B38233 emergency-purchase-final-cost-and-term-v-22-2.pdf

PDF 191 KB Posted

Attached to
24. IVHA-EMERGENCY FINAL COSTS -REPAIR OF SEWER SYSTEM
Solicitation number
24-497DVA-CENTR-B-38233
Issued by
Tazewell County, Illinois

About this file

This document is an Emergency Purchase Final Cost and Term report from the State of Illinois Chief Procurement Office for General Services. The report details the final costs and term for an emergency contract to A & W Plumbing and Heating to repair the sewer system at the Illinois Department of Veterans Affairs facility in Anna, Illinois. The final total cost of the contract was $70,000 over 11 days. The emergency contract was authorized under Reference Number 24-497DVA-CENTR-B-38037.

The report indicates that this was an emergency purchase made to address an urgent issue with the sewer system. No other details about the project scope or requirements are provided. The report simply documents the final costs and duration of the emergency contract.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Page of

EMERGENCY PURCHASE FINAL COST AND TERM

State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.22.2

EMERGENCY PURCHASE FINAL COST AND TERM

Final Cost and Term Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term Version 22.2 Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.

11.0.0.20130303.1.892433.887364

PageCount:
CurrentPage:
VendorZip: 62966
VendorState: IL
VendorCity: Murphysboro
VendorAddress: 11 Alliance Ave
Vendor: A & W Plumbing and Heating
AgencyZip: 62906
AgencyState: IL
AgencyCity: Anna
AgencyAddress: 792 North Main St
AgencyDivision: Anna
AgencyUniversity: IDVA
CurrentMasterPage:
MasterPageCount:
ReferenceNumber: 24-497DVA-CENTR-B-38037
FinalTotalCost: 70,000.00
FinalTotalTerm: 11 days
AuthorizedSignature:
TitleField: APO
PrintedName: Amanda Gray
Date: 7/26/2023

File details come from the government source that posted it. Updated .