This document is a Performance Work Statement (PWS) for the repair and maintenance of B18 chillers at Joint Base Anacostia-Bolling in Washington, D.C. The scope of work includes repairing leaks on Chiller 1, performing annual routine maintenance on Chillers 1-4, and cleaning up any debris or materials generated during the work. The contractor is required to conduct electronic leak tests, tighten flanges and bolts, inspect the purge system and safety controls, change oil and filters, and report any deficiencies. The work is to be completed within 12 months from the date of award, and the contractor must provide a 12-month warranty on replaced parts. The contracting agency is the Department of the Air Force Headquarters District Washington.

View the file

Other files for this federal contract opportunity

Other files attached to B18 Chiller Repair, newest first.
File Type Posted
Combined Synopsis Solicitation_B18 Chiller Repair signed.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

FA5000‐XX-X-XXXX

PERFORMANCE WORK STATEMENT (PWS)

FOR

REPAIR AND PERFORM MAINTENANCE OF B18 CHILLERS

AT

JOINT BASE ANACOSTIA-BOLLING, WASHINGTON D.C.

05-SEP-24

Table of Contents

SECTION I3
1.0DESCRIPTION OF SERVICES3
1.1General3
1.2Scope3
1.3Background3
2.0Task Descriptions3
2.1Leak Repair3
2.2Annual Routine Maintenance3
2.3Clean Up3
SECTION III3
3.0COMMUNICATION3
SECTION IV5
4.0WARRANTY5

SECTION I

DESCRIPTION OF SERVICES

General This service will ensure cooling capabilities for twenty-six facilities across the installation.

Scope This work includes repairing the leaks found on Chiller 1 in Building 18 and performing annual routine maintenance service on Chillers 1,2,3 and 4.

Background During routine maintenance of Chiller 1 in Building 18, multiple leaks were identified. This will lead to failure of this Chiller and greatly reduce the plant’s capabilities to provide cooling for twenty-six facilities across the installation.

SECTION II

TASK DESCRIPTIONS

Leak Repair:

· Repair the leaks previously found on Chiller 1. Purge connection, solenoid valves, and evaporator charging valves. Evacuate the system refrigerant and recharge the Chiller with recovered refrigerant. Trim the charge with 300 pounds of new R123 refrigerant. Finally, reinsulate all areas that were removed due to leak check.

Annual Routine Maintenance:

· Electronic leak test as required and report minor leaks. Tighten all exposed flanges and seal all bolts. Inspect purge system and inspect and calibrate safety controls. Change oil & purge filters. Report any uncorrected deficiencies noted. Condenser tube cleaning provided machine is flanged so that heads can be readily removed, and valves are in good operating condition.

Pick up and clean after completing the duct cleaning:

· The Contractor will clean up any debris, dust, or other materials that may have been generated during the duct cleaning process. They will also dispose of any waste materials adequately, ensuring that the workspace remains clean and debris-free after cleaning.

SECTION III

COMMUNICATION

Project Kick-off Meeting: The Contractor must schedule and coordinate a project kick-off meeting no later than five (5) calendar days after the contract award. The meeting will provide an introduction between the Contractor and government personnel involved with the contract. The meeting will provide the opportunity to discuss technical, management, and logistic issues; travel authorization; communication process between government and Contractor; and reporting procedures. The Contractor shall provide a kick-off meeting agenda that will include, but not be limited to, the following:

· Introduction of personnel

· Overview of project tasks

· Review of organization (complexity)

· Invoice procedures

· POCs

· Roles and responsibilities

· Prioritization of contractor activities

· Other logistic issues

· Quality control plan (QCP)

· Sensitivity and protection of information Draft Agenda: The Contractor shall provide a draft copy of the agenda no later than three (3) days after the contract award for review and approval by the Contracting Officer Representative (COR). The government will provide the Contractor with the number of participants for the kick-off meeting, and the Contractor shall provide sufficient copies of the presentation for all present.

Communication with Incumbent Contractor and Government Personnel: The Contractor shall establish and maintain effective communication with the incumbent Contractor and government personnel for the period of the transition via weekly status meetings per the COR's direction.

Quality Control Program: The Contractor must develop and maintain an effective quality control program to ensure services are performed per the Performance Work Statement (PWS), applicable laws and regulations, and best commercial practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services, emphasizing those listed in this PWS.

3.5Reporting Labor Hours: The Contractor reports all labor hours, including subcontractor labor hours, via the Contractor Manpower Reporting Application (CMRA). The Contractor must report inputs for the labor executed during the performance period for each government fiscal year (FY), which runs from October 1 through September 30. The Contractor may direct questions to the CMRA help desk.
3.6Subcontractor Input in CMRA: Prime Contractors ensure all subcontractor data is reported. Subcontractors will not be able to enter any data into CMRA. However, they will enter their information into a Bulk Loader spreadsheet from the AF CMRA helpdesk. The subcontractor shall fill in columns A-C then return it to the AF CMRA helpdesk after it's completed, and a technician team will enter the information into CMRA.

0. Compliance with Physical Security, FOIA, FOUO, Privacy Act, and Records Management Requirements: The contractor is required to comply with all physical security, FOIA, FOUO, Privacy Act, and records management requirements.

0. Industry Standards, Federal, Local, and State Laws and Regulations: The contractor is required to comply with all industry standards, federal, local, and state laws and regulations.

0. Inherently Governmental Functions: The contractor shall not perform inherently governmental functions as defined in the Federal Acquisition Regulation (FAR) Subpart 7.5 in relation to this PWS.

Employment of US Government or Department of the Air Force Personnel: The Contractor shall not employ any person who is an employee of the US Government or the Department of the Air Force if employing that person would create a conflict of interest Supervision and Tasking of Contractor Employees: The government shall not supervise or task contractor employees in any manner that generates actions of the nature of personal services.

SECTION IV

WARRANTY COVERAGE:

The Vendor hereby warrants that all parts identified for replacement on the final invoice shall be covered for 12 months from the date of installation or delivery to the Customer unless otherwise specified in writing.

The Vendor shall provide a comprehensive Warranty Claim Procedure and relevant Operating Manuals to ensure that both the Customer's and Vendor's expectations are met.

The Warranty Claim Procedure shall include:

4.3.1Clear instructions on how to submit a warranty claim.
4.3.2Requirements for documenting the alleged defect, including providing photographs or other evidence as requested by the Vendor.
4.3.3Contact information for the Vendor's warranty department or designated representative.
4.3.4Timeframes for the resolution of warranty claims, including acknowledgment of receipt, investigation, and resolution.
4.3.5Details regarding any potential costs associated with the warranty claim process, including shipping, handling, or inspection fees.
4.4Customer Obligations: The Customer agrees to adhere to the Warranty Claim Procedure provided by the Vendor. Failure to follow the specified procedure may result in the rejection of the warranty claim.
4.5Vendor's Obligations: The Vendor agrees to promptly respond to all warranty claims submitted by the Customer in accordance with the Warranty Claim Procedure. The Vendor shall undertake reasonable efforts to remedy any defects covered under this warranty within a reasonable timeframe.
4.6Limitations of Warranty:This warranty shall not apply to any defects or damages caused by:
4.6.1Misuse, abuse, neglect, or improper handling of the parts by the Customer.
4.6.2Unauthorized modifications or alterations made to the parts.
4.6.3Act of Nature or circumstances beyond the Vendor's control.