This addendum document pertains to Bangor Township Schools' 2023 Bond Phase 5 Roofing Projects located in Bay City, Michigan, issued by Wolgast Corporation Construction Management Division on behalf of the school district. The project encompasses roof replacements at multiple facilities: Bangor Middle School, West Elementary, Lincoln Elementary, and Central Elementary. Bids are divided into two bid divisions: one covering Bangor Middle School and West Elementary, and a second covering Lincoln Elementary and Central Elementary. Sealed bids are due Tuesday, November 24, 2026, at 2:00 PM at Bangor Township Schools Administration Office, 3359 E Midland Road, Bay City, MI 48706, with bids to be opened and read aloud immediately thereafter. The pre-bid meeting was held on November 10, 2026. Contract award is anticipated on or about Monday, December 14, 2026. Start and completion dates are referenced in the project milestone schedule. Addendum #1, issued November 17, 2026, contains five Request for Information (RFI) responses addressing roof material alternates, gutter and downspout color clarifications, soffit specifications, roof transition key note clarifications, and dome insulation layer requirements, along with revised proposal forms and a pre-bid sign-in sheet.

A five percent bid bond, certified check, or money order must accompany each bid. The base bid should exclude labor, material, and performance bond costs, which are to be itemized separately. Bidders must demonstrate the ability to provide performance bonds and labor and material payment bonds regardless of bid amount; bonds exceeding $50,000.00 are mandatory by state law. Voluntary alternates may be proposed with product information and warranty documentation for consideration. Bidders must acknowledge receipt of all addenda on the proposal form and provide a combined bid deduction if awarded contracts for completing all work as a single project. The familial relationship affidavit and Iran Economic Sanctions Act certification must be completed and notarized. Each bid division requires submission in a separate sealed 9" x 12" manila envelope. Questions regarding design and specifications should be directed to Wolgast Corporation via email to jmcdonald@wolgast.com and ldonahue@wolgast.com. Bidding procedures questions may be directed to Jason McDonald at 989-790-9120.

View the file

Other files

File Type Posted
Roofing - Summer 2027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION MANAGEMENT DIVISION

Executive One Building 4835 Towne Centre Road, Suite 203

Saginaw, Michigan 48604 Phone: 989-790-9120

Fax: 989-790-9063

TO: Bangor Township Schools:

2023 Bond Phase 5 - Roofing Plan holders

ATTN: Bidders and Estimators

FROM: Lisa Donahue, Project Administrator

DATE: November 17, 2026

PROJECT: Bangor Township Schools - Roofing Projects

SUBJECT: Addendum #1

• Addendum #1 – Integrated Designs Inc o Nothing

Wolgast Changes

• Clarification Page 1 Page

• Revised Proposal Forms 18 Pages

• RFIs 1-5 10 Pages

• Pre-Bid Agenda 2 Pages

• Pre-Bid Sign Inn Sheet s 1 page

NOTES:

• Bids will be received, opened and read at:

• Bangor Township Schools- Administration Office 3359 E Midland Road Bay City, MI 48706

• Bid Date Is: Tuesday, November 24th, 2026 @ 2:00 PM

Number of pages (including this sheet) : 33 pages

If you have any problems with this transmission, please contact Lisa @ 989-790-9120

Bangor Township Schools

2027 Bond Work - Series 2 PH 5 MS / West El. / Lincoln El. / Central El. Roof replacements

Pre Bid RFI’s

Addendum #1

November 17, 2026

• RFI #1 Roof alternate materials.

o Please provide any proposed options as voluntary alternate suggestions on the bidding form. Provide related product information and warranty.

o See attached RFI response.

• RFI #2 Gutter-downspout-fascia clarification o See RFI response for colors.

o Provide voluntary alternate pricing for painting vs. replacing edge metal per school.

o Base bid should be per the documents.

• RFI #3 MS Soffit Clarification o See attached RFI response.

• RFI #4 Roof Clarification o See attached sketches for transitions between key notes.

• RFI #5 Dome Insulation layers o See attached RFI answer requiring two layers to achieve Minimum R-Value.

Bid Form Clarifications

• See attached revised bid form for bidding of roofs.

o Bids to be broken out:

▪ Bangor Middle School / West Elementary: one bid.

▪ Central Elementary / Lincoln Elementary: second bid.

• Provide a combined bid deduction for completing all work as one job.

Bangor Township School District Section 00300 2023 Bond - Phase 5 - Roofing Projects Instruction for Proposals and Bid Divisions

A. If you choose to submit Voluntary Alternates or Value Engineering Suggestions, please summarize your suggestions and state the amount to be deducted from the Base Bid.

B. Review the “Bid Division Responsibilities” portion of the Proposal Form.

C. Review the “Schedule” portion of the Proposal Form.

D. If the Proposal includes exceptions or substitutions to any part of the Bidding Documents or the Contract Documents, state the exceptions or substitutions in writing on the Proposal Form.

E. Fill in the Bidder’s legal name.

F. Indicate the Bidder’s status as a sole proprietor, partnership, corporation, or other type of entity.

G. Sign the Proposal Form in the space provided.

H. Type or print the signer’s name and title in the spaces provided below the signature line.

I. Date the Proposal Form in the space provided.

X. Provide a phone number, fax number and email address on the space provided.

3.01 SEALED BID ENVELOPE

A. Bids submitted must be sealed, preferably in a 9” x 12” manila envelope.

B. Each Bid Division is to be submitted in a separate envelope.

C. Label the sealed bid as follows:

END OF SECTION 00300

Wolgast Corporation – Construction Management 00300 – Page 3

TO: Bangor Township Schools Attn: Stephen Bouvy 3359 E Midland Road Bay City, MI 48706

SEALED BID FOR:

Bangor Township School District 2023 Bond - Phase 5 - Roofing Projects West Elemenary and Middle School

Bid Division No:

Bangor Township School District Section 00305 2023 Bond - Phase 5 - Roofing Projects Proposal Form

Project: Bangor Township School District

West Elementary/Middle School

Submitted By:

(Bidder’s Company Name)

Address:

City / State / Zip:

Phone:

Contact Name:

Email: ______________________________________________

Bid Proposal Deadline:Prior to Tuesday, November 24, 2026 at 2:00 PM (local time) to:

Stephen Bouvy, Superintendent, Bay City, MI 48706.

Or upload to Building Connected https://app.buildingconnected.com/login?retUrl=%2F

Bid Division Name:

Bid Division Number:

ADDENDA

We (the Bidder) acknowledge receipt of the following Addenda: Addendum #__ Dated _________ Addendum #__ Dated _________ Addendum #__ Dated _________

BID BOND ATTACHED? Yes, 5% Bid Bond is Attached Certified Check/Money Order for 5% of Base Bid is Attached

BASE BID for Bangor Township School District – Roofs – West/MS (not including Labor Bond, Material Bond, and/or Performance Bond Costs):

Dollars and 00/100ths

BOND COST for Bangor Township School District - Roofs – West/MS (Cost to provide Labor Bond, Material

Bond, and/or Performance Bonds on Base Bid):

Dollars and 00/100ths

Wolgast Corporation – Construction Management 00305 – Page 1 https://app.buildingconnected.com/login?retUrl=%2F

COMBINED BID DEDUCT

Building Breakdown

Building Base Bid Bond Alternate TOTAL

West Elem.

Christa McAuliffe MS

TOTAL

ALTERNATES

Alternate 1 – Christa McAuliffe MS – Soffit Panel – Base Bid – NO SCOPE – Add Alternate – Install new solid soffit panel at underside of existing overhang. Coordinate with Fascia/Edge Metal replacement. All material to be from same source/color match as building edge metal.

Alt 1 – MS ADD ___________________________

Alt 1 – MS Bond ___________________________

Wolgast Corporation – Construction Management 00305 – Page 2 jmcdonald Text Box jmcdonald Text Box If awarded a contract for the work, please provide a combined bid deduct for completing both projects as one.

jmcdonald Text Box Building jmcdonald Text Box Combined bid deduction

SUBMITTALS

Anticipated Date of Shop Drawing Submittal at Post Bid Interview:

Anticipated Number of Days to Begin:

Anticipated Number of On-site Staff:

Anticipated Number of Days to Complete:

Anticipated Number of Days for Delivery of Needed Items:

Proposed Manufacturers, Suppliers, and/or Subcontractors:

Item(s) Manufacturer/Subcontractor/Supplier

VOLUNTARY ALTERNATES / VALUE ENGINEERING SUGGESTIONS

We suggest the following alternate procedure(s) and/or material(s):

Summary of Suggestions Deduct from Base Bid

BID DIVISION RESPONSIBILITY

We recognize that the Scope of Work within a Bid Division represents a construction segment that is not necessarily restricted to a single construction trade, and our Proposal includes work of all trades required to fully and successfully complete all of the Work required in the Bid Division(s) we have submitted Proposals for:

SCHEDULE

We have reviewed the Preliminary Milestone Schedule and hereby endorse it with regard to the Work of Bid Division(s) we have bid. ALL WORK MUST BE COMPLETED BY Refer to Milestone Schedule.

Wolgast Corporation – Construction Management 00305 – Page 3

EXCEPTIONS AND/OR SUBSTITUTIONS

We have submitted our Proposal, as specified, complete and in accordance with the Bidding Documents, including Addenda and the Contract Documents, without exceptions or substitutions, unless otherwise noted in the “Voluntary Alternate / Value Engineering Suggestions” portion of this Proposal Form.

EXECUTION

Name of Bidder:

Bidder’s Status:

Corporation; Partnership; Sole Proprietor; Other: (Please Specify: )

By/Signature:

Name:

Title:

Date:

Email:

Phone: Fax:

END OF SECTION 00305

Wolgast Corporation – Construction Management 00305 – Page 4

Bangor Township School District Section 00306 2023 Bond - Phase 5 - Roofing Projects Familial Relationship Affidavit

Familial Relationship Sworn Statement

_____________________________________ does hereby disclose that per MCL 380.1267:

Company Name

YES, there exists a familial relationship between the Owner of the project or any member of their

Board, or Board of Directors, or the Superintendent of the School district, intermediate superintendent of the intermediate school district, or chief executive officer of the public-school academy and the

Owner or an employee(s) of ______________________________________.

Disclosure Between:

Name _______________________________ AND Name _______________________________

Title: _______________________________ Title:_________________________________

Relationship: __________________________ Relationship: __________________________

NO, there does not exist a familial relationship between the Owner of the project or any member of their Board, or Board of Directors, or the Superintendent of the School district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy and the Owner or an employee(s) of _______________________________________.

Company Name Name (printed):

Position:

Signature:

Date:

Notary Public(printed):

Signature:

County:

Date: _______________________________ My Commission Expires:

Affix Notary Seal Here:

END OF SECTION 00306

Wolgast Corporation – Construction Management 00306 – Page 1

Bangor Township School District Section 00307 2023 Bond - Phase 5 - Roofing Projects Iran Business Relationship Affidavit

Iran Business Relationship Affidavit

Effective April 1, 2013, all bids, proposals, and/or qualification statements received in the State of Michigan must comply with the “Iran Economic Sanctions Act”. The following certification is to be signed and included at time of submittal.

CERTIFICATION

Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran linked business,” as that term is defined in the Act.

Signature Title

Company Date

Wolgast Corporation – Construction Management 00307 – Page 1

Wolgast Corporation – Construction Management 00307 – Page 2

END OF SECTION 00307

Wolgast Corporation – Construction Management 00307 – Page 3

Bangor Township School District Section 00300 2023 Bond - Phase 5 - Roofing Projects Instruction for Proposals and Bid Divisions

A. If you choose to submit Voluntary Alternates or Value Engineering Suggestions, please summarize your suggestions and state the amount to be deducted from the Base Bid.

B. Review the “Bid Division Responsibilities” portion of the Proposal Form.

C. Review the “Schedule” portion of the Proposal Form.

D. If the Proposal includes exceptions or substitutions to any part of the Bidding Documents or the Contract Documents, state the exceptions or substitutions in writing on the Proposal Form.

E. Fill in the Bidder’s legal name.

F. Indicate the Bidder’s status as a sole proprietor, partnership, corporation, or other type of entity.

G. Sign the Proposal Form in the space provided.

H. Type or print the signer’s name and title in the spaces provided below the signature line.

I. Date the Proposal Form in the space provided.

X. Provide a phone number, fax number and email address on the space provided.

3.01 SEALED BID ENVELOPE

A. Bids submitted must be sealed, preferably in a 9” x 12” manila envelope.

B. Each Bid Division is to be submitted in a separate envelope.

C. Label the sealed bid as follows:

END OF SECTION 00300

Wolgast Corporation – Construction Management 00300 – Page 3

TO: Bangor Township Schools Attn: Stephen Bouvy 3359 E Midland Road Bay City, MI 48706

SEALED BID FOR:

Bangor Township School District

Lincoln Elementary and Central Elementary

Bid Division No:

Project: Bangor Township School District

Lincoln/Central Elementary Roofs

Submitted By:

(Bidder’s Company Name)

Address:

City / State / Zip:

Phone:

Contact Name:

Email: ______________________________________________

Bid Proposal Deadline:Prior to Tuesday, November 24, 2026 at 2:00 PM (local time) to:

Stephen Bouvy, Superintendent, Bay City, MI 48706.

Or upload to Building Connected https://app.buildingconnected.com/login?retUrl=%2F

Bid Division Name:

Bid Division Number:

ADDENDA

We (the Bidder) acknowledge receipt of the following Addenda: Addendum #__ Dated _________ Addendum #__ Dated _________ Addendum #__ Dated _________

BID BOND ATTACHED? Yes, 5% Bid Bond is Attached Certified Check/Money Order for 5% of Base Bid is Attached

BASE BID for Bangor Township School District – Roofs – Lincoln/Central Elem (not including Labor Bond, Material Bond, and/or Performance Bond Costs):

Dollars and 00/100ths

BOND COST for Bangor Township School District – Roofs – Lincoln/Central Elem (Cost to provide Labor Bond, Material Bond, and/or Performance Bonds on Base Bid):

Dollars and 00/100ths

Wolgast Corporation – Construction Management 00305 – Page 1

Building Breakdown

Building Base Bid Bond Alternate TOTAL

Lincoln Elem.

Central Elem.

TOTAL

ALTERNATES

Wolgast Corporation – Construction Management 00305 – Page 2 jmcdonald Snapshot

SUBMITTALS

Anticipated Date of Shop Drawing Submittal at Post Bid Interview:

Anticipated Number of Days to Begin:

Anticipated Number of On-site Staff:

Anticipated Number of Days to Complete:

Anticipated Number of Days for Delivery of Needed Items:

Proposed Manufacturers, Suppliers, and/or Subcontractors:

Item(s) Manufacturer/Subcontractor/Supplier

VOLUNTARY ALTERNATES / VALUE ENGINEERING SUGGESTIONS

We suggest the following alternate procedure(s) and/or material(s):

Summary of Suggestions Deduct from Base Bid

BID DIVISION RESPONSIBILITY

We recognize that the Scope of Work within a Bid Division represents a construction segment that is not necessarily restricted to a single construction trade, and our Proposal includes work of all trades required to fully and successfully complete all of the Work required in the Bid Division(s) we have submitted Proposals for:

SCHEDULE

We have reviewed the Preliminary Milestone Schedule and hereby endorse it with regard to the Work of Bid Division(s) we have bid. ALL WORK MUST BE COMPLETED BY Refer to Milestone Schedule.

Wolgast Corporation – Construction Management 00305 – Page 3

EXCEPTIONS AND/OR SUBSTITUTIONS

We have submitted our Proposal, as specified, complete and in accordance with the Bidding Documents, including Addenda and the Contract Documents, without exceptions or substitutions, unless otherwise noted in the “Voluntary Alternate / Value Engineering Suggestions” portion of this Proposal Form.

EXECUTION

Name of Bidder:

Bidder’s Status:

Corporation; Partnership; Sole Proprietor; Other: (Please Specify: )

By/Signature:

Name:

Title:

Date:

Email:

Phone: Fax:

END OF SECTION 00305

Wolgast Corporation – Construction Management 00305 – Page 4

Bangor Township School District Section 00306 2023 Bond - Phase 5 - Roofing Projects Familial Relationship Affidavit

Familial Relationship Sworn Statement

_____________________________________ does hereby disclose that per MCL 380.1267:

YES, there exists a familial relationship between the Owner of the project or any member of their

Board, or Board of Directors, or the Superintendent of the School district, intermediate superintendent of the intermediate school district, or chief executive officer of the public-school academy and the

Owner or an employee(s) of ______________________________________.

Disclosure Between:

Name _______________________________ AND Name _______________________________

Title: _______________________________ Title:_________________________________

Relationship: __________________________ Relationship: __________________________

NO, there does not exist a familial relationship between the Owner of the project or any member of their Board, or Board of Directors, or the Superintendent of the School district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy and the Owner or an employee(s) of _______________________________________.

Company Name Name (printed):

Position:

Signature:

Date:

Notary Public(printed):

Signature:

County:

Date: _______________________________ My Commission Expires:

Affix Notary Seal Here:

END OF SECTION 00306

Wolgast Corporation – Construction Management 00306 – Page 1

Iran Business Relationship Affidavit

Effective April 1, 2013, all bids, proposals, and/or qualification statements received in the State of Michigan must comply with the “Iran Economic Sanctions Act”. The following certification is to be signed and included at time of submittal.

CERTIFICATION

Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran linked business,” as that term is defined in the Act.

Signature Title

Company Date

Wolgast Corporation – Construction Management 00307 – Page 1

Wolgast Corporation – Construction Management 00307 – Page 2

END OF SECTION 00307

Wolgast Corporation – Construction Management 00307 – Page 3

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #1 - Roof material alternate options

RFI detail

#1 Roof material alternate options

Status Open In Review

Created on Nov 11, 2026 by Jason McDonald (WOLGAST CORPORATION)

RFI type Default RFI workflow

Ball in court Shannon Derocher (INTEGRATED DESIGNS, INC)

Due date Nov 13, 2026

Question Contractor question: was looking at the drawings and specifications and i noticed you want to mechanically attach 50mil PVC. Is there any other options. a 60 mil TPO will be around the same price and will have a better warranty

Impact

Cost impact -

Schedule impact -

Other attributes

Priority Normal

Discipline -

Category -

Location -

Location details -

External ID -

Optional reviewer(s) -

Watcher(s) Dan Blossom (WOLGAST CORPORATION)

Created by Shannon Derocher with Autodesk® Forma™ on Nov 11, 2026 at 8:21 AM EST Page 1 of 2

RESPONSE:

DISTRICT IS OPEN TO ROOFING OPTIONS WITH EQUAL

PERFORMANCE AND EQUAL OR GREATER

WARRANTIES.

PLEASE PROVIDE BID AS A VOLUNTARY ALTERNATE

OCCOMPANIED WITH RELATED PRODUCT AND

WARRANTY INFORMATION.

JMK 11/11/2026

https://acc.autodesk.com/build/rfis/projects/88a5f441-1690-441b-b210-0a57288f77ab/?preview=856e8b58-fbad-4dda-8a62-21a495070664

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #1 - Roof material alternate options

Julia Krieger (INTEGRATED DESIGNS, INC)

Lisa Donahue (WOLGAST CORPORATION)

Construction Phase -

Spec Section -

Activities By At changed the question to Contractor question: was looking at the drawings and specifications and i noticed you want to mechanically attach 50mil PVC. Is there any other options. a 60 mil TPO will be around the same price and will have a better warranty

Jason McDonald

Nov 11, 2026, 7:57

AM EST

Jason McDonald (WOLGAST CORPORATION) created this RFI in Open In Review status and set Ball in court to Shannon Finnila

(INTEGRATED DESIGNS, INC).

Jason McDonald

Nov 11, 2026, 7:56

AM EST

Created by Shannon Derocher with Autodesk® Forma™ on Nov 11, 2026 at 8:21 AM EST Page 2 of 2

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #2 - West Elementary gutter and down spout colors

#2 West Elementary gutter and down spout colors

Status Open In Review

Created on Nov 12, 2026 by Jason McDonald (WOLGAST CORPORATION)

RFI type Default RFI workflow

Ball in court Shannon Derocher (INTEGRATED DESIGNS, INC)

Due date Nov 16, 2026

Question At west elementary, what is the intent with the gutter and downs if we are to match bangor blue color.

Is painting an option, if so can we also paint at the middle school on the big fascia.

Impact

Cost impact -

Schedule impact -

Other attributes

Priority Normal

Discipline -

Category -

Location -

Location details -

External ID -

Optional reviewer(s) Julia Krieger (INTEGRATED DESIGNS, INC)

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 8:36 AM EST Page 1 of 2

-Provide cost to replace Gutter and Downspout with matching blue.

-Provide cost to paint.

JMK 11/17/26

https://acc.autodesk.com/build/rfis/projects/88a5f441-1690-441b-b210-0a57288f77ab/?preview=290736af-7ce9-47bf-b652-88c5ed90eb83

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #2 - West Elementary gutter and down spout colors

Watcher(s) Dan Blossom (WOLGAST CORPORATION)

Lisa Donahue (WOLGAST CORPORATION)

Construction Phase -

Spec Section -

Activities By At

Jason McDonald (WOLGAST CORPORATION) created this RFI in Open In Review status and set Ball in court to Shannon Finnila

(INTEGRATED DESIGNS, INC).

Jason McDonald

Nov 12, 2026, 8:19

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 8:36 AM EST Page 2 of 2

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #3 - Middle School Soffit

#3 Middle School Soffit

Status Open In Review

Created on Nov 12, 2026 by Jason McDonald (WOLGAST CORPORATION)

RFI type Default RFI workflow

Ball in court Shannon Derocher (INTEGRATED DESIGNS, INC)

Due date Nov 16, 2026

Question Middle school calls out for new soffit but there isn’t any soffit there, its just a big fascia. Is it the understanding that the alt. is referring to the entire fascia to match Bangor blue?

Impact

Cost impact -

Schedule impact -

Other attributes

Priority Normal

Discipline -

Category -

Location -

Location details -

External ID -

Optional reviewer(s) Julia Krieger (INTEGRATED DESIGNS, INC)

Watcher(s) Dan Blossom (WOLGAST CORPORATION)

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 8:38 AM EST Page 1 of 2

Intent is for all fascia and underside to match bangor blue. New soffit refers to metal to cover the existing exposed tectum overhang.

Thank you, JMK 11-17-26 https://acc.autodesk.com/build/rfis/projects/88a5f441-1690-441b-b210-0a57288f77ab/?preview=c5eff515-f8d4-458b-9b63-4557351d43bd

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #3 - Middle School Soffit

Lisa Donahue (WOLGAST CORPORATION)

Construction Phase -

Spec Section -

Activities By At

Jason McDonald (WOLGAST CORPORATION) created this RFI in Open In Review status and set Ball in court to Shannon Finnila

(INTEGRATED DESIGNS, INC).

Jason McDonald

Nov 12, 2026, 8:21

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 8:38 AM EST Page 2 of 2

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #4 - Roof Key note clarification

#4 Roof Key note clarification

Status Open In Review

Created on Nov 12, 2026 by Jason McDonald (WOLGAST CORPORATION)

RFI type Default RFI workflow

Ball in court Shannon Derocher (INTEGRATED DESIGNS, INC)

Due date Nov 17, 2026

Question On the West Elementary roof assembly, there is no distinction between where key note #2 and #3 stop and start.

Lincoln Elementary has the same issue: no line to separate key note #3 and #2. Will there be updated drawings to show this?

Impact

Cost impact -

Schedule impact -

Other attributes

Priority Normal

Discipline -

Category -

Location -

Location details -

External ID -

Optional reviewer(s) Julia Krieger (INTEGRATED DESIGNS, INC)

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 8:39 AM EST Page 1 of 2

FOR BIDDING PURPOSES REFER TO ATTACHED

SKETCHES FOR ANTICIPATED TRANSITION POINTS IN

THICKNESS OF INSULATION.

ADDITIONAL VERIFICATION MAY BE REQUIRED AT TIME

OF INSTALLATION TO CONFIRM EXTENTS OF

UNDERINSULATED ROOF SURFACE.

JMK 11/17/26

https://acc.autodesk.com/build/rfis/projects/88a5f441-1690-441b-b210-0a57288f77ab/?preview=ddf2cbd3-b0c5-40e2-8013-dcce722101be transition point from #3 to #2 transition point from #3 to #2

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #5 - Domed Roofing insulation clarification

#5 Domed Roofing insulation clarification

Status Open In Review

Created on Nov 12, 2026 by Jason McDonald (WOLGAST CORPORATION)

RFI type Default RFI workflow

Ball in court Shannon Derocher (INTEGRATED DESIGNS, INC)

Due date -

Question During the pre-bid walkthroughs, contractors asked about the dome areas and whether they get one layer or two layers of built-up insulation. Please clarify

Impact

Cost impact -

Schedule impact -

Other attributes

Priority Normal

Discipline -

Category -

Location -

Location details -

External ID -

Optional reviewer(s) Julia Krieger (INTEGRATED DESIGNS, INC)

Watcher(s) Lisa Donahue (WOLGAST CORPORATION)

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 12:56 PM EST Page 1 of 2

2 LAYERS WILL BE REQUIRED TO ACHIEVE MINIMUM R-VALUE

AND CONFORM TO DOME SHAPE.

JMK 11-17-26

https://acc.autodesk.com/build/rfis/projects/88a5f441-1690-441b-b210-0a57288f77ab/?preview=e73206f7-4f56-4f52-bf32-bfd653ffefac

Bangor Twp - 23 Bond PH 5 - Roofing Projects - Main #5 - Domed Roofing insulation clarification

Dan Blossom (WOLGAST CORPORATION)

Construction Phase -

Spec Section -

Activities By At

Jason McDonald (WOLGAST CORPORATION) created this RFI in Open In Review status and set Ball in court to Shannon Finnila

(INTEGRATED DESIGNS, INC).

Jason McDonald

Nov 12, 2026, 12:21

PM EST

Created by Shannon Derocher with Autodesk® Forma™ on Nov 12, 2026 at 12:56 PM EST Page 2 of 2

WOLGAST CORPORATION

PRE–BID MEETING

Bangor Township Schools 2023 Bond - Phase 5 - Roofing Projects

PRE-BID MEETING AGENDA

Tuesday, November 10, 2026, at 3:00 PM

1. Introductions:

a. Owner Rep: Stephen Bouvy- Bangor Township Schools– Superintendent Casey Hamel – Bangor Township Schools

b. Construction Manager: Jason McDonald, Wolgast Corporation – Project Manager Dan Blossom, Wolgast Corporation – Field Manager

c. Architect: Julia Krieger- Integrated Designs, Inc.– Architect

2. Project Scope:

09 10 00 – Drywall, Insulation & Acoustical 09 90 00 - Painting 26 00 00 - Electrical

3. Contractor Bid Proposals:

a. Sealed bids for this project are due no later than: Tuesday, November 24, 2026@ 2:00 PM

Proposals may be mailed or delivered in person to: Stephen Bouvy, Superintendent Bangor Township Schools

Bay City, MI 48706

All bids will be opened and read aloud at approximately 2:15 PM at the Bangor Administration

Building - Conference Room.

Electronic Sealed bids may also be submitted using Building Connected see below link.

If you want to listen in during the bidding process here is the TEAMS link:

https://teams.microsoft.com/meet/2517196468425801?p=L2t7UAx1XUUTfLZbN0

Meeting ID: 251 719 646 842 580 1 Passcode: yG2Zx6JF

b. The successful bidder will be “prime” contractor having a contract directly with the Bangor Township

Schools.

c. Familial Relationship Affidavit – Section 00306 of Spec Book.

d. Iran Economic Sanctions Act – Section 00307 of Spec Book https://teams.microsoft.com/meet/2517196468425801?p=L2t7UAx1XUUTfLZbN0

4. Addenda:

a. The Architect will issue any and all addenda.

b. Last day to submit addendum questions will be November 16, 2026.

5. Milestone Schedule:

a. Award of Contracts: It is the intention of Bangor Township Schools to award contracts on or about

Monday, December 14, 2026.

b. The start & completion dates for this project are tentatively set for:

Start Date: See Milestone Schedule Completion Date: See Milestone Schedule

a. The Construction Manager will provide a detailed project construction schedule to all contractors based on input received at the post bid interview.

6. Bonds:

a. A five percent (5%) bid security must accompany each bid. Personal or Company checks do not satisfy the bid bond requirement and may be grounds for disqualification of that bid.

b. All bidders must have the ability to provide Performance Bonds and Labor and Material Payment Bonds.

These bonds may or may not be requested by the Owner if the awarded proposal amount is less than $50,000.00, but all bids must include the cost of the PLM bond regardless of bid amount. All awarded proposal amounts exceeding $50,000.00 must be secured by both performance and payment bonds as required by State law.

c. The Performance Bond and Labor and Material Payment Bond are to be submitted to the Construction Manager before construction begins.

7. Inquiries:

a. All questions regarding the design, the drawings and the specifications are to be faxed or emailed to:

Wolgast Corporation, Attn: Jason McDonald, Project Manager, email: jmcdonald@wolgast.com also copy Lisa Donahue at ldonahue@wolgast.com in the form of a Clarification Request Form. This will be forwarded to the architect for clarification. The Construction Manager will make no interpretations of the construction documents.

b. All questions regarding the bidding procedures (what to bid, how to fill out the proposal form, construction schedules, etc) are to be directed to Wolgast Corporation, Attn: Jason McDonald, Project Manager, Office #: 989-790-9120, or email: jmcdonald@wolgast.com and copy Lisa Donahue at ldonahue@wolgast.com .

8. Post Bid Procedures:

a. Post-Bid interviews will be conducted with the low bidder and in some cases the second low bidder. The interviews will be conducted by the Construction Manager and the Architect. The Owner may elect to be present at the interviews.

b. The apparent low bidders will be notified the day after the bid of their scheduled interview time.

c. Bid results will be made available from the Construction Manager.

9. Questions:

END OF PRE-BID MEETING AGENDA