B405 1212_1214 HVAC SOW R1_DRAFT.pdf

PDF 180 KB Posted

Attached to
HVAC Climate Control Solution AEDC Tunnel 9 Federal contract opportunity
Solicitation number
FA9101-22-R-3005
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Climate Control Solution AEDC Tunnel 9, newest first.
File Type Posted
Sources Sought.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 February 2022 Revision 1

STATEMENT OF WORK

FOR

HVAC CLIMATE CONTROL SOLUTION

AEDC TUNNEL 9

BUILDING 405

SECURE SERVER ROOM 1212 AND SECURE CUSTOMER ROOM 1214

ARNOLD ENGINEERING DEVELOPMENT COMPLEX

ARNOLD AIR FORCE (AF) BASE, TN 37389-9998

Distribution A.

Approved for Public Release. Distribution is unlimited.

(AEDC PA # AEDC2018-032 & IRA-3622)

Table of Contents-1

Table of Contents

1. INTRODUCTION

2. SCOPE of Work

3. APPLICABLE DOCUMENTS

3.1 Government Documents

4. REQUIREMENTS

4.1 General

4.2 Security and Access

4.3 Period of Performance

4.4 Submittals

Appendix A – Submittal Procedure

Page-1

1. INTRODUCTION

1.1. Tunnel 9 legacy buildings’ design uses a central system of chilled water (CW), hot water (HW), and steam to heat and cool buildings. Boilers that were intended to operate year round now only operate from May to October. With no heat energy, some controls that look for humidity inputs to remove moisture result in excessive cooling. Many instruments and certain equipment have been disconnected from pneumatic control systems. In addition, over decades, rooms were isolated from the central system and units were installed to provide specific-room climate control. In noting these deficiencies, it is observed that GSA’s maintenance contractor spends approximately a third of their time manually intervening to correct temperature swings in various occupied parts of buildings.

1.2. Multiple solutions are needed to solve problems in different areas. A system wide BMS that was formerly proposed is not appropriate as there are too many disparate variables to place entire buildings under one HVAC solution. Any solution and selection of controllers/software should emphasize task simplicity and be easily user addressable. Human-machine interface (HMI), or laptop, is desired outside secure areas, as maintenance staff lack unescorted access to many areas.

1.3. The scope of work (SOW) presented herein identifies a solution for temperature and humidity problems for two mission critical secure spaces in Building 405.

The SOW introduces automated controls for Mechanical Room 1208 to replace original pneumatic components, along with selected equipment to be installed inside ductwork. Both rooms serve critical testing activities:

A. Server Room 1212 – occupied and used daily in reduction of test data.

B. Customer Room 1214 – essential for customer participation in review and reduction of test data, in addition to a providing a focal point for visitors.

2. Scope of Work

2.1. Demolition

2.1.1. Demo existing pneumatic control panel, pneumatic tubing, and pneumatic control damper.

2.1.2. Demo existing pneumatic CHW and HW control valve and actuator.

2.1.3. Demo existing thermostat in room 1212.

2.2. Design and Install New Controls and Control Components

2.2.1. Provide and install new control panel, power supply, relays, all required end devices and BACnet IP DDC controller for air handing unit (AHU) to provide a complete functional system.

2.2.2. Provide and install electric damper actuators.

2.2.3. Provide and install new 3-way CHW and HW electric control valve and actuator. Reinsulate piping.

2.2.4. Provide and install new thermostats in rooms 1212 and 1214.

Page-2

2.2.5. Provide and install remote display on the control panel cover for operator access.

2.2.6. Program BACnet IP controller per required sequence of operation (SOO).

2.2.7. Operation of equipment shall be standalone with the ability to connect to future DDC operating system.

2.3. Provide and Install Duct Electric Heater for Room 1214.

2.3.1. Provide a 10 kW electric duct heater in existing duct work.

A. Provide with electronic step controller.

2.3.2. Provide and install electric service to duct heater.

2.3.3. Thermostat is provided in above work.

2.4. Provide and Install Ducted Dehumidifier to Room 1212.

2.4.1. Provide a ducted dehumidifier in adjacent mechanical room to the secure server room.

2.4.2. Provide and install electric service to dehumidifier.

2.4.3. Provide and install drain line to closet floor drain.

2.5. Provide and Install 8 ea. Supply Air Diffusers and 2 ea. Return Air Grills.

2.5.1. Demo existing supply air diffusers and replace with new.

2.5.2. Demo existing return air grills and replace with new.

2.6. Installation shall include:

2.6.1. Engineering, programming, and drawings

2.6.2. One year warranty

2.6.3. Installation work shall be conducted at times acceptable to AEDC.

2.7. Installation does not include:

2.7.1. Maryland sales tax.

2.7.2. Cost of bonds.

2.7.3. Cost of permits, if required.

2.7.4. Cost of insurance above IEC Systems current coverage.

2.7.5. Off-site training.

2.7.6. Maintenance/Inspection agreement.

2.7.7. Materials or services other than those listed herein.

3. APPLICABLE DOCUMENTS

3.1. Government Documents:

3.1.1 AEDC Safety, Health, and Environmental Standard B2, Lockout/Tagout

(LOTO)

3.1.2 AF Form 3000

4. REQUIREMENTS

4.1. General:

4.1.1. The Contractor shall be responsible for installing new equipment, and removing and disposing of discarded components.

Page-3

4.1.2. When working around the HVAC equipment, the Contractor shall apply personnel locks to facility Lockout/Tagout Box per AEDC Safety, Health and Environmental (SHE) Standard B2, Lockout/Tagout (LOTO) when instructed by the AF.

4.1.3. The AF will provide electrical power to the Contractor’s equipment.

4.2. Security and Access

The Contractor shall comply with all security regulations and directives as identified herein. AEDC White Oak is a closed military installation, therefor certain requirements apply to all contractors working at AEDC White Oak that DO NOT require access to sensitive information in the performance of their contract. All employees performing on this contract must be US citizens or Lawful Permanent Residents (LPRs). The AEDC White Oak host shall require that all Lawful Permanent Residents (LPRs) have in their possession their Permanent Resident Cards (USCIS Form I-551). If Lawful Permanent Residents fail to produce the proper credentials, they will be denied access to AEDC White Oak.

The Contractor will be held responsible for complying with federal statutes, which prohibit the hiring of illegal aliens and foreign nationals who are not authorized to work in the United States. Non-US citizens must present their resident alien cards to the Visitor Control Officer or designated representative to show proof that they have been legally admitted to the United States. Failure to show proof will result in entry being denied. The Contractor employees working on this contract will be required to sign in at the visitor office each morning. The Contractor must request vehicle access to the site which can only be granted by the AF Site Director.

4.3. Period of Performance:

4.3.1. The Contractor shall have two weeks to complete scope listed in Section

2. Start of work is tentatively scheduled for 9-20 May 2022.

4.3.2. The AF will coordinate a firm start date with the Contractor not less than three (3) weeks prior to date on which the work is to begin.

4.3.3. Installation shall be completed within 12 weeks after receipt of order

(ARO).

4.4. Submittals

4.4.1. Contractor shall provide submittal package four (4) weeks ARO.

Submittal package shall include information for items of supply, such as valves, dampers, actuators, diffusers, and controllers; and, include panel layouts, drawings, P&IDs, V&IDs, descriptions, SOO, instructions, HMI, and all other items of supply. Typical items that comprise a submittal package are listed in Table 1. Not all items for this particular submittal package are listed, and some items listed in Table 1 may not be part of the submittal package.

4.4.2. The Contractor shall submit all documentation in accordance with Appendix A – Submittal Procedure.

No. Section Reference Required Submittals Due 1 2.6, 4.4 Submittal Package 4 weeks after PO 2 2.6 Warranty 3 weeks after PO

Page-4

No. Section Reference Required Submittals Due 3 4.4 Equipment data sheets TBD 4 4.4 Component data sheets TBD 5 4.4 Drawings – panel layout TBD 6 4.4 Drawings – P&IDs TBD 7 4.4 Drawings – V&IDs TBD 8 4.4 Drawings – valves and actuators TBD 9 4.4 Drawings – electric duct heater TBD

10 4.4 Drawings – ducted dehumidifier TBD 11 4.4 Drawings – other (TBD) TBD

12 4.4 SOO TBD

13 4.4 Programing information TBD 14 4.4 Other - TBD TBD

Table 1. Required Submittal List

Appendix A-1

APPENDIX A

SUBMITTAL PROCEDURE

PART 1 GENERAL

1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including but not limited to shop drawings, product data, manufacturer’s certificate, design data, calculations, and verifications, manufacturer’s instructions, manufacturer’s field service reports, samples, operation and maintenance manuals, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract.

Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as: contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections of the specification or statement of work.

1.2 SUBMITTAL PROCEDURE

A. Definition: For the purposes of this section, the term “Contractor” denotes the prime contractor.

B. Listing: The statement of work contains a summarized listing of item submittals requiring approval for the work. The listing is included for the convenience of users of the contract documents. The listing may not be all inclusive and additional item submittals may be required.

C. Risk: Do not proceed with the part of the work covered by an item submittal including purchasing, fabricating, and delivering until approval is received.

Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. Any fabrication or other work performed in advance of the receipt of accepted item submittals and approvals shall be entirely at the Contractor’s risk and expense.

D. Transmittal Timing: Coordinate the preparation and processing of item submittals with the performance of the work. Prepare and transmit each item submittal to the Contracting Officer sufficiently in advance of the performance of related work and other applicable activities. Transmit related item submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for coordination. No delay damages or time extensions will be allowed for time lost in late submittals.

Appendix A-2

E. Content: Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Complete AF Form 3000 and attach as cover sheet for each submittal. Contractor may include multiple item numbers on an AF Form 3000.

F. Language: All item submittals shall be written in English, including documents, notes on drawings, sketches, and/or samples, calculations, manuals, and all other instances of written text and communication.

G. Units: All item submittals shall be marked or show dimensions and values in the same units as specified in the contract documents.

H. Review Time: Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 10 working days for initial Government processing of each submittal. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Government sufficiently in advance of the work.

I. Contractor Certification: All submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Government. Each submittal shall be dated, signed, and certified by the Contractor as being correct and in strict conformance with the contract documents. No consideration for review by the Government of any Contractor’s submittal will be made for any items which have not been so certified by the Contractor. All noncertified submittals will be returned to the Contractor without action taken by the Government, and any delays caused thereby shall be the total responsibility of the Contractor.

J. Deviations: Should any item submittals required by the contract documents show deviations from the contract requirement, the Contractor shall make specific mention of such deviations in the letter of transmittal, including stating cost effects, and product and system limitations which may adversely affect the work, in order that if acceptable, suitable action may be taken for proper adjustment of the contract; otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the contract documents and the approved submittals. Contractor shall clearly mark the proposed variation in all documentation and specifically point out deviations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government. Deviations from contract requirements require Government approval and will only be considered when advantageous to the Government. When proposing deviations, deliver written request to the Contracting Officer, with documentation of the nature and features of the deviation and why the deviation is desirable and beneficial to the Government. If lower cost is a benefit, include an estimate of the cost savings. In addition to documentation required for deviation, include the submittal information

Appendix A-3 required for the item. Allow an additional 10 working days beyond normal submittal review period for consideration by the Government of submittals with deviations.

K. Approved Submittals: The part of the work covered by the approved item submittal may proceed provided it complies with the requirements of the contract documents. Final acceptance will depend upon that compliance.

The term “Approved” shall only indicate that there is no exception taken to the submittal. Approval of the item submittal shall not be construed as a complete check, and indicates only that the general method or other information appears to meet the contract requirements. Approval does not relieve the Contractor of the responsibility for any error which may exist.

After item submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment, or changes to any other information will be considered unless accompanied by an explanation of why a substitution or change is necessary.

L. Disapproved Submittals: Contractor shall correct disapproved item submittals and resubmit for approval within timeframe noted. If no date is given, Contractor shall submit corrected submittal within 10 working days.

If the Contractor considers any correction or notation on the returned submittal to constitute a change to the contract drawings, specification, or statement of work the Contractor shall notify the Contracting Officer.

M. Responsibility: The Government’s review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions and conformance to the specifications. The Contractor shall assume all responsibility and risk for any mistakes and/or costs due to any errors in submittals.

N. Inconsistencies: If a conflict or inconsistency arises between an approved item submittal and the contract documents, the contract documents shall govern.

1.3 SPECIFIC SUBMITTAL DESCRIPTIONS AND REQUIREMENTS: Submittal requirements for individual units of work are specified in the Statement of Work (SOW). Except as otherwise indicated in the SOW, comply with the following requirements for each type of submittal.

A. Shop Drawings: These are technical drawings and data specially prepared for this contract including fabrication and installation drawings, setting and seaming diagrams, and coordination drawings (for use on-site). Shop drawings include drawings, diagrams and schedules specifically prepared to illustrate some portion of the work, diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project, or drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated. Information required on shop

Appendix A-4 drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work.

Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one hard copy and one electronic copy.

B. Product Data: This data includes standard printed information on manufactured products that has not been specially prepared for this contract, including manufacturers' product specifications illustrating size, physical appearance and other characteristics of materials, installation instructions, standard color charts, catalog cuts, illustrations, schedules, standard wiring diagrams, standard product operating and maintenance manuals, and samples of warranty language when the contract requires extended product warranties. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish three hard copies and one electronic copy.

C. Design Data: Design data includes design calculations, mix designs, analyses or other data pertaining to a part of work. Refer to statement of work for required quantities, formats, and signatures or certifications required. Furnish three hard copies and one electronic copy.

D. Test Reports: These include reports signed by an authorized official of a testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with the specified requirements. Testing shall have been within three years of date of contract award for the project. Reports also include findings of tests required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to the job site, findings of tests made at the job site or on a sample taken from the job site, investigation reports, daily logs and checklists, and final acceptance test and operational test procedures. Furnish three hard copies and one electronic copy of each such report required.

E. Certificates: These include statements printed on the manufacturer’s letterhead and signed by the responsible officials of the manufacturer of a product, system or material attesting that the product, system or material meets specification requirements. Certificates include documentation required of the Contractor, or of a manufacturer, supplier, installer or subcontractor through the Contractor, to further demonstrate the quality of orderly progressions of a portion of the work by documenting procedures, Appendix A-5 acceptability of methods or personnel qualifications. Certificates shall be dated after award of the project contract and clearly name the project.

Furnish three hard copies and one electronic copy of each certificate required.

F. Manufacturer’s Instructions: Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

Furnish three hard copies and one electronic copy.

G. Operation and Maintenance Data: Data furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer’s help and product line documentation necessary to maintain and install the equipment, and needed by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item. The data is intended to be incorporated in an operations and maintenance manual or control system. Furnish two hard copies and one electronic copy.

H. Miscellaneous Submittals: These are work-related, non-administrative submittals that do not fit in the previous categories, including the following:

1. Maintenance agreements. Furnish one hard copy and one electronic copy.

2. Maintenance tools, spare parts, and overrun or maintenance stock.

Refer to SOW for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.

3. Qualification certificates. Furnish one hard copy and one electronic copy.

4. Warranties.

END OF SOW