Q A_for_Call_0001_(version_1).docx

DOCX document 19 KB Posted

Attached to
Laser Simulation, Analysis and Research (LSAR) Federal contract opportunity
Solicitation number
BAA-RVKD-2014-0001
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Posted April 23 2014 Question and Answers dated 23 April 2014 (version 1)

View the file

Other files for this federal contract opportunity

Other files attached to Laser Simulation, Analysis and Research (LSAR), newest first.
File Type Posted
Questions_and_Answers_26_Jul.docx DOCX document
SIFT_QA_20180723.pdf PDF
Attch_4_-_SIFT_Draft_DD_254_20171117.pdf PDF
Attch_2_-_SIFT_Supp_Req_20180629.pdf PDF
BAA-RVKD-2014-0001_Call_0007_SIFT.pdf PDF
Attch_6_-_Cost_Proposal_Inst_20161019.pdf PDF
BAA-RVKD-2014-0001_Call_0006_FLARE__w_6_Attachments_20180319.pdf PDF
COSMO_QA_20171115.pdf PDF
Attachment_5_-_BARD_Section_K.pdf PDF
Attachment_1_-_BARD_SOO.pdf PDF
BAA_RVKD-2014-0001_Call_0004_BARD.pdf PDF
Attachment_3_-_BARD_DD_Form_1423__CDRLS.pdf PDF
Attachment_2_-_BARD_SOW_Supplement.pdf PDF
LSAR_BAA_Amend_02_06_Mar_2017.pdf PDF
Guide_to_Preparing_CSOW.pdf PDF
q&a.docx DOCX document
SOO_-_Phased_Array__25Aug2016.docx DOCX document
1_-_Statement_of_Objectives.pdf PDF
3_-_Contract_Data_Requirements_List_(Draft).pdf PDF
5_-_Proposal_Adequacy_Checklist.pdf PDF
BAA-RVKD-2014-0001_Call_0003_(Final).pdf PDF
BAA-RVKD-2014-0001_CALL_0002_(ALMS)_Q A_(06_Jun_2016).pdf PDF
BAA-RVKD-2014-0001_CALL_0002_(ALMS)_Q A_(23_May_2016).pdf PDF
Attch_4_-_ALMS_Draft_DoD_Security_Classification_Specification_DD_Form_254.pdf PDF
Attch_1_-_ALMS_SOO_(05_May_2016).pdf PDF
BAA-RVKD-2014-0001_Call_0002_(05_May_2016).pdf PDF
Attch_5_-_Proposal_Adequacy_Checklist_(Jan_2014).pdf PDF
Attch_3_-_ALMS_Draft_CDRL_DD_Form_1423_A001-A007.pdf PDF
Attch_2_-_ALMS_SOW_Supplemental_Requirements_(05_May_2016).pdf PDF
Contract_awards.docx DOCX document
Q A_for_Call_0001_(version_6).docx DOCX document
CALL_0001_-_LEAMER_v1_(11_Dec_14)(Amendment_2).docx DOCX document
Call_0001 _Summary_of_Changes_(Amendment_2).docx DOCX document
LSAR_BAA_29_Sep.docx DOCX document
LSAR_BAA _Summary_of_Changes_(Amendment_1).docx DOCX document
Q A_for_Call_0001_(version_5).docx DOCX document
Q A_for_Call_0001.docx DOCX document
Attch_1_CALL_0001 _SOO_8_May_14.docx DOCX document
Call_0001 _Summary_of_Changes_(Amendment_1).docx DOCX document
Q A_for_Call_0001_(version_2).docx DOCX document
Attachment_14_-_Special_Topic_14-1_or_Contractor_Suggested_TO_(16_Apr_14).docx DOCX document
AF_SW_Guidebook_V0.9_DEC_04.doc DOC document
Attachment_3_-_TO__2 _TA_-_13_(16_Apr_14).docx DOCX document
Attachment_8_-_Map_bldg_427.pdf PDF
Attachment_6_-_DD_254_(Draft).pdf PDF
Attachment_12_-_Special_Topic_12-1_or_Contractor_Suggested_TO_(16_Apr_14).docx DOCX document
Attachment_4_-_TO__3 _TA_-_14_(16_Apr_2014).docx DOCX document
Attachment_9_-_Proposal_Content_Checklist.docx DOCX document
Attachment_2_-_TO__1 _TA_-_12_(16_Apr_14).docx DOCX document
Attachment_2_-_AFRLI61-103.pdf PDF
Show all 50

Laser Simulation, Analysis and Research (LSAR) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Questions

BAA-RVKD-2014-0001

Call 0001

Question
Government Response

1.

Please provide the following details:

· List of Items, Schedule of Requirements, Scope of Work, Terms of Reference, Bill of Materials required.

· Soft Copy of the Tender Document through email.

· Names of countries that will be eligible to participate in this tender.

· Information about the Tendering Procedure and Guidelines

· Estimated Budget for this Purchase

· Any Extension of Bidding Deadline?

· Any Addendum or Pre Bid meeting Minutes?

Please refer to the BAA-RVKD-2014-0001 (LSAR) and Call 0001 (LEAMR).

2.
Are the electronic files for the Cost/Business Proposal and the Technical Proposal to be submitted on the same CD?

Cost/Business and Technical Proposals may be submitted on the same or separate CD’s.

3.
Reference: Proposal Call Announcement 0001, Proposal Submission, Sections 4 & 5.

Scenario: If the Contractor wishes to bid on two Task Orders [TA 13 and 14] with two Special Topics related to TA 13 and three Special Topics related to TA 14, for a total of 5 special topics.

Question 2a: How many full technical proposals per the instructions in Section VI of the Baseline BAA (BAA-RVKD-2014-0001) are required to be submitted?

Question 2b: How many cost proposals are required to be submitted?

Answer 2a: For this scenario 5 technical proposals will be submitted. The technical proposals would be as follows:

1 for the Technical Area 13 (Core) + Technical Area Special Topic 1 for Technical Area 13 Special Topic

1 for the Technical Area 14 (Core) + Technical Area Special Topic 1 for Technical Area 14 Special Topic

Answer 2b: For this scenario 7 cost proposals will be submitted. The cost proposals would be as follows:

1 for the Technical Area 13 (Core) 1 for Technical Area 13 Special Topic 1 for Technical Area 13 Special Topic

1 for the Technical Area 14 (Core) 1 for Technical Area 14 Special Topic

4.
Reference: Proposal Call Announcement 0001, Proposal Submission, Section 5.

Question: If the Contractor wishes to bid on Task Order TA 13 with a Contractor Suggested TO, is there still a requirement to submit a CSOW for at least one Special Topic TO required?

Yes. At a minimum the offeror is required to submit a proposal to address a core Task Order (TA12-14) and at least one related item under the Special Topic associated with the core Task Order.

5.
Reference: Proposal Call Announcement 0001, Proposal Submission, Sections 4.a.i. “Submit one for each Core/Special Topic/Contractor-suggested TO proposed.”

Question: Specifically, what constitutes a cost proposal for a Special Topic or Contractor-Suggested CSOW? Does Cost Proposal for a Special Topic or Contractor-suggested CSOW mean pricing tables (Excel spreadsheets) only? Or is a BOE narrative required, as well?

The cost proposal shall include excel spreadsheets, BOE and the additional items listed in the Cost Proposal Instructions. Each cost proposal submittal shall be IAW with Attachment 11, Cost Proposal Instructions.

File details come from the government source that posted it. Updated .