This Project Manual is issued by the Maryland Department of General Services (DGS) for the design, construction, and delivery of temporary event infrastructure supporting the Governor Inauguration scheduled for January 20, 2027, at the Maryland State House in Annapolis, Maryland (DGS Project No. BA-000-270-003). The contract requires a complete, turn-key installation and operation of staging platforms, broadcast infrastructure, tentage with climate control, generators, seating, heating systems, sound equipment, and lighting. Key deliverables include a tiered main stage with reinforced structural capacity to support a 1,500-pound ballistic glass shield, multiple elevated TV/MPT camera platforms with enhanced broadcast stability features, one 20-by-30-foot medical tent with HVAC and lighting, seven 10-by-15-foot security checkpoint tents each equipped with dedicated 8,500-watt generators and gas heaters, 1,000 general seating chairs and 100 VIP chairs, choral platforms, sound systems with mixing stations, and 40 heavy-duty cable protection ramps. The pre-bid conference is scheduled for December 1, 2026, from 12:00 p.m. to 1:30 p.m. at 29 St. Johns Street, Annapolis, Maryland, with a mandatory site walk-through. Vendor questions must be submitted in writing via eMaryland Marketplace Advantage (eMMA) no later than 2:00 p.m. on December 8, 2026. Sealed bids are due via eMMA by 2:00 p.m. on Friday, December 11, 2026. All staging must be fully installed and verified by 11:00 a.m. on Tuesday, January 19, 2027, with complete teardown and site clearance required no later than 11:59 p.m. on Wednesday, January 20, 2027. The contract term runs from Notice to Proceed through final completion on January 20, 2027, with no renewal options.
The contract is structured with a Base Bid (including a $15,000 contingency allowance for additional event equipment), five additive alternates (main stage tent, presidential teleprompters, Jumbotron LED video screens, exterior step carpeting, and state house lobby curtain), and eight unit price line items for additional chairs, staging sections, heating units, cable ramps, tents with generators and heaters, and portable generators. The lowest responsive responsible bidder submitting the Base Bid will be selected for award, with alternates and unit prices to be accepted based on fund availability. MBE and VSBE participation is encouraged in accordance with COMAR regulations and project-specific goals. The State of Maryland will not establish a set-aside. Liquidated damages are assessed at $350 per calendar day for failure to meet milestone deadlines. The prime contractor must hold an active Maryland Contractor's License, be in good standing with the Maryland State Department of Assessments and Taxation, possess a minimum of five years of comparable experience in public or commercial staging and broadcast event infrastructure, and submit all required pre-event submittals including detailed shop drawings, equipment cut sheets, electrical load schedules (due January 5, 2027), chair samples (due January 8, 2027), and site-specific health and safety plans. The contractor is solely liable for all hazardous materials containment, environmental remediation, historic property restoration, and snow/ice removal operations. No additional compensation will be provided for overtime, weekend work, or shift differentials, which must be included in the Base Bid. Final payment is contingent upon completion of post-event site inspection sign-offs, competent person safety certificates, allowance reconciliation, and final lien waivers.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
EVENT (JAN. 20, 2027)
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS)
Design, Construction and Energy – Facilities Engineering Division
PROJECT MANUAL
FOR
GOVERNOR INAUGURATION EVENT
TO BE HELD JANUARY 20, 2027
AT
MARYLAND STATE HOUSE
100 State Circle, Annapolis, MD 21401
FOR
DGS PROJECT NUMBER: BA-000-270-003
MARYLAND DEPARTMENT OF GENERAL SERVICES
DATE: 11/19/2026
PROJECT CLASSIFICATION: B
NOTICE TO BIDDERS:
Minority Business Enterprises (MBE) and Veteran-Owned Small Business Enterprises (VSBE) are encouraged to respond to this solicitation in accordance with COMAR regulations and project-specific goals.
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS
Atif Chaudhry, Secretary Wes Moore, Governor
301 West Preston Street, Room 1405 Brooke E. Lierman, Comptroller
Baltimore, Maryland 21201 Dereck E. Davis, Treasurer
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
DIVISION 0 – PROCUREMENT & CONTRACTING REQUIREMENTS
• Notice To Bidders – Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)
• Instructions to Bidders for Construction Projects (January 18, 2023) (eMaryland Marketplace Advantage attachment)
• General Conditions for Construction Contracts (July 21, 2022) (eMaryland Marketplace Advantage attachment)
• Bid Proposal Affidavit (eMaryland Marketplace Advantage attachment)
• State Funded Construction Projects – Payment of Employee Health Care Expenses (eMaryland Marketplace Advantage attachment)
• Payment of Employee Health Care Expenses Certification (eMaryland Marketplace Advantage attachment)
• Contractor's Questionnaire
• Bid Bond, if applicable (eMaryland Marketplace Advantage attachment)
• Minority Business Enterprise Utilization Procedures (May 7, 2019) (eMaryland Marketplace Advantage attachment)
• MBE Attachment D and D-1A Forms (eMaryland Marketplace Advantage attachment)
• List of Prevailing Wage Rates, if applicable
• Addenda, if any (eMaryland Marketplace Advantage attachment)
• List of Drawings
• Pre-Bid Conference/Site Visit – Refer to: State Finance and Procurement Article §14-302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).
TABLE OF CONTENTS
DIVISION 0 Procurement & Contracting Requirements
SECTION 1 General Information
SECTION 2 Detailed Scope of Work, Specifications, Alternates & Unit Prices
SECTION 3 Contractor Qualifications & Submittals
SECTION 4 Site Conditions & Field Verification
SECTION 5 Site Security, Health & Safety Protocols
SECTION 6 Material Quality, Storage & Hazardous Materials
SECTION 7 Project Schedule, Duration & Liquidated Damages
SECTION 8 Work Hours, Point of Contact & Coordination
SECTION 9 General Conditions & Regulatory Compliance
SECTION 10 Warranties, O&M Manuals & Closeout
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
APPENDIX A Reference Photographs, Conceptual Site Layout & Stage Diagram
APPENDIX B Prior Inauguration Reference Drawings (For Information Only – To Be Updated for 2027 Plan)
NOTICE REGARDING DRAWINGS, SKETCHES, AND PHOTOGRAPHS:
All drawings, sketches, and photographs included in this Project Manual are for informational purposes only.
All measurements and dimensions are for information only; the Contractor shall field-verify all information prior to fabrication and installation.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
1. GENERAL INFORMATION
1.1 Project Description
This project consists of providing all labor, equipment, materials, tools, parts, scaffolding, hoisting, permits, fees, overhead, and supervision necessary to perform complete, turn-key specified event infrastructure support of the Inauguration of Governor-Elect to be conducted on Wednesday, January 20, 2027, at the Maryland State House, 100 State Circle, Annapolis, MD 21401 (including associated staging, broadcast/MPT production support, Medical Tent with HVAC/lighting, Security Checkpoint/Scanner Tents with dedicated 8,500W generators and gas checkpoint heaters, seating, heating, generators, audio, and broadcast lighting at Lawyer's Mall, State Circle, Senate Chamber, and the rear courtyard of the Lowe House of Delegates Building).
1.2 Basis of Award & Base Bid Structure
The Contract shall be awarded to the responsible bidder submitting the lowest responsive Base Bid (including unit prices and allowances), or Base Bid plus any Unit Prices or Add Alternates based on fund availability. Refer to Section 3 for Responsibility Determination requirements.
The BASE BID shall be the total lump sum cost for the provision of all unit prices, allowances, labor, tools, transportation, equipment, parts, materials, overhead, and all direct and indirect costs necessary to furnish the support of the 2027 Inauguration as detailed in these specifications, with the exception of work required for Alternates No. 1 through No. 5. Bidders must submit their Base Bid and Alternate prices on eMaryland Marketplace Advantage (eMMA) at the designated line items.
1.3 Base Bid Allowance (Allowance No. 1)
Include in the Base Bid a total allowance figure of $15,000.00 for services required to supply or install additional equipment, chairs, platforms, tents, etc., required for the event. These services must be requested by the Using Agency and approved in writing by the Using Agency / DGS Project Manager.
The Contractor shall supply detailed proposals for those additional services as required for approval prior to execution. Any funds not used will be credited back to the State / Using Agency.
2. DETAILED SCOPE OF WORK, SPECIFICATIONS, ALTERNATES & UNIT
PRICES
2.1 Scope Provisions & Technical Specifications
The Contractor shall provide a complete, turn-key installation, winter weather management (snow removal and de-icing), continuous operation, rapid-response contingency maintenance, and same-day teardown of all temporary event infrastructure, broadcast/MPT platforms, tents, seating, heating/HVAC, generators/power distribution, cable protection, sound systems, and broadcast lighting, including, but not limited to, the following specific tasks:
2.1.1 Staging & Platform Services (Including Enhanced Broadcast & MPT Stability Requirements)
CRITICAL STAGING SCHEDULE, STRUCTURAL RIGIDITY & SAFETY CERTIFICATION
REQUIREMENTS:
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
• Installation Window: Work may NOT begin before Sunday, January 17, 2027, at 12:00 Noon. All staging and platforms must be completely put in place NO LATER THAN 11:00 A.M. on Tuesday, January 19, 2027.
• Heavy Ballistic Shield Structural Load Capacity (Main Stage): The Main Stage speaker/podium deck (Tier 1 / Tier 1 Rear Projection and podium zone) MUST be engineered, reinforced, and structurally rated to safely support a concentrated point/footprint load of a minimum 1,500-pound (1,500 lb.) high-powered-rifle-rated ballistic glass shield assembly (procured/installed separately) in addition to live speaker, lectern, and dignitary loads without deflection or sway.
• Safety & Soundness Verification: Contract includes mandatory verification of safety and soundness of all platforms (including verification of the >=1,500 lb. ballistic shield load zone on the Main Stage), to be completed by an approved Competent Person on the morning of Tuesday, January 19, 2027, NO LATER THAN 8:00 A.M. for all staging and platforms.
• Zero-Movement Broadcast Stability Standard: All TV, MPT, and media platforms must be heavily braced, tried, and tested to guarantee absolute structural rigidity and soundness. NO SHAKING, DEFLECTION, OR VIBRATION OF ANY PLATFORM IS ACCEPTABLE. The Contractor is responsible for engineering and bracing all stages so TV and camera platforms provide rock-solid stability for long-lens broadcast filming and photoshoots.
• Mandatory Teardown & Site Clearance Deadline (NO EXCEPTIONS): All staging, platforms, tents, generators, chairs, bleachers, cable ramps, and Contractor equipment must be dismantled and completely removed from the site NO LATER THAN 11:59 P.M. on Wednesday, January 20, 2027. NO EXCEPTIONS.
A. Main Stage (West Steps of State House): Construct a tiered, pyramidal staging structure of varying heights ascending the West Steps of the Maryland State House:
• Tier 1 (Lowest/Forwardmost Point nearest Lawyer's Mall): 6' wide by 4' long, and 7' high (±).
• Tier 1 Rear Projection: Projects rearward at the same elevation (+7' ±), measuring 20' wide by 20' deep.
• Tier 2 (Second Elevation): 32' wide by 12' deep, and 3' high above Tier 1 (± so as to be level with the nearest step). Access to the lower stage shall be via a ramp or existing steps through the center of the uppermost stage, not less than 5' wide.
• Tier 3 (Third Elevation): Located to the outside of the left and right sides of the brass handrails (creating two separate platforms that leave the center stairs open and unobstructed). Each platform shall be 10' wide by 12' deep, and 3' high above Tier 2 (± so as to be level with the nearest step). Access shall be from the rear next to the brass handrail on either side.
• Uppermost Column Seating Platforms: Construct two (2) additional seating platforms on the uppermost level of the State House steps, between the 2nd & 3rd columns and between the 4th & 5th columns, level with the top of the left and right cheek walls. These platforms shall incorporate the tops of the cheek walls and radiate at approximately a 60-degree angle from the inside columns (2 & 3) to the end of the cheek wall. Access shall be from the rear as determined by seating arrangement. All seating areas shall incorporate code-compliant safety rails to prevent falls.
• Main Stage Heavy Ballistic Glass Shield Structural Capacity (Minimum 1,500 lbs.
Concentrated Load): The Main Stage podium/speaker platform area (Tier 1 and Tier 1 Rear Projection) shall be engineered with heavy-duty structural framing, steel/aluminum under-structure cribbing, and reinforced load-bearing decking capable of safely supporting a ballistic glass shield assembly weighing approximately 1,500 pounds (1,500 lbs. minimum concentrated dead load), plus full live occupancy and wind loads, with zero structural deflection, racking, or instability. (Note: The ballistic glass shield itself is furnished/installed under the separate DGS security package; the Contractor shall coordinate exact
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B shield footprint dimensions and placement with DGS and Maryland State Police / Capitol Police and verify structural load capacity in the Competent Person certification).
B. Choral Platform: Accommodate between 65 and 80 personnel. Construct with three (3) tiered levels at approximately 10", 20", and 30" high, with a rear safety railing on the top level to prevent falls.
Arrange in a loose semi-circle arc facing Lawyer's Mall, positioned to the viewer's left front of the Main Stage. No heating requirement applies to the Choral Platform.
C. Sound Platforms & Mix Position: Provide two (2) 5' x 7' platforms, one on each side of the Main Stage, finished/covered with patriotic bunting; platform height shall be varied as appropriate to accommodate the speaker systems. Provide one (1) 8' x 8' x 1' high mix position platform to accommodate the sound engineer and audio console equipment.
D. TV Bank at Government House: Provide one (1) 5' deep x 50' long x 4' high platform with a 3' deep x 50' long x 32" high stage positioned to the front of the high platform. Access to these platforms shall be provided from both ends (State Circle side and Lawyer's Mall side).
E. TV & Maryland Public Television (MPT) Camera Platforms (Enhanced Stabilization & Isolation):
• Far West End of Lawyer's Mall TV/MPT Camera Platform (Mandatory Stabilization & Perimeter Isolation): Provide the primary elevated TV/MPT camera platform at the far west end of Lawyer's Mall (near College Avenue / stormwater retention pond area), configured with separate camera-mount and operator decks (12' high x 4' deep x 7'–8' wide and 12' high x 6' deep x 7'–8' wide with a minimum 2" physical separation gap between operator standing area and camera mounting deck). To eliminate broadcast camera shake experienced during prior inaugurations, the Contractor MUST implement all three of the following structural upgrades:
1. Complete Structural Detachment: Keep the elevated TV/MPT camera platform completely detached and physically isolated from the lower Still Photographer platform (and any adjacent pedestrian risers) so movement or foot traffic on the lower tier cannot transfer vibration to the TV cameras.
2. Reinforced Internal & External Diagonal Bracing: Install heavy-duty internal cross-bracing and external diagonal outrigger/guy bracing on all bays of the scaffolding/staging frame to maximize lateral and torsional rigidity and completely eliminate sway or movement under live broadcast zoom operation.
3. Perimeter Snow Fencing Exclusion Zone: Surround the entire perimeter of the elevated TV/MPT camera platform with continuous, securely staked high-visibility safety snow fencing (minimum 4' high, offset clear of platform legs) to prevent members of the public from leaning against, resting on, or climbing the platform structure.
• Statue Camera Platforms: One (1) 12' x 8' x 7' high stand-alone platform with ladder access for TV Camera at statue; plus two (2) 8' x 7' x 7' high stand-alone platforms with ladder access for MPT Cameras at statue, constructed with heavy-duty diagonal cross-bracing for zero-shake TV broadcast use.
• Flanking Main Stage Platforms: Two (2) 5' x 7' platforms, one on each side of the Main Stage, covered with bunting, with height determined as appropriate to accommodate speaker/camera requirements.
F. Still Photo Platform (Isolated Stand-Alone Structure): Provide one (1) 4' x 12' x 40" high stand-alone stage with ladder access positioned to the front of the TV platform. This platform must remain 100% structurally detached from the adjacent TV/MPT camera platform with clear physical separation so photographers stepping onto or moving across this tier do not induce vibration in the elevated TV platform.
G. LSB Side Platform: Provide one (1) 5' x 7' x 7' high cutaway platform for TV, heavily braced for broadcast camera stability.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
H. LSB Side Radio Stage: Provide one (1) 8' x 8' x 1' high platform.
I. Senate Chamber Platforms: Provide one (1) 5' x 7' x 10' high platform for TV (placed at center entry) and two (2) 2' x 30' x 32" high platforms (placed alongside walls on the Senate Floor).
J. Parade Camera Platform: Provide one (1) 5' x 7' platform for TV on the West Side of the State
House, cross-braced to eliminate camera shake.
2.1.2 Tentage, Climate Control, Dedicated Tent Power & Continuous Maintenance
A. Uniform Tent Appearance Standard (All Tents): All tents furnished under the Base Bid and Add Alternates shall be commercial-grade, clean, matching white event tents of uniform style, finish, and appearance, equipped with roll-up sidewalls and full code-compliant wind anchoring/ballasting.
B. Medical Tent (Base Bid – One [1] 20' x 30' Climate-Controlled Tent at Public Buildings & Grounds / Bladen St.): Furnish, erect, anchor, power, heat, light, and maintain one (1) 20' x 30' white commercial-grade Medical Tent positioned on the Office of Public Buildings & Grounds (APBG) plaza/courtyard adjacent to Bladen Street (see Figure A-11 Tent & Checkpoint Deployment Map in Appendix A), meeting the following mandatory specifications:
• Roll-Up Sidewalls: Equipped with removable/roll-up white sidewalls allowing the tent sides to be rolled up or enclosed as weather and medical operations require.
• Interior Lighting & Electrical Power: Equipped with dedicated electrical power distribution and bright, uniform interior overhead lighting suitable for clinical/medical evaluation and patient care.
C. Security Checkpoint / Scanner Tents (Base Bid – Seven [7] 10' x 15' Tents with Dedicated Generators & Gas Heaters): Furnish, erect, anchor, power, heat, light, and maintain seven (7) uniform white 10' x 15' tents positioned across the five (5) designated security screening checkpoint zones shown on Figure A-10 (Tent & Checkpoint Deployment Map in Appendix A)—specifically: (CP-1) Bladen St.
& Calvert St. adjacent to Public Buildings & Grounds (2 tents); (CP-2) College Ave. & Bladen St. North near General Assembly / Lawyers Mall (1 tent); (CP-3) College Ave. & Lawyers Mall South near James Senate Building (1 tent); (CP-4) State Circle & North St. (1 tent); and (CP-5) State Circle & School St.
(2-tent dual bay, or as directed by DGS/Capitol Police)—to shelter security scanning equipment and screening personnel, meeting the following mandatory specifications:
• Roll-Up Sidewalls & Interior Lighting: All seven (7) tents shall feature roll-up white sidewalls and integrated interior lighting fixtures powered by each tent's dedicated generator so lighting is immediately available whenever needed.
• Dedicated 8,500-Watt Minimum Generator per Tent (7 Generators Total): Each of the seven (7) 10' x 15' scanner tents shall be equipped with its own dedicated, whisper-quiet portable generator rated at a minimum of 8,500 watts (8.5 kW) continuous output, complete with weatherproof GFCI distribution/cabling to reliably power the security scanning units (provided by others) and interior tent lighting.
• Individual Gas-Powered Checkpoint Heaters (7 Heaters Total): Each of the seven (7) 10' x 15' scanner tents shall be equipped with an individual, commercial gas-powered (propane/LP) checkpoint heater positioned and vented safely in strict compliance with State Fire Marshal regulations to keep screening workers warm throughout event operations.
• Individual Gas-Powered Checkpoint Heaters (6 Heaters Total): Each of the six (6) 10' x 15' scanner tents shall be equipped with an individual, commercial gas-powered (propane/LP) checkpoint heater positioned and vented safely in strict compliance with State Fire Marshal regulations to keep screening workers warm throughout event operations.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
Tent ID / Zone Tent Type & Size Designated Site Location (See Figure A-11)
Dedicated Power, Climate & Lighting Specs
MED-1 (1) 20' x 30' White Tent (Roll-Up Sides)
Public Buildings & Grounds Plaza (Off Bladen St. / St. Johns St.)
Dedicated Electrical Power, Overhead Clinical Lighting & Thermostatic Tent HVAC Heating Unit
CP-1 A/B (2) 10' x 15' White Tents (Roll-Up Sides)
Bladen St. & Calvert St.
(Adjacent to Public Buildings & Grounds)
Two (2) Dedicated 8,500W Min.
Whisper Generators, Interior Lighting & Two (2) Gas Heaters
CP-2 (1) 10' x 15' White Tent (Roll-Up Sides)
College Ave. & Bladen St. (North) (Lawyers Mall / General Assembly Side)
Dedicated 8,500W Min. Whisper Generator, Interior Lighting & Individual Gas Checkpoint Heater
CP-3 (1) 10' x 15' White Tent (Roll-Up Sides)
College Ave. & Lawyers Mall (South) (James Senate Building Side)
Dedicated 8,500W Min. Whisper Generator, Interior Lighting & Individual Gas Checkpoint Heater
CP-4 (1) 10' x 15' White Tent (Roll-Up Sides)
State Circle & North St.
(North State House Perimeter Entry)
Dedicated 8,500W Min. Whisper Generator, Interior Lighting & Individual Gas Checkpoint Heater
CP-5 (A/B) (2) 10' x 15' White Tents (Roll-Up Sides)
State Circle & School St.
(South State House Perimeter / Dual Bay)
Two (2) Dedicated 8,500W Min.
Whisper Generators, Interior Lighting & Two (2) Gas Heaters
D. Main Stage Tent (Alternate Price No. 1): See Section 2.5.A for Alternate pricing scope (white tent with translucent roll-up sides).
F. Continuous Tent, Generator, HVAC & Fuel Maintenance Personnel: The Contractor shall include in their Base Bid the cost of dedicated, qualified maintenance and refueling personnel to remain on-site overnight (Jan. 19–20) and continuously throughout the entire Inauguration Event on January 20, 2027, to monitor and maintain the structural soundness, anchoring, appearance, HVAC operation, gas checkpoint heaters, and continuous fueling/operation of all tent generators (including all seven 8,500W scanner tent generators and Medical Tent HVAC/power systems).
2.1.3 Portable Heating, Broadcast/Event Generators & Cable Protection
A. Portable Propane Heating (Main Stage): Provide heating to the Main Stage and the 2nd & 3rd Tier Stages via commercial propane heaters. A minimum of four (4) heating systems capable of distributing heat evenly across the Main Stage (20' x 20') and heating the two elevated rear stages shall be furnished, installed, fueled, and maintained by the Contractor. Heating systems must be completely in place and functioning properly NO LATER THAN 3:00 P.M. on Tuesday, January 19, 2027, and shall maintain continuous heat throughout the entirety of the Inauguration Event on January 20, 2027. Propane tanks shall be located behind the East corner of the State House in strict compliance with Fire Marshal regulations.
B. General Event Whisper Generator: Provide one (1) 200-amp whisper-quiet generator with disconnect, delivered, fueled, and positioned NO LATER THAN 12:00 P.M. (Noon) on Sunday, January 17, 2027. Exact delivery location to be confirmed by the DGS / Military Department Designee.
C. Maryland Public Television (MPT) Dedicated Broadcast Generators (State Circle): In addition to general event power, the Contractor shall furnish, deliver, fuel, and maintain two (2) dedicated whisper-quiet broadcast generators positioned on the left side of State Circle (facing the Capitol
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B building) adjacent to the MPT production truck parking zone, delivered NO LATER THAN 12:00 P.M.
(Noon) on Sunday, January 17, 2027, meeting the following exact MPT engineering specifications:
• Quantity & Rating: Two (2) whisper-quiet broadcast-grade generators, each rated at 200 Amps and 85 kW (capable of supporting MPT's primary production truck and B-unit simultaneously or serving as full load-bearing primary/redundant units).
• Phase Configuration & Connectors: Equipped with standard Camlock output connectors and switchable/configured voltage output to support 3-phase power (required for MPT's larger primary production truck) as well as single-phase power (required for MPT's smaller B-unit truck).
• Fueling & Technician Standby: Delivered with full fuel tanks, continuous refueling support through event teardown, and a qualified generator technician on-site during rehearsal (Jan. 19) and Inauguration Day (Jan. 20).
D. Heavy-Duty Cable Protection Ramps (40 Yellow Jacket Units): Because broadcast and production cables can no longer be routed along the adjacent construction fence, the Contractor shall furnish, deploy, and recover forty (40) heavy-duty 5-channel "Yellow Jacket" (or DGS/MPT-approved equal) ADA-compliant cable protector ramps across pedestrian walkways, brick paths, and vehicular crossings between State Circle, Lawyer's Mall, and the media/camera platforms.
E. Medical Tent HVAC & Security Checkpoint Tent Generators / Gas Heaters (Base Bid): In addition to Main Stage heating and broadcast/event generators above, the Contractor shall furnish, fuel, and continuously maintain the dedicated HVAC heating/power system for the 20' x 30' Medical Tent, seven (7) dedicated minimum 8,500-watt generators (one per 10' x 15' scanner tent), and seven (7) individual gas-powered checkpoint heaters (one per 10' x 15' scanner tent) in accordance with Section 2.1.2.
F. Self-Contained Generators & Equipment Standard (Mandatory): All generators (including the 200A general event whisper generator, the two [2] 200A/85kW MPT broadcast generators, the six [6] 8,500W minimum scanner tent generators, and any reserve/unit-price generators), HVAC units, heaters, lighting rigs, and ancillary support equipment furnished under this Contract shall be completely self-contained, weatherproofed, equipped with integrated fuel tanks, secondary spill containment, disconnect switches/GFCI protection, and all required distribution cabling, requiring no external utility infrastructure other than DGS-designated hookups where explicitly specified.
2.1.4 Event Seating & Bleachers
A. General Seating (1,000 Chairs): Provide 1,000 white general seating chairs delivered and off-loaded in the vicinity of the Maryland State House, Annapolis, MD, NO LATER THAN 9:00 A.M. on Sunday, January 17, 2027. Chairs must be safe, commercial-grade folding chairs with a metal frame and plastic seat and back. A sample chair must be submitted for Military Department / DGS approval by Friday, January 8, 2027, prior to delivery.
B. VIP Seating (100 Chairs): Provide 100 VIP chairs delivered and off-loaded in the vicinity of the Maryland State House, Annapolis, MD, NO LATER THAN 9:00 A.M. on Sunday, January 17, 2027.
Chairs must be safe, high-quality wood chairs with padded seats. A sample chair must be submitted for Military Department / DGS approval by Friday, January 8, 2027, prior to delivery.
C. Stadium Bleacher Seating: Provide six-row aluminum bleacher seating at College Avenue along Lawyer's Mall (one six-seat row spanning the full width of Lawyer's Mall). Bleachers shall be constructed of structural aluminum equipped with code-compliant guardrails and safety railing systems.
D. Chair Deployment, Contingency Support & Removal: All chairs shall be delivered clean and serviceable. The Contractor shall provide labor and forklift equipment for full chair setup on Sunday, STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
January 17, 2027, in Maryland Avenue, at the Main Stage, and at the Parade Stage, and shall keep personnel on-site during the Inauguration on January 20, 2027, for immediate contingencies. All chairs and bleachers must be removed immediately following the conclusion of Inauguration activities.
2.1.5 Sound System Services & Audio Engineering
A. Main Stage & Choral PA System: Furnish, install, and operate an outdoor, weatherproof XLR- and quarter-inch-based public address (PA) sound system engineered for a large crowd event:
• Microphones & Origin Points: One (1) PA system with a wide-necked gooseneck microphone affixed to the Governor's main speech lectern (lectern provided by DGS), plus four (4) to five (5) choral microphones on stands (provided by Contractor) placed to the front of the Choral Platform at ground level / stage right choral riser to capture choir and band audio for the audience and press multboxes.
• Termination Points & Delay Speakers: Provide a press multbox (48+ isolated outlets) in the main press area, a second small multbox (1 outlet) at the head-on television pool position, and a distributed PA speaker array throughout the crowd area (accommodating several thousand guests) operating on calibrated audio delay rearward from the Main Stage and Choral Riser. Point of origin for the sound will be on the West Steps and must be satisfactorily audible at least halfway down Maryland Avenue.
• Playback, Weatherproofing & Redundancy: Provide playback capability for pre-selected music (MP3, computer file, and/or CD) routed through the primary mixing console. While a mix platform is provided, the Contractor shall furnish its own weatherproofing, including a white canopy tent without walls. Full backup resources must be on-site for all critical audio components. Consultative services for an indoor, preset sound system in the Senate Chamber may also be requested. Primary and backup electrical power will be provided by DGS.
B. Dedicated Sound Engineer: Provide a qualified Sound Engineer to set up, test, operate, and tear down all audio systems following the event. The Sound Engineer must be on-site for the full rehearsal on Tuesday, January 19, 2027, from 11:00 A.M. to 3:00 P.M., and throughout the Inauguration on Wednesday, January 20, 2027, ensuring zero echo or phase delay between speaker zones.
2.1.6 Broadcast Lighting & Electrical Power Distribution
A. Architectural & Broadcast Lighting: Furnish and install two (2) 5600K HMI lights mounted atop 7' stand-alone stanchions, hidden from general public viewing and positioned behind the 3rd and 4th columns of the State House portico directed at the State House main doors; plus one (1) 5600K HMI light mounted on a horizontal bar positioned within and above the State House doorway, hidden from general viewing and directed downward at the State House door.
B. Media Platform Power Distribution (20-Amp Quad Boxes): Provide and energize dedicated standard 20-amp electrical quad boxes at all TV and media platforms (cameras themselves receive power directly from the MPT production truck via SMPTE fiber cables, while platform auxiliary/monitoring equipment requires local 20A quad-box service).
C. Electrical Power Coordination & Jumbotron Power: The State of Maryland / DGS will coordinate facility power hookups alongside the Contractor-furnished generators. Note that MPT supplies only the broadcast video feed to the Jumbotrons (Alternate No. 3); if Alternate No. 3 is awarded, the Contractor must provide self-contained power/generators for all Jumbotron units. The Contractor must coordinate all electrical loads and submit complete written power requirements NO LATER THAN Tuesday, January 5, 2027, to the DGS Project Manager and Military Department Designee (see Section 8.2). The Contractor shall verify written approval of all equipment and deliverables prior to site delivery.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
2.2 Complete & Functional System ("Turn-Key" Clause)
IMPORTANT – TURN-KEY RESPONSIBILITY:
Any labor, materials, equipment, rigging, ballast, cross-bracing, snow fencing, cable ramps, design adjustments, accessories, or services not explicitly mentioned in these specifications or drawings, but necessary to produce a complete, fully functional, code-compliant, weather-protected, and safe event installation, shall be provided by the Contractor as part of the Base Bid at no additional cost to the State of Maryland.
2.3 Code Compliance
All temporary structures, electrical connections, generators, propane heating systems, bleachers, rigging, and materials shall comply strictly with the latest adopted editions of:
Maryland Occupational Safety and Health (MOSH) and Federal OSHA Standards (29 CFR 1910 / 1926) International Building Code (IBC) / International Mechanical Code (IMC) / International Plumbing Code
(IPC)
National Electrical Code (NEC – NFPA 70) and applicable NFPA Life Safety Codes (NFPA 101 / NFPA
102 for Assembly Seating, Tents, and Membrane Structures) Maryland State Fire Prevention Code (COMAR 29.06.01) and Office of the State Fire Marshal directives City of Annapolis / Anne Arundel County Municipal Utility and Historic District Building Codes
2.4 Operational Walkthrough, Dry Run & Systems Verification
Prior to final acceptance for the ceremony, the Contractor shall conduct a minimum of four (4) hours of on-site operational testing, sound check, generator load verification, and system walkthroughs (including the mandatory rehearsal on January 19, 2027, from 11:00 A.M. to 3:00 P.M. and the scheduled interagency dry run) with the DGS Project Manager, Military Department Designee, Maryland Public Television (MPT) engineering staff, and State House facility personnel.
2.5 Alternates & Unit Prices
A. Add Alternates
Bidders shall provide separate pricing for the following five (5) Add Alternates on eMaryland Marketplace Advantage (eMMA) as indicated on the Bid Form. Add Alternates are NOT included in the Base Bid and may be accepted or rejected by the State in any order or combination at the time of award:
Alternate No. Title Base Bid vs. Add Alternate Scope Description
Alternate No. 1 (Additive) Main Stage Tent Base Bid excludes tenting over the Main Stage.
Alternate includes furnishing, erecting, anchoring, and maintaining one (1) clear-span tent with translucent roll-up sides over the Main Stage Platform, erected on Tuesday, January 19, 2027, maintained overnight, and taken down immediately following the Inaugural Event on January 20, 2027.
Alternate No. 2 (Additive) Presidential Teleprompters (3 Units + Technician)
Base Bid excludes teleprompters. Alternate includes providing three (3) Presidential
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
Teleprompters with a qualified on-site technician.
Two (2) units are due no later than 48 hours after Notice of Award and delivered to a secure location in Anne Arundel County (location disclosed post-award). The third (3rd) Presidential Teleprompter is due on-site at the State House and fully operational by 10:00 A.M. on Wednesday, January 20, 2027.
Alternate No. 3 (Additive) Jumbotron LED Video Screens (4 Units + Dedicated Power)
Base Bid excludes LED video walls. Alternate includes furnishing, positioning, powering, and operating four (4) self-contained, trailer- or truck-mounted Jumbotron LED screens located in and around the Inauguration Event area, each with a minimum screen size of 9' x 14', complete with dedicated self-contained power/generators, signal distribution equipment (receiving video feed from MPT), and active, functioning Closed Captioning (CC) capability.
Alternate No. 4 (Additive) Exterior Stone Step Maroon Carpet
Base Bid excludes exterior step carpeting.
Alternate includes furnishing and installing a ceremonial maroon carpet measuring 10' wide by approximately 25 linear feet long (adjusted to cover risers/treads of steps measuring 14" tread width by 8" riser height). Carpet must be secured to the historic natural stone steps using non-invasive, non-staining fastening methods that do not harm or damage the stone in any way.
Alternate No. 5 (Additive) State House Lobby Maroon Curtain
Base Bid excludes interior lobby drapery. Alternate includes furnishing, rigging, and removing a ceremonial maroon curtain measuring approximately 15' high by 30' wide, installed inside the Maryland State House lobby to cover the interior entry doors without damaging historic woodwork or plaster.
B. Unit Prices & Allowances
Unit prices and allowances shall be used to adjust the Contract Sum for additions to or deductions from the Scope of Work due to unforeseen site conditions or owner-requested adjustments. Unit prices include all necessary labor, materials, equipment, overhead, profit, taxes, and shipping/handling costs.
Quantities listed below are estimated for bidding evaluation purposes only; actual quantities will be measured in the field and verified by the DGS Project Manager prior to payment.
Item No. Item Description Unit of Measure Estimated Quantity
Unit Price ($)
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
AL-1 Contingency Allowance for Additional Event Equipment, Chairs, Platforms, or Tenting (See Section 1.3)
Lump Sum Allowance
1 $15,000.00
UP-1 Additional White Metal-Frame Folding General Seating Chairs (Delivered, Placed & Removed)
Each (EA) 100 $__________
UP-2 Additional Padded Wood VIP Seating Chairs (Delivered, Placed & Removed)
Each (EA) 25 $__________
UP-3 Additional Modular Staging / Camera Riser Decking (4' x 8' Section with Cross- Bracing/Railings)
Section (EA) 4 $__________
UP-4 Additional Portable Propane Stage Heating Unit (Installed, Fueled & Operated)
Each (EA) 1 $__________
UP-5 Additional Heavy-Duty 5-Channel Yellow Jacket Cable Protector Ramps (Delivered, Placed & Removed)
Each (EA) 10 $__________
UP-6 Additional 10' x 15' White Roll-Up Tent with 8,500W Generator, Lighting & Gas Heater (Installed, Fueled & Maintained)
Each (EA) 1 $__________
UP-7 Additional Self-Contained Portable Whisper Generator (8,500W Minimum, Fueled, Cabled & Maintained)
Each (EA) 1 $__________
UP-8 Additional Individual Gas-Powered Checkpoint Heater (Self-Contained, Installed, Fueled & Operated)
Each (EA) 1 $__________
3. CONTRACTOR QUALIFICATIONS & SUBMITTALS
3.1 Experience, Licensing & Responsibility Determination
State Licensing & SDAT Good Standing: The Prime Contractor must hold a valid, active Contractor's License in the State of Maryland and be registered and in good standing with the Maryland State Department of Assessments and Taxation (SDAT). The lowest bidder's information will be verified with SDAT for clearance of any non-payment issues; the bidder must promptly clear any outstanding issues upon notification.
Minimum Experience Requirement: The Prime Contractor shall have a minimum of five (5) consecutive years of successful experience performing public or commercial work of comparable size, scope, and technical complexity, including substantiated experience providing staging, sound, broadcast generator support, and event infrastructure for a governmental or ceremonial event of comparable magnitude.
Trade Licensing: All specialized trade workers (electricians, generator technicians, HVAC/propane technicians, riggers, scaffold erectors) must hold current Maryland trade licenses and OSHA/MOSH certifications appropriate for their assigned scope.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
Responsibility Determination & References: To be considered for award, the lowest responsive bidder must timely submit References, Bid and Contractor Affidavits, Proof of Insurance, and copies of applicable licenses within the timeframe set by the Procurement Officer. References will be contacted and must respond within three (3) calendar days. Unreasonable failure to supply required documentation promptly is grounds for bid rejection.
3.2 Pre-Event Submittals, Samples & Shop Drawings
Prior to ordering materials or commencing on-site installation, the Contractor shall submit the following deliverables to the DGS Project Manager and Military Department Designee for written approval within five (5) calendar days after Notice to Proceed (NTP), and no later than the specific milestone dates listed below:
Shop Drawings & Structural Bracing Plans: Detailed dimensional staging plans, elevation drawings, structural load ratings (explicitly certifying support for a minimum 1,500-lb. concentrated ballistic glass shield load on the Main Stage speaker/podium deck), internal/external diagonal bracing layouts for all TV/MPT platforms, snow fencing perimeter layouts, guardrail details, and wind-anchoring/ballast calculations for all stages, bleachers, and tents.
Product Data & Equipment Cut Sheets: Manufacturer technical data sheets for staging systems, propane heaters, Medical Tent HVAC unit, seven (7) 8,500W minimum scanner tent generators, gas-powered checkpoint heaters, 200A/85kW 3-phase/single-phase Camlock broadcast generators, 200A general whisper generator, 5-channel Yellow Jacket cable protectors, sound system components/multboxes, 5600K HMI lighting, and optional Jumbotron/teleprompter units.
Written Electrical Power Requirements (Due January 5, 2027): Complete itemized electrical load schedule (including 20A quad-box distribution and generator phase configurations) submitted in writing no later than Tuesday, January 5, 2027, to the DGS Project Manager and Military Department Designee.
Physical Chair Samples (Due January 8, 2027): One (1) sample white folding general seating chair and one (1) sample padded wood VIP chair delivered for Military Department / DGS inspection and approval no later than Friday, January 8, 2027.
Master Installation & Teardown Schedule: Hour-by-hour mobilization, setup, testing, rehearsal, event standby, and teardown schedule.
Site-Specific Health & Safety Plan (HASP): Emergency response procedures, Competent Person credentials for stage inspection, propane/diesel fuel safety protocols, and badging roster.
4. SITE CONDITIONS & FIELD VERIFICATION
4.1 Mandatory Field Verification
All drawings, sketches, conceptual layouts, and photographs provided in the contract documents (including Appendix A and Appendix B) are diagrammatic and for informational and reference purposes only, reflect prior inauguration configurations that will be updated to match the final 2027 Inauguration layout plan, and are not guaranteed to be to scale.
The Contractor is solely responsible for field-verifying all existing site conditions, historic stone step dimensions, column clearances, uneven brick/stone grades, underground utility/irrigation locations, cable run lengths (noting that cables can no longer be routed along the adjacent construction fence), STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B equipment counts, and access routes prior to submitting a bid and prior to fabricating or delivering materials.
No Change Orders or claims for additional compensation or time extensions will be considered due to the Contractor's failure to accurately field-verify existing conditions that could have been observed prior to bid submission.
4.2 Pre-Bid Conference & Mandatory Site Inspection
Due to tight event timelines, a single scheduled Pre-Bid Conference / Site Visit will be conducted on Tuesday, December 1, 2026, from 12:00 P.M. to 1:30 P.M., convening in the Conference Room at 29 St.
Johns Street, Annapolis, MD 21401, followed by an on-site walk-through of the Maryland State House and Lawyer's Mall. All vendor questions must be submitted in writing via eMaryland Marketplace Advantage (eMMA) no later than 2:00 P.M. on Tuesday, December 8, 2026, and sealed vendor bids are due via eMMA no later than 2:00 P.M. on Friday, December 11, 2026.
Although attendance at the scheduled Pre-Bid Conference is strongly encouraged rather than a prerequisite to bid submission, as part of the Responsibility Determination, any apparent low bidder who failed to attend the scheduled Pre-Bid Conference will be required to attend a mandatory site inspection with the DGS / Military Department Representative within five (5) working days at the Project Manager's availability to confirm full compliance with site conditions. Bid confirmation is not possible without a verified site visit, and claims resulting from lack of knowledge of inspectable site conditions will be summarily denied.
5. SITE SECURITY, HEALTH & SAFETY PROTOCOLS
5.1 Facility Security, Capitol Complex & Broadcast Parking Protocols
High-Security Occupied State Capitol Complex & Scope Separation: All work covered by this specification takes place within the Maryland State House complex and adjacent legislative grounds—an occupied, high-security State facility hosting constitutional officers and dignitaries. Perimeter anti-scalable security fencing, vehicle barriers, security scanners, and ballistic glass (including the ~1,500-lb.
ballistic glass shield positioned on the Main Stage if deployed) are managed under a separate DGS security solicitation; however, the Contractor under this contract shall engineer the Main Stage to support the shield's weight and coordinate closely with DGS, Maryland Capitol Police, Maryland State Police, and the Military Department regarding shield placement, perimeter access gates, staging clearances, and security zones.
MPT Broadcast Production Truck & Generator Parking Zone (State Circle): The Contractor shall coordinate staging, barriers, and cable protection to maintain a dedicated, unobstructed ~100-linear-foot parking and staging zone on the left side of State Circle (facing the Capitol building) reserved exclusively for Maryland Public Television's (MPT) primary production truck, B-unit truck, and the two
(2) 200A/85kW broadcast generators.
Access Control & Background Checks: Contractor personnel shall strictly comply with all Maryland Capitol Police, Military Department, and DGS security directives, credential/badging procedures, vehicle searches, and sign-in/sign-out logs. The Contractor must submit full employee rosters and background check documentation for all personnel entering secure facility boundaries upon request.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES (DGS) | DGS PROJECT NO. BA-000-270-003 | GOVERNOR INAUGURATION
DGS Project No. BA-000-270-003 – Maryland State House, 100 State Circle, Annapolis, MD 21401 | Project Classification: B
Vehicle & Equipment Security: The Contractor shall use their work vehicles as a controlled staging point to bring equipment and materials onto the site. All vehicles, trailers, toolboxes, and storage containers must be locked and/or continuously supervised at all times to prevent unauthorized access.
Immediate Stop-Work Authority: The Contractor shall immediately cease any activity deemed by Owner's personnel or Capitol Police to pose a threat to the safety or well-being of visitors, dignitaries, or State staff, and shall immediately notify the DGS Project Manager. The State shall incur no additional cost due to such security or safety directives.
5.2 Environmental, Health & Safety Standards
Snow Removal & De-Icing Operations (Mandatory Winter Weather Readiness): The Contractor shall be solely responsible for all snow removal and de-icing in and around all staging areas, steps, ramps, tents (including the Medical Tent and Security Checkpoint/Scanner Tents), seating/chair sections, bleachers, and podiums throughout setup, rehearsal, and Inauguration Day (January 17–20, 2027). The Contractor shall maintain on-site snow removal equipment and historic-surface-safe, non-corrosive de-icing agents approved by DGS / Annapolis Public Buildings & Grounds so all stages, walkways, stairs, and seating zones remain completely clear of snow and ice at all times.
Structural, Public & Crowd Exclusion Safety: All staging, ramps, stairs, and bleachers must feature continuous guardrails, toe boards, non-slip treads, internal/external diagonal bracing, and proper ballast/anchoring. The Main Stage speaker/podium platform must be reinforced to support a minimum 1,500-lb. concentrated ballistic glass shield load. Perimeter snow fencing must be installed around the elevated TV/MPT camera platform at the west end of Lawyer's Mall to keep spectators clear of the structure. A qualified Competent Person must inspect and certify all platforms (including the Main Stage ballistic shield load-bearing zone) prior to 8:00 A.M. on January 19, 2027.
Pedestrian Cable Trip-Hazard Mitigation: All temporary broadcast, audio, and power cables crossing walkways or roadways must be housed inside heavy-duty Yellow Jacket cable protector ramps (40 units minimum) to ensure safe ADA-compliant pedestrian passage.
Noise, Dust & Operational Disruption Control: Work shall be executed to minimize disruption to ongoing State House and legislative operations. Use whisper-quiet generators and install temporary protection barriers where required.
Daily Housekeeping & Historic Surface Protection: The work area must be maintained in a neat, safe, and orderly condition at all times, free of accumulated rubbish or tripping hazards. Protective padding/plywood cribbing must be placed beneath all stage legs, scaffolding, generators, forklifts, and heavy equipment to prevent scratching, cracking, or staining historic granite steps, brick pavers, and lawns.
6. MATERIAL QUALITY, STORAGE & HAZARDOUS MATERIALS
6.1 Material Quality, Storage & Weather Protection
Equipment Standards & Self-Contained Design: All materials, staging decks, cross-bracing, snow fencing, Yellow Jacket cable protectors, tents, chairs, heaters, HVAC units, broadcast/event generators, and audio/lighting systems furnished shall be clean, commercial-grade, serviceable, self-contained, and manufactured by reputable firms regularly engaged in the production of event/broadcast equipment.
Where multiple options exist, the higher-durability option suitable for institutional/ceremonial use shall be provided.
STATE OF MARYLAND – DEPARTMENT OF GENERAL SERVICES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .