d.) Capacity expansion procedures e.) Storage expansion procedures f.) Network expansion procedures g.) Compute expansion procedures h.) Application scaling procedures i.) User onboarding procedures j.) Integration onboarding procedures k.) Disaster communications procedures l.) Staffing requirements m.) Reconstitution procedures as defined in Section 8.4.11

7.11.7.3. Technical runbooks shall address operation during disruptions lasting:

a.) Less than 7 days b.) 7 to 30 days c.) 30 to 90 days d.) Greater than 90 days

7.12. Timeline:

7.12.1. Project start: February 2027

7.12.2. Cloud Environment configuration completed by March 31st

7.12.3. Testing and validation: June–July 2027

7.12.4. Additional testing: October 2027

7.12.5. Include milestone tracking and contingency planning

8. PRE-AWARD PRESENTATION / DEMONSTRATIONS

8.1. The A&M Office of Central Procurement (OCP) reserves the right to request demonstrations or product samples from any or all-responding Bidders. As part of the evaluation process presentations may be required from the highest ranked respondents.

During these presentations, providers may be asked to provide additional data including product demonstration.

8.2. If the University requires such a presentation, the buyer of record (listed in #3 above) will schedule the time and place of such an event. Each firm should be prepared to discuss and substantiate any of the areas of the proposal.

9. SCHEDULE AND TIMING

9.1. Time is of the essence and will be a major factor during the evaluation and bid award.

The desired implementation start date is no later than _December 2026_ and the go-live date is February 2027_.

9.2. To ensure the successful implementation of the product offering and appropriate training of the solution, all bids must be accompanied by a project timeline for completion and an example of a project schedule plan.

9.3. Describe the implementation process and how project management is handled.

Describe how training will be conducted such as number of hours, resumes of the individuals conducting the training, on-site or virtual, etc.

9.4. The schedule should be uploaded in the Supplier Attachments section of the e-bid and labeled “Project Schedule”.

10. COST PROPOSAL

10.1. Bidder is to provide a detailed breakdown of the total price to include but not limited to all professional services, maintenance, support, implementation, training, and any other related expenses for the solution offered.

10.2. The cost proposal should contain the complete financial offer made to The System. Any additional expenses, not explicitly stated, will not be honored by The System.

10.3. The Cost Proposal should be uploaded in the Supplier Attachments section of the e-bid system and labeled “Cost Proposal”.

11. QUALIFICATIONS / EXPERIENCE / REFERENCES

11.1. Bidder should be able to demonstrate a history of competency and successful experience in providing these types of products/services to other institutions of higher education.

11.1.1. Experience and Expertise:

11.1.1.1. Minimum of 5 years of experience implementing Business Continuity and Disaster Recovery solutions for Higher Education Institutions.

11.1.1.2. Demonstrated technical implementation experience with Banner ERP systems, including Student, HR, Financial Aid, and Admissions modules.

11.1.1.3. Proven track record of successful OCI-based implementations, including Exadata and Oracle Active Data Guard.

11.1.2. Technical Capabilities:

11.1.2.1. Certified Oracle Cloud Infrastructure (OCI) professionals on staff.

11.1.2.2. Expertise in Linux and Windows server environments.

11.1.2.3. Experience integrating with Banner Document Management, DegreeWorks, and Ethos.

11.1.2.4. Experience integrating with third-party integrations (TouchNet, StarRez, Jaggaer).

11.1.2.5. Ability to design and implement secure cloud architectures with IAM controls.

11.1.3. Project Management:

11.1.3.1. Ability to manage complex, multi-phase projects with defined milestones and deliverables.

11.1.3.2. Experience collaborating with internal IT teams and stakeholders.

11.1.3.3. Demonstrated ability to meet RTO/RPO targets in previous engagements.

11.1.4. Compliance and Security:

11.1.4.1. Demonstrated competence with FERPA, HIPAA, and other relevant compliance frameworks.

11.1.4.2. Ability to implement and document security controls, encryption standards, and access policies.

11.1.5. Support and Training:

11.1.5.1. Ability to provide ongoing support and knowledge transfer.

11.1.5.2. Experience delivering technical training and documentation to IT and functional staff.

11.2. Submit the names and contact information of at least three (3) references that are familiar with your experience and competence. Include contact information, project scope, and outcomes.

11.3. References should be uploaded in the Supplier Attachments section of the e-bid system and labeled “References”.

12. VALUE-ADDED SERVICES

12.1. Describe any special resources, skills, or services that your organization possess, and which are not addressed as part of this RFP, that would be available as part of an agreement with the successful bidder. Describe advantages to be realized by The System as a result of these value-added resources.

13. BID SUBMISSION

13.1. Bidder should prepare a proposal that addresses each section in the specifications, numbered and in order. Please describe how your proposed solution meets or exceeds the University’s needs as described in the specifications.

13.2. Bid response should be uploaded to the Supplier Attachments section of this e-bid system and labeled “Proposal”.

14. METHOD OF AWARD

14.1. Evaluation methodology - will be “Best Value” as defined in the terms and conditions.

14.2. Proposal Clarification - OCP reserves the right, at its sole discretion, to request clarifications of technical Bids or to conduct discussions for the purpose of clarification with any or all bidders. The purpose of any such discussions shall be to ensure full understanding of the bid. If clarifications are made because of such discussion, the bidder(s) shall put such clarifications in writing. The clarification shall not alter or supplement the bid.

14.3. Competitive Negotiations - OCP reserves the right to negotiate with one, selected, all or none of the Bidders responding to this Solicitation to in order to obtain the best value.

Negotiations could entail discussions on products, services, pricing, contract terminology or any other issue material to an award decision or that may mitigate institutional risks. OCP shall consider all issues negotiable and will not be artificially constrained by internal corporate policies. Negotiation may be with one or more Bidders, for one or all items in the Bid. Bidders that contend that they lack flexibility because of their corporate policy on a negotiation item shall face a significant disadvantage and may not be considered.

14.3.1. Negotiations may be conducted in person, in writing, or by telephone.

14.3.2. Negotiations shall only be conducted with potentially acceptable Bids. OCP reserves the right to limit negotiations to those Bids that received the highest rankings during the initial evaluation phase.

14.3.3. Terms, conditions, prices, methodology, or other features of the Bid may be subject to negotiations and subsequent revision. As part of the negotiations, the Bidder may be required to submit supporting financial, pricing, and other data in order to allow a detailed evaluation of the feasibility, reasonableness, and acceptability of the Bid.

14.3.4. The requirements of this Solicitation shall not be negotiable and shall remain unchanged unless the OCP Chief Procurement Officer determines that a change in such requirements is in the best interest of the A&M System.

14.3.5. BEST and FINAL – OCP may request best and final bids if deemed necessary and shall determine the scope and subject of any best and final request.

However, the bidder should not expect an opportunity to strengthen its bid and should submit its best bid based on the terms and condition set forth in this solicitation.

15. EVALUATION CRITERIA

15.1. Cost Evaluation

15.1.1. The average of all bids will be utilized to determine the baseline and establish a competitive range. The cost component will be evaluated utilizing the competitive range. The top scoring bid based on qualitative evaluation metrics will be compared to the competitive range. If the bid price is within the competitive range or is justified with performance information, the award process continues to the highest qualitative score. If performance metrics and information do not support an award, the evaluation process will continue to the next highest qualitative score.

15.1.2. Your bid should include all relevant information about your pricing proposal to justify the cost. Suppliers who do not show dominant information of performance, cost, time, etc. to prove their price is valid and justifiable are eliminated from consideration due to their pricing not being within the competitive range.

15.2. Qualitative Evaluation Criteria

15.2.1. Technical Capabilities: 30%

15.2.2. Experience and Expertise: 20%

15.2.3. Compliance and Security: 20%

15.2.4. Support and Training: 15%

15.2.5. Project Management: 10%

15.2.6. References: 5%

7.1. As authorized by 74 O.S. 1004, it is the intent of this solicitation and resulting contract(s) to allow for cooperative procurement. In the event a contract between the University and bidder(s) results from this RFP, the bidder (supplier) may of...
8.1. The A&M Office of Central Procurement (OCP) reserves the right to request demonstrations or product samples from any or all-responding Bidders. As part of the evaluation process presentations may be required from the highest ranked respondents. ...
15.2.1. Technical Capabilities: 30%
15.2.6. References: 5%