B44446 Revised Change Order Notice V.23.2.pdf
PDF 2 MB Posted
- Solicitation number
- 25-422DNR-RESCO-B-44446
- Issued by
- Illinois
About this file
This document is a Change Order Notice issued by the Chief Procurement Office for General Services. It outlines a change order for Contract No. 25-422DNR-RESCO-B-44446, which is for the CWD Cold Storage and Processing project. The change order is required to allow for the harvesting, testing, storage, and processing of more deer than originally anticipated at 2 of the 3 contracted locations. Favorable environmental conditions, the addition of new shooting sites, and increasing prevalence of Chronic Wasting Disease (CWD) in northern Illinois have led to the need to harvest and process more deer. As a result, the contract maximum is being increased from $320,000 to $444,000 for the renewal period across all three locations.
The change order is in accordance with Section 33E-9 of the Criminal Code, which requires that the circumstances necessitating the change were not reasonably foreseeable at the time the contract was signed, or that the change is germane to the original contract. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B44446 Change Order Notice V.23.2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.23.2 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: DNR - Natural Resources |
| ProcurementTitle: CWD Cold Storage and Processing |
| BBREFNO.: 25-422DNR-RESCO-B-44446 |
| thedetails: A change order is required to allow more deer to be harvested, tested, stored and processed at 2 of the 3 contracted locations. More deer than originally anticipated have been harvested in winter of 2024 for several reasons. Favorable environmental conditions, the addition of new shooting sites and a greater need to remove more deer given increasing CWD prevalence across norther Illinois are contributing factors. This increases the contract maximum from $320,000 to $444,000 for all three locations for the renewal period. |
| CheckBox1: 1 |
| CheckBox2: 1 |
File details come from the government source that posted it. Updated .