DD Form 1423.docx

DOCX document 27 KB Posted

Attached to
Solicitation-MOUNT, AIRCRAFT, BAR; NSN: 2840-01-583-7965
Solicitation number
BA011
Issued by

About this file

This is a DD Form 1423, Contract Data Requirement List, dated February 2024, specifying data deliverables for a contract related to the M24 Left Assembly (NSN: 2840-01-583-7965). The form identifies six required data items with specific submission requirements, distribution instructions, and approval processes.

The contract requires submission of configuration management documentation including an Engineering Change Proposal (A001), Request for Variance (A002), and Notice of Revision (A003), all due as required with four final copies submitted electronically to the Procuring Contracting Officer and Contract Specialist. Additional technical deliverables include a Test Procedure for Heavy Phosphate Coating (A004) due within 60 days after contract award requiring government approval before production initiation; an Acceptance Inspection Equipment Report (A005) due as required prior to production or First Article Test; and a First Article Test Report (A006) due as required with contractor format acceptable. All documentation must be submitted in government-compatible software (Microsoft Office or PDF format). The heavy phosphate coating procedure requires detailed descriptions of processes, equipment, controls, testing frequencies, and coated panel samples (three phosphate-only, three phosphate with primer, three phosphate with primer and top coat). The government will provide review responses within specified timeframes (30 days for FATR, 45 days for AIE), and the contractor must provide 15 calendar days advance written notice of First Article Test scheduling to enable government witness.

View the file

Other files

File Type Posted
First Article Waiver Worksheet.pdf PDF
OPERATIONS SECURITY (OPSEC) PLAN.pdf PDF
W912CH27BA011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, FEB 2024

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:

B. EXHIBIT:

C. CATEGORY:

TDP _X_ TM ____ OTHER ____

D. SYSTEM/ITEM: M24, LEFT ASSEMBLY, NSN: 2840-01-583-7965

E. CONTRACT/PR NO.: TBD

F. CONTRACTOR: TBD

G. PREPARED BY: FCDD-ACE-SP

H: DATE: 29 May 2025

I: APPROVED BY: MIKE ROBERTSON

J: DATE: 29 May 2025

1. DATA ITEM NO: A001

2. TITLE: ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE: N/A

4. AUTHORITY: DI-SESS-80639E

5. CONTRACT REFERENCE: SECTION C.5 CONFIGURATION MANAGEMENT DOCUMENTATION

6. REQUIRING OFFICE:

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: SEE ITEM 16

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: SEE ITEM 16

A. ADDRESSEE: PCO, CS, ACO, ENG

B. COPIES:

DRAFT: 0

FINAL: 4

REG REPRO: 0

15. TOTAL COPIES: 0/4/0 SEE ITEM 16

16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE ECP SHALL BE THE MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE ECP. **SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT XXXX@ARMY.MIL AND CONTRACT SPECIALIST AT XXXX@ARMY.MIL; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING OFFICE AT XXXX@ARMY.MIL AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil. DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.1 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1692 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A002

2. TITLE: REQUEST FOR VARIANCE (RFV)

3. SUBTITLE: N/A

4. AUTHORITY: DI-SESS-80640E

5. CONTRACT REFERENCE: SECTION C.5 CONFIGURATION MANAGEMENT DOCUMENTATION

6. REQUIRING OFFICE:

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: SEE ITEM 16

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: SEE ITEM 16

A. ADDRESSEE: PCO, CS, ACO, ENG

B. COPIES:

DRAFT: 0

FINAL: 4

REG REPRO: 0

15. TOTAL COPIES: 0/4/0 SEE ITEM 16

16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE RFV SHALL BE THE MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE RFV. **SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT XXXX@ARMY.MIL AND CONTRACT SPECIALIST AT XXXX@ARMY.MIL; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING OFFICE AT XXXX@ARMY.MIL AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil. DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.2 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1694 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A003

2. TITLE: NOTICE OF REVISION (NOR)

3. SUBTITLE: N/A

4. AUTHORITY: DI-SESS-80642E

5. CONTRACT REFERENCE: SECTION C.5 CONFIGURATION MANAGEMENT DOCUMENTATION

6. REQUIRING OFFICE:

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: SEE ITEM 16

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: SEE ITEM 16

A. ADDRESSEE: PCO, CS, ACO, ENG

B. COPIES:

DRAFT: 0

FINAL: 4

REG REPRO: 0

15. TOTAL COPIES: 0/4/0 SEE ITEM 16

16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE NOR SHALL BE THE MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE NOR. **SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT XXXX@ARMY.MIL AND CONTRACT SPECIALIST AT XXXX@ARMY.MIL; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING OFFICE AT XXXX@ARMY.MIL AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil. DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.4 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1695 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO.: A004

2. TITLE OF DATA ITEM: TEST PROCEDURE – HEAVY PHOSPHATE COATING

3. SUBTITLE: PRE-PRODUCTION PROCEDURE

4. AUTHORITY: DI-NDTI-80603A

5. CONTRACT REFERENCE: Section C.6 HEAVY PHOPSHATE COATING REQUIREMENT

6. REQUIRING OFFICE: RDAR-MEE-W(R)

7. DD250 REQ: Not Required

8. APP CODE: A

9. DIST. STATEMENT: D

10. FREQUENCY: ONE/R

11. AS OF DATE: Date of Contract award

12. DATE OF FIRST SUB: 60DAC

13. DATE OF SUBS: N/A

14. DISTRIBUTION:

A. ADDRESSEE: [Government Procuring Contract Officer (PCO)], [Contract Specialist (CS)], and mark.a.godlewski.civ@army.mil

B. COPIES: 2

DRAFT:

FINAL: 2

15. TOTAL: 2

16. REMARKS:

BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THRU THE CONTRACTING OFFICER IS REQUIRED W/IN 60 DAYS AFTER CONTRACT AWARD. CONTRACTING OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (RDAR-MEE-W(R)). CONTRACTING OFFICER SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO CONTRACTOR. COATED PANELS PER PARA 3.2.2 SHALL INCLUDE THREE WITH PHOSPHATE ONLY, THREE WITH PHOSPHATE AND PRIMER, AND THREE WITH PHOSPHATE, PRIMER AND TOP COAT.

The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.

1. DATA ITEM NO.: A005

2. TITLE OF DATA ITEM: ACCEPTANCE INSPECTION EQUIPMENT (AIE) REPORT

3. SUBTITLE: SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE DOCUMENTATION

4. AUTHORITY: DI-MGMT-81979

5. CONTRACT REFERENCE: SECTION E.3 ACCEPTANCE INSPECTION EQUIPMENT (AIE)

6. REQUIRING OFFICE: RDAR-EIQ-P

7. DD250 REQ: Not required

8. APP CODE: A

9. DIST. STATEMENT: D

10. FREQUENCY: ASREQ

11. AS OF DATE: Date of Contract Award

12. DATE OF FIRST SUB: ASREQ (See Block 16)

13. DATE OF SUBS: ASREQ (See Block 16)

14. DISTRIBUTION:

A. ADDRESSEE: Engineering, usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil , Quality Assurance, usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil

B. COPIES: 3

DRAFT:

FINAL: 3

15. TOTAL: 3

16. REMARKS:

BOX 12: PRIOR TO INITIATION OF PRODUCTION OR FIRST ARTICLE TEST, IF CONTRACTUALLY REQUIRED (SEE NOTE 1).

BOX 13: WHENEVER ANY REVISION THERETO IS NEEDED FOR ANY REASON.

NOTE 1: THE GOVT WILL FURNISH DISPOSITION WITHIN 45 CALENDAR DAYS AFTER RECEIPT.

NOTE 2: MICROSOFT OFFICE 97 DRAWINGS: AUTOCAD-RELEASE 14 (EXPRESS MAILED

HARD COPIES WILL BE ACCEPTED) FILES MAY BE COMPRESSED USING ZIP PROGRAM.

WARNING: LARGE PACKAGES MAY CAUSE DELAYS IN DELIVERY USING MAIL INTERNET. EMAIL SUBJECT LINE MUST CONTAIN END ITEM NOMENCLATURE

1. DATA ITEM NO.: A006

2. TITLE OF DATA ITEM: FIRST ARTICLE TEST REPORT (FATR)

3. SUBTITLE: TEST/INSPECTION REPORT

4. AUTHORITY: DI-NDTI-80809B

5. CONTRACT REFERENCE: SECTION E.4 FIRST ARTICLE TEST (CONTRACTOR TESTING) and F.1 TIME OF DELIVERY

6. REQUIRING OFFICE: RDAR-EIQ-P

7. DD250 REQ: Not required

8. APP CODE: A*

9. DIST. STATEMENT: D

10. FREQUENCY: ASREQ

11. AS OF DATE: SEE BLOCK 16

12. DATE OF FIRST SUB: SEE BLOCK 16

13. DATE OF SUBS: SEE BLOCK 16

14. DISTRIBUTION:

A. ADDRESSEE: Engineering, usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil, Quality Assurance, usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil

B. COPIES: 3

DRAFT:

FINAL: 3

15. TOTAL: 3

16. REMARKS: REQUIRED BY THE AUTHORITY IN BOX 4, PARA 10.2 AND ITS SUBPARAGRAPHS. CONTRACTOR FORMAT IS ACCEPTABLE.

The FATR shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF FAT, SO THAT THE GOVERNMENT MAY WITNESS THE TESTS. THE GOVERNMENT WILL REVIEW THE FATR AND PROVIDE FEEDBACK TO THE CONTRACTOR WITHIN 30 CALENDAR DAYS OF RECEIPT OF FATR.

BLOCK 13: SUBSEQUENT SUBMISSION ONLY IF INITIAL FAT FAIL

29 May 2025