ISSUED TO:
MCDONALD SEWAGE AUTHORITY
WASHINGTON COUNTY, PENNSYLVANIA
BIDDING DOCUMENTS FOR
CONTRACT NO. 2025-01
SANITARY SEWER LINING PROJECT
RELEASED FOR BID
NOVEMBER 2025
Copyright © 2025 KLH Engineers, Inc., All Rights Reserved Worldwide. No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.
5173 Campbells Run Road
Pittsburgh, PA 15205
Telephone: (412) 494-0510
Fax: (412) 494-0426
E-mail: info@klhengineers.com
Ref. No. 611-09
Copyright © 2025 KLH Engineers, Inc.
All Rights Reserved Worldwide i 611/2025-01
MCDONALD SEWAGE AUTHORITY
TABLE OF CONTENTS
SECTION PAGE NO.
Advertisement..........................................A-1 to A-2
Instructions to Bidders................................B-1 to B-8
Bid Form / Contract No. 2025-01...........................PennBid
Bid Bond...............................................D-1 to D-2
General Conditions....................................E-1 to E-30
Supplemental General Conditions.......................F-1 to F-18
TECHNICAL SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01000 – Scope.....................................01000-1
Section 01020 - Summary of Work...........................01020-1
Section 01040 – Coordination..............................01040-1
Section 01042 – Supplemental Construction Conditions......01042-1
Section 01090 - References................................01090-1
Section 01200 – Project Meetings..........................01200-1
Section 01300 – Submittals................................01300-1
Section 01500 – Temporary Facilities & Controls...........01500-1
Section 01551 – Barriers and Enclosures...................01551-1
Section 01651 – Utility Pipeline Commissioning............01651-1
Section 01700 – Rights of Way.............................01700-1
Section 01740 – Clean Up of Work Site.....................01740-1
Section 01741 – Dust and Mud Control......................01741-1
Section 01800 – Substantial Completion....................01800-1
DIVISION 2 - SITE WORK
Section 02000 – Site Work.................................02000-1
Section 02080 – Bypassing Sewage..........................02080-1 ii 611/2025-01
Section 02140 – Dewatering................................02140-1
Section 02766 – Trenchless Technology Pipe Rehabilitation.02766-1
Section 02910 – Soil Treatment............................02910-1
Section 02959 – Televising................................02959-1
Section 02960 – Sanitary Sewer Cleaning...................02960-1
DIVISION 3 - CONCRETE
Section 03010 – Concrete Work.............................03010-1
Section 03600 – Grout.....................................03600-1
Measurement and Payment................................H-1 to H-4
Supplemental Details..........................................N/A
Agreement / Contract No. 2025-01.......................J-1 to J-4
Payment Bond...........................................K-1 to K-3
Performance and Maintenance Bond.......................K-4 to K-6
Certificate of Insurance......................................K-7
Appendix A – Project Area Map
A-1 611/2025-01
ADVERTISEMENT
Sealed bids will be received by the McDonald Sewage Authority, Washington County, Commonwealth of Pennsylvania, for the following:
BID OPENING – Sealed bids shall be submitted online via the PennBid
Program until 10:00 AM local time Thursday, December 11, 2025, at which time all bids will become publicly available.
Equipment and Services to be provided shall be according to the specifications which are on file at the office of KLH ENGINEERS, INC., 5173 Campbells Run Road, Pittsburgh, Pennsylvania 15205, and at the office of the McDonald Sewage Authority, 151 School Street, McDonald, Pennsylvania 15057.
All plans and specifications are available online at no cost at https://pennbid.bonfirehub.com.
No Bid may be withdrawn for a period of sixty (60) days after the time of the opening of the bids.
Contractor shall submit an E-Verify Program Verification in compliance with the Public Works Employment Verification Act 127 of
2012.
BIDDER'S SURETY -- A certified check payable to the McDonald Sewage
Authority or a bid bond on the bid form executed by the Bidder and a surety company approved by the OWNER, in an amount equal to ten percent (10%) of the total amount of bid, must be submitted with each bid or bids will be considered nonresponsive and immediately rejected.
SUCCESSFUL BIDDING BIDDER awarded this contract shall provide a performance surety in the amount of one hundred percent (100%) of the Contract amount.
EQUAL OPPORTUNITY EMPLOYER – McDonald Sewage Authority fully complies with the provisions of this act. All qualified bidders are invited to submit a proposal.
THE MCDONALD SEWAGE AUTHORITY BOARD RESERVES THE RIGHT TO AWARD OR
TO REJECT ANY AND/OR ALL PORTIONS THEREOF PROPOSALS SUBMITTED, AND
TO WAIVE INFORMALITIES IN THE BIDDING PROCESS IF IN THE BEST
INTEREST OF THE AUTHORITY.
Ed Walker
Chairman, McDonald Sewage Authority
A-2 611/2025-01
THIS PAGE LEFT INTENTIONALLY BLANK
B-1 611/2025-01
Section B
INSTRUCTIONS TO BIDDERS
B1 Designation of Work
The work included under this contract covers the furnishing of all labor, materials, tools, and equipment required to complete the work as described herein, shown on the Contract Drawings and necessary for complete operating facilities.
The work under Contract No. 2025-01 generally consists of manhole-to-manhole sanitary sewer lining.
B2 Location of Construction Work
All construction work is proposed to be performed in McDonald
Borough, Washington County, Pennsylvania.
B3 Copies of Bidding Documents
Copies of the Bidding Documents for the described work may be obtained online at no cost via the PennBid Program
(https://pennbid.bonfirehub.com).
Complete sets of Bidding Documents shall be used in preparing
Bids; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
B4 Qualifications of Bidders
To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit, within five days of OWNER's request, written information such as financial data, previous experience, and evidence of authority to conduct business in the jurisdiction where the Project is located.
B5 Examination of Contract Documents and Site
Before submitting a Bid, each Bidder shall: (a) examine the
Bidding/Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect access, cost, progress or performance of the work, (c)
B-2 611/2025-01 familiarize himself with federal, state and local laws, ordinances, rules, and regulations that may in any manner affect access, cost, progress or performance of the Work; and (d) study and carefully correlate Bidder's observations with the Contract
Documents.
Before submitting his Bid, each Bidder shall, at his own expense, make such investigations and tests as the Bidder may deem necessary to determine his Bid for performance of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
On request, OWNER may assist each Bidder who desires access to the site to conduct such investigations and tests as each Bidder deems necessary for submission of his Bid.
B6 Interpretations
Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Messages/Vendor Discussions” feature in PennBid no later than five (5) days prior to the date for receipt of bids. Replies will be issued by Addenda, posted within PennBid’s “Files/Public Notices” tab, and an email notice will be sent to all parties recorded as having received the
Bidding Documents. Questions received less than five days prior to the date of bid opening may not be answered. Only interpretations written by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
B7 Bid Security
Bid Security shall be made payable to OWNER, in an amount of not less than ten percent (10%) of the Bidder's maximum Bid price in the form of either a certified bank check or a Bid Bond on the form attached in Section D, issued by a Surety meeting the requirements set forth at the bottom thereof. The bid bond must be uploaded when electronically submitting bid.
The Bid Security of the Successful Bidder will be retained until such Bidder has executed the Agreement and furnished the
Required Contract Security, whereupon it will be returned; if the successful Bidder fails to execute and deliver the Agreement and furnish the required Contract Security within 15 days of
Notice of Award, OWNER may annul said Notice and the Bid
Security of that Bidder will be forfeited. The Bid Security of any Bidder whom OWNER believes to have a reasonable
B-3 611/2025-01 consideration for receiving the award may be retained by OWNER until after the effective date of the Agreement.
B8 Employee Eligibility Verification
The CONTRACTOR shall include a Public Works Employment
Verification Form, as provided by the Pennsylvania Department of
General Services, and available at www.dgs.state.pa.us. The
Public Works Employment Verification Form pertains to each employee hired by the CONTRACTOR after January 1, 2013, whether the employee will be working on or offsite of the Project, or otherwise. The Public Works Employment Verification Form will be evaluated by the OWNER as part of establishing Bidder responsibility.
B9 Contract Time
The number of calendar days within which, or the date by which, the Work is to be completed (the Contract Time) is set forth in the Bid Form and will be included in the Agreement.
B10 Liquidated Damages
Provisions for liquidated damages are set forth in the
Agreement.
B11 Bid Forms
With the exception of the Public Works Employment Verification
Form which must be obtained from the Pennsylvania Department of
General Services website, www.dgs.pa.gov, the Bid Forms are available within PennBid’s “Bid” tab.
Bids by Corporations must be executed and submitted in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to submit).
Bids by Partnerships must be executed and submitted in the partnership name by a partner.
The Bids shall contain an acknowledgment of receipt of all
Addenda (the numbers of which shall be filled in on the Bid Form by the Bidder).
B-4 611/2025-01
B12 Submission of Bids
Bids shall be submitted online via the PennBid Program
(https://pennbid.bonfirehub.com).
B13 Modification and Withdrawal of Bids
Bids may be modified or withdrawn at any time prior to the opening of Bids.
B14 Award of Contract
OWNER reserves the right to reject any and all Bids for whatsoever cause and to waive any and all informalities in the
Bid. Discrepancies between words and figures will be resolved in favor of words. Discrepancies between the indicated sum and/or the products shown as a result of extending unit prices and the correct sum and/or products thereof will be resolved in favor of the correct sum and/or products.
In evaluating Bids, OWNER shall consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements and alternates and unit prices (if requested) in the Bid forms.
OWNER may conduct such investigations as he deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of any or all Bidders.
If the contract is to be awarded, it will be awarded on the Base
Bid or Alternate Bid Items selected by the OWNER which are those of the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the Project.
B15 Performance and Other Bonds
The General Conditions and/or the Supplemental General
Conditions set forth OWNER's requirements as to Performance and other Bonds. When the Successful Bidder delivers the executed
Agreement to OWNER it shall be accompanied by the required
Contract Security.
B16 Signing of Agreement
When OWNER advises of a Contract Award to the Successful Bidder, B-5 611/2025-01 it will be accompanied by at least five unsigned counterparts of the Agreement and all other Contract Documents. Within fifteen
(15) days thereafter, CONTRACTOR shall sign and deliver all counterparts of the Agreement to OWNER with all other Contract
Documents attached. Within ten (10) days thereafter OWNER will deliver two fully signed counterparts to CONTRACTOR -- one each intended for the CONTRACTOR and the CONTRACTOR's Surety Company.
The times set forth herein are of the essence and Bidder's failure to comply herewith may, at the discretion of the OWNER, result in forfeiture of the Bid Security.
B17 Existing Utilities, Structures, Materials and Subsurface
Conditions
CONTRACTOR is directed to the provisions of the Underground
Utility Line Protection Law Act 287 (1974), as amended by Act
181 December 2006, and full compliance therewith is required of the CONTRACTOR.
Certain information regarding the reputed presence, size, character and location of existing underground structures and public and private utilities such as pipes, drains, sewers, electrical lines, telephone lines, cable TV lines, gas lines, water lines, materials and/or subsurface conditions, has been shown on the Contract Drawings.
Neither the OWNER nor the ENGINEER makes any warranty or representation that the information obtained through the
Pennsylvania One-Call system is accurate. To this end the
CONTRACTOR shall perform due diligence in determining the actual location of the reputed facilities as required by Act 287 as amended.
The CONTRACTOR shall be responsible for and bear all costs of protecting all structures and utilities indicated on the drawings, both above the ground and below the ground, within and outside the right-of-way.
The CONTRACTOR shall have the responsibility of providing special means to brace and hold the utility lines, the telephone poles, and the electrical power poles in place during the construction, and to reinforce and protect same from future displacement, disturbance or damage attributable to settlement of backfill or surface water erosion of restored areas.
B18 Buy American
In accordance with federal regulations and guidelines the
B-6 611/2025-01
CONTRACTOR agrees that preference will be given to domestic construction materials by the CONTRACTOR, subcontractors, materials, and suppliers in the performance of this contract.
The requirements of the “Steel Products Procurement Act” shall supersede the “Buy American” requirements.
B19 Pennsylvania Sales and Use Tax
Materials and equipment utilized under the contract may or may not be exempt from Pennsylvania sales tax. The CONTRACTOR shall make their own determination as to which, if any, of the materials and equipment utilized under the contract are exempt from sales tax. Beyond issuing a blanket sales tax exemption form, the OWNER and/or ENGINEER will provide no further assistance in this determination. Failure of the CONTRACTOR to make this determination will not be grounds for additional compensation under the contract.
B20 Steel Products
Each CONTRACTOR, equipment and material supplier on these contracts is notified that materials utilized under these contracts must comply with the provisions of the Act of March 3, 1978 (P.L.6 No. 3), known as the "Steel Products Procurement
Act". The CONTRACTOR is required to submit Form SP (provided as the last page of Section B) with each initial shop drawing submittal as applicable.
All iron, steel and manufactured goods used in this project shall, pursuant to the allowances of the Steel Products
Procurement Act, be produced in the United States unless:
i. The head of the Owner, in writing, determines that steel products as defined by the Steel Products
Procurement Act are not produced in the United States in sufficient quantities to meet the requirements of the contract; or
ii. The steel products, as defined by the Steel Products
Procurement Act, are included on a list, published on the Pennsylvania Department of General Services website, of exempt machinery and equipment steel products identified by the Pennsylvania Department of
General Services as having not been produced in the
United States in sufficient quantities in the previous calendar year.
End of Section B
Instructions to Bidders
B-7 611/2025-01
FORM SP
This form must be executed by a Fabricator of any item containing BOTH FOREIGN AND U.S.
MANUFACTURED STEEL. The Steel Products Procurement Act (73 P.S. S1881 et seq.) allows the use of steel products with both types of steel if seventy-five (75%) percent of the cost of the materials (including steel, rubber, wood, plastic, etc.) in the product are manufactured or produced, as the case may be, in the United
States.
The Fabricator shall be herein defined as the firm that assembles the component parts of the item(s) to be purchased. The OWNER will accept the certification of firms that are earlier in the chain of purchase (i.e.
manufacturers of components, steel, suppliers) in lieu of the Fabricator. This form must be submitted to the
ENGINEER with the initial shop drawing submission and before the product may be incorporated as provided above.
TO BE COMPLETED BY THE FABRICATOR:
1. Contract No. __________________ Contract Title:__________________________________________
2. Specification Paragraph No. ______________ Specification Page:____________________________
3. Product: ____________________________________________________________________________
4. Name of Supplier: ___________________________________________________________________
5. Address of Supplier:__________________________________________________________________
6. Federal Employer I.D. No.:_________________ Phone No. : (___) __________________________
7. Total cost of materials in the item listed in Item 3 that were manufactured/produced in the United States is greater than 75% of total cost of all materials.
________YES _________ NO
CERTIFICATION: I, the undersigned Officer of the above named firm, do certify that our firm assembled/manufactured the components to the steel products listed in Item 3, that the steel in said product is both foreign and domestically manufactured and that all the facts contained in this document are true. I further understand that this document is subject to the provisions of the Unsworn Falsification to Authorities Act (18
P.S. S4904) which provide penalties including, but not limited to, debarment from supplying and products for
Commonwealth of Pennsylvania public works projects for a period of five (5) years for violations therein.
WITNESS:
______________________________________ _______________________________(SEAL)
Secretary or Treasure President or Vice President
(Corporate Seal) (Fabricator's Company)
Date:________________________________
B-8 611/2025-01
THIS PAGE LEFT INTENTIONALLY BLANK
Section C
C1 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in Section J of the Contract Documents and, to complete all Work as Specified and within the Contract Time indicated in this Bid, in accordance with the Contract Documents. (Enter I
Agree or I Do Not Agree)
C2 BIDDER accepts all of the terms and conditions of the
Instructions to Bidders and other components of the Contract
Documents. This Bid may not be withdrawn for sixty (60) days after the day of Bid opening. BIDDER will sign the Agreement and submit the Contract Security and other documents required by the
Contract Documents within fifteen days after the date of OWNER's
Notice of Award. (Enter I Agree or I Do Not Agree)
C3 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that Bidder has examined copies of all Contract Documents including Sections A through K and all
Drawings, and the following Addenda designated as Section L (if any) receipt of all which is hereby acknowledged. (Enter I Agree or I Do Not Agree)
C4 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that BIDDER has examined the site and locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations) and the conditions affecting cost, progress or performance of the work and has made such independent investigations as BIDDER deems necessary. BIDDER has satisfied itself as to the conditions to be encountered both overhead and on the surface of the ground and/or within existing structures and of the character, quality, and quantities of work to be done, materials to be furnished, services required and all other terms of the Technical Specifications and other Contract
Documents. BIDDER assumes all risks inherent in performing the work and arising from any deficiencies in the Drawings or
Specifications or other Contract Documents and will make no claim against the OWNER or the ENGINEER because of any such alleged deficiency. (Enter I Agree or I Do Not Agree)
C5 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that this Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation, BIDDER has not directly or indirectly induced any person, firm, or a corporation to refrain from bidding; and
BIDDER has not sought by collusion to obtain for himself any advantage over any other Bidder or over OWNER. (Enter I Agree or
I Do Not Agree)
C6 BIDDER will complete the Work under Contract No. 2025-01 for the submitted Lump Sum and Unit Prices. (Enter I Agree or I
Do Not Agree)
C7 BIDDER shall be aware that Cured-In-Place materials, or approved equal, are proposed for the CIPP lining portion of this project. Any Contractor desiring to use a product other than
Cured-In-Place Liners must submit all pertinent product literature to the ENGINEER at KLH Engineers, Inc., 5173
Campbells Run Road, Pittsburgh, PA 15205 prior to the bid opening for consideration.
C8 BIDDER acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract
C9 BIDDER agrees that the Work will be substantially completed within ninety (90) Calendar Days after the date when the
Contract Time commences. Work shall be completed and ready for
Final Payment within thirty (30) Calendar Days after the date of substantial completion. (Enter I Agree or I Do Not Agree)
C10 BIDDER understands and agrees to coordinate his construction activities with those of the OWNER, the ENGINEER, and the other CONTRACTORS. (Enter I Agree or I Do Not Agree)
C11 BIDDER accepts the provisions set forth in the Agreement in
Section J of the Contract Documents as to liquidated damages in the event of failure to complete the Work on time. (Enter I
Agree or I Do Not Agree)
C12 The required Bid Security set forth in Paragraphs B7 of the
Instructions to Bidders in the form of a certified bank check, or a Bid Bond, the form for which is included as Section D of the Contract Documents, is in the amount of 10% of the Amount of the Bid. (Enter I Agree or I Do Not Agree)
C13 The terms used in this Bid which are defined in the General
Conditions of the Construction Contract included as part of the
Contract Documents have the meanings assigned to them in the
General Conditions. (Enter I Agree or I Do Not Agree)
C14 BIDDER recognizes that site safety, for all persons
(including OWNER and ENGINEER PERSONNEL) who enter the work site, will be the complete responsibility of the BIDDER, if the
BIDDER is awarded the Contract and enter into Agreement with the
OWNER for the proposed work. The BIDDER certifies acceptance of the site safety responsibility by submitting this Bid Form.
(Enter I Agree or I Do Not Agree)
C15 Enter Bidders Entity Type: Individual, Partnership, Corporation, Joint Venture
BID ITEM QUANTITY/UNIT
UNIT
PRICE
TOTAL
PRICE
A.
8” Sanitary Sewer CIPP Lining (MH to MH), all depths, complete in place
3,100 LF /LF
B.
Reinstatement of Active Service Laterals in CIPP Segments, complete in place
40 EA /EA
C.
Grouting of Active Service Laterals in CIPP Segments, complete in place
40 EA /EA
D. Heavy Cleaning, complete in place 3,100 LF /LF
E. Resident Notification, complete in place Lump Sum Lump Sum
F. Mobilization/Demobilization/Insurance/Bonds Lump Sum Lump Sum
G. Photographic Documentation Lump Sum Lump Sum
D-1 611/2025-01
Section D
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we ________________________ as Principal and _______________________________________________ of ____________________________________, State of _____________, a corporation existing under the laws and the State of ____________________, and authorized to transact business in ____________________, as Surety, are held and firmly bound unto
(OWNER)
(ADDRESS)
hereinafter called the Obligee, in the sum of __________________________ Dollars ($_______________) lawful money of the United States of America, for payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the accompanying Proposal or Bid dated _________________, 20___, for the ______________________________
NOW THEREFORE, the condition of this Bond shall be such that if the Principal, upon due acceptance of said Proposal and award of the Contract to him by the Obligee, bonds with good and sufficient surety as may be required by the Contract Documents, and furnishes the Obligee proper evidence of effectiveness of insurance coverage, respectively, within the time, in the forms and in the amounts as appropriate, required by the Contract Documents, and enters into a Contract with the Obligee in accordance with the Contract Documents, then this Bond shall be void; otherwise, the Bond shall be and shall remain in full force and effect.
The Principal and Surety hereby stipulate and agree that if the Principal fails to perform all conditions of this Bond, they will pay the sum of the Bond to the Obligee as fixed, liquidated damages.
The Surety, for value received, hereby stipulates, and agrees that the obligations of said Surety and its Bond shall be in no way impaired of affected by any extension of time within which the OWNER may accept such bid; and said Surety does hereby waive notice of extension.
D-2 611/2025-01
It is the intention of the parties to be legally bound by this instrument.
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their several seals this ___ day of ___________, 20___, the name and corporate seal of each corporate party being hereto affixed, and these presents duly signed by its undersigned and representative, pursuant to authority of its governing body.
ATTEST: DATE: ____________________, 20____
WITNESS: __________________________________
Name of Bidder, Corporation, Firm or Individual
__________________________ By________________________________
(Title)
Business Address of Bidder
ATTEST:
Surety
Attorney-in-Fact
IMPORTANT – Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.
E-1
Section E
GENERAL CONDITIONS
E1 Definitions
Wherever used in these General Conditions or in the other
Contract Documents, the following terms have the meanings indicated which are applicable to both the singular and plural thereof:
Addenda
Written or graphic instruments issued prior to the opening of bids which clarify, correct or change the bidding documents or the Contract Documents and which will be included as Section L of the Contract Documents for award and construction.
Advertisement
The legally published and/or distributed notification to prospective Bidders and others of the Project and the OWNER's intent to receive bids on same. The Advertisement is included as
Section A of these documents.
Agreement
The written agreement between OWNER and CONTRACTOR covering the
Work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. The
Agreement is included as Section J of the Bidding/Contract
Application for Payment
The form accepted by ENGINEER which is to be used by CONTRACTOR in requesting progress or final payments and which is to include such supporting documentation as is required by the Contract
Documents, Section H.
Bid
The offer or proposal of the bidder submitted on the prescribed
Bid Form setting forth the prices for the Work to be performed.
Bid Forms are Section C of these documents.
Bonds
Bid, performance, payment, labor and materialsmen, maintenance and special bonds and other instruments of security. The Bid
Bond form is Section D; other Surety Bond forms are Section K of these documents.
E-2
Change Order
A document signed by CONTRACTOR and OWNER which authorizes an addition, deletion or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the
Effective Date of the Agreement.
Contract Documents
The Advertisement, Instructions to Bidders, Bid Form, Bid Bond, General Conditions, Supplemental General Conditions, Technical
Specifications, Measurement and Payment, Agreement, Bonds, Addenda and Drawings together with all modifications and supplements issued as Change Orders on or after the Effective
Date of the Agreement.
Contract Price
The moneys payable by OWNER to CONTRACTOR under the Contract
Documents as stated in the Agreement.
Contract Time
The number of calendar days stated in the Bid Form and in the
Agreement for the completion of the Work.
CONTRACTOR
The person(s), firm(s) or corporation(s) with whom OWNER has entered into the Agreement.
Drawings
The drawings, plans, details, supplemental details, graphics, diagrams, photo reproductions and other representations which show the character and scope of the Work to be performed and which have been prepared or approved by ENGINEER and/or the
OWNER.
Effective Date of the Agreement
The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the parties to sign and deliver.
ENGINEER
KLH Engineers, Inc.
General Conditions
Terms pertaining to the Contract and the performance of the Work thereunder that are of frequent and continuing applicability.
The General Conditions are included as Section E of these documents.
E-3
Laws and Regulations
Laws, rules, regulations, ordinances, codes appertaining to the conduct of and/or location of the work.
Insurance
Protection provided to the parties to the Contract as required by the General Conditions and the Supplemental General
Conditions and evidenced by either insurance policies or certificates of insurance coverages. Form of certificate and coverages is included under Section K.
Measurement and Payment
The conditions under which payments are to be determined and made to the CONTRACTOR for Work performed under the Contract or as an addition to or deduction from the Contract. The
Measurement and Payment provisions are included as Section H.
Notice of Award
The written notice by the OWNER or ENGINEER to the apparent
Successful Bidder stating that the Contract has been awarded to it.
Notice to Proceed
A written notice given by the OWNER or ENGINEER to CONTRACTOR fixing the date on which the Contract Time will commence. When such Notice to Proceed is not issued, the Contract Time will commence on the date appearing in the Agreement (Section J).
OWNER
The private or public agency with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be provided.
Partial Utilization
Placing a portion of the Work in service for the purpose for which it is intended (or a related purpose) before reaching
Substantial Completion for all the Work.
Project
The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents.
Resident Project Representative
The authorized representative of the ENGINEER or the OWNER who is assigned to the site or any part thereof, for the purpose of monitoring the construction of the work under this contract.
E-4
Shop Drawings
All drawings, diagrams, illustrations, schedules, catalog information and other data which are specifically prepared by or for CONTRACTOR to illustrate some portion of the Work and which are submitted by CONTRACTOR for review and/or approval for incorporation in the Work.
Technical Specifications
Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto. They are
Section G of these documents.
Subcontractor
An individual, firm or corporation having a direct contract with
CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the site.
Substantial Completion
The Work (or a specified part thereof) which has progressed to the point where, in the opinion of the OWNER and/or ENGINEER, it is sufficiently complete, in accordance with the Contract
Documents, so that the WORK (or specified part) can be utilized for the purposes for which it is intended.
Supplemental Details
Certain drawings, plans, details, characteristic curves, graphics, diagrams, photo reproductions, tabular data, or other representation respective to the Work and which are bound in the rear of the Bidding/Contract Documents Book as Section I.
Supplemental General Conditions
The part of the Contract Documents which amends or supplements these General Conditions (if any). They are Section F of these documents.
Supplier
A manufacturer, fabricator, supplier, distributor, materialman, or vendor.
Unit Price Work
Work to be paid for on the basis of unit prices.
E-5
Work
The entire construction or the various separately identifiable parts thereof required to be furnished under the Contract
Documents. Work is the result of performing services, furnishing labor, and furnishing and incorporating materials and equipment into the construction, all as required by the Contract
E2 Preliminary Matters
E2.1 Delivery of Bonds
When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish in accordance with the Contract
Documents. The Surety Bond forms are attached as Section K of these documents.
E2.2 Copies of Documents
All bidding documents are available online at no cost via the
PennBid Program (https://pennbid.bonfirehub.com). Unauthorized reproduction of the drawings or the specifications by the
CONTRACTOR shall not be permitted.
E2.3 Public Works Employment Verification Act
The Contractor and any Subcontractor(s) shall participate in the
E-Verify Program operated by the United States Department of
Homeland Security that electronically verifies employment eligibility for employees (“EVP”) and shall, subject to the requirements of federal law governing the use of EVP, use EVP to verify employment eligibility of each new employee hired after
January 1, 2013, whether such employee will be working onsite or offsite of the Work or otherwise. Contractor and any
Subcontractor(s) shall prove participation with EVP through providing the Owner with a fully completed and unaltered Public
Works Employment Verification Form, as provided by the
Pennsylvania Department of General Services, and available at www.dgs.state.pa.us, for each employee hired by the Contractor after January 1, 2013, whether the employee will be working onsite or offsite of the Project or otherwise. Each new employee hired by Contractor or Subcontractor(s) after January 1, 2013, shall be verified within 5 business days of his start date, whether such employee will be working onsite or offsite of the
Project or otherwise.
A Subcontractor must submit to the Contractor, and the
Contractor must submit to the Owner, a fully complete and unaltered Public Works Employment Verification Form prior to commencing work.
E-6
The Contractor and Subcontractor(s) shall maintain documentation of continued compliance with the Public Works Employment
Verification Act by utilizing the EVP for new employees hired throughout the duration of the public works contract.
Neither the Contractor nor Subcontractor(s) shall discriminate against an employee on the basis of race, ethnicity, color or national origin while utilizing the EVP for verification purposes.
Contractors and Subcontractor(s) shall cooperate with the
Pennsylvania Department of General Services and/or any other competent authorities during any investigation or audit arising under the Act.
Contracts between the Contractor and Subcontractor(s) and
Subcontractor(s) with Subcontractor(s) shall contain provisions substantially similar to the following:
“This Agreement is subject to the requirements of the Public
Works Employment Verification Act, Act 127 of 2012, 43 P.S. §§
167.1-167.11, and applicable regulations and guidelines, 4 PA.
Code Ch. 66 (the “Act”). Generally, the Act requires that prior to beginning work on a public works contract; Subcontractors are required to submit to the public body awarding the contract a fully completed and unaltered Public Works Employment
Verification Form, as provided by the Pennsylvania Department of
General Services, and available at www.dgs.state.pa.us. Each new employee hired by Subcontractor after January 1, 2013, shall be verified within 5 business days of his start date, whether such employee will be working onsite or offsite of a public work or otherwise.
The Subcontractor(s) shall maintain documentation of continued compliance with the Public Works Employment Verification Act, Act 127 of 2012, 43 P.S. §§ 167.1-167.11, by utilizing the E-
Verify Program for new employees hired throughout the duration of the public works contract. Subcontractor(s) shall not discriminate against an employee on the basis of race, ethnicity, color or national origin while utilizing the E-Verify
Program operated by the United States Department of Homeland
Security for verification purposes. Subcontractor(s) shall cooperate with the Pennsylvania Department of General Services and/or any other competent authorities during any investigation or audit arising under the Act.”
E2.4 Commencement of Contract Time; Notice to Proceed
The Contract Time will commence on the effective date of the
Agreement or, if a Notice to Proceed is given, on the date indicated in the Notice to Proceed. A Notice to Proceed may
E-7 follow contract award by OWNER by no more than 45 days, unless otherwise specifically noted within Section B, Instructions to
Bidders.
E2.5 Starting the Project
CONTRACTOR may start to perform the Work on the date when the
Contract Time commences, but no Work shall be done at the site prior to the date on which the Contract Time commences. If scheduled by the Engineer, the CONTRACTOR will be required to attend a pre-construction meeting.
Within ten days after the Effective Date of the Agreement
(unless otherwise specified in the General Requirements), CONTRACTOR shall submit to OWNER or his designee, for review:
- A proposed progress schedule indicating the starting and completion dates of the various stages of the work;
- A schedule of values for all of the Work. This will include quantities and prices of items aggregating the
Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction.
Before any Work at the site is started, CONTRACTOR shall deliver to OWNER, with a copy to ENGINEER, certificates, and other evidence of insurance requested by OWNER which CONTRACTOR is required to purchase and maintain in accordance with the
Contract Documents.
E3 Intent of the Contract Documents
E3.1 The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the Work. The Contract
Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the
Project.
If, during the performance of the Work, CONTRACTOR finds a conflict, error or discrepancy in the Contract Documents, CONTRACTOR shall so report to ENGINEER in writing at once, and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification from ENGINEER; any work performed by CONTRACTOR without reporting such conflicts, errors, or discrepancies, in writing, to the ENGINEER will be at the CONTRACTOR's risk.
E-8
In addition, the requirements of the Contract Documents may be supplemented and minor variations and deviations in the Work may be authorized, in one or more of the following ways:
- ENGINEER'S approval of Shop Drawing(s) or sample(s)
- ENGINEER's written interpretation or clarification
E4 Availability of Lands; Report of Differing Conditions;
Underground Facilities; Reference Points
E4.1 Availability of Lands
OWNER shall furnish the lands upon which the Work is to be performed and rights-of-way and easements which, in the opinion of the ENGINEER, are required for construction. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract Documents. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities, specific access routes to the site of the work, or storage of materials and equipment.
E4.2 Report of Differing Conditions
If CONTRACTOR believes that any physical condition uncovered or revealed at the site differs materially from that indicated, reflected, or referred to in the Contract Documents, he shall promptly, after becoming aware thereof and before performing any Work in connection therewith (except in an emergency), notify OWNER and ENGINEER in writing about the difference.
E4.3 Underground Facilities
The information and data shown or indicated in the Contract
Documents with respect to existing underground utilities, structures and/or other facilities at or contiguous to the site, is based on information and data furnished to OWNER or
ENGINEER by the owners of such underground facilities or by others. CONTRACTOR shall have full responsibility for:
reviewing and checking all such information and data; for locating all underground facilities; and for coordination of the Work with the owners of such underground facilities during construction and repairing any damage thereto resulting from the Work, the cost of all of which will be considered as having been included in the Contract Price. PA One Call regulation will be used to determine compensation due to the Contractor if required by law.
E-9
E4.4 Definition of "Underground Facilities"
For the purposes of this paragraph, the term "underground facilities" includes without limitation: pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments and any encasements containing such facilities which have been installed underground to furnish any of the following services or materials:
electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems, water, wastewater or stormwater.
E4.5 Reference Points
OWNER will provide certain reference points for construction which in ENGINEER's judgment are adequate to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for surveying and laying out the Work, shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of OWNER.
CONTRACTOR shall report to ENGINEER whenever any reference point is lost or destroyed or required relocation because of necessary changes in grades or locations and shall be responsible for the accurate replacement or relocation of such reference points by professionally qualified personnel.
E5 Bonds and Insurance
E5.1 Performance and Other Bonds
CONTRACTOR shall furnish Bonds, each in an amount equal to the
Contract Price as security for the faithful performance and payment of all CONTRACTOR's obligations under the Contract
Documents; CONTRACTOR shall also furnish such other Bonds as are required by the Contract Documents. All Bonds shall be in the forms prescribed by the bidding documents or Supplemental
General Conditions and be executed by such Sureties as are named in the current list of "Companies Holding Certificates of
Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in Circular 570
(amended) by the Audit Staff Bureau of Accounts, U. S. Treasury
Department. All Bonds signed by an agent must be accompanied by a certified copy of the authority to act.
If the Surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of the above paragraph, CONTRACTOR shall within five days thereafter, substitute another
Bond and Surety, meeting the OWNER's approval.
E-10
E5.2 Contractor's Liability Insurance
CONTRACTOR shall purchase and maintain such insurance as is appropriate for the Work being performed and furnished and will provide protection from claims which may arise out of or result from CONTRACTOR's performance and furnishing of the Work and
CONTRACTOR's other obligations under the Contract Documents, whether it is to be performed or furnished by CONTRACTOR, by any
Subcontractor, by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable.
The insurance required shall include the specific coverages and be written for not less than the limits of liability and coverages provided in the Supplemental General Conditions. The
Certificate of Insurance included in Section K of these documents shall be required to be completed prior to the commencement of any construction work. All of the policies of insurance required to be purchased and maintained shall contain a provision or endorsement that the coverage afforded will not be canceled, materially changed, or renewal refused, until at least ten days' prior written notice has been given to OWNER and
ENGINEER. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing, maintaining, repairing or replacing defective Work.
E6 Certain Responsibilities of the CONTRACTOR
E6.1 Supervision and Superintendence
CONTRACTOR shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CONTRACTOR shall be responsible to see that the finished Work complies with the requirements of the Contract Documents.
CONTRACTOR shall keep on the Work at all times during its progress a competent resident superintendent, who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary circumstances. The superintendent will be
CONTRACTOR's representative at the site and shall have authority to act on behalf of CONTRACTOR. All communications during construction and before issuance of the Final Payment, given to the superintendent, shall be as binding as if given to
CONTRACTOR.
E-11
E6.2 Labor, Materials and Equipment
CONTRACTOR shall provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the site. Except in connection with the safety or protection of persons or the Work or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all Work at the site shall be performed during regular working hours, and
CONTRACTOR will not permit overtime work or the performance of
Work on Sunday or any legal holiday without OWNER's written consent.
CONTRACTOR shall furnish all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water and sanitary facilities and all other facilities and incidentals necessary for the execution, testing, start-up and completion of the Work.
All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Documents. If required, CONTRACTOR shall furnish satisfactory evidence
(including reports of required tests) as to the kind and quality of materials and equipment.
All materials and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents; but no provision of any such instructions will be effective to impose on ENGINEER responsibility for the means, methods, techniques, sequences or procedures of construction or for safety precautions or programs incident thereto.
E6.3 Adjusting Progress Schedule
CONTRACTOR shall submit to ENGINEER adjustments in the progress schedule to reflect the impact thereon of new developments;
these will conform generally to the progress schedule then in effect and…