- Defense Production Act Title III, Lithium Ion Battery Production for Military Applications Project
- Solicitation number
- BAA-11-17-PKM
About this file
Questions Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BAA-11-17-PKM-Amd4.doc | DOC document | |
| BAA-11-17-PKM-Amd3.doc | DOC document | |
| BAA-11-17-PKM-Amd2.doc | DOC document | |
| Cost_Share_Guidance.doc | DOC document | |
| BAA-11-17-PKM-Amd1.doc | DOC document | |
| BAA-11-17-PKM-Certs.doc | DOC document | |
| Sample_TIA.pdf | ||
| BAA-11-17-PKM.doc | DOC document | |
| Cost_Proposal_Sample.xls | XLS spreadsheet | |
| Sample_Business_Plan.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 5
BAA-11-17-PKM
Lithium Ion Battery Production for Military Applications Project This is an amendment to BAA 11-17-PKM, which is being issued in accordance with FAR 15.206(b). This amendment answers questions received since issuance of BAA-11-17-PKM Amendment 4 on 26 Aug 2011 through 05 Sep 2011, the cut-off date for question submittal.
- QUESTION: Is the Government expecting to receive comparable offers with such a wide constellation of payload alternatives?
- ANSWER: Based on the extensive market research the Government has conducted on this program and with similar ongoing active efforts, we expect a wide depth and breadth of capability from U.S. industry to meet the current and future needs of the Department of Defense relative to the Title III lithium ion battery production for military applications to include long endurance
UAVs, portable power for the dismount, long endurance autonomous systems, tactical vehicles, unattended sensors, reconnaissance and surveillance systems.
- QUESTION: Would the Government consider that by setting some design constraints it might receive higher and more creative proposals? Example
(dimensions, aerodynamics, shock, heat, recharge speed, state of health, etc.)
- ANSWER: The Government has established a multi-service and multi-department technical and technology assessment team for this program that has a wide variety of technical requirements for Government users on this program. As is frequently done on BAAs and other Title III programs, we do not detail specification requirements so as to allow industry to be as creative as possible in meeting the requirements of the BAA.
- QUESTION: It appears to me that a potential offeror having a very viable engineering capability with good product capability would not be selected for this BAA if they did not possess adequate background of the operational characteristics of long endurance UAVs, what a dismounted soldier uses in combat, what are the various tactical vehicles, sensor, and military systems currently being used. As this is a GRANT, are you not looking for new creative ideas or only ideas from those who know the old problems?
- ANSWER: The evaluation criteria is consistent with other Title III programs and BAAs relative to credible and relevant background and experience. The
Government is seeking the offerors that possess the business, technical and financial capability, demonstrated experience, willingness, and a credible business plan to be a competitive, economically viable, responsive, merchant supplier to the high energy density lithium ion battery industry.
- QUESTION: The phase 2 award is stated as being:
ONE (1) award at approximately $21.9M Government share plus recipient cost share for the Phase II Option.
That's a significant amount of cost sharing for a small company. We were wondering if that Phase II award could be either lessened or broken into smaller pieces to ease the cost sharing burden for the winning small business.
- ANSWER: Please see Amendment 1 to the BAA, specifically the answer to the final question. Also see the attachment to Amendment 1, “Title III Cost Share Guidelines," which may be helpful.
- QUESTION: Will you please confirm and clarify which of the following elements will be included in the page count (list of illustrations/tables, executive summary, resumes)?
- ANSWER: See BAA 11-15-PKM, Section V. Proposal and Submission Information, 3. Content and Form of Proposal Submission, D. Technical and Management Proposal, 1) Page Limitations, a) through i) specifically (f )
- QUESTION: Is it possible to amend the BAA to consider the resumes as an appendix that do not count against the page limit of the technical proposal? If not, please provide guidance regarding the number and length of resumes that is considered to be acceptable, or an example format of such a resume.
- ANSWER: No, the BAA will not be amended for resume count. The number and length of resumes should be determined by your company to be responsive to BAA requirements.
- QUESTION: Is it preferred to submit the Technical proposal, business plan, and statement of work as a single document attachment to the SF424 with a single & combined cover page and table of contents or is it preferred to submit at separate attachments with each document having its own cover page and table of contents?
- ANSWER: Since the table of contents and cover page will not be included in the page count, separate attachments with each document having its own cover page and table of contents would make the separate portions of the proposal more identifiable, however that decision should be made by your company.