Banks Road _ Ellis Road Final Plans.pdf
PDF 2 MB Posted
- Solicitation number
- PE-65600-NONST-2026-000000235
- Issued by
- Douglas County, Georgia
About this file
This file contains final construction plans for a traffic signal installation project at the intersection of Banks Road and Ellis Road in Fayette County, Georgia, prepared by the Department of Public Works. The project involves the installation of traffic signal equipment, detection systems, and related infrastructure improvements at this intersection, which experiences traffic volumes of 9,726 vehicles per day on Banks Road and 5,595 vehicles per day on Ellis Road. The scope of work includes four treated timber poles (CL-2, 40 feet), guy and anchor assemblies, microwave radar detection systems, 3-section and 4-section LED signal heads with 12-inch faces, controller cabinet assemblies (332 model with 2070LX controller units), pull boxes (TP 2, 3, and 6), traffic signal cable, conduit installation, thermoplastic traffic striping in various widths and colors, warning signs, and overhead street name signs. The plans also specify removal of existing rumble strips using hydro-blasting methods, installation of raised pavement markers, sodding, and directional boring for conduit. Material certification is required prior to beginning signal installation work, and the contractor must coordinate with utility companies including Coweta-Fayette EMC for power service connections. The project includes a bid alternative for sidewalk guy anchor assemblies to address right-of-way constraints. Bids were due by 3:00 p.m. on Tuesday, June 23, 2026.
The contractor is responsible for all traffic control costs, maintenance of traffic measures, and staging of construction to adhere to restricted road closure timelines, with all associated expenses to be included in the lump sum traffic control bid item. The contractor must also manage erosion control compliance with state and federal regulations, utility coordination for "make ready" work, field verification of radar detection placement, and removal or replacement of existing traffic markings and infrastructure damaged during construction. The contractor bears responsibility for all monthly power and communication service costs until the signal installation completes a 30-day uninterrupted operation test period, at which point utility costs transfer to Fayette County. All materials, devices, and signage must conform to current Manual on Uniform Traffic Control Devices standards, AASHTO requirements, and GDOT specifications, with devices meeting NCHRP and MASH crashworthiness test procedures. Sign posts, barricades, and traffic control devices must be sourced from the GDOT Qualified Products List.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26136_B ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F
TAX ID 0538 032
LIVING TRUSTNIPPER JOYCE B
N/F
TAX ID 0531 080
NATHAN PYLES
N/F
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F
TAX ID 0538 032
LIVING TRUSTNIPPER JOYCE B
N/F
TAX ID 0531 080
NATHAN PYLES
N/F
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F
TAX ID 0538 032
LIVING TRUSTNIPPER JOYCE B
N/F
TAX ID 0531 080
NATHAN PYLES
N/F
PLANS COMPLETED 03-13-2026
ADT (2024)
BANKS RD AT ELLIS RD
TRAFFIC SIGNAL IMPROVEMENTS
DEPARTMENT OF PUBLIC WORKS
FAYETTE COUNTY
PROJECT LOCATIONLOCATION SKETCH
DATE
PREPARED BY:
01-
BANKS RD
EXIST R/W
DESIGN
REVISIONS
PLAN AND PROFILE OF PROPOSED
DRAWING NO.
FAYETTE COUNTY
BANKS RD
E L L
IS
R D
EXIST R/W
EXIST R/W
EXIST R/W
DESIGN SPEED:
ELLIS RD: LOCAL
BANKS RD: MINOR ARTERIAL
ROADWAY CLASSIFICATION
100% IN CONG. DIST. NO. 3.
FAYETTE COUNTY AND IS
THIS PROJECT IS 100% IN
BANKS RD: 35 MPH
ELLIS RD: 35 MPH
DESIGN DATA:
LL 153
LL 168
E X I S T
W
E X I
W
ELLIS RD - 5,595 VPD
BANKS RD - 9,726 VPD
(NAVD) OF 1988.
NORTH AMERICAN VERTICAL DATUM
1983)/94 WEST ZONE, AND THE
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
MEAN THE DEPARTMENT OF TRANSPORTATION.
DEPARTMENT OF GEORGIA, AND SHALL BE DEEMED TO
THE CONTEXT THEREOF MEANS THESTATE HIGHWAY
" HIGHWAY DEPARTMENT ", OR " DEPARTMENT " WHEN
DEPARTMENT ", GEORGIA STATE HIGHWAY DEPARTMENT ",
DEPARTMENT OF GEORGIA ", "STATE HIGHWAY
WITH THIS DOCUMENT, TO " STATE HIGHWAY
PHOTOGRAPHS USED, OR TO BE USED IN CONNECTION
ALL PAPERS, WRITINGS, DOCUMENTS, DRAWINGS, OR
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES
NOTE :
THE SPECIFICATIONS.
DIRECTED TO SUBSECTIONS 102.04, 102.05, AND 104.03 OF
THE ATTENTION OF BIDDER IS SPECIFICALLY
DO NOT BIND FAYETTE COUNTY IN ANY WAY.
ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND
INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE SAME
UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE
DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED
THESE PLANS OR IN ANYWAY INDICATED THEREBY, WHETHER BY
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON
A CONFLICT.
WHICH THEY REVISE OR IN WHICH THERE IS
CONSTRUCTION STANDARDS AND DETAILS BOOK
WITHIN THIS PLAN SET SUPERSEDE THE 2025
FORMS/ALLITEMS.ASPX. ANY REVISIONS CONTAINED
INFO/GDOTPUBS/CONSTRUCTIONSTANDARDSANDDETAILS/
BOOK IS AVAILABLE AT: HTTP://MYDOCS.DOT.GA.GOV/
THE 2025 CONSTRUCTION STANDARDS AND DETAILS
DETAILS BOOK AND ATTACHED APPLICABLE REVISIONS.
WITH THE 2025 CONSTRUCTION STANDARDS AND
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE
NOTE :
INDEX.HTML?ID=962A2591F91A4303AEAFE016BA8DB96B
HTTPS://ITOS.MAPS.ARCGIS.COM/APPS/WEBAPPVIEWER/
GDOT STATE FUNCTIONAL CLASSIFICATION MAP:
50 100 200
SCALE IN FEET
3500 Parkway Lane
Peachtree Corners, Ga. 30092
Phone 678-336-7740
Fax 678-336-7744
Web www.pondco.com
Suite 500
03/13/2026
AN - Hanger Bracket Detail27-0006
AN - Power Pedestal Pole Detail27-0005
N - Summary of Quantities27-0004
Signal Plan27-0003
N - General Notes27-0002
- Legend27-0001
Index Drawing02-0001
Cover Drawing01-0001
12/10/24
02-0001
DRAWING NO. DESCRIPTION DRAWING NO. DESCRIPTION
INDEX
BANKS RD AT ELLIS RD
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
3/13/2026 mccoyj
GPLOT-ORD
gplotborder-ORD-PO.tbl
11051_01-0002_copy.dgn
3:12:26 PM
GPLN-CE
PROJECT NUMBER
INDEX
BANKS RD AT ELLIS RD
Signal Plan
Signal Plan
Signal Plan
Signal Plan
Signal Plan
BLA
ELA
LEGEND - TRAFFIC SIGNALS
STRAIN POLE
TIMBER POLE
DOWN GUY
MAST ARM
STREET LIGHT
3 SECTION FACE
3 SECTION FACE W/BACKPLATE
4 SECTION FACE
4 SECTION FACE W/BACKPLATE
OVERHEAD SIGN
PEDESTAL POLE
PED SIGNAL FACE
SIGN POST
STRAIN POLE
CONTROLLER CABINET
TIMBER POLE
DOWN GUY
MAST ARM
STREET LIGHT
3 SECTION FACE W/BACKPLATE
4 SECTION FACE W/BACKPLATE
OVERHEAD SIGN
PEDESTAL POLE
PED SIGNAL FACE
PULLBOX, TP 2
SIGN POST
CONDUIT, (OPEN TRENCH)
CONDUIT, DIRECTIONAL BORE
RADAR DETECTION DEVICE
VIDEO DETECTION DEVICE
MAGNETOMETER DETECTION DEVICE
EXISTING R/W LINE
PROPERTY LINE
CONSTRUCTION CUT LIMIT
CONSTRUCTION FILL LIMIT
REQUIRED R/W LINE
AGENCY SPECIFIC
BEGIN LIMIT OF ACCESS
END LIMIT OF ACCESS
REQ'D LIMIT OF ACCESS
REQ'D LIMIT OF ACCESS & R/W
ORANGE BARRIER FENCE
ESA - ENV. SENTITIVE AREA
(SEE ERIT TABLE)
EASEMENT FOR CONTRUCTION
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
3 SECTION FACE W/BACKPLATE
4 SECTION FACE W/BACKPLATE
RELOCATEDPROPOSEDEXISTING
CURB CUT RAMP
CONDUIT
CURB CUT RAMP, ALL TYPE
VIRTUAL DETECTION ZONE
RADAR
RADAR DETECTION DEVICE
VIDEO DETECTION DEVICE
MAGNETOMETER DETECTION DEVICE
4/5 SECTION (CLUSTER/T-SHAPE) FACE
W/BACKPLATE
VIRTUAL DETECTION ZONE
RADAR
4/5 SECTION (CLUSTER/T-SHAPE) FACE
W/BACKPLATE
PEDESTAL POLE
PED SIGNAL FACE
PULLBOX, TP 3
PULLBOX, TP 6
CONTROLLER CABINET
EXISTING PULLBOX, TP 2
EXISTING PULLBOX, TP 3
EXISTING PULLBOX, TP 6
POWER SEVICE
PULLBOX, TP 4S
REQ'D R/W
BANKS RD AT ELLIS RD
SIGNAL PLANS
LEGEND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/7/2026 mccoyj
GPLOT-ORD
11051_27-0001_copy.dgn
12:40:49 PM
27-0001
TRAFFIC SIGNAL GENERAL NOTES
1.
2. SIGNAL HEADS SHALL BE ERECTED TO PROVIDE AT LEAST 17 FEET BUT NO
MORE THAN 19 FEET CLEARANCE FROM BOTTOM OF SIGNAL HEADS TO TOP OF ROAD
SURFACE AND A MINIMUM OF 8 FEET MEASURED HORIZONTALLY BETWEEN CENTERS
OF SIGNAL FACES.
3. THE CONTRACTOR SHALL LOCATE UNDERGROUND UTILITIES IN VICINITY OF
NEW TRAFFIC SIGNAL POLES PRIOR TO ORDERING. AT THE DISCRETION OF THE
ENGINEER, MINOR SHIFTS (UP TO 5 FEET, MAXIMUM) IN LOCATION OF NEW
SIGNAL POLES ARE ACCEPTABLE TO AVOID UNDERGROUND UTILITIES. PER AASHTO
REQUIREMENTS, MINIMUM LATERAL OFFSET OF 14' FROM EDGE OF PAVEMENT SHALL
FOR ALL PROPOSED TIMBER POLES AND CABINET ASSEMBLY. PLEASE BE MAINTAINED
5.
6.
7.
MATERIAL CERTIFICATION IS REQUIRED PRIOR TO BEGINNING ANY SIGNAL
INSTALLATION WORK. THE CONTRACTOR SHALL FOLLOW PROCEDURES OUTLINED IN
THE DOT SPECIFICATION.
10.
PROVIDED AS GENERAL GUIDELINES TO INSTALLER, ACTUAL ATTACHMENT
HEIGHTS SHALL BE FIELD DETERMINED BY INSTALLER TO PROVIDE REQUIRED
SIGNAL HEAD MOUNTING HEIGHTS AND CLEARANCE FROM EXISTING UTILITIES.
11.
THE CONTRACTOR SHALL REPLACE IN KIND AND SIZE, AT NO SEPARATE
EXPENSE TO THE COUNTY, ANY BARRIER WALL, FENCE, DITCH PAVING,
CURBING, SIDEWALK, GUTTER, SLOPE PAVEMENT, SIGNS, GUARDRAILS,
LANDSCAPING, GRASSING, UTILITY SERVICE LINES, STORM DRAIN
PIPES,MASONRY WALLS AND PAVING THAT IS REMOVED, DAMAGED OR DESTROYED
DUE TO CONTRACTOR'S ACTIVITIES.
12.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL
MEASURES TO ENSURE COMPLIANCE TO ALL STATE AND FEDERAL LAWS AND
GUIDELINES, THE COST SHALL BE CONSIDERED INCIDENTAL AND BE INCLUDED
. NO ADDITIONAL PAYMENTS PAY ITEM 210-0100 GRADING COMPLETE IN THE
THIS IS SHALL BE MADE TO THE CONTRACTOR FOR EROSION CONTROL.
13.
ANY ADDITIONAL TRAFFIC MARKINGS, SYMBOLS OR STRIPING TO BE REMOVED
THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL FEES ASSOCIATED WITH
MODIFYING EXISTING AND ESTABLISHING NEW POWER AND COMMUNICATIONS
SERVICES FOR TRAFFIC SIGNALS, VIDEO DETECTION SYSTEMS AND/OR CCTV
CAMERAS ON THIS PROJECT. IF A UTILITY TRANSFORMER IS REQUIRED FOR
TRAFFIC SIGNAL EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO INCLUDE THE COST, AS PART OF THEIR BID PRICE, FOR THAT TRAFFIC
SIGNAL INSTALLATION, IF THE RESPECTIVE UTILITY REQUIRES PAYMENT FOR
INSTALLATION.
COMMUNICATION SERVICE TO THE TRAFFIC SIGNAL INSTALLATION AND SUPPORT
DEVICES, UNTIL THE NEW TRAFFIC SIGNAL INSTALLATION HAS
SATISFACTORILY COMPLETED A TEST PERIOD, OF UNINTERRUPTED OPERATION,
FOR 30 DAYS. UPON COMPLETION OF THE TEST PERIOD, THE CONTRACTOR
THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL MONTHLY POWER AND
THE COMPLETE TRAFFIC SIGNAL AND INSTALLATION SHALL CONFORM
TO ALL APPROPRIATE PARTS OF THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES, CURRENT EDITION.
PROPOSED SIGNAL SUPPORT WIRE ATTACHMENT HEIGHTS ON POLES ARE
SHALL BE PAID (THAT ARE NOT SHOWN ON THE PLANS)AND/OR REPLACED
WILL COMPLETE A TRANSFER OF UTILITY COST TO FAYETTE COUNTY
. PLACEMENT OF THE SIGNAL NOTE THAT PLANS SHOW 15' LATERAL OFFSET MINIMUM.
14.4. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL NEW GUYS ON EXISTING UTILITY
TIMBER POLES WHEN ATTACHING SPAN WIRE OR INTERCONNECT CABLE TO THE POLES
UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
8.
9.
ALL EXISTING STOP BARS, WORDS, ARROWS AND CROSSWALKS THAT ARE NOT REMOVED
OR RELOCATED SHALL BE REPLACED IN ACCORDANCE WITH CURRENT GDOT STANDARDS.
(THE MAINTAINING AGENCY).
PROVIDED BY THE COUNTY.
FINAL ACCEPTANCE. CONTRACTOR TO FIELD IMPLEMENT SIGNAL TIMINGS, AS
INSTALLATION IS TO BE CHECKED AND ACCEPTED BY FAYETTE COUNTY, PRIOR TO
INCLUSIVE OF SODDING TO MATCH IN KIND, INCLUDING
WATERING AND ESTABLISHMENT.
DETECTION IN FIELD. ALL ASSOCIATED COSTS, INCLUDING PRUNING OF TREES,
SHALL BE INCLUDED IN PAY ITEM 647-1000.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING PLACEMENT OF RADAR
404-387-3164
THE FOLLOWING UTILITIES HAVE FACILITIES IN THE PROJECT AREA:
CITY OF FAYETTEVILLE
CITY OF FAYETTEVILLE
WATERTELECOMMUNICATIONS
800-624-9675
770-460-4660
770-460-4660
706-763-9207
678-708-7112
770-252-7448
HEADS SHALL BE RETAINED AS SHOWN ON THE PLANS. THE CONTRACTOR SHALL
COORDINATE WITH THE OFFICE OF UTILITIES FOR ALL "MAKE READY" WORK.
FOR IN THE TRAFFIC CONTROL LUMP SUM ITEM,
16.
INCLUDED IN THE PRICE BID FOR “TRAFFIC CONTROL”.
ALL ITEMS NECESSARY FOR COMPLIANCE WITH THESE REQUIREMENTS SHALL BE
17. ALL SIGNS SHALL HAVE TYPE (XI) RETROREFLECTIVE SHEETING UNLESS OTHERWISE
NOTED.
18. IN RESIDENTIAL AREAS, TEMPORARY AND PERMANENT SIGNS SHALL BE LOCATED ON
OR AS CLOSE AS POSSIBLE TO PROPERTY LINES.
19. EXISTING TRAFFIC SIGNS SHALL BE MAINTAINED BY THE CONTRACTOR THROUGHOUT
CONSTRUCTION. MAINTENANCE CONSTRUCTION RELATED TRAFFIC CONTROL DEVICES.
20. THE WORK-SITE TRAFFIC CONTROL SUPERVISOR (WCTS) SHALL BE RESPONSIBLE
FOR THE ELIMINATION OF ANY CONFLICTING PAVEMENT MARKINGS. THE WCTS SHALL
NOT USE “BLACK OUT PAINT” TO ERADICATE CONFLICTING MARKINGS. THE ENGINEER
SHALL MAKE THE FINAL DETERMINATION WHETHER THE CONFLICTING MARKINGS HAVE
BEEN ADEQUATELY ELIMINATED.
21. ALL TRAFFIC CONTROL DEVICES SHALL BE MAINTAINED BY THE CONTRACTOR SO AS
OR AS CLOSE AS POSSIBLE TO PROPERTY LINES.NOT TO INTERFERE WITH SIGHT
22. FAYETTE COUNTY RESERVES THE RIGHT TO MODIFY THIS MAINTENANCE OF TRAFFIC
PLAN AS FIELD CONDITIONS WARRANT. IF ADDITIONAL TRAFFIC CONTROL DEVICES
DISTANCES ALONG ANY ADJACENT SIDE ROAD OR DRIVEWAY.
ARE REQUIRED, THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL
EXPENSE TO THE COUNTY.
23. TEMPORARY TRAFFIC CONTROL PLANS MUST BE SUBMITTED BY THE CONTRACTOR TO
FAYETTE COUNTY PUBLIC WORKS DEPARTMENT. FOR INFORMATION CALL (770) 320-6010.
24. CHANGEABLE MESSAGE SIGNS, INFORMING MOTORISTS OF LANE AND/OR ROAD CLOSURES
AND/OR TRAFFIC SHIFTS SHALL BE INSTALLED A MINIMUM OF 2 WEEKS PRIOR TO THE
25. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO PREPARE A MAINTENANCE OF
TRAFFIC PLAN FOR APPROVAL BY FAYETTE COUNTY BEFORE STARTING CONSTRUCTION.
ROAD CLOSURE. THESE SIGNS SHALL BE INSTALLED AT OR AS NEAR AS POSSIBLE TO
PAYMENT SHALL BE INCLUDED IN THE PRICE FOR TRAFFIC CONTROL. THE CONTRACTOR
SHALL CONSTRUCT THE PROJECT IN PHASES TO ADHERE TO THE RESTRICTED ROAD CLOSURE
26. THE CONTRACTOR SHALL MAINTAIN INGRESS AND EGRESS TO ALL DRIVEWAYS AT ALL TIMES.
THE ROAD CLOSURE (SEE SPECIFICATIONS BELOW):
(ROAD NAME) WILL BE CLOSED TO THRU TRAFFIC
FROM (SIDE ROAD) TO (SIDE ROAD)
FROM (DATE) THRU (DATE)
(REASON FOR CLOSURE)
FOR INFO CALL (770) 320-6010
TIMELINE AND DATES AS STATED IN THE CONTRACT SPECIFICATIONS.
15.
SHALL INCLUDE THE COST OF STAGED CONSTRUCTION, ALL MAINTENANCE OF
TRAFFIC, INCLUDING AGGREGATE SURFACE, INSTALLATION AND REMOVAL OF ANY
TEMPORARY SIGNING, CHANNELING DEVICES, BARRICADES, OTHER INTERIM TRAFFIC
CONTROL DEVICE NECESSARY FOR THE CONSTRUCTION AND MAINTENANCE OF TRAFFIC,
LUMP SUM TRAFFIC CONTROL, THE PRICE BID FOR LUMP SUM TRAFFIC CONTROL
AND PROJECT SAFETY. FOR COMPLIANCE WITH THE MANUAL ON UNIFORM TRAFFIC
SIGNS, POSTS, BARRICADES, ETC. SHALL BE FROM THE GDOT QUALIFIED PRODUCTS
LIST (QPL). ALL DEVICES SHALL BE CRASHWORTHY UNDER NCHRP AND MASH TEST
PROCEDURES. THE ENGINEER MAY DIRECT MINOR ADDITION, DEVICES AND SIGNINGS
BE ADDED TO THE TRAFFIC CONTROL PLAN. THE COST OF NORMAL ITEMS ADDED BY
CONTROL DEVICES (MUTCD), CURRENT EDITION AND SECTION 150. ALL DEVICES,
THE ENGINEER SHALL BE INCLUDED IN LUMP SUM TRAFFIC CONTROL EXCEPT FOR THE
ADDITION OF A CHANGED MESSAGE SIGNS. THE CONTRACT UNIT PRICE WILL BE PAID
FOR THE CHANGEABLE MESSAGE SIGNS (OR A UNIT PRICE WILL BE DEFINED WHEN A
CHANGEABLE MESSAGE SIGN IS NOT INCLUDED IN THE CONTRACT).
MAINTENANCE OF TRAFFIC GENERAL NOTES
BANKS RD AT ELLIS RD
SIGNAL PLANS
GENERAL NOTES
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
3/13/2026 mccoyj
GPLOT-ORD
11051_27-0001_copy - Copy.dgn
2:59:30 PM
27-0004
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F
TAX ID 0538 032
LIVING TRUSTNIPPER JOYCE B
N/F
TAX ID 0531 080
NATHAN PYLES
N/F
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F
TAX ID 0538 032
LIVING TRUSTNIPPER JOYCE B
N/F
TAX ID 0531 080
NATHAN PYLES
N/F
PL PL
SPEED LIMIT = 35 MPH
BANKS RD
SPEED LIMIT = 35 MPH
BANKS RD
S P E E
D
L I
M I T
M P
H E L L I
LL 168
LL 153
EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/W
E X I
W
E X I
W
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F
TAX ID 0538 032
LIVING TRUSTNIPPER JOYCE B
N/F
TAX ID 0531 080
NATHAN PYLES
N/F
D3-1#2
R6
R4
R2 D3-1#3D3-1#1
P R I
V A
E
I
V E
W A Y
SEE NOTE 4 BELOW
1-2" POWER SERVICE CONDUIT, NM, TP 2, 2 IN, 1 EA (30 LF)
INSTALL ON EXISTING POWER POLE:
EXIST. R/W
PULL BOX, TP 3
N:1262194.993, E:2214093.893
GUY AND ANCHOR ASSEMBLY
TREATED TIMBER POLE, CL-2, 40 FT
INSTALL:
SEE NOTE 5 BELOW
N:1262134.288, E:2214068.046
MICROWAVE RADAR DETECTION SYSTEM (RDS R2,R3)
LUMINAIRE BRACKET ARM, 15 FT
GUY AND ANCHOR ASSEMBLY
TREATED TIMBER POLE, CL-2, 40 FT
INSTALL:
(TYP)
IN8
STEEL STRAND WIRE CABLE
INSTALL:
N:1262199.414, E:2213923.737
PULL BOX, TP 3
MICROWAVE RADAR DETECTION SYSTEM (RDS R4,R6)
LUMINAIRE BRACKET ARM, 15 FT
GUY AND ANCHOR ASSEMBLY
TREATED TIMBER POLE, CL-2, 40 FT
INSTALL:
SEE NOTE 5 BELOW
N:1262134.372, E:2213914.750
GUY AND ANCHOR ASSEMBLY
TREATED TIMBER POLE, CL-2, 40 FT
INSTALL:
(TYP)
260' FROM STOP BAR
6'X6' SETBACK DETECTION ZONE
INSTALL:
SEE NOTE 3 BELOW
W3-1 SIGN
REMOVE EXISTING:
SEE NOTE 3 BELOW
R1-1 SIGNS AND FLASHER BEACONS
REMOVE EXISTING:
SEE NOTE 3 BELOW
STREETNAME SIGN ASSEMBLY
REMOVE EXISTING:
N:1262142.829, E:2213972.446
OM4-3 SIGNS AND POSTS
W1-7 SIGN AND POST
INSTALL:
W1-7 SIGN
REMOVE EXISTING:
(TYP)
24" SOLID WHITE
REFRESH/INSTALL:
(TYP)
6" SOLID WHITE
REFRESH/INSTALL:
35 MPH SPEED LIMIT SIGN AND POST
RETAIN EXISTING:
W3-1 SIGN
REMOVE EXISTING:
AND POST
35 MPH SPEED LIMIT SIGN
RETAIN EXISTING:
R3
(TYP)
TIE IN TO EXISTING STRIPING
N:1262157.124, E:2213687.129
W3-3/W16-8P SIGN AND POST
INSTALL:
N:1262448.247, E:2213948.595
W3-3/W16-8P SIGN AND POST
INSTALL 250' FROM STOP BAR (TYP):
N:1262180.810, E:2214330.485
W3-3/W16-8P SIGN AND POST
INSTALL:
D3-1#1
TYPE 1 RPMS
INSTALL:
6" SOLID DOUBLE YELLOW
REFRESH:
, YELLOW @ 40' SPACING O.C.,
SEE NOTE 4 BELOW
POWER PEDESTAL
PULL BOX, TP 6
CONDUIT, NM, TP 2, 2 IN, 4 EA
2070 LX CONTROLLER
332 CABINET WITH BASE
INSTALL:
CONDUIT, NM, TP 3, 2 IN, 4 EA
SEE NOTE 7 BELOW
RUMBLE STRIPS
REMOVE EXISTING:
SEE NOTE 2 BELOW
5" SOLID DOUBLE YELLOW
REMOVE EXISTING:
24" SOLID WHITE
INSTALL:
SIGNAL PLANS
TRAFFIC SIGNAL INSTALLATION NO. 1
BANKS RD AT ELLIS RD
SIGNAL HEAD
PROPOSED
SIGNAL HEAD
EXISTING
SIGNAL HEAD
RELOCATED
SIGNAL HEAD
PEDESTRIAN
SIGNAL HEAD
PROPOSED 4-SECTION
SIGNAL LEGEND
PROPOSED 5-SECTION OR
4-SECTION SIGNAL HEAD
DETECTION LEGEND
PROPOSED MAGNETOMETER
PROPOSED INDUCTIVE LOOP
PROPOSED VIDEO DETECTION CAMERA
PROPOSED RADAR
OVERHEAD STREET NAME SIGNS
RETRO-REFLECTIVE BACK PLATE
LED SIGNAL HEADS WITH
2,3,4,6
12"
12"
12"
01/ 02/ 03/ 04/
05/ 06/ 07/ 08/
OMIT
PHASING DIAGRAM
OMIT
OMIT
D3-1#1 D3-1#2
WARNING SIGNS
OM4-3 (18"X18")
OM4-3 (18"X18")
W1-7 (48"X24")
OMIT
WARNING SIGNS
W3-3 (36"X36")
TAX ID 0531 114
ANGIE AND JOHNNY CARTER
N/F TAX ID 0531 080
NATHAN PYLES
N/F
TAX ID 0538 032
JOYCE B NIPPER LIVING TRUST
N/F
H I
D D
N
V A L L
Y
W16-8P (8"X28")
W3-3 (36"X36")
W16-8P (8"X24")
D3-1#3
PROPOSED VIRTUAL DETECTION ZONE
6. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING UTILITIES PRIOR TO CONSTRUCTION.
GRADING COMPLETE.
SHALL BE UTILIZED FOR REMOVAL. PAYMENT SHALL BE INCLUDED IN PAY ITEM 210-0100
384' AND 584', RESPECTIVELY, FROM THE PROPOSED STOP BAR. HYDRO-BLASTING METHOD
CONTRACTOR SHALL REMOVE THE EXISTING FOUR RUMBLE STRIP LOCATIONS AT 184', 260', 7.
RIGHT OF WAY.
ALL POLES, GUY WIRES AND RELATED EQUIPMENT SHALL BE INSTALLED WITHIN EXISTING 8.
OF WAY IMPACTS. SEE SHEET 27-0004 FOR INFORMATION REGARDING THIS BID ALT #1.
ANCHOR ASSEMBLY IS NEEDED, THIS ASSEMBLY SHALL BE INSTALLED TO AVOID ANY RIGHT
DUE TO CONSTRAINED RIGHT OF WAY, IF CONTRACTOR DETERMINES THAT SIDEWALK GUY9.
CONTRACTOR SHALL UTILIZE HYDRO-BLASTING METHOD ONLY FOR
ERADICATION.
PROPOSED TIMBER AND TO ENSURE SUFFICIENT OPERATION OF RADAR DETECTION.
R
G
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
3/13/2026 mccoyj
GPLOT-ORD
3:16:14 PM
GPLN-CE 30 60 120
SCALE IN FEET
PROJECT NUMBER
TAX ID 0531 088
DAN LATHAM
N/F
TAX ID 0538 032
JOYCE B NIPPER LIVING TRUST
N/F
27-0003
LIST OF MATERIALS IS FOR INFORMATION PURPOSES ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL MATERIALS AND QUANTITIES REQUIRED FOR INSTALLATION.
MATERIALS UNIT
CABINET CONTROLLER ASSEMBLIES
A.
E.
F. SWITCH PACK (LOAD SWITCH)
L.
PULL BOX, PB-2
EA
EA
EA
EA
REEL
EA
EA
EA
EA
A. 7 CONDUCTOR, PER 1000 FT
PULL BOX, PB-6
CABINET ASSEMBLY, 332
SIGNAL CABLE (14 AWG)
2018ECLIP SIGNAL MONITOR, TYPE B (ETHERNET)
HARDWARE FOR SPAN WIRE MOUNTING
MISC. MATL. TO COMPLETE INSTALLATION LUMP SUM
LIST OF MATERIALS
BACKPLATE FOR ONE-WAY, 3 SECTION, 12" SIGNAL HEAD, ABS PLASTIC, BLACK W/ RETROREFLECTIVE STRIP
CONTROLLER UNIT, MODEL 2070LX
PAY ITEMS
ITEM NO. DESCRIPTION
150-1000
680-5275 LUMINAIRE BRACKET ARM, 15 FT
UNIT
LUMP SUM
EA
DESCRIPTION UNIT
DETECTION SYSTEMS
LIST OF MATERIALS
937-6010
A. MOUNTING ASSEMBLY
B. CABLES
EA
LF
- BANKS RD AT ELLIS RDMICROWAVE DETECTION SYSTEM NO. 1 LUMP SUM
TRAFFIC CONTROL
ELECTRICAL POWER SERVICE ASSEMBLY, AERIAL SERVICE POINT.
*THE CONTRACTOR SHALL COORDINATE WITH COWETA-FAYETTE EMC REGARDING POWER SERVICE POINT. PAYMENT FOR ALL NECESSARY COMPONENTS/EQUIPMENT SHALL BE INCLUDED IN PAY ITEM 939-5010
QUANTITY
QUANTITY
QUANTITY
937-6010 LUMP SUM - BANKS RD AT ELLIS RDMICROWAVE DETECTION SYSTEM NO. 1 1
939-5010 EAELECTRICAL POWER SERVICE ASSEMBLY (AERIAL SERVICE POINT)* 1
PULL BOX, PB-3 EA 1
EA3-SECTION, 12" SIGNAL HEAD LED-, BLACK HOUSING W/BLACK FRONT, PLASTIC 8
682-6233 CONDUIT, NONMETAL, TP 3, 2 IN LF 120
639-2002 LF IN8
STEEL WIRE STRAIN CABLE, 450
M. EAAUXILIARY OUTPUT FILE 1
639-1240 EATREATED TIMBER POLE, CL 2, 40 FT (OVERALL POLE HEIGHT, INCL EMBEDDED DEPTH PLUS ABOVE GROUND) 4
639-1600 EAGUY AND ANCHOR ASSEMBLY** 4
647-1000 LUMP SUMTRAFFIC SIGNAL INSTALLATION NO.1 - BANKS RD AT ELLIS RD 1
653-1704 LFTHERMOPLASTIC SOLID TRAF STRIPE, 24 IN, WHITE 120
682-6120 CONDUIT, RIGID, 2 IN (INCL WEATHERHEAD) LF 30
653-1906 LFTHERMOPLASTIC SOLID TRAF STRIPE, 6 IN, WHITE 380
653-2602 LFTHERMOPLASTIC SOLID TRAF STRIPE, 6 IN, YELLOW 290
OVERHEAD STREET NAME SIGNS
D3-1#1
D3-1#2
636-2070 LFGALV STEEL POSTS, TP 7 93
636-1036 SFHIGHWAY SIGNS, TP 1 MATL. REFL SHEETING,TP 11 81
W16-8P WARNING SIGNS
BORDER
R=1.5 in
TH=0.9 in
IN=0.5 in
WHITE TEXT ON GREEN BORDER
D3-1#3
4.1 19.8 4.2
28 in
C
C i n
BORDER
R=1.5 in
TH=0.375 in
IN=0.375 in
4.1 15.7 4.2
24 in
C
C i n
BORDER
R=1.5 in
TH=0.375 in
IN=0.375 in
BLACK TEXT ON YELLOW BORDER
BLACK TEXT ON YELLOW BORDER
610-9001 EAREM SIGN 5
656-0050 LFREMOVE EXIST SOLID TRAF STRIPE, 5 IN, THERMOPLASTIC 300
654-1001 EARAISED PAVEMENT MARKERS TP 1 8
700-9300 SOD SY
682-9950 DIRECTIONAL BORE - 5 IN LF 100
210-0100 LUMP SUMGRADING COMPLETE 1
8.2 in 33 in 6 in 21 in 6 in 13.7 in 8.2 in
8'
.5
D
.5
.5
.5
.5
D
.5
BORDER
R=1.5 in
TH=0.9 in
IN=0.5 in
WHITE TEXT ON GREEN BORDER
BORDER
R=1.5 in
TH=0.9 in
IN=0.5 in
WHITE TEXT ON GREEN BORDER
9.1 in 50.7 in 6 in 21 in 9.2 in
8'
.5
D
.5
.5
D
.5
.5
D
.5
8.2 in 13.7 in 6 in 33 in 6 in 21 in 8.2 in
8'
.5
.5
.5
D .5
**BID ALT #1 - REPLACE GUY ANCHOR ASSEMBLY FOR GUY ANCHOR ASSEMBLY, SIDEWALK
639-1600 GUY AND ANCHOR ASSEMBLY-SIDEWALK** EA 4
BANKS RD AT ELLIS RD
SIGNAL PLANS
SUMMARY OF QUANTITIES
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
3/13/2026 mccoyj
GPLOT-ORD
3:08:05 PM
27-0004
SIGNAL PLANS
NOTES:
(AERIAL SERVICE POINT).
PAY ITEM 939-5010 ELECTRICAL POWER SERVICE ASSEMBLY
POWER SERVICE CONNECTION SHALL BE INCLUDED IN
PAYMENT FOR EQUIPMENT SHOWN ABOVE REQUIRED FOR
CONTROLLER CABINETS IS NOT PERMITTED.
MOUNTING OF POWER METERS OR DISCONNECTS ON SIGNAL 1.
2.
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/7/2026 mccoyj
GPLOT-ORD
11051_27-0001_copy.dgn
12:38:55 PM
POWER PEDESTAL POLE DETAIL
27-0005
SIGNAL PLANS
27-0006
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
10/30/2025 mccoyj
GPLOT-ORD
11051_27-0001.dgn
1:42:19 PM
HANGER BRACKET DETAIL
P.I. No.PROJECT NUMBER
File details come from the government source that posted it. Updated .