B2613ADD2.pdf
PDF 11 KB Posted
- Attached to
- RECLAIMED WATER MAIN EXTENSIONS PHASE 6
- Solicitation number
- B-26-13
- Issued by
- Volusia County, Florida
About this file
This is an addendum to a construction contract for the City of DeLand, Florida, for the Reclaimed Water Main Extensions Phase 6 project (Bid No. 26-13). The addendum, dated May 27, 2026, clarifies and revises the project scope to specify construction of approximately 5,700 linear feet of reuse transmission main and 530 linear feet of reclaimed distribution mains to serve a portion of the Mallory Square subdivision. The project scope also includes pressure testing and leak repair of existing dry reclaimed lines within Mallory Square. The contract requires substantial completion within 150 days from the Notice to Proceed, with all remaining work to be completed within 30 days of Notice of Substantial Completion. Contractors are required to acknowledge receipt of this addendum on their bid proposals, and failure to do so may result in bid rejection. All contractors must inform subcontractors, suppliers, manufacturers, and other participating parties of the requirements outlined in this addendum.
The addendum takes precedence over the original contract documents, and all other contract provisions remain in full force and effect. No pricing terms, set-asides, incumbent information, or funding sources are specified in this addendum. The document serves as a clarification and correction to the original Instruction to Bidders, Description of Work, and Summary of Work sections, ensuring that all parties involved have a clear understanding of the project scope and schedule before submitting proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2613RCA.pdf | ||
| B2613Tabulation.pdf | ||
| B2613ADD5.pdf | ||
| B2613ADD4.pdf | ||
| B2613PriceSheetRevised.xlsx | XLSX spreadsheet | |
| B2613ADD3.pdf | ||
| B2613ADD1.pdf | ||
| B2613PriceSheet.xlsx | XLSX spreadsheet | |
| B2613Plans.pdf | ||
| B2613Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
RECLAIMED WATER MAIN EXTENSIONS PHASE 6
CITY OF DeLAND
BID NO. 26-13
MAY 27, 2026
The following items are clarifications, corrections or deletions to the contract documents. THIS
ADDENDUM TAKES PRECEDENCE OVER THE ORIGINAL PARTS OF THE
CONTRACT DOCUMENTS.
All the parts of the contract documents, not specifically modified by this or other addenda, remain in full force and effect.
Contractors shall thoroughly familiarize themselves with the contents of this addendum before submitting bid proposals. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
INFORM THE SUBCONTRACTORS, SUPPLIERS, MANUFACTURERS AND OTHER
PARTIES PARTICIPATING IN THE WORK OF APPLICABLE REQUIREMENTS IN
THIS ADDENDUM.
Contractors shall acknowledge receipt of this addendum, identified by number and date, on their bid proposal. Failure to acknowledge receipt of addendum may be grounds for rejection of the bid proposal.
1. Project Description in Section 000100 – Instruction to Bidders Part 1 Item 1.1 A should be revised to state the following: The work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services, and incidentals and performing all work necessary to construct Reclaimed Water Main Extension Phase 6. Construction of approximately 5,700 Linear Feet of reuse transmission main and 530 Linear Feet of reclaimed distribution mains to serve a portion of the Mallory Square subdivision. Project also includes pressure testing and leak repair of existing dry reclaimed lines within
Mallory Square.
2. Section 00640 Description of Work should be revised to state the following: Construction of approximately 5,700 Linear Feet of reuse transmission main and 530 Linear Feet of reclaimed distribution mains to serve a portion of the Mallory Square subdivision. Project
3. Section 011100 – Summary of Work Part 1 Item 1.1A should be revised to state the following: This Contract is for the construction of the Reclaimed Water Main Extension
Phase 6. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: Construction of approximately 5,700 Linear Feet of reuse transmission main and 530 Linear Feet of reclaimed distribution mains to serve a portion of the Mallory Square subdivision. Project
4. Section 00300 Item 1.01 Completion Time of Contract and Section 00500 ARTICLE II A.
shall be revised to indicate the project shall be substantially completed within 150 days and all remaining work shall be completed within 30 days of Notice of Substantial Completion.
END OF ADDENDUM NO. 2