BAA-11-17-PKM.doc

DOC document 195 KB Posted

Attached to
Defense Production Act Title III, Lithium Ion Battery Production for Military Applications Project
Solicitation number
BAA-11-17-PKM
Issued by

About this file

BAA Full Solicitation

View the file

Other files

File Type Posted
BAA-11-17-PKM-Amd5.doc DOC document
BAA-11-17-PKM-Amd4.doc DOC document
BAA-11-17-PKM-Amd3.doc DOC document
BAA-11-17-PKM-Amd2.doc DOC document
Cost_Share_Guidance.doc DOC document
BAA-11-17-PKM-Amd1.doc DOC document
BAA-11-17-PKM-Certs.doc DOC document
Sample_TIA.pdf PDF
Cost_Proposal_Sample.xls XLS spreadsheet
Sample_Business_Plan.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-Step Broad Agency Announcement

Overview Information

Federal Agency Name: Air Force Research Laboratory, AFRL/RX Broad Agency Announcement Title: Defense Production Act Title III Lithium Ion Battery Production for Military Applications Project Additional information on the Defense Production Act Title III:

This announcement is to solicit production technology partnership proposals for the Defense Production Act (DPA) Title III Program managed by the Office of the Secretary of Defense (OSD) and executed by the DoD Executive Agent Program Office, a component of the Manufacturing Technology Division (AFRL/RXM) of the Materials and Manufacturing Directorate, Air Force Research Laboratory (http://acq.osd.mil/ott/dpatitle3/). As the Executive Agent for DoD’s DPA Title III Program, the Air Force is responsible for executing programs that ensure domestic production capability for technology items that are essential to national defense.

Title III of the Defense Production Act (DPA) provides unique authorities, under which the Government may provide appropriate incentives to create, maintain, protect, expand, or restore the productive capacities of domestic sources (see below for definition) for critical components, critical technology items, and industrial resources essential for the execution of the national security strategy of the United States. The principal objective of all DPA Title III investments is to strengthen and expand these domestic productive capacities and to ensure Government access to critical technology items well into the future. The contract/agreement awarded under this BAA will be awarded under the authority of Title III of the Defense Production Act of 1950 as amended (50 U.S.C. App. § 2061 et seq.).

Each DPA Title III program effort will provide incentives to domestic manufacturers to create, maintain, protect, expand, or restore their critical production technologies and to develop and/or adopt best business and marketing practices to achieve joint manufacturing capacity, quality, affordability, and economic viability requirements.

Solicitations shall be restricted to domestic sources as defined in the Defense Production Act of 1950: “A business concern that performs in the United States or Canada substantially all of the research and development, engineering, manufacturing, and production activities required of such business concern under a contract with the United States relating to a critical component or a critical technology item; and that procures from business concerns (described as above) substantially all of any components and assemblies required under a contract with the United States relating to a critical component or critical technology item.”

Proposals should be addressed to the Contracting Point of Contact (POC) stated in Section VIII of the Full Text Announcement.

Broad Agency Announcement Type: This is the Initial Announcement Broad Agency Announcement Number: BAA-11-17-PKM Catalog of Federal Domestic Assistance (CFDA) Number(s): 12.800_AF Proposal Due Date and Time: 22 August 2011 at 12:00PM Eastern Standard Time. NOTE: Proposal receipt after the due date and time shall be governed by the provisions of FAR 52.215-1(c)(3). It should be noted that this installation observes strict security procedures to enter the facility. These security procedures are NOT considered an interruption of normal Government processes, and proposals received after the above stated date and time as a result of security delays will be considered “late.” Furthermore, note that if offerors utilize commercial carriers in the delivery of proposals, they may not honor time-of-day delivery guarantees on military installations. Early proposal submission is encouraged.

Solicitation Request: Air Force Research Laboratory, AFRL/RXM, Manufacturing Technology Division, Wright Research Site is soliciting technical and cost proposals on the production technology partnership effort described below. Proposals should be addressed to the Contracting Point of Contact (POC) stated in Section VIII of the Full Text Announcement. This is a restricted solicitation. Only those firms that meet the definitions of “domestic source” as provided above should respond. The NAICS Code for this acquisition is 541712(for Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology), and the small business size standard is 500 employees. Proposals submitted shall be in accordance with this announcement. There will be no other solicitation issued in regard to this requirement. Offerors should be alert for any BAA amendments that may permit requirement modifications, clarifications or extensions to the proposal submission date.

CCR Registration: Unless exempted by 2 CFR 25.110 all offerors must (1) Be registered in the Central Contractor Registration (CCR) prior to submitting an application (for an assistance award) or proposal;(2) Maintain an active CCR registration with current information at all times during which it has an active Federal award or an application or proposal under consideration by an agency; and (3) Provide its DUNS number in each application or proposal it submits to the agency. On-line registration instructions can be accessed from the DISA CCR home page at http://www.ccr.gov.

Representations and Certifications: Potential offerors should complete the Representations and Certifications located at Appendix I. to this BAA or reference section V. paragraph 2. B.

Type of Contract/Instrument: The Government intends to award a Department of Defense Grant and Agreement Regulations (DoDGARS)-based Technology Investment Agreement.

Estimated Program Cost: Total $48.8M- $24.4M Government share plus $24.4M Recipient share. Expect approximately five (5) awards at $500K each ($2.5M) Government share plus recipient cost share for Phase I; and ONE (1) award at approximately $21.9M Government share plus recipient cost share for the Phase II Option.

Anticipated Number of Awards: The Air Force reserves the right to make multiple awards, single award, or no awards as a result of this BAA.

Multiple awards are anticipated. Expect approximately 5 awards in Phase I at $500K each ($2.5M), Government share plus recipient 50/50 cost share. At the end of Phase I, the Government will determine whether to exercise ONE recipient’s Phase II Option at estimated $21.9M Government share plus recipient 50/50 cost share.

Recipients are cautioned that the inclusion of an option in the contract/agreement does not guarantee that the Government will exercise the Phase II Option. The exercise of the Phase II Option is subject to the Government’s determination of “best value” based on the evaluation criteria described in Section VI, availability of funding, and agencies’ needs at the end of Phase I.

The Government reserves the right to select for negotiation any, all, part, or none of the proposals received in response to this solicitation, and to make awards without discussions with proposers. The Government reserves the right to conduct discussions if it is later determined to be necessary.

The Government intends to use this BAA to cover the entirety of this program for award purposes and does not intend to conduct a new competition for Phase II Option.

Awards under this BAA will be made to proposers on the basis of the evaluation criteria and review and selection process outlined in Section VI, Proposal Review Information.

Brief Program Summary: To increase the domestic capacity for next generation, high energy density lithium ion batteries that are designed to provide power for U.S. military long endurance Unmanned Aerial Vehicles (UAV), portable power for the dismounted soldier, long endurance autonomous systems, and tactical vehicles. For the purpose of this project, the Li-ion cells of interest will have an energy density of ≥ 250 Wh/kg at 250 W/kg continuous (i.e. 1C rate) for military applications.

Address any questions to: Ms. Cathie Stropki, Agreements Negotiator, Det 1 AFRL/PKMD, 2310 Eighth Street, Bldg 167, Wright-Patterson AFB, OH 45433-7801, Catherine.stropki@wpafb.af.mil.

Full Text Announcement

I. Program Description: Air Force Research Laboratory, Materials & Manufacturing Directorate, Manufacturing Technology Division (AFRL/RXM) is soliciting technical and cost proposals on the following Title III Production Technology Partnership effort:

1. Statement of Objective/Needs/Deliverables:

1.1 Scope

The scope of this project is to establish a long-term, viable, world-class domestic manufacturer of high energy density lithium ion (Li-ion) batteries that is responsive to customer requirements with respect to performance, reliability, quality, delivery, and price. For the purpose of this project, the Li-ion cells of interest will have an energy density ≥ 250 Wh/kg at 250 W/kg continuous (i.e. 1C rate) for military applications. It is anticipated to be a multi-phase effort in which the initial phase (Phase I) is a 9 month effort plus three (3) months for the final report and the second phase (Phase II Option) is a 33 month effort plus three (3) months for the final report. During Phase I the contractor will demonstrate their proposed technology and manufacturing process on their equipment. The contractor will also demonstrate their understanding of Department of Defense (DoD) battery requirements and price points and their pricing strategy to ensure viability in the marketplace. During Phase II Option, the contractor will modify their production line with the objective to achieve a Manufacturing Readiness Level (MRL) of 8 (Low Rate Initial Production - LRIP), implement business and marketing plans, and conduct lean activities to ensure their viability to meet current and future military needs.

1.2 Background

Lithium ion batteries are critical for military applications in support of national defense capabilities. They are used as a power source in a wide array of military systems including long endurance unmanned aerial vehicles (UAVs), portable power for the dismounted soldier, long endurance autonomous systems, tactical vehicles, unattended sensors, reconnaissance and surveillance systems. Recent advances in Li-ion battery technology have demonstrated commercial viability of energy densities in excess of 250 Wh/kg with commensurate improvements in power density, discharge rate, temperature range, and safety. These improvements could fundamentally transform the Department’s system concepts in energy density constrained environments resulting in a profound impact on military systems.

The DPA, Title III Program Office, Air Force Research Laboratory, Manufacturing Technology Division (AFRL/RXM) is seeking to improve both the technical capabilities and the business viability of domestic high energy density Li-ion battery suppliers to the DoD. The United States Government (USG) is seeking to ensure that a domestic source of high energy density Li-ion batteries continues to be accessible for meeting military requirements. The intent is to create a flexible production line capable of multiple battery form factors for both military and commercial applications, to effectively reduce the cost of high energy density Li-ion batteries, by leveraging increased combined assembly line volumes, even at low production runs of individual battery form factors.

1.3 Program Objectives

1.3.1 Phase I

A. Technical Effort

1. Provide specific technical description of the battery(s) proposed to be produced in the program. Details shall include but not be limited to the energy density, cell capacity, materials chemistry, packaging, performance and environmental test data, reliability, Material Safety Data Sheets (MSDS), and Technology Readiness Level (TRL).

2. The contractor will describe how they will establish the LRIP capability to build such batteries and how those batteries will be tested to demonstrate compliance with requirements.

3. Demonstrate understanding of DoD Li-ion current and future technical requirements.

4. Provide a minimum of five (5) sample cells/batteries proposed for production in the program to the USG for independent testing and verification of the product. Tests to be agreed upon by the USG.

5. Demonstrate test capabilities.

B. Strategic Business and Market Planning Effort

1. Develop a comprehensive Strategic Business Plan that addresses the key aspects of establishing a competitive and commercially viable capacity for the manufacture of Li-ion batteries.

2. Develop a Marketing Plan that formally assesses and verifies the military and commercial market demand for Li-ion batteries.

3. Conduct marketing and sales operations to potential DoD and non-DoD customers for Li-ion batteries. Participate in industry-related tradeshows and conferences on key customer and program opportunities. Publish product brochures and technical papers.

4. Identify DoD Li-ion users (customers) and garner their endorsement(s) for the battery proposed for production in Phase II of the program.

C. Production Capacity Baseline and Manufacturing Cost Analysis and Demonstration

1. Identify all costs for critical materials and personnel required to evaluate and expand Li-ion battery production within the scope of this project.

2. Identify and establish a baseline of cost and key process metrics for which targeted objectives to be achieved will be measured, tracked and periodically evaluated against during the program.

3. Conduct a Manufacturing Readiness Assessment (MRA) relating to Li-ion battery manufacturing capability to demonstrate the maturity of the baseline manufacturing process.

D. Production Capacity Expansion and Process Improvement

1. Develop and provide a detailed list of required equipment, facilities, and the proposed procurement schedule.

2. Identify all equipment to be upgraded and refurbished.

3. Provide a detailed schematic of the anticipated facility layout to support the production capabilities.

E. Program Management, Administration, and Reporting

1. Manage the program and report to the Title III Program Office. Conduct quarterly program reviews, provide status, progress, integrated schedule, milestones, work breakdown structure, and submit required reporting.

2. Manage program’s cost, schedule, and performance parameters.

3. Participate on an Integrated Product Team (IPT) and attend conference calls with the IPT twice a month.

4. Conduct a Technical Program Kickoff Meeting no later than 30 days following award.

5. Conduct Quarterly Project Management Reviews (PMRs). Reviews shall be held at Wright-Patterson AFB or contractor facility, or another mutually agreed upon site. One PMR shall be held at WPAFB annually.

6. Work with the Title III Program Office to develop a minimum of two metrics under each of the following categories by which the progress of the project can be objectively measured: Technical, Manufacturing, Financial, and Marketing. The mutually agreed upon metrics shall be presented at PMRs.

F. Phase I Deliverables:

Scientific and Technical Report- Final Report:

Draft 30 days after completion of technical phase

Final 90 days after completion of technical phase Product Samples: Battery cells (5) will be required for Government lab performance test verification no later than 6 months after contract award; Unique Identification will not apply Software: No Other:

Contractor’s Progress, Status & Management Report (Monthly)

Contractor’s Billing Voucher (Monthly)

Funds and Man-Hour Expenditure Report (Monthly)

Manufacturing Readiness Assessment (MRA) Report (Assessment no later than 6 months after contract award (ACA); report 30 days after MRA)

Strategic Business Plan (no later than 7 months after contract award); (Use Government Provided Outline for Guidance on Recommended Structure and Detail) Marketing Plans (no later than 7 months after contract award)

Presentation Material (As Required)

Meeting Minutes (3 days after PMRs and IPT meetings

1.3.2 Phase II Option

A. Technical Effort

1. Provide a description of the battery technology that is produced and what will be provided by sub-tier vendors such as cells, materials, and other components and production processes.

2. Advance the technology readiness level of the Li-ion battery as appropriate to achieve objective of MRL eight (8) (LRIP).

B. Strategic Business and Market Planning Effort

1. Implement a comprehensive Strategic Business Plan that addresses the key aspects of establishing a competitive and commercially viable capacity for the manufacture of Li-ion batteries. Prepare updates on an annual basis.

2. Implement a Marketing Plan that formally assesses and verifies the military and commercial market demand for Li-ion batteries. Prepare updates on annual basis.

3. Conduct marketing and sales operations to potential DoD and commercial customers for Li-ion batteries. Participate in industry-related tradeshows and conferences on key customer and program opportunities. Publish product brochures and technical papers.

C. Production Capacity Baseline and Manufacturing Cost Analysis

1. Identify all costs for critical materials and personnel required to evaluate and expand Li-ion battery production within the scope of this project.

2. Identify and establish a baseline of cost and key process metrics for which targeted objectives to be achieved will be measured, tracked and periodically evaluated against during the program.

3. Conduct a minimum of three (3) MRAs as agreed upon by the USG to periodically demonstrate the manufacturing maturity of the Li-ion battery manufacturing process.

D. Production Capacity Expansion and Process Improvement

1. Maintain detailed list of required equipment, facilities, materials, and the procurement schedule.

2. Design the facilities and production flow set-up using lean principles to maximize manufacturing efficiencies.

3. Expand production capacity and improve existing manufacturing capabilities to meet customer specifications and delivery requirements. This includes existing assets the contractor owns, new equipment as necessary and required technology improvements. The contractor shall leverage other assets as appropriate to efficiently use manufacturing resources.

4. Implement manufacturing improvements to minimize process variation, improve product quality and yield, and reduce production costs.

5. Maintain, operate, and service all USG owned and non-USG owned capital equipment and tooling required for Li-ion battery production.

E. Process Improvement Initiatives and Implementation

1. Incorporate and document Lean and other relevant Manufacturing principles and process improvements.

F. Quality Improvement Initiatives and Implementation

1. Obtain and maintain Quality Management System Certification (e.g. ISO 9001: 2008). Provide documentation supporting these and other relevant quality and safety certifications.

2. Conduct all process changes and training in accordance with quality systems such as ISO 9001 and/or AS 9100 requirements.

G. Program Management, Administration, and Reporting

1. Manage the program and report to the Title III Program Office. Conduct quarterly program reviews, provide status, progress, integrated schedule, milestones, work breakdown structure, and submit required reporting.

2. Manage program’s cost, schedule, and performance parameters.

3. Participate on an Integrated Product Team (IPT) and attend conference calls with the IPT twice a month.

4. Conduct a Technical Program Kickoff Meeting no later than 30 days following award.

5. Conduct Quarterly Project Management Reviews (PMRs). Reviews shall be held at Wright-Patterson AFB or contractor facility, or another mutually agreed upon site. One PMR shall be held at WPAFB annually.

6. Track a minimum of two metrics under each of the following categories by which the progress of the project can be objectively measured: Technical, Manufacturing, Financial, and Marketing. The mutually agreed upon metrics shall be presented at PMRs.

H. Phase II Option Deliverables-

Scientific and Technical Report- Final Report:

Draft 30 days after completion of technical phase

Final 90 days after completion of technical phase Software: No Other:

Contractor’s Progress, Status & Management Report (Monthly)

Manufacturing Readiness Assessment (MRA) Report (annual assessment; report 30 days after MRA)

Property Control List (Quarterly)

Strategic Business Plan (Annually)

Marketing Plans (Annually)

Presentation Material (As Required)

Meeting Minutes (3 days after PMR)

2. Schedule: The anticipated period of performance for this award is anticipated to be a multi-phase effort in which the initial Phase I will be 12 months which includes 9 months for the technical effort plus 3 months for the final report. The Phase II Option will be 36 months which includes 33 months for the technical effort plus 3 months for the final report.

3. Deliverable Items:

A. Phase I- Scientific and Technical Report- Final Report:

Draft 30 days after completion of technical phase

Final 90 days after completion of technical phase Product Samples: Battery cells (5) will be required for Government lab performance test verification no later than 6 months after contract award; Unique Identification will not apply Software: No Other:

Contractor’s Progress, Status & Management Report (Monthly)

Manufacturing Readiness Assessment (MRA) Report (Assessment no later than 6 months after contract award (ACA); report 30 days after MRA)

Strategic Business Plan (no later than 7 months after contract award); (Use Government Provided Outline for Guidance on Recommended Structure and Detail) Marketing Plans (no later than 7 months after contract award)

Presentation Material (As Required)

Meeting Minutes (3 days after PMRs and IPT meetings

B. Phase II Option Scientific and Technical Report- Final Report:

Draft 30 days after completion of technical phase

Final 90 days after completion of technical phase Software: No Other:

Contractor’s Progress, Status & Management Report (Monthly)

Manufacturing Readiness Assessment (MRA) Report (annual assessment; report 30 days after MRA)

Property Control List (Quarterly)

Strategic Business Plan (Annually)

Marketing Plans (Annually)

Presentation Material (As Required)

Meeting Minutes (3 days after PMR)

4. Future Phases: It is anticipated that future phases may result for any award resulting from this BAA, if the program necessitates additional work and if Government funding is available.

5. Other Requirements:

A. Program security classification: This effort deals with unclassified technology and a DD254 is not required to perform the work.

B. Export Control: Information involved in this effort will not be subject to Export Control (International Traffic in Arms Regulation (ITAR) 22 CFR 120-131, or Export Administration Regulations (EAR) 15 CFR 710-774).

6. Other Information: None II. Government Furnished Property (GFP) availability: GFP is not anticipated to be made available under any resulting award.

III. Award Information

The Government intends to award a DoDGARS-based specific Cooperative Agreement known as a Technology Investment Agreement. Agreements are guided by the Department of Defense Grant and Agreement Regulations (DODGARs), which is available for review at http://www.dtic.mil/whs/directives/corres/pdf/321006r37p.pdf. A sample TIA, along with other sample documents, is available at Appendix II. to this BAA.

Any clarifications/exceptions to the TIA articles, as presented in the sample TIA, must be stated at time of proposal submission.

1. Anticipated Award Date: 30 December 11- Agreement award date is anticipated no earlier than two months after receipt of proposals.

2. Anticipated funding for the program (not per agreement):

FY10
FY11
FY12
FY13
TOTAL
Phase I
$2.5M
$0
$0
$0
$2.5M
Phase II Option
$21.9M
$0
$0
$0
$21.9M
TOTAL
$24.4M
$0
$0
$0
$24.4M

This funding profile is an estimate only and will not be a contractual obligation for funding as all funding is subject to change due to Government discretion and availability.

3. Number of awards anticipated: The Air Force reserves the right to make multiple awards, single award, or no awards as a result of this BAA.

Multiple awards are anticipated. Expect approximately 5 awards in Phase I at $500K each ($2.5M), Government share plus recipient 50/50 cost share. At the end of Phase I, the Government will determine whether to exercise ONE recipient’s Phase II Option at estimated $21.9M Government share plus recipient 50/50 cost share.

Recipients are cautioned that the inclusion of an option in the agreement does not guarantee that the Government will exercise the Phase II Option. The exercise of the Phase II Option is subject to the Government’s determination of “best value” based on the evaluation criteria described in Section VI, availability of funding, and agencies’ needs at the end of Phase I.

The Government reserves the right to select for negotiation any, all, part, or none of the proposals received in response to this solicitation. The Government reserves the right to conduct discussions if it is later determined to be necessary.

The Government intends to use this BAA to cover the entirety of this program for award purposes and does not intend to conduct a new competition for Phase II Option.

Awards under this BAA will be made to proposers on the basis of the evaluation criteria and review and selection process outlined in Section VI, Proposal Review Information.

Due to the criticality of the technology of this program, it is imperative that all aspects of negotiations are resolved as expeditiously as possible to make multiple awards in a timely manner.

Non-Government Technical Advisors: All proposals submitted in response to this BAA may be subject to review by non-government personnel. Contractors employing these individuals and supporting each project are identified below. The role of these non-governmental personnel will be to function as technical advisors to the Government technical evaluators. These support contracts include nondisclosure agreements prohibiting their contractor employees from disclosing any information submitted by other contractors or using such information for any purpose other than that for which it was furnished. Only Government employees will participate in the actual decision or selection of proposals for award.

Contractor Support Companies Northrop Grumman Technical Services 2555 University Blvd

Fairborn, OH 45324

D.K. Jones Consulting 2915 Niagara Drive

Beavercreek, OH 45431

Any concerns regarding this issue may be addressed to the Contracting POC cited above.

IV. Eligibility Information

1. Eligible Offeror: Solicitations shall be restricted to domestic sources as defined in the Defense Production Act.

2. Cost Sharing or Matching: Cost Sharing is anticipated. Cost sharing is a requirement of Technology Investment Agreements in the amount of 50% Recipient and 50% Government (DoDGARS Part 37.215). Cost share other than 50/50 requires preparation and approval of a special waiver. If you do not propose a cost share of at least 50% provide justification.

3. Other:

A. Offerors may be ineligible for award if all requirements of this BAA are not met as of the specified proposal due date(s) set forth in above.

B. Offerors are advised that each may submit one and only one proposal.

V. Proposal and Submission Information

1. Overview: Proposals submitted shall be in accordance with this announcement. There will be no other solicitation issued in regard to this requirement. Offerors should be alert for any BAA amendments that may permit extensions to the proposal submission date. There is no additional information to be provided.

2. Proposals for Grants and Cooperative Agreements A. Grant Opportunity: Go to http://Grants.Gov to find the grant opportunity. The initial screen will provide the synopsis for that specific grant opportunity. To view the entire opportunity open the “Full Announcement” box in the upper center of the synopsis page and select from the documents available under “Announcement Group.” NOTE: http://Grants.Gov has tools and guiding documents in the left margin under “Applicant Resources” to help you find and apply for grant opportunities. Grants.gov requires Adobe Reader version 8.13 to open, download, save, and submit an application electronically. Adobe Reader version 8.13 is available for free from Grants.gov under “Applicant Resources,” “Download Software.” You must notify your contracting POC before the stated proposal due date and time of this notice if you decide to submit your proposal electronically or your proposal will not be considered.

B. Proposal Cover Page – SF 424 (R&R) Form: All proposals for grants or assistance, whether submitted electronically or in hard copy must include an SF 424 (R&R) as the cover page. The SF 424 (R&R) should be downloaded from the “Application” box in the upper right hand corner of the synopsis page. Click on “download” under the column “Instructions and Application.” Select “Download Application Package” and complete the SF 424 (R & R).

C. Certifications: To access the requisite Certifications, select the “Application” box in upper right hand corner of the synopsis page. Click on “Instructions and Application” and select “Download Application Instructions” to view the Certifications. To complete the Certifications you must check Block 18 of the SF 424 (R&R), and by signing it (either by pressing the “submit” button for Grants.gov or by hand if submitting it in hard copy), you are certifying that you have read and agree to abide by the terms in the Certifications. You do not need to submit any additional documentation unless you have lobbying activities to disclose on an SF –LLL.

D. Proposals for Grants or Assistance Instruments: Proposals for grants or assistance instruments may be submitted either (1) directly with a hard copy to the AFRL/Det 1 contracting POC listed in this announcement or (2) electronically through the Grants.gov government-wide electronic portal. You must notify your contracting POC before the stated proposal due date and time of this notice if you decide to submit your proposal electronically or your proposal will not be considered.

E. For Hard Copy Submission: The original proposal and the number of copies specified in this announcement must be delivered directly to the contracting POC in AFRL Det 1 at the time and date specified in this announcement.

F. For Electronic Submission:

1) Advance Preparation – Electronic proposals must be submitted through Grants.gov. There are several one-time actions your organization must have completed. Long before the proposal submission deadline, you should verify that the persons authorized to submit proposals for your organization have completed these actions. If not, it may take them up to 21 days to complete the actions before they will be able to submit proposals.

2) Electronic Submission Process: The process your organization must complete includes obtaining a Dun and Bradstreet Data Universal Numbering System (DUNS) number, registering with the Central Contract Registry (CCR), registering with the credential provider, and registering with Grants.gov. Designating an E-Business Point of Contact (EBiz POC) and obtaining a special password called MPIN are important steps in the registration process. Go to www.Grants.gov/GetStarted <http://www.Grants.gov/GetStarted> .

3) Your organization’s E-Business POC, identified during CCR Registration, must authorize someone to become an Authorized Organization Representative (AOR). This safeguards your organization from individuals who may attempt to submit proposals without permission. Note: In some organizations, a person may serve as both an E-Business POC and an AOR.

4) The Grants.gov Organization Registration Checklist is located at http://www.Grants.gov/section3/OrganizationRegCheck.pdf <http://www.Grants.gov/section3/OrganizationRegCheck.pdf> to guide you through the process.

5) If a proposal is submitted through Grants.gov, Adobe Reader version 8.13 or later will need to be downloaded. This small, free program will allow you to access, complete, and submit applications electronically and securely. Reference IV. 2. a. above for instructions on how to obtain a free version of the software.

6) Should you have questions relating to the registration process, system requirements, how an application form works or the submittal process, call Grants.gov at 1-800-518-4726 or support@Grants.gov <mailto:support@Grants.gov> .

G. Submitting the Electronic Proposal

1) Application forms and instructions are available at Grants.gov. To access these materials, go to http://grants.gov <http://grants.gov> Select “Apply for Grant”, and then select “Download Application Package”. Enter the CFDA number (typically 12.800). You should also enter the BAA number, and then follow the prompts to download the application package.

2) The applicant will receive a confirmation page upon completing the submission to Grants.gov. This confirmation page is a record of the time and date stamp that is used to determine whether the proposal was submitted by the deadline. A proposal received after the deadline is “late” and will not be considered for an award.

H. Section 3 below “Content and Form of Proposal Submission” applies to grants and cooperative agreement (in hard copy or electronic) and contract proposals.

3. Content and Form of Proposal Submission: The paragraphs below identify proposal format and content. Proposals should be addressed via mail to the Contracting Point of Contact (POC) identified in Section VIII.

A. General Instructions: Offerors should apply the restrictive notice prescribed in the provision of FAR 52.215-1(e) Instructions to Offerors—Competitive Acquisition. Offerors should consider proposal instructions contained in the Broad Agency Announcement (BAA) Guide for Industry, which can be accessed on line at http://www.wpafb.af.mil/library/factsheets/factsheet.asp?id=9218. This guide is specifically designed to assist the offeror in understanding the BAA proposal process. The proposal submittal shall include four distinctly separate sections as follows: Technical proposal, Statement of Work, Summary Business Plan, and Cost Proposal. Note: All four proposal sections are a proposal submission requirement. It is preferable that two separate proposal volumes be provided. The first volume should contain three sections: 1) Technical proposal, 2) Statement of Work, and 3) Summary Business Plan, and, each of the three documents must be easily separated. The second volume should contain the Cost proposal. The Cost proposal may be provided in Microsoft formats such as Excel, WORD, PowerPoint, etc. It is required that all documents be provided with a Font size of no less than 10. Examples of standard business fonts which are equivalent to 10 pitch are Arial, Bookman, or Times New Roman. The proposal must be valid for 180 days. Proposals must reference the above BAA number. Offerors must submit one original, five paper copies and two electronic copies of their proposals to the Contracting POC identified above. Each electronic copy must be submitted on one Compact Disk (CD), and the file format must be readable by Microsoft Word 2000. No proposals sent by fax or e-mail will be accepted. Offerors are advised that only Contracting Officers are legally authorized to contractually bind or otherwise commit the government. The cost of preparing proposals in response to this BAA is not considered an allowable direct charge to any resulting or any other contract; however, they may be allowable expenses to the normal bid and proposal indirect cost as specified in FAR 31.205-18.

B. Cover Page: The cover page should include the BAA number, BAA title as well as the name and telephone number for the principal points of contact (both technical and contractual), and any other information that identifies the proposal. The cover page should also contain the proprietary data disclosure statement, if applicable. However, it is noted that the Statement of Work portion of the Technical Proposal shall be formatted so that it is absent of any proprietary data and therefore fully incorporable into a resulting award and releasable pursuant to Freedom of Information Act requirements.

C. Table of Contents: Include a Table of Contents immediately following the cover page.

D. Technical/Management Proposal:

1) Page Limitations: The following describes the page limitations on the proposal submittal:

a) Proposal shall be limited to 75 pages, prepared and submitted in Word format. This limitation includes all information, e.g., indices, photographs, foldouts, appendices, attachment, etc. The limitation includes the offeror’s proposed Statement of Work (SOW), which itself is limited to 10 pages, and the Summary Business Plan, which itself is limited to 25 pages. The government will not consider pages in excess of these page limitations. Technical/Management Proposal page limitations are summarized as follows:

Technical Discussion:

up to 40 pages

Summary Business Plan:

up to 25 pages

Statement of Work:

up to 10 pages

Tech Proposal Total:

up to 75 pages

Note 1: Offerors are instructed to contact the Contracting Point of Contact as early as possible prior to submitting any classified information with their proposal.

Note 2: The Cost Proposal requirements are provided later in this announcement.

Note 3: The table of contents and cover page will not be included in the page count referenced above.

b) Font shall be standard 10-point business font Arial, Bookman, or Times New Roman.

c) Character spacing must be “normal,” not condensed in any manner.

d) Pages shall be double-spaced, single-sided, 8.5 by 11 inches, with at least one-inch margins on both sides, top and bottom. Lines between text lines must also be 10-point.

e) All text, including text in tables and charts, must adhere to all font size and line spacing requirements listed herein. Font and line spacing requirements do not have to be followed for illustrations, flowcharts, drawings, and diagrams. These exceptions shall not be used to circumvent formatting requirements and page count limitations by including lengthy narratives in such items.

f) Pages shall be numbered starting with the technical discussion cover page being Page 1, and the last page being Page XXX of the Statement of Work. The page limitation covers all information including indices, photographs, foldouts (counted as 1 page for each 8.5 by 11 portion) tables, charts, appendices, attachments, resumes, etc…

g) The proposal page limit does include the offeror’s proposed Statement of Work (SOW); however, the same formatting rules apply to the SOW, which is limited to 10 pages.

h) A CD with the WORD version of your Technical/Management Proposal and the SOW must be submitted with the hard copies of the proposal, and must match the hard copy. It is the responsibility of the contractor to ensure that both the paper copy and electronic copy are identical. If not, the paper copy will take precedence and be deemed the “official” version of the proposal for evaluation purposes.

i) The Government will check the proposal and SOW for conformance to the stated requirements. Any pages in excess of the stated page limitation after the format check will not be considered. In addition if the proposal does not conform to the above requirements, a notification will be sent to the offeror’s POC on the cover page to advise of the nonconformance.

2) Technical Discussion and Information: The proposal shall include a discussion of the nature and scope of the technical approach. Additional information on prior work in this area, descriptions of available equipment, data and facilities and resumes of personnel who will be participating in this effort should also be included as attachments to the technical proposal. This volume shall include a SOW detailing the technical tasks proposed to be accomplished under the proposed effort and suitable for contract incorporation. Do not include any proprietary information in the SOW. Refer to the BAA Guide for Industry referenced above to assist in SOW preparation.

3) Technical Approach:

a) Background/Scope/Program Objectives: The technical proposal must convey an understanding of the problems or limitations of the current state of the technology and the intended application(s). It should be an overall summary of the production technology issues addressed by the offeror’s proposal without merely repeating the requirements. This should provide a vision of what will ultimately be achieved and what solution this effort will produce.

b) Program Plan: The program plan should present an orderly progression of the technical and management efforts to be performed. Upper and lower bounds should be placed on what will be attempted or completed within the confines of program funding. Some redundancy is inevitable, but should be used judiciously to stress key points.

c) Technical Discussion: In this section, the offeror should provide technical detail and analysis necessary to support the technical approach they are proposing. They must clearly identify the core of the intended approach. If the offeror has a “new and creative” solution to the Production Technology Partnership goal(s), that solution should be developed and analyzed in this section. The proposal should include a risk assessment of key technical, schedule or cost areas and their potential impact on the program. If subcontractors are proposed, identify why selected and what tasks they are to perform. The offeror shall reference/acknowledge the acceptability of all specified/applicable data items in the list of deliverables that were identified in the Statement of Objectives.

d) Program Schedule: The schedule represents the offeror’s plan to perform the program tasks in an orderly, timely manner. Provide each major task identified in the SOW as a separate line on the program schedule chart. Provide a schedule of when all deliverables identified in the announcement are to be delivered. The period of performance shall be proposed in the format “includes 48 months for technical effort and 3 months for Final Report.”

4) Capabilities and Relevant Experience

a) Identify related Government, commercial, previous, or related production efforts.

b) Identify facilities/resources proposed for the effort

c) Identify and provide resumes of all key personnel (include key subcontract/consultant personnel).

5) Management

a) Program Organization: Identify the program organization. Organizational charts may be helpful in showing the structure of the program.

b) Management Approach: Identify management approach to assure contract completion (e.g., meeting schedule, cost and program goals).

c) Appendix: Appendices may include technical reports, published papers, and referenced material in support of the offeror’s proposal. Commercial product advertising brochures may also be provided. Please be aware that these items shall be included in the proposal page limitation.

6) Summary Business Plan: The summary business plan describes how the offeror’s production capability developed or expanded under the project will achieve/maintain long-term economic viability. The plan identifies target customers (both military and commercial) as well as specific targeted military systems (where information is available). Financial information required in Appendix IV – Summary Business Plan Outline must be provided. It should be noted by all offerors that a Summary Business Plan must be submitted with the proposal and is one of the proposal submission requirements listed above. A sample outline for the Summary Business Plan appears in Appendix IV of this BAA. Length is not to exceed 25 pages. Note: The Summary Business Plan is not the same as the Strategic Business Plan that is a required annual deliverable item after award.

7) Offeror's Statement of Work (SOW)

a) The SOW developed by the offeror and included in the proposal may be incorporated into a binding instrument. The SOW should build upon the requirements of the Government’s SOO (Section I.1.).The proposed SOW must contain a summary description of the technical methodology as well as the task description, but not in so much detail as to make the contract inflexible. Do not include any proprietary information in the SOW. The Government requires a SOW that is fully releasable under the Freedom of Information Act to allow the public to be informed of the use of Government Funds; consequently, it is imperative that no company-sensitive information be included in the SOW of the technical proposal. Length is not to exceed 10 pages.

b) The following is offered as a recommended format for the SOW. Begin this section on a new page. Start your SOW at Paragraph 1.0.

1.0 Scope: This section includes a statement of what the program covers. This should include the overall effort to be advanced or capacitized, objectives/goals, and major milestones for the effort.

2.0 Requirements:

2.1 The work effort should be segregated into major tasks and identified in separately numbered paragraphs (similar to the numbered breakdown of these paragraphs). Each numbered major task should delineate by subtask the work to be performed, including any cost-sharing work, and should be sequentially numbered.

2.2 The offeror must identify all reviews (by milestone or task) and when/where the reviews will be conducted.

2.3 The offeror must identify any and all hardware/software to be delivered to the Government as a result of the program.

Any questions concerning the proposal, whether technical or contractual in nature, shall be referred to the Contractual POC stated above.

E. Cost/Business Proposal: Separate the Cost/Business proposal into a business section and cost section. Adequate price competition is anticipated. The business section should contain all business aspects to the proposed instrument arrangement, such as the type of instrument, any exceptions to terms and conditions of the announcement model agreement, any information not technically related, etc. Provide rationale for exceptions. Cost proposals have no limitations; however, offerors are requested to keep cost proposals to 50 pages as a goal. The proposal shall be furnished with supporting schedules and shall contain a person-hour breakdown per task. The cost proposal shall include a time-phased description of anticipated costs over the entire effort (see Appendix III). Time phasing shall be shown at least quarterly with a preference for monthly breakout. The costs shall be broken out by contractor and government cost. If the BAA provides the schedule of estimated Government funding, the proposal shall show how the proposed plan is compatible with the Government funding schedule. If it is not compatible, the offeror shall explain how the incompatibility is to be remedied. In consideration of adequate price competition, the government will be determining the Price Reasonableness and Cost Realism of your proposal. To facilitate this, offerors are required to provide, as a part of their Cost section, information determined as necessary by the offeror to demonstrate/support the submission of realistic and reasonable prices/costs for the technical effort proposed. The submission of overly extensive or elaborate supporting data with the initial proposal is neither required nor desired. Of importance in this cost section is the offeror’s analysis demonstrating the relationship between the cost information submitted and the business and technical effort set forth. This approach is intended to decrease the offeror’s proposal preparation costs, time, resources and administrative burden as well as overall acquisition lead times in order to achieve maximum efficiency, economy, flexibility and streamlining. The material solicited in this volume will facilitate the government's evaluation of price reasonableness and determination of cost realism. The receipt of information from offerors is more relevant to an analysis of resources proposed for the technical program tendered than uncorrelated and voluminous data (i.e., your analysis should address the specific complexities of the work proposed and the rationale for the specific resources required to complete the program). Refer to BAA/PRDA Guide for Industry http://www.wpafb.af.mil/library/factsheets/factsheet.asp?id=9218 for further detailed proposal instructions.

Government funds may typically be used for labor hours, consumables, materials, special tooling and special test equipment, subcontractors, and similar expenditures. The definitions of special tooling and special test equipment are as follows:

Special Tooling: means jigs, dies, fixtures, molds, patterns, taps, gauges, and all components of these items including foundations and similar improvements necessary for installing special test equipment, and which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services. Special tooling does not include material, special test equipment, real property, equipment, machine tools, or similar capital items.

Special Test Equipment: means either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract. It consists of items or assemblies of equipment including foundations and similar improvements necessary for installing special test equipment, and standard or general purpose items or components that are interconnected and interdependent so as to become a new functional entity for special testing purposes. Special test equipment does not include material, special tooling, real property, and equipment items used for general purposes or property that with relatively minor expense can be made suitable for general purpose use.

Since the principal objective of all DPA Title III investments is to strengthen and expand domestic productive capacities and to ensure Government access to critical technology items well into the future, the Government funds may be used to purchase capital…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .