Text version

L1-1 611/2025-01

ADDENDUM NO. 1

McDonald Sewage Authority

Contract No. 2025-01

Sanitary Sewer Lining Project

November 26, 2025

All prospective Bidders interested in the above construction work are herein advised of the following additions, deletions and/or modifications of the plans, specifications and Bidding

Documents:

1. Revision: A line item has been added for 10” CIPP Lining.

The Pricing Section has been revised on PennBid. Section C, Bid Form, and Section H, Measurement and Payment, have been updated accordingly.

All Bidders shall acknowledge receipt of this Addendum No. 1 in the space provided on the Bid Form corresponding to the appropriate Contract(s).

END OF ADDENDUM NO. 1

McDonald Sewage Authority

Contract No. 2025-01

Sanitary Sewer Lining Project

KLH Engineers, Inc

5173 Campbells Run Road

Pittsburgh, PA 15205

Phone: 412-494-0510

Fax: 412-494-0426

Section C

C1 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in Section J of the Contract Documents and, to complete all Work as Specified and within the Contract Time indicated in this Bid, in accordance with the Contract Documents. (Enter I

Agree or I Do Not Agree)

C2 BIDDER accepts all of the terms and conditions of the

Instructions to Bidders and other components of the Contract

Documents. This Bid may not be withdrawn for sixty (60) days after the day of Bid opening. BIDDER will sign the Agreement and submit the Contract Security and other documents required by the

Contract Documents within fifteen days after the date of OWNER's

Notice of Award. (Enter I Agree or I Do Not Agree)

C3 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that Bidder has examined copies of all Contract Documents including Sections A through K and all

Drawings, and the following Addenda designated as Section L (if any) receipt of all which is hereby acknowledged. (Enter I Agree or I Do Not Agree)

C4 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that BIDDER has examined the site and locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations) and the conditions affecting cost, progress or performance of the work and has made such independent investigations as BIDDER deems necessary. BIDDER has satisfied itself as to the conditions to be encountered both overhead and on the surface of the ground and/or within existing structures and of the character, quality, and quantities of work to be done, materials to be furnished, services required and all other terms of the Technical Specifications and other Contract

Documents. BIDDER assumes all risks inherent in performing the work and arising from any deficiencies in the Drawings or

Specifications or other Contract Documents and will make no claim against the OWNER or the ENGINEER because of any such alleged deficiency. (Enter I Agree or I Do Not Agree)

C5 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that this Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation, BIDDER has not directly or indirectly induced any person, firm, or a corporation to refrain from bidding; and

BIDDER has not sought by collusion to obtain for himself any advantage over any other Bidder or over OWNER. (Enter I Agree or

I Do Not Agree)

C6 BIDDER will complete the Work under Contract No. 2025-01 for the submitted Lump Sum and Unit Prices. (Enter I Agree or I

Do Not Agree)

C7 BIDDER shall be aware that Cured-In-Place materials, or approved equal, are proposed for the CIPP lining portion of this project. Any Contractor desiring to use a product other than

Cured-In-Place Liners must submit all pertinent product literature to the ENGINEER at KLH Engineers, Inc., 5173

Campbells Run Road, Pittsburgh, PA 15205 prior to the bid opening for consideration.

C8 BIDDER acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract

Documents.

C9 BIDDER agrees that the Work will be substantially completed within ninety (90) Calendar Days after the date when the

Contract Time commences. Work shall be completed and ready for

Final Payment within thirty (30) Calendar Days after the date of substantial completion. (Enter I Agree or I Do Not Agree)

C10 BIDDER understands and agrees to coordinate his construction activities with those of the OWNER, the ENGINEER, and the other CONTRACTORS. (Enter I Agree or I Do Not Agree)

C11 BIDDER accepts the provisions set forth in the Agreement in

Section J of the Contract Documents as to liquidated damages in the event of failure to complete the Work on time. (Enter I

Agree or I Do Not Agree)

C12 The required Bid Security set forth in Paragraphs B7 of the

Instructions to Bidders in the form of a certified bank check, or a Bid Bond, the form for which is included as Section D of the Contract Documents, is in the amount of 10% of the Amount of the Bid. (Enter I Agree or I Do Not Agree)

C13 The terms used in this Bid which are defined in the General

Conditions of the Construction Contract included as part of the

Contract Documents have the meanings assigned to them in the

General Conditions. (Enter I Agree or I Do Not Agree)

C14 BIDDER recognizes that site safety, for all persons

(including OWNER and ENGINEER PERSONNEL) who enter the work site, will be the complete responsibility of the BIDDER, if the

BIDDER is awarded the Contract and enter into Agreement with the

OWNER for the proposed work. The BIDDER certifies acceptance of the site safety responsibility by submitting this Bid Form.

(Enter I Agree or I Do Not Agree)

C15 Enter Bidders Entity Type: Individual, Partnership, Corporation, Joint Venture

BID ITEM QUANTITY/UNIT

UNIT

PRICE

TOTAL

PRICE

A1.

8” Sanitary Sewer CIPP Lining (MH to MH), all depths, complete in place

2,685 LF /LF

A2.

10” Sanitary Sewer CIPP Lining (MH to MH), all depths, complete in place

415 LF /LF

B.

Reinstatement of Active Service Laterals in CIPP Segments, complete in place

40 EA /EA

C.

Grouting of Active Service Laterals in CIPP Segments, complete in place

40 EA /EA

D. Heavy Cleaning, complete in place 3,100 LF /LF

E. Resident Notification, complete in place Lump Sum Lump Sum

F. Mobilization/Demobilization/Insurance/Bonds Lump Sum Lump Sum

G. Photographic Documentation Lump Sum Lump Sum

Copyright © 2025 KLH Engineers, Inc.

All Rights Reserved Worldwide

HR-1

Revised Addendum 1 611/2025-01

Section H

MEASUREMENT AND PAYMENT

H1 General

The Construction Contract is based upon a unit price bid and therefore measurements will be made for the purpose of determining progress payments, unless appropriate Change Orders are issued which alter the payment basis. Linear measurements shall be made horizontally and vertically which is the same basis used for preparation of the drawings.

H2 Applications for Payment

Applications for Payment during construction progress shall be jointly developed each month by authorized representatives of the

CONTRACTOR, OWNER and ENGINEER. In the event of a dispute the

ENGINEER's decision shall be final and binding upon all parties.

The CONTRACTOR shall then have the Application for Payment form typed, reproduced in the number of copies directed by the ENGINEER, and filed with the ENGINEER on or before the first day of each month. Monthly payment periods shall terminate on the last day of each month to be compatible with the OWNER's meeting dates.

The sum or sums withheld by the OWNER from the CONTRACTOR after the contract is 50% completed shall not exceed 5% of the value of completed work based on monthly progress payment request: provided, however, that in the event a dispute arises between the OWNER and any CONTRACTOR which dispute is based upon increased costs claimed by one CONTRACTOR, additional retainage in the sum of one and one-half times the amount of any possible liability may be withheld until such time as a final resolution is agreed to by all parties directly or indirectly involved, unless the CONTRACTOR causing the additional claim furnishes a bond satisfactory to the OWNER to indemnify OWNER against the claim. However, all such moneys retained by the OWNER may be withheld from the CONTRACTOR until substantial completion of the contract.

The Applications for Payment shall be required to include such evidence of payment to suppliers and subcontractors by the

CONTRACTOR, as the OWNER may require, and shall also be accompanied by such lien or other releases as requested by the OWNER.

Progress payments based upon information developed on the

Applications for Payment and supporting documentation, if approved by the ENGINEER, shall be made within 45 days following proper

HR-2

submission of the necessary papers to the ENGINEER. Any payments which are not made by the OWNER on that schedule will bear interest computed at the rate determined by the Secretary of Revenue for interest payments on overdue taxes or the refund of taxes as provided in sections 806, 806.1 of the Act of April 9, 1929 (P.L.

343, No. 176) known as "The Fiscal Code" and any subsequent amendments to those sections.

H3 Final Payment

The making and acceptance of final payment shall constitute:

- A waiver of all claims by OWNER against CONTRACTOR, except those claims arising from unsettled liens, from defective work appearing after final inspection, or from failure to comply with terms of the contract documents; and

- A waiver of all claims by CONTRACTOR against OWNER other than those previously submitted in writing and still unsettled.

H4 Description of Work to be Included in the unit Prices, Lump Sums and Total Prices Submitted on the Bid Forms

The prices bid for those items on the Bid Forms which have the designation “A” shall include all work required for 8” and 10” CIPP

Sanitary Sewer Lining (MH to MH), all depths, including the pre-televising of the sanitary sewer, post-televising of the sanitary sewer after liner installation, liner, installation of the liner, light cleaning, break-in connection trimming, installation of the sealing agent to seal the liner at the manholes, by-pass pumping and all other tools, materials, and labor required to meet the specifications provided, complete in place. Pre-televising and post-televising shall be delivered to ENGINEER. A warranty inspection of the sewers one month prior to the expiration of the

Maintenance Bond is incidental to this item. Restoration of work areas disturbed is incidental to this item. Payment shall be on a per linear foot basis. The OWNER reserves the right to remove segments from consideration based upon determinations made during completion of preliminary CCTV inspection. The CONTRACTOR shall be compensated at a unit price of $3.00/LF for cleaning and CCTV inspection of lines removed at this stage. Unit prices identified for Heavy Cleaning shall remain in effect as applicable.

The prices bid for those items on the Bid forms which have the designation “B” shall include all work required for the

HR-3

Reinstatement of Active Service Laterals (CIPP Lining Repairs), including all labor, tools, equipment, and materials necessary for the reinstatement of active laterals, including CCTV, relief cutting immediately after lining and full reinstatement and brushing within 48 hours of lining, as per the contract specifications provided, complete in place. Payment shall be per each basis.

The prices bid for those items on the Bid forms which have the designation “C” shall include all work required for the Grouting of

Active Service Laterals a minimum of 6 feet from the main sewer, including grouting material, pressure testing and all labor, tools, equipment, and materials necessary for the grouting of active laterals, as per the contract specifications provided, complete in place. Payment shall be per each basis.

designation “D” shall include all work required for Sanitary Sewer

Heavy Cleaning in pipes of all sizes, including all tools, materials and labor required to meet the specifications provided, complete in place. Application under this pay item shall be agreed upon by the OWNER prior to the completion of work and demonstrated by means of CCTV inspection. Payment shall be on a per linear foot basis (as needed).

designation “E” shall include all work required for Resident

Notification, including all tools, materials and labor required to meet the Contract Specifications provided, complete in place.

Payment shall be on a lump sum basis.

designation “F” Mobilization/Demobilization/Insurance/Bonds may be any lump sum amount up to a maximum of 8% of the Total Price Bid.

One half of the amount so bid for those items, however, shall be withheld (in addition to the stipulated retainage) until the issuance of the final Payment to the CONTRACTOR.

designation “G” shall include all work required for Photographic

Documentation, including photographs of the existing conditions of the work area. A date and time stamp must be provided on each photograph for it to be acceptable. The ENGINEER must have a copy of the photographs prior to starting any work. Payment will not be considered for work done without approved pre-construction photography. Payment shall be on a lump sum basis.

HR-4

End of Section H

Measurement and Payment

THIS PAGE LEFT INTENTIONALLY BLANK

611-09_Addendum 1.pdf (p.1)
611-09_2025-01 Section C_PennBid_rev Addendum 1.pdf (p.2-4)
611-09_2025-01 Section H_Unit Price_rev Addendum 1.pdf (p.5-8)

File details come from the government source that posted it. Updated .