BAA-12-09-PKM-Q As.pdf

PDF 38 KB Posted

Attached to
Integrated Computational Methods for Composite Materials (ICM2)
Solicitation number
BAA-12-09-PKM
Issued by

About this file

Questions Answers

View the file

Other files

File Type Posted
ICM2_Industry_Day_Briefing.pdf PDF
ICM2_Q As.pdf PDF
ICM2_Industry_Day_Attendance.pdf PDF
BAA-12-09-PKM-CDRLs.pdf PDF
BAA-12-09-PKM.doc DOC document
BAA-12-09-PKM-ANSI-Guide.doc DOC document
BAA-12-09-PKM-SF298.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 02

BAA 12-09-PKM

BAA Title: Integrated Computational Methods for Composite Materials (ICM2)

General Questions and Answers

May 18, 2012

Question #1: BAA-12-09-PKM specifically calls out submission via mail on page 12 under

Section IV. Is hand delivery of proposals an acceptable means for submission?

Answer: Yes, in addition to mail, hand delivery of proposals is an acceptable means for submission. Hand delivery can be channeled through Gary Victor, DET 1 AFRL/PKMN, Bldg.

167, 2310 Eighth Street (Area B), Wright-Patterson AFB, OH, 45433-7801---Phone (937) 255-

0808 from the front lobby of Bldg. 167 or the Area B Visitors Center, which is adjacent to Gate

1B located off Springfield Street (Area B) east of Harshman Rd.

The proposal due date and time remains Tuesday, 22 May 2012, 2:00PM, EDT.

Question #2: We would like some clarification on the format requirements for figures. Would a figure require double spacing of the text to meet the format requirements on page 13 of the

BAA?

Answer: No. The font size and line space requirements shown on page 13 of the BAA for the text in the Technical/Management Proposal do not apply to figures, illustrations, flowcharts, diagrams or drawings.

File details come from the government source that posted it. Updated .