This document is an Addendum No. 1 issued by the Maryland Department of General Services for the BA-631-221-003 Emergency Generator Replacement project in Annapolis, MD. The project involves the removal, relocation, and replacement of the emergency generator and automatic transfer switch at the Income Tax Building. The addendum clarifies that the transfer switch, not the bypass transfer switch, needs to be replaced. A new concrete pad should be designed to support the new generator, load bank testing is required, and temporary power must be provided during construction. The existing conduit remains.
The contract opportunity involves jurisdictions within Anne Arundel County and the City of Annapolis, Maryland. No additional pricing terms, set asides, incumbents, funding requirements, or other salient information is provided in this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
301 west Preston Street Toll Free 1-800-449-4347 Baltimore, Maryland 21201 email: Courtney.League@maryland.gov 410-767-5516 TTY users 1-800-735-2258
ADDENDUM NO. 1
December 6, 2022
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
PRE-BID
PROJECT NO. BA-631-221-003
EMERGENCY GENERATOR REPLACEMENT
Income Tax Building 110 Carroll Street
Annapolis, MD 21401
This Addendum will clarify, add to, delete from, correct and/or change the bid documents for the project referenced above to the extent indicated. This Addendum is hereby made a part of the bid documents on which the contract will be based. By submitting a bid for this solicitation, you acknowledge receipt of this addendum. All questions must be in writing and addressed to the Procurement Officer, James Alston.
This Addendum clarifies the 5 questions, listed below, raised at the pre-bid meeting on December 1, 2022 at 9:00 AM.
Q.1. Transfer switch or Bypass Transfer switch, which one needs to be replaced?
A.1. Transfer Switch
Q.2. Does this project require a new concrete pad?
A.2. Yes, the new concrete pad should be designed to support the new generator.
Q.3. Does Load Bank Testing is required?
A.3. Yes
Q.4. Does temporary power should be provided during construction?
A.4. Yes
Q.5. Does existing conduit remains?
A.5. Yes
All other terms, conditions and specifications remain unchanged.
END OF ADDENDUM NUMBER: 1
Issued by: James Alston Fatma Yilmaz – Project Manager mailto:Courtney.League@maryland.gov