This document contains a Quality Assurance Surveillance Plan (QASP) and related federal contract opportunity for vegetation treatment services on the Badger Mountain area. The QASP establishes procedures for monitoring contractor performance against requirements in the Performance Work Statement. Key performance standards include masticating identified trees at 85% or higher and submitting accurate monthly progress reports. Surveillance methods involve record reviews, inspections, random verification, and customer feedback. Analysis of inspection results will determine if performance is outstanding, satisfactory, or unsatisfactory. The related federal contract opportunity is to reduce basal area and trees per acre in Badger Mountain to favor large pine trees, reduce wildfire risk, and protect infrastructure through mastication or chipping services. Management objectives include encouraging more open forest conditions and maintaining structural diversity and complexity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LQ22Q0044 Solicitation Service.docx | DOCX document | |
| wage determinations 15-5435.txt | TXT text file | |
| PastPerformanceSurvey.docx | DOCX document | |
| Badger_Mtn_PWS.docx | DOCX document | |
| Badger_Mtn_CAM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Quality Assurance Surveillance Plan
Contents
| Project Name | 3 | |
| Solicitation / Contract Number | 3 | |
| Section 1: Introduction | 3 | |
| 1.1 | Purpose | 3 |
| 1.2 | QASP Relation to the Contract | 3 |
| 1.2.1 | QASP Revisions | 3 |
| 1.2.2 | Surveillance of Performance Progression | 3 |
| 1.3 | QASP Relation to the Quality Control Plan (QCP) | 3 |
| Section 2: Performance Description | 3 | |
| 2.1 | Performance Standards and Acceptable Quality Levels (AQLs) | 3 |
| 2.1.1 | Allowable Deviation | 4 |
| 2.1.2 | Substantially Complete | 4 |
| 2.2 | Non-Performance | 4 |
| 2.2.1 | Documentation | 4 |
| 2.2.2 | Remedial Actions | 4 |
| Section 3: Contractor and Government Responsibilities | 4 | |
| 3.1 | Contractor Responsibility | 4 |
| 3.2 | Government Responsibility | 5 |
| 3.2.1 | Contracting Officer (CO) | 5 |
| 3.2.2 | Contracting Officer Representative (COR) | 5 |
| 3.2.3 | Customers | 5 |
| Section 4: Surveillance Methods to Perform Quality Assurance | 5 | |
| 4.1 | Surveillance Methods | 5 |
| 4.2 | Analysis and Results | 6 |
| Appendix A: Example Performance Requirement Summaries | 8 | |
| Appendix B: Example Discrepancy Report | 9 | |
| Appendix C: Customer Feedback Record | 10 | |
| Appendix D: Example Guide / Inspection List | 11 | |
| Appendix E: Example Quality Assurance Monitoring | 12 | |
| Appendix F: Example Customer Complaint Investigation | 13 | |
| Appendix G: Example Surveillance Activity Checklist | 14 |
Project Name
Badger Mountain Vegetation Treatment Service Contract
Solicitation / Contract Number Insert Solicitation / Contract Number
Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Willis Creek Service Contract. This plan sets forth the procedures and guidelines that the USDA, Pike and San Isabel National Forests, San Carlos Ranger District will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression
As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP)
The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.
Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.
2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.
The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.
2.1.1 Allowable Deviation
The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).
2.1.2 Substantially Complete
In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.
2.2 Non-Performance
Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement. Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.
When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.
2.2.1 Documentation
Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix B: Example Discrepancy Report. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
B: Example Discrepancy Report
2.2.2 Remedial Actions
The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.
3.2.2 Contracting Officer Representative (COR)
The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP; and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.
The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause, see following table:
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause Number
Title
Date
PERTAINING TO ALL ITEMS
PERTAINING TO SERVICE ITEMS
52.246-4
Inspection of Services—Fixed Price
(Aug 1996)
52.246-20
Warranty of Services
(May 2001)
PERTAINING TO CONSTRUCTION ITEMS
52.246-12
Inspection of Construction
(Aug 1996)
52.246-21
Warranty of Construction
(Mar 1994)
3.2.3 Customers
Insert this Section if applicable Customers or organizations/offices that the Contractor provided support may be requested to assist the COR in conducting QA to provide information relating to the Contractor’s performance through Customer Feedback. Information gained from the Customer Feedback may be used in conjunction with other methods of observation to rate the performance of the Contractor.
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist, and improvements are necessary.
PERFORMANCE REQUIREMENTS
| WORK DESCRIPTION |
| PERFORMANCE STANDARD |
| ACCEPTABLE QUALITY LEVEL (AQL) |
| MONITORING METHOD |
| Mastication |
| Masticate all trees identified in the treatment descriptions; PWS 3.1. |
| 85%, unless otherwise agreed to in writing. |
| · Review Contractor’s written record of Plot Inspections |
· Visual inspection—walk through Units
· Random verification of compliance—Plot Inspections
4.1.1 PAYMENTS, REDUCTIONS & RE-INSPECTION COSTS
Method of Payment Payment will be made for completed task(s) meeting or exceeding the Acceptable Quality Level (AQL). Upon acceptance, payment will be determined on the service less any deductions for any nonconforming or unacceptable performance as noted below.
Reductions Payments at 90% AQL or above The Government expects to receive good services. The minimum 90% AQL is required to achieve a satisfactory performance rating. Full payment will be made for final work meeting at least 90% AQL and above.
Payments at 81 to 89% AQL If the unit cannot/will not be reworked to achieve the minimum required 90% AQL, payment of 90% of the unit price will be made for AQL falling between 80 to 89% AQL.
Payments below 80% AQL If the unit cannot/will not be reworked to achieve the minimum required 90% AQL, payment of 90% of the unit price times the actual AQL received will be made for AQL falling below 80% AQL.
Example - 75% AQL is achieved. Unit price is $10,000.00 10,000 x 90% = 9,000 x 75% = $6,750.00 price to be paid for unit.
Re-Inspection Costs If the original government inspection results are not acceptable to the Contractor, a re-inspection may be requested, in writing, up to seven (7) days after receiving notification of unacceptable work. If the original inspection results in failure due to an unacceptable Form Score or Total Score, but re-inspection results in fully passing score, then the Government assumes the cost of re-inspection. If the re-inspection confirms the results of the original inspection, the Contractor shall reimburse the Government for actual costs incurred for performing re-inspection.
If rework of task(s) is required, the Contractor will be assessed the costs incurred by the Government in performing such activities. The table below lists charge rates for Government re-inspection of work.
| Activity |
| Charge rate |
| Government wages (per employee performing re-inspection) |
| $50.00/hour |
| *Government mileage |
| $0.58/mile |
*Mileage reimbursement rate in effect January 1, 2019 is $0.58 per mile. Mileage rates change periodically and the most current mileage rates for assessed damages at the time will be used. Most current mileage rates can be found at the General Services Administration website https://www.gsa.gov/travel/plan-book/transportation- airfare-rates-pov-rates/privately-owned-vehicle-pov-mileage-reimbursement-rates
[Insert and describe the Surveillance Methods. Below is an Example.]
4.1.1 100 Percent Inspection The 100 percent inspection method requires complete inspection each month and will be used for critical contract requirements.
4.1.1.1 Performance Standards and AQLs
The performance standards and AQLs may be stated as either percentages or absolute numbers.
4.1.1.2 Evaluation Procedures
Observed defects for a service monitored by 100 percent inspection is compared to the performance standard and AQL.
4.2 Analysis and Results
When the inspections and customer feedback validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:
Insert and define the Performance Outcome. Below is an Example.
4.2.1 Outstanding Performance
Outstanding performance is the result of the Contractor substantially exceeding the performance standards with significant achievements and no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that significantly exceeds the requirements with no significant deficiencies.
Disincentives for failure to meet the above standards may be as follows:
(a) Rework will be completed at Contractor’s expense.
(b) If rework is not physically possible, payment deductions will be made for work falling below AQL (Payment Reductions.
(c) Damage to the residual stand or infrastructure will be assessed against the Contractor.
(d) Government re-inspection charges.
(e) Poor performance rating will be given.
[THIS PAGE IS FOR INFORMATIONAL PURPOSES]
The Contacting Officer must include as attachments or exhibits the appropriate performance requirement summary, forms, checklists, etc. in the QASP that will be used during surveillance / monitoring for the applicable contract.
Appendix A: Example Performance Requirement Summaries The following documents are examples only, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
EXAMPLE- 1
PERFORMANCE REQUIREMENT SUMMARY
Performance Task (PWS Reference)
Performance Indicator
Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
Timeliness and Accuracy of Delivery-Supplies/ Services (PWS, Section 6.6.4)
| Supplies/Services delivered as ordered –Quantity / Quality |
| Delivery matches Order quantity and Supplies/ Services description |
| 95% of all deliveries match order quantity and supplies / services |
Inspection of Monthly Sales and Delivery Report.
EXAMPLE-2
PERFORMANCE REQUIREMENT SUMMARY
Performance Objective
PWS Reference/ Contract Reference
Performance Standard Acceptable Quality Level (AQL)
Method of Surveillance
Ensure smooth transition with the incumbent during the phase-in period
| 5.4.3 Transition |
| Obtain GFP, access to classified documents, access to network, obtain CACs and access badges for employees, obtain proper security levels, obtain room/building keys |
| Score of acceptable or higher required on scale |
100% inspection (TEP review)
EXAMPLE-3
PERFORMANCE REQUIREMENT SUMMARY
Required Services (PWS Task)
Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance Incentive (+ /-) Impact on Contractor Payment
Submit a PM report of scheduled, completed, and outstanding tasks monthly
(PWS C.2.1.2 (G))
| 100% of reports accurately depict current status |
| 99% |
| File reviews, periodic inspections, and random, observations, customer complaints |
| $500 for each documented instance when a report is submitted after the 15th of the month |
Appendix B: Example Discrepancy Report The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
| DISCREPANCY REPORT |
| 1. DISCREPENCY REPORT NO. |
| 2. TO: (Contractor / Project Manager Name) |
| 3. FROM: (Name of COR) |
CONTRACT NUMBER: DATE:
| PREPARED |
| ORAL NOTIFICATION |
| RETURNED BY CONTRACTOR |
| ACTION COMPLETE |
4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)
5. SIGNATURE OF COR
| 6. TO: (Name of COR) |
| 7. FROM: (Contractor / Project Manager) |
8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)
| 9. SIGNATURE OF CONTRACTOR REPRESENTIVE |
| 10. DATE |
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)
12. GOVERNMENT ACTIONS (Cure notice, show cause, other)
CLOSE OUT
KTR NOTIFIED
| NAME AND TITLE |
| SIGNATURE |
| DATE |
COR
Appendix C: Customer Feedback Record The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CUSTOMER FEEDBACK RECORD
DATE AND TIME OF COMPLAINT CONTRACT NUMBER/ OR PROJECT:
SOURCE OF COMPLAINT
ORGANIZATION
INDIVIDUAL
NATURE OF COMPLAINT
PWS REFERENCE
VALIDATION
| DATE AND TIME CONTRACTOR INFORMED OF COMPLAINT |
| NAME OF CONTRACTOR REPRESENTATIVE INFORMED OF COMPLAINT |
ACTION TAKEN BY CONTRACTOR (Responsible officer):
RECEIVED AND VALIDATED BY
Determination: Complaint Valid Complaint Invalid
Appendix D: Example Guide / Inspection List The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CONTRACT NUMBER: ___________________________________
SERVICE FUNCTION:
PWS SECTION:
| 1 |
| Method of Surveillance: |
| 2 |
| Lot Size: |
| 3 |
| Sample Size: |
| 4 | ||
| Performance Requirement: Performance is Excellent (E) when ___________or fewer defects are discovered per month. Performance is Satisfactory (S) when ________ | or fewer defects are discovered per month. Performance is Unsatisfactory (U) when _______ | or more defects are discovered per month. |
| 5 |
| Sampling Procedure: Instructions on how to select the sample must be clear and complete |
| 6 |
| Inspection Procedure: The procedure must be detailed enough to allow a yes/no objective decision as to the acceptability of performance by anyone making the inspection. Explain when evaluation is to occur and what is acceptable/unacceptable |
Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)
| PRS Requirements |
| Timeliness |
| Quality of Work |
| Notes |
Overall Rating Of Inspection (E, S, U or N/A)
COR/Inspector Comments:
Contractor Signature: ___ Date: __
COR Signature: ____________________Date: _________________
Appendix E: Example Quality Assurance Monitoring The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CONTRACT NUMBER: ______________________________________
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check the applicable item):
r Random Sampling r 100% Inspection r Periodic Inspection r Customer Complaint LEVEL OF SURVEILLANCE (Check the applicable item):
| r | Monthly | r | Quarterly | r | As needed |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______% Service Provider’s Performance (Check the applicable item):
r Meets Standards r Does Not Meet Standards Narrative of Performance During Survey Period:
Prepared By: _______________________________ Date: ______________
Appendix F: Example Customer Complaint Investigation The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CONTRACT NUMBER: _________________________
SERVICE or STANDARD:
SURVEY PERIOD: ___________________
DATE COMPLAINT RECEIVED: ____________
SOURCE OF COMPLAINT: _________________________________________ (Name) _______________________________________________________________ (Organization) ___________________ (Phone No.) _________________________________ (Email Address)
NATURE OF COMPLAINT: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
RESULTS OF COMPLAINT INVESTIGATION: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
DATE SERVICE PROVIDER INFORMED OF COMPLAINT: _____________
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER: _________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Received and Validated By: __________________________________________ Prepared By: _____________________________ Date: _________________
Appendix G: Example Surveillance Activity Checklist The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
Performance Requirement Performance Standard Method of Measurement
Performance Metrics Method of Surveillance Date Accomplished Compliance (Exceed, Met, Partial Met) image1.png