B49614 Change Order Notice~1.pdf

PDF 1 MB Posted

Attached to
CHANGE ORDER NOTICE - Asian Carp Harvest and Sampling - Gilpin Airboat Services, Inc.
Solicitation number
26-422DNR-RESCO-B-49614
Issued by
Illinois

About this file

This appears to be a generic Adobe Reader loading page with technical instructions for troubleshooting PDF document display issues. The document does not contain any substantive contract, solicitation, or project information. It provides standard guidance for users experiencing problems viewing PDF files, including recommendations to upgrade Adobe Reader and links to download the software. The page also includes trademark attribution statements for Windows, Mac, and Linux operating systems.

No specific contract details, procurement information, or project scope can be extracted from this document. The image is a placeholder technical support page typically seen when a PDF file is not rendering correctly.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DNR - Natural Resources
ProcurementTitle: Asian Carp Harvest and Sampling
BBREFNO.: 26-422DNR-RESCO-B-49614
thedetails: Due to unforeseen opportunities, DNR was able to branch out to the Wabash River and remove carp, which has ran current scheduling insufficient for contracted fishermen. IDNR did several rapid response efforts on the Wabash River that were not included in the original contract as the project and funding did not exist at contract establishment. While the funding was separate, it was not accounted for in the contract dollar amounts.

The two vendors requiring amendments are the sole vendors responsible for conducting seine hauls which is a tool DNR has begun to rely on more heavily due to its effectiveness. Approximately 40% of the carp removed over the last 2 years are the result of this tool. The seine use falls under rapid response which has increased the overall cost of the contract for these two individuals. The full amount of the amendment may not be utilized but is needed for possible rapid response deployments if needed. A new contract is anticipated to be in place when this contract expires in December 2025.

CheckBox1: 1
CheckBox2: 1

File details come from the government source that posted it. Updated .