W912CH27BA011.pdf
PDF 469 KB Posted
- Solicitation number
- BA011
- Issued by
-
Department of the Army
About this file
This is an Invitation for Bids (IFB) for a two-year firm-fixed-price requirements-type contract issued by the U.S. Army Contracting Command - Detroit Arsenal for the manufacture of MOUNT, AIRCRAFT, BAR (National Stock Number 2840-01-583-7965, Part Number 13027377). The contract will be established for pricing utilized through delivery orders for discrete quantities during the stated period. The IFB is issued on an unrestricted basis with a bid submission deadline of December 16, 2026, at 10:00 a.m. local time (Warren, Michigan), and bid opening will be held virtually on December 17, 2026, at 1:00 p.m. All bids must be submitted electronically via email to the Contract Specialists. Bidders must acknowledge all IFB amendments by the closing date and time. The NAICS code is 336412 (Aircraft Engine and Engine Parts Manufacturing), and all large businesses under this code must submit a subcontracting plan. All bids must remain valid for a minimum of 120 calendar days. The IFB requires bidders to access a Technical Data Package (TDP) with distribution code "B" (limited to Department of War and U.S. DoW contractors only) prior to submitting a bid; failure to do so will result in bid rejection. Bidders must have a current DD Form 2345 certification on file with the Defense Logistics Information Service to access the export-controlled TDP.
The contract includes three Contract Line Items (CLINs): CLIN 0001 for a First Article Test Report (1 lot), CLIN 0002 for Order Year One (6 each), and CLIN 0003 for Order Year Two (6 each). Delivery is required within 240 calendar days after award with First Article Test (FAT) or 120 days without FAT for CLIN 0001, and 120 days after award for CLINs 0002 and 0003. Bidders may request a waiver of First Article Approval by submitting a completed First Article Waiver Worksheet with supporting documentation; if approved, the FAT price will be deducted from the total award, and an accelerated delivery schedule will apply. The contract requires heavy phosphate coating in accordance with MIL-DTL-16232 with specific testing and verification frequencies. Packaging must comply with MIL-STD-2073-1 (Military Level B packing). Inspection and acceptance will occur at the contractor's facility (origin). First Article testing shall use MIL-STD 1916 with Verification Level III for major characteristics and VL II for minor characteristics. Questions must be submitted by December 3, 2026, at 12:00 p.m. local time. This is an "all or none" sealed bidding solicitation; only one award will be made, and bids for less than the total quantity will not be considered. Electronic invoicing shall be submitted through the Wide Area Workflow (WAWF) system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DD Form 1423.docx | DOCX document | |
| First Article Waiver Worksheet.pdf | ||
| OPERATIONS SECURITY (OPSEC) PLAN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSES
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
DO-A4 1 89
W912CH27BA011 16 NOV 2026
W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING, 6501 EAST 11 MILE ROAD
WARREN, MI 48397-5000
UNITED STATES
CIARA WOODARD-BROWN, EMAIL: CIARA.L.WOODARD-BROWN.CIV@ARMY.MIL TELEPHONE: 571-588-9077
W912CH
10:00 AM 16 DEC 2026
CIARA WOODARD-BROWN
571 588-9077 CIARA.L.WOODARD-BROWN.CIV@ARM
1-9 10-12 13-19 20-24 25-34 35-38 39-43
44-60
62-75
76-86 87-88
A.1. DESCRIPTION OF ACTION
A.1.1 This Invitation for Bids (IFB) is intended to result in the award of a single two-year Firm-Fixed-price (FFP) Requirements-type contract for the MOUNT, AIRCRAFT, BAR, National Stock Number (NSN): 2840-01-583-7965, Part Number: 13027377. The resulting contract will establish pricing to be utilized through issuance of delivery orders, for discrete quantities during the period stated in the Schedule. The Government bears no responsibility to issue an initial minimum order upon base contract award. Further, the quantities listed in this IFB and the resulting contract are estimates only and not a representation they will be ordered, nor is it a representation that conditions affecting Government needs will be stable. Please see Revolutionary FAR Overhaul (RFO) 52.216-21: Requirements for additional information.
A.1.2 This IFB is issued on an unrestricted basis. All large businesses under North American Industry Classification System (NAICS) code 336412 are required to submit a subcontracting plan with their bid.
A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "B", which limits access to Department of War (DoW) and U.S. DoW contractors only. Please see Section C.1. TECHNICAL DATA PACKAGE INFORMATION for instructions on how to access this data. BIDDERS MUST ACCESS THE TDP PRIOR TO SUBMITTING A BID
OR THE BID SUBMISSION WILL BE REJECTED.
A.1.4 Bidders are advised to carefully read and understand this entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions/negotiations and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.
A.1.5 Bidders must complete all necessary fill-ins and representations throughout this IFB, including but not limited to:
(1) STANDARD FORM 33 (IFB COVER PAGE):
(2) SECTION B: The unit prices and dollar amounts requested for CLIN 0001: First Article Test Report, CLIN 0002: Order Year One, and CLIN 0003: Ordering Year Two.
W912CH27BA011
(3) SECTION E: E.1. Inspection and Acceptance Points - Origin;
(4) SECTION F.1 Time of Delivery
(5) SECTION K: RFO 52.209-13 - Violation of Arms Control Treaties or Agreements - Certification;
(6) SECTION K: RFO 52.225-18 - Place of Manufacture; and
(7) SECTION K: RFO 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation
Failure to complete all required fill-ins and representations may result in the rejection of a bid.
A.1.6 Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, all terms and conditions not modified remain unchanged.
Please see Section A.7. Acknowledgement of Amendments and RFO 52.214-3: Amendments to IFBs for additional information.
A.1.7 Bid opening will be held with all Bidders and shall commence on 17 December 2026 at 1:00 (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be p.m. local time held virtually. Bidder attendance at this event is not required. The Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the following personnel via email, after IFB close and a minimum 24 hours prior to bid opening, to receive this information:
CIARA WOODARD-BROWN
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: ciara.l.woodard-brown.civ@army.mil
-and-
PAMELA CUNHA
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: pamela.cunha.civ@army.mil
A.2. IFB STRUCTURE
A.2.1 NAICS. The Government will utilize North American Industry Classification System (NAICS) code 336412 "Aircraft Engine and Engine Parts Manufacturing" for this procurement. Failure to register via the System for Award Management (SAM) website for this NAICS, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.S. small business concerns are defined in RFO Part 19, RFO DFARS Part 219, and 13 CFR 121 Small Business Size Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.
A.2.2 All bids received in response to this IFB shall be valid for a minimum of 120 calendar days.
Please see RFO 52.214-16: Minimum Bid Acceptance Period for additional information.
A.3. ELECTRONIC CONTRACTING
A.3.1 All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the SAM website:
https://www.SAM.gov
Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the IFB.
A.3.2 Interested Bidders shall submit a completed IFB, including the Standard Form 33, via email with the subject line "IFB Submission - W912CH-27-B-A011 (Contractor Name)" to the following personnel:
CIARA WOODARD-BROWN
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: ciara.l.woodard-brown.civ@army.mil
-and-
PAMELA CUNHA
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: pamela.cunha.civ@army.mil
A.3.3 Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL
NOT BE ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL
ALSO NOT BE ACCEPTED.
A.3.4 Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions/modifications, so as to be received by the Government office designated in the IFB by the date and time specified.
A.3.5 It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government infrastructure (in this case, received via email) by the exact date and time specified on the cover page of this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required by the IFB are included in the electronic submission.
NOTE: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.
A.3.6 IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.
A.3.7 Any award issued as a result of this IFB will be distributed electronically. In the event of a Freedom of Information Act (FOIA) request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price(s). This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under FOIA, 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data /information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.
A.3.8 All questions pertaining to this IFB shall be submitted via email to the following personnel by local time (Warren, MI):03 December 2026 at 12:00pm
CIARA WOODARD-BROWN
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: ciara.l.woodard-brown.civ@army.mil
-and-
PAMELA CUNHA
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: pamela.cunha.civ@army.mil
A.3.9 Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see RFO 52.214-6: Explanation to Prospective Bidders for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date/time noted above, prior to IFB close.
A.3.10 For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website to locate a regional center at:
http://www.aptac-us.org
A.4. ALL OR NONE - NON COMMERCIAL - SEALED BIDDING
A.4.1 This provision serves as notice that all bid submissions must offer to provide the total quantity of all items identified in this solicitation.
A.4.2 Only one award will be made as a result of this solicitation. Bids submitted for less than the total quantity of all items identified in this solicitation will not be considered for award.
A.4.3 Note: This provision supersedes any other solicitation language that pertains to or references multiple awards.
A.5. ARMY CONTRACTING COMMAND - DETROIT ARSENAL (DTA) OMBUDSPERSON
A.5.1 Information regarding the Ombudsperson for this contract is located at the following website:
https://tacom.army.mil/ombudsman (Best viewed using Google Chrome or Microsoft Edge).
A.6. DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA
PACKAGE
A.6.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
A.6.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, "Militarily Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products /LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C "Technical Data Package" instructions.
A.6.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
A.6.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.7. ACKNOWLEDGEMENT OF AMENDMENTS
A.7.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
*** END OF NARRATIVE 1 ***
A First Article Test Report (FATR) is required in accordance with the clause entitled
"FIRST ARTICLE APPROAL CONTRACTOR TESTING, "FAR 52.209-3".
All bidder shall identify a dollar amount for CLIN 0001, even when requesting a First Article Test Waiver in accordance with E.5 Provision for Waiver of Required First Article Approval- Sealed Bidding. Failure to separately identify a FAT(R) dollar amount shall mean that the bidder will provide FAT(R) at no additional cost to the Government, and the bid will be evaluated accordingly.
1 Lot is equivalent to 1 report.
The Contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements List.
See Section J, Exhibit A: DD Form 1423.
C.1. TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
W912CH-27-B-A011
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
C.1.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code).
C.1.2 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
C.1.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
C.1.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.5 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren
(DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
C.1.6 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted.
Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
C.1.7 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2. REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.2.1 The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.2.2 The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.
C.2.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
C.3. OPSEC TRAINING REQUIREMENT
C.3.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).
C.4. COUNTERINTELLIGENCE AWARENESS AND REPORTING (CIAR); FORMERLY KNOWN
AS THREAT AWARENESS REPORTING PROGRAM (TARP):
C.4.1 Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization /contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete "Counterintelligence Awareness and Reporting for DoD Employees" - CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.
C.4.2 In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:
C.4.2.1 DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381-12 13 June 2025 11.
C.4.2.2 DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.
C.4.2.3 DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.
C.4.2.4 DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.
C.4.5 Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.
C.4.6 Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.
C.4.7 Personnel with access to Sensitive Compartmented Information and Special Access Programs.
C.4.8 Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.
C.4.9 Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.
C.4.10 Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.
C.4.11 Professional and educational exchange programs with foreign governments.
C.4.12 These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.
C.5 CONFIGURATION MANAGEMENT DOCUMENTATION
C.5.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
C.5.2 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
C.5.3 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.5.4 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
C.5.5 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
C.5.6 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
C.5.6.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW)
CDRL A001.
C.5.6.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
C.5.6.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
C.5.7 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e (i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.5.8 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
C.5.9 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
C.6 HEAVY PHOSPHATE COATING REQUIREMENT
C.6.1 The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232. All baseline testing, validation, and quality requirements mandated by MIL-DTL- 16232 remain fully applicable and mandatory. Except where modified herein, all testing criteria, execution methods, and process verification frequencies shall conform to MIL-DTL-16232 and all other referenced or applicable specifications.
C.6.2 Written procedures developed in accordance with MIL-DTL-16232 "Preproduction Inspection" shall be submitted in accordance with Contract Data Requirements List (CDRL 9000).
The active contract number shall be cited on all procedures submitted for review and approval. All processes, equipment, control ranges, testing, and test frequencies used for phosphating and the application of supplemental finishes shall be described in detail. In addition to the baseline specification requirements of MIL-DTL-16232, the Contractor shall document, define, and incorporate the following elements within the submitted procedure:
C.6.2.1 Product name and manufacturer of all chemicals and materials used in the phosphate coating and supplemental finishing processes, including any supplemental dry film lubricant and CARC paint (primer/topcoat), with clear traceability to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at https://qpd.dla.mil/.
C.6.2.2 Bath Materials and Controls in accordance with MIL-DTL-16232, detailing the methods used to monitor and control the chemical content of the phosphate coating solutions, to include the determination methods and control ranges for free acid, total acid, and ferrous iron.
C.6.2.3 Non-Chrome Sealer Rinse application and control, in accordance with the manufacturer's recommendations and MIL-DTL-16232, including how ongoing control and verification of this step is performed.
C.6.2.4 The minimum and maximum dry film thickness range for all applied supplemental finishes, including how thickness is measured and recorded.
C.6.2.5 The adhesion testing methodology utilized for supplemental finishes, including ASTM D2510 for dry film lubricant or ASTM D3359, Method B for CARC paint.
C.6.2.6 Process and curing parameters for dry film lubricants, specifying either a heat cure cycle (air drying for 1.0 hour or flash drying at 155-175 F for 10-30 minutes, followed by a heat cure at 375-425 F for 55-65 minutes) or an air cure cycle (air drying at room temperature for a minimum of 24 hours), in accordance with MIL PRF 46010 and any applicable product manufacturer's instructions.
C.6.2.7 Salt spray testing of parts or representative specimens/coupons with phosphate and a specified primer/topcoat system, performed in accordance with ASTM B117, TT C 490, and any other applicable coating specifications, identifying the required exposure duration, test frequency, and performance criteria.
C.6.2.8 Color verification parameters for CARC paint, citing the specified color number or chip number in accordance with SAE AMS-STD-595.
C.6.2.9 Cure verification parameters for CARC paint utilizing the solvent wipe method, including the manufacturer of the acetone or methyl ethyl ketone (MEK) solvent utilized.
C.6.3 Test and verification frequencies shall be clearly identified in the written procedures and supporting work instructions. Test frequencies shall be in accordance with MIL DTL 16232 and any other applicable specifications unless specifically modified or supplemented below. Where a test frequency is stated both in MIL-DTL-16232 and this narrative, the frequency requiring the greater number of tests within the defined unit of production or time shall apply. Failure of any test shall result in rejection of the entire lot back to the last passing test.
C.6.4 Weight per unit area of phosphate coating shall be tested per lot, at a minimum of once every eight hours of continuous production.
C.6.5 Non chrome sealer rinse concentration shall be verified in accordance with the sealer manufacturer's recommendations prior to starting production and at least once every eight hours of continuous operation.
C.6.6 Final chromic acid rinse shall be verified prior to starting production and at least once every eight hours of continuous operation.
C.6.7 Accelerated corrosion resistance (salt spray) of phosphate coatings, shall be tested in accordance with ASTM B117 per lot, at a minimum of once every eight hours of continuous production.
C.6.8 Thickness of supplemental finishes, including dry film lubricants and CARC paint (primer /topcoat), shall be measured at least once per production day.
C.6.9 Adhesion of supplemental finishes shall be tested at least once per production day, utilizing ASTM D2510 for dry film lubricants and ASTM D3359, Method B, for CARC coatings.
C.6.10 Topcoat cure verification shall be performed at least once per production day by solvent wipe in accordance with MIL DTL 53072.
D.1. PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS)
D.1.1 Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of
MIL-STD-2073-1
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 1
D.1.2 MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: (Table j.i. and j.ia.) ZZ
(2) Cleaning Procedure Code: (Table j.ii) Z
(3) Preservative Material Code: ZZ (Table j.iii)
(4) Wrapping Material Code: ZZ (Table j.iv)
(5) Cushioning and Dunnage Code: (Table j.v) ZZ
(6) Thickness of Cushioning or Dunnage Code: (Table j.vi) Z
(7) Unit Container Code: ZZ (Table j.vii)
(8) Intermediate Container Code: ZZ (Table j.vii)
(9) Quantity per Intermediate Container Code: ZZ (Appendix J.4.11)
(10) Packing Code: Z (Table j.IX and J.IXa)
(11) Special Marking Code: ZZ (Table j.x)
D.1.3 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage
D.1.4 Marking:
D.1.4.1 All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi /uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
D.1.5 Heat Treatment and Marking of Wood Packaging Materials (WPM):
D.1.5.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM
15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.
D.1.5.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
D.1.5.3 Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
D.1.6 These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractor's expense.
D.1.7 Hazardous Materials (as applicable):
D.1.7.1 Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.1.7.2 Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I) /DLAM 4145.3(I) (for military air shipments).
D.1.7.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
D.1.7.4 A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
D.1.8 SUPPLEMENTAL INSTRUCTIONS: N/A
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
E.1.1 The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or his subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: ORIGIN
a. NAME
b. CAGE
c. ADDRESS, CITY, STATE, ZIP
ACCEPTANCE POINT: ORIGIN
a. NAME
b. CAGE
c. ADDRESS, CITY, STATE, ZIP
E.2 REWORK AND REPAIR OF NONCONFORMING MATERIAL
E.2.1 Rework and Repair are defined as follows:
E.2.2 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
E.2.3 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
E.2.4 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
E.2.5 Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
E.2.6 Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
E.2.7 The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.3 ACCEPTANCE INSPECTION EQUIPMENT (AIE)
E.3.1 The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.
E.3.2 The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.
E.3.3 AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.
E.3.4 Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government.
Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data Requirements List, DD Form 1423. Government approval of AIE design shall not be considered to modify the contract requirements.
E.3.5 When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.
E.3.6 Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.
E.3.7 The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.
E.3.8 If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.
E.4 FIRST ARTICLE TEST (CONTRACTOR TESTING)
E.4.1 The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
E.4.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
E.4.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
E.4.4 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
E.4.5 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
E.4.6 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
E.4.7 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
E.4.8 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
E.4.9 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
E.4.10 A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing /specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to usarmy.ria.rdecom-ardec.mbx.rdar-qep@mail.mil
E.4.11 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.
E.4.12 Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
E.4.13 All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
E.4.14 The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or inprocess testing, unless specifically authorized by the Contracting Officer.
E.4.15 The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the
Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
E.4.16 USE OF MIL-STD 1916
a. The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer.