Ballard & Carlisle Co WLS.pdf
PDF 422 KB Posted
- Attached to
- RoW Mow & Trim Ballard & Carlisle Co Section 1
- Solicitation number
- RFB 605 2000000539 2
- Issued by
- Ballard County, Kentucky
About this file
This document is a mowing contract specification for two Kentucky counties—Carlisle County and Ballard County—administered through the Paducah Section. The contract encompasses roadside mowing services across multiple state routes and US highways in both counties. The Carlisle County section covers six routes totaling 67.194 miles, with an expected 157 Type II mowing cycles and 287 Type III mowing cycles. The Ballard County section covers six routes totaling 66.129 miles, with an expected 156 Type II cycles and 271 Type III cycles. The combined contract area spans 133.32 miles requiring a total of 313 Type II cycles and 558 Type III cycles. Contractors must complete one full mowing cycle within a maximum of 15 working days.
The document does not provide pricing information, set-aside provisions, incumbent contractor details, funding sources, or contract award dates. No response deadlines, bid submission dates, or site visit requirements are specified in this excerpt. The specification serves primarily as a technical description of the mowing routes, their respective mileages, and the expected frequency of mowing operations required to maintain roadside vegetation across the specified highway corridors in both counties.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Paducah Section Mowing Contract by County
Carlisle County
Route # Sys. Start Stop Miles Type II Type III US 51 MP Hickman Co Line Ballard Co Line 12.533 30 62
(MP 0.000) (MP 12.533)
US 62 MP US 51 Ballard Co Line 12.981 32 67
(MP 0.000) (MP12.981)
KY 80 MP Hickman Co Line Graves Co Line 15.009 29 44
(MP 0.000) (MP 15.009)
KY 121 MP Graves Co Line Ballard Co Line 9.714 24 48
(MP 0.000) (MP 9.714)
KY 123 MP Hickman Co Line US 51 7.703 19 31
(MP 0.000) (MP 7.703)
KY 307 MP Hickman Co Line US 62 9.254 23 35
(MP 0.000) (MP 9.254)
TOTALS: 67.194 157 287
Paducah Section Mowing Contract by County
Ballard County
Route # Sys. Start Stop Miles Type II Type III US 51 MP Carlisle Co Line Ohio River Bridge 7.327 14 18
(MP 0.000) (MP 7.327)
US 60 MP US 51 McCracken Co Line 16.937 41 74
(MP 0.000) (MP 16.937)
US 62 MP Carlisle Co Line McCracken Co Line 1.754 4 9
(MP 0.000) (MP 1.754)
KY 121 MP Carlisle Co Line US 51 8.689 21 34
(MP 0.000) (MP 8.689)
KY 286 MP KY 121 McCracken Co Line 14.415 35 75
(MP 0.000) (MP 14.415)
KY 358 RS KY 286 McCracken Co Line 17.007 41 61
(MP 0.000) (MP 17.007)
TOTALS: 66.129 156 271
Grand Total: 133.32 313 558 Maximum number of working days to complete a cycle = 15
File details come from the government source that posted it. Updated .