Text version
L1-1 115/2025-01
ADDENDUM NO. 1
City of St. Marys Contract No. 2025-01
Wastewater Treatment Plant Access Bridge Replacement
August 7, 2025
All prospective Bidders interested in the above construction work are herein advised of the following additions, deletions and/or modifications of the plans, specifications and Bidding Documents:
1. A Pre-Bid Meeting was held at 1:00 PM, Wednesday, July 30, 2025, at the St. Marys Wastewater Treatment Plant, 282 State Street, St. Marys, PA 15857. Representatives of OWNER and ENGINEER were present to discuss the Project.
Attendance at the Pre-Bid Conference was encouraged but not required. The meeting minutes and the sign-in sheet are attached.
2. Clarification: The OWNER is identified as the City of St, Marys. Bidders are advised that the Contracts may ultimately be signed between the CONTRACTOR and the St.
Marys Municipal Authority. For the purposes of the Bidder’s Surety, a certified check payable to the City of St. Marys or a bid bond on the bid form executed by the Bidder and a surety company approved by the City of St. Marys, in an amount equal to ten percent (10%) of the total amount of bid, must be submitted with each bid or bids will be considered nonresponsive and immediately rejected. Upon award, OWNER will provide clarification as to whether payment, performance, and maintenance bonds shall be provided to the City of St. Marys or the St. Marys Municipal Authority.
3. Clarification: It is anticipated that a recommendation for award will be provided to the OWNER, and award will be made on August 18, 2025. The Notice to Proceed is anticipated to be issued by mid-November.
4. Clarification: There is no posted weight restriction for the bridge on the neighboring property which will be used for temporary access to the Wastewater Treatment Plant during construction. The City will coordinate access through the neighboring property. The neighboring property is an active business and will require consistent
L1-2 115/2025-01 communication and coordination between all parties to minimize impact on the business.
5. Clarification: There appears to be a conflict between existing piles and proposed. During excavation and cutting off existing piles, location of the existing piles shall be mapped out by CONTRACTOR to determine if any conflict with the proposed piles may occur. CONTRACTOR to relay any conflicts to the ENGINEER to determine how piles can be shifted to avoid existing piles. It appears that 2 proposed piles conflict with existing on the Drawings and will be offset.
6. Modification: A base length/elevation for the piles is provided in the plans and specifications. The bid form has been modified to request unit pricing per foot beyond specified base length/elevation.
7. Clarification: The CONTRACTOR is not required to be PennDOT prequalified. Since this is a private bridge and not on a roadway, it does not fall under PennDOT requirements even though it is being built to PennDOT standards which the CONTRACTOR will still have to follow.
8. Clarification: Prestressed beams are to be designed and stamped by a Professional Engineer (P.E.) registered in Pennsylvania by CONTRACTOR.
9. Clarification: The Drawings call out for a 1-1/4" SS Tendon. Monostrand is acceptable for the tendon ties.
10. Clarification: Bearing pads shall be designed in conjunction with prestressed beam design.
11. Clarification: The proposed new fence line is shown on Drawing C2, and a scale is provided. The CONTRACTOR is responsible for all field measurements to determine final quantities.
12. Clarification: On Drawing C2, there is a label “Remove and Replace Guiderail” with an arrow pointing at the Limit of Disturbance boundary. The arrow should be pointing to the proposed guiderail on Drawing C2.
13. Clarification: For proposed thickness of the R-7 rip-rap, refer to the Stream Bank Stabilization Detail on Drawing
ESDT2.
L1-3 115/2025-01
14. Clarification: No asphalt shall be placed on the bridge or approach slabs.
15. Clarification: The driven pile specifications indicate that static load testing is to be performed in compression, tension, and lateral on all test piles. The typical PennDOT standard for a bridge on driven H-piles is to perform dynamic pile load testing per ASTM D4945 and PennDOT 408 1005.3(h)2 to confirm bearing capacity. Dynamic load testing is acceptable for bearing capacity.
16. Clarification: Per PennDOT Standard for the height of the abutment, the rear face of the abutments is to be battered.
The face of the abutment shall be battered as designed.
All Bidders shall acknowledge receipt of this Addendum No. 1 in the space provided on the Bid Form corresponding to the appropriate Contract(s).
END OF ADDENDUM NO. 1
City of St. Marys Contract No. 2025-01
Wastewater Treatment Plant Access Bridge Replacement
KLH Engineers, Inc 5173 Campbells Run Road Pittsburgh, PA 15205 Phone: 412-494-0510 Fax: 412-494-0426
5 17 3 C A M P B E L L S R U N R O A D P I T T S B U R G H , P A 1 52 0 5
4 12 . 4 94 . 05 1 0 F A X 41 2 .4 9 4 .0 4 2 6
REF. NO.: 115-55
PRE-BID MEETING MINUTES
TO: Prospective Bidders
DATE: July 30, 2025, 1:00 PM
SUBJECT: Contract 2025-01: Wastewater Treatment Plant Access Bridge Replacement
COURTESY COPY: City of St. Marys, St. Marys Area Water Authority
CITY OF ST. MARYS
CONTRACT NO. 2025-01
WASTEWATER TREATMENT PLANT ACCESS BRIDGE REPLACEMENT
1. Introductions
A. City of St. Marys
B. KLH
2. Scope of Work – Refer to Sections 01000 and 01020
A. Work under Contract No. 2025-01 covers the furnishing of all labor, material, plant, utilities, and services required for the construction of a new precast adjacent box beam and concrete abutment wall bridge. The project is located in City of St. Marys, Elk County, PA. The work is shown on the Contract Drawings.
3. Bidding Requirements – Refer to Section B, Instructions to Bidders
A. Copies of the Bidding Documents for the described work may be obtained online at no cost via the PennBid Program (https://pennbid.bonfirehub.com).
B. Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Messages/Vendor Discussions” feature in PennBid.
C. Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com).
D. Bid Security shall be made payable to the City of St. Marys, in an amount of not less than ten percent (10%) of the Bidder's maximum Bid price.
4. General Contract Information
A. Contract Duration - Contract must be substantially complete within 365 days.
B. Liquidated Damages - $650 per day - Refer to Section J.
C. All excavations are to be considered unclassified. Contractors are to bid accordingly.
https://pennbid.bonfirehub.com/ https://pennbid.bonfirehub.com/
D. Prevailing Wages - Refer to Section F.
E. Pennsylvania Steel Product Procurement Act - Certification must be included with all impacted shop drawings.
F. Submittals - Refer Section 01300. Submittals can be sent via email to Sam Gibson (sgibson@klhengineers.com).
G. Lump Sum Bid.
H. Resident Observer - No construction activities are to occur without the RO on-site.
I. Maintenance Bond - 18 months from the completion and acceptance of the Project.
J. Role of the General Contractor – The Contractor is designated as the Coordinating Contractor and shall coordinate all work between all parties. See Section 01040. The Contractor is responsible for the overall scheduling, expediting, site supervision and all other duties required to maintain orderly construction. The Coordinating Contractor shall develop and maintain a project schedule throughout construction.
K. Maintaining System Operations – At no time are the operations to the existing Wastewater Treatment Plant to be impacted by construction activities without the knowledge and consent of the City of St. Marys and plant personnel.
L. All work must be performed within the existing rights-of-way, and within the Limit of Disturbance shown on the Contract Drawings. The Contractor is required to obtain the necessary easements for work on property not included in the Limit of Disturbance.
M. Safety and Security – This will be the responsibility the Contractor during the duration of all construction activities.
N. Engineer’s Estimate of Probable Project Cost: $1,560,000.00
5. General Information
A. Geotechnical Investigation Report – Refer to Appendix A.
B. General Permits (GP-3 Bank Rehabilitation, Bank Protection and Gravel Bar Removal, GP-11
Maintenance, Testing, Repair, Rehabilitation, or Replacement of Water Obstructions and Encroachments) – Refer to Appendix B.
6. Addenda
A. Addendum No. 1 will include the Minutes and sign-in sheet from this Pre-Bid Meeting. Engineer will transmit to all prospective Bidders of record such Addenda, as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
7. Bid Opening
A. Date - 11:00 AM local time, Tuesday, August 12, 2025, via PennBid. Bid Results will be uploaded as a Public Notice on PennBid.
mailto:sgibson@klhengineers.com
8. Bid Award
A. It is anticipated that a recommendation of award for Contract 2025-01 will be made to the City of
St. Marys at their August 18, 2025, meeting. The Notice to Proceed is anticipated to be issued by mid-November.
9. Pay Applications
A. Submission and processing of Pay Applications shall be as determined by the City of St. Marys in accordance with their monthly meetings.
10. Miscellaneous
A. Access to the Wastewater Treatment Plant during construction will be provided through the neighboring property. The Contractor shall coordinate all equipment and delivery access with the City of St. Marys and plant personnel.
11. Sign-In Sheet
A. The sign-in sheet is attached. Attendance at the Pre-Bid Conference was encouraged but not required.
12. Questions / Comments
A. Q: Is there a weight restriction on neighbor’s bridge?
A: No. Access through neighbor’s property to be coordinated between CONTRACTOR, OWNER, and neighbor.
B. Q: There appears to be a conflict between existing and proposed piles. How with this be addressed.
A: Refer to Addendum No. 1.
C. Q: If piles need to be extended beyond designed length/elevation, how will contractor be paid for additional length?
A: The bid form will be modified to request unit pricing per foot beyond specified base length/elevation.
End Minutes