B1619 Reno A3 Submital Register 17May22.pdf
PDF 608 KB Posted
- Attached to
- Building 1619 Renovation at NAS JRB Fort Worth
- Solicitation number
- FA667522R0006
About this file
This document provides details for a federal construction contract opportunity to renovate an existing building at Naval Air Station Joint Reserve Base Fort Worth to create space for security forces and investigative offices. Key requirements include demolishing the existing interior space and upgrading building systems for full accessibility compliance. The renovation and construction work must follow provided design specifications and drawings. Interested contractors can attend an optional site visit on June 29 and must submit fixed price proposals by July 22 to be considered for the single contract award. The project value is estimated between $3 million to $6 million, setting it as a 100% small business set-aside. The North American Industry Classification System code is 236220 with a small business size standard of $39.5 million. The solicitation will be posted on SAM.gov and contractors must register in SAM to receive notifications or be eligible for award. The requirement is currently unfunded so no award will be made until funding is available.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 60 PAGES
FA664318D0006
Renovate for Consolidated Security Forces Operations Center/AFOSI
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
SD-11 Closeout Submittals
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
1.5.3.1 GFinal Sustainability eNotebook
1.5.3.1 GAmended Final Sustainability
eNotebook
01 74 19 SD-01 Preconstruction Submittals
1.6 GConstruction Waste Management
Plan
SD-11 Closeout Submittals
1.8 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.5.1Warranty Management Plan
1.5.4Warranty Tags
1.4Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
01 78 00 SD-08 Manufacturer’s Instructions
1.5.1Instructions
SD-10 Operation and Maintenance
Data
3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.1.2 GRecord Drawings
1.5.1As-Built Record of Equipment and Materials
2.1 GCertification of EPA Designated
Items
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.3Receipts
02 85 00 SD-01 Preconstruction Submittals
1.2.25 GVentilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
02 85 00 1.4.1.3 GRespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 GCertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH)
Qualifications
1.4.1.6 GMicrobial Remediation Supervisor
Qualifications
SD-03 Product Data
1.2.11 GDisinfectants or Biocide
Sanitizing Solutions
1.2.14 GFungicidal Agents, (EPA)
1.2.20 GPersonal Protective Equipment
(PPE)
1.2.23Pressure Differential Measuring
Instrument
2.2 GSafety Data Sheets (SDS) for All
Materials
3.1.4Dehumidifiers
3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3 GIH Daily Reports
SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 30 53 SD-03 Product Data
2.2.3.1Air-Entraining Admixture
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
03 30 53 2.2.3.2Accelerating Admixture
2.2.3.3Water-Reducing or Retarding
Admixture
2.2.10Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
3.2Conveying and Placing Concrete
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.4.1Curing Compound
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.3.3.2Measurement of Floor Tolerances
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
1.5.1CPG for recycled materials or appropriate Waiver Form
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
03 30 53 2.4.1Curing Compound
04 20 00 SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.1.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2.1 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GBar Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.5 GBracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
3.6.1.4Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
2.2.2.1Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Bar Positioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
04 20 00 2.6.3Joint Reinforcement
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.2 SRecycled Content
05 05 20.00 27 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
2.1.1.5 GMechanical and Adhesive
Anchors in Masonry
3.1.3 GNon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
05 05 20.00 27 3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
05 05 23.16 1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
SD-05 Design Data
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.5.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
05 12 00 1.3AISC Structural Steel Fabricator
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 GSteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports
3.4Erection Inspection
3.4Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
05 30 00 2.2Accessories
2.1Deck Units
2.1.6Galvanizing Repair Paint
2.2.9Mechanical Fasteners
2.1.6Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 50 13 SD-02 Shop Drawings
2.5 GAngles and Plates
SD-03 Product Data
2.4 GDownspout Terminations
2.1 SRecycled Content
05 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
05 51 00 2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GCold-Drawn Steel Tubing
2.4.8 GGray Iron Castings
2.4.9 GMalleable Iron Castings
2.2.3 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
05 51 00 2.4.5 GHot-Rolled Carbon Steel Sheets and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GCold-Drawn Steel Tubing
2.4.8 GGray Iron Castings
2.4.9 GMalleable Iron Castings
2.2.3 GProtective Coating
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.1.3 GProtective Coating
2.2.2 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.3 GStructural Glued Laminated
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
06 10 00 SD-03 Product Data
1.8Fire-retardant Treatment
SD-05 Design Data
1.9.2 GModifications of Structural
Members
SD-07 Certificates
1.10.1Certificates of Grade
1.7Preservative Treatment
SD-10 Operation and Maintenance
Data
3.5Take-back Program
06 18 00 SD-02 Shop Drawings
2.1.1Fabrication Drawings
3.1.2 GInstallation Drawings
SD-04 Samples
1.3.3 GExposed-to-View Surfaces
SD-07 Certificates
1.3.2Glued-Laminated Structural
Members
1.3.2Structural Members
1.3.2Design Load Compliance
SD-08 Manufacturer’s Instructions
3.1.1Laminated Wood Materials
3.1.1Adhesive
06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
06 41 16.00 10 3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9.8.3Finish Schedule
1.5.3Certification
SD-04 Samples
2.3Plastic Laminates
2.5Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1 GSolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
06 61 16 2.1.1 SIndoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.2Sill Sealer Insulation
2.4Pressure Sensitive Tape
2.5Accessories
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
2.5.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 24 00 SD-02 Shop Drawings
3.3 GShop Drawings
SD-03 Product Data
2.5Thermal Insulation
2.2Adhesive
2.11Accessories
2.6Base Coat
2.7Portland Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 24 00 2.8Reinforcing Fabric
2.9Finish Coat
2.12Joint Sealant
2.10Sealant Primer
2.13Bond Breaker
2.14Backer Rod
1.4.5Insulation Board
1.7Warranty
SD-04 Samples
1.2.3.7 GSample Boards
SD-05 Design Data
1.2.1.2Wind Load
1.2.4Moisture Analysis
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
1.2.2.3Impact Resistance
1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
1.2.4Vapor Transmission
1.2.3.6Absorption-Freeze-Thaw
1.2.1.3Wall Fire Test
1.2.1.1Water Penetration
1.2.3.5Water Resistance
1.2.1.3Full Scale or Intermediate Scale
Fire Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 24 00 1.2.2.1Surface Burning Characteristics
1.2.2.2Radiant Heat
3.1Substrate
1.2.1.2Wind Load
SD-07 Certificates
1.4.1Qualifications of EIFS
Manufacturer
1.4.2Qualification of EIFS Installer
1.4.3Qualification of Sealant Applicator
1.4.4Qualifications of Third Party
Inspector
3.5.1 GInspection Check List
SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
1.7EIFS
07 27 36 SD-01 Preconstruction Submittals
1.9.1 GQualification of Manufacturer
1.9.2 GQualification of Installer
1.10 GQuality Control Plan
1.10 GSafety Plan
1.8.1 GFire Prevention Plan
1.8.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 27 36 SD-03 Product Data
2.1.2 GOpen Cell
2.4 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GThermal Barrier Materials
2.1.6 GAccessories
SD-06 Test Reports
1.5.3 GField Peel Adhesion Test
1.11.2 GPrimers
1.5.3 GFire-Ratings Of Thermal Barrier
Materials
1.5.3 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.3 GFlame Propagation Of Wall
Assemblies
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GOpen cell
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GThermal Barrier
2.2 GPrimers, Adhesives, and Mastics
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 27 36 SD-09 Manufacturer’s Field
Reports
1.10Core Samples
3.3.3Daily Work Record
07 41 63 SD-02 Shop Drawings
1.4.1 GRoofing Panels
1.4.1 GFlashing and Accessories
SD-03 Product Data
1.4.1 GFactory Color Finish
SD-05 Design Data
1.4.1Wind Design Analysis
SD-07 Certificates
2.3.1.2Fasteners
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.17 GGutters
3.1.18 GDownspouts
2.2.1 GGravel Stops and fascia
3.1.19 GSplash Pans
3.1.11 GBase Flashing
3.1.12 GCounterflashing
3.1.21 GFlashing at Roof Penetrations
and Equipment Supports
2.2.15 GReglets
3.1.16 GDrip Edges
3.1.20 GEave Flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 60 00 2.1 SRecycled Content
SD-03 Product Data
2.2.12 GCool Roof
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.1 GRoofing Panels
2.1 SEnergy Star Label for Steel
Roofing Product
2.1.1 SRecycled Content for Steel
Roofing Product
2.3Attachment Clips
2.4.1Closures
2.4Accessories
2.4.2Fasteners
2.4.3Sealants
1.7 GWarranty
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 61 14.00 20 2.1Panel
2.4Accessories
2.4.3Sealants
2.2Intermediate Support
SD-05 Design Data
1.5Design Calculations
SD-06 Test Reports
3.6Field Inspection
1.3.3Structural Performance
1.6.6Finish
SD-07 Certificates
1.6.3Manufacturer's Technical
Representative
1.6.4Installer's Qualifications
2.1 GCoil Stock
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8Information Card
1.7Warranty
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
07 84 00 SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.5 GFrames
2.3Accessories
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
08 14 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
08 14 00 2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
2.1.3 GSound Transmission Class
Rating
2.1.4 GFire Resistance Rating
SD-04 Samples
2.1Doors
2.3.6.4 GDoor Finish Colors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
2.1 SRecycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
08 31 00 SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
1.3.1 GAcoustical Ratings of Assemblies
08 34 01 SD-02 Shop Drawings
3.5 GInstallation
SD-03 Product Data
1.3Forced Entry Resistant
Components
3.5Installation
1.4Components
SD-07 Certificates
1.3 GForced Entry Resistant
Components
08 34 02 SD-02 Shop Drawings
3.3 GInstallation
SD-03 Product Data
1.4Bullet Resistant Components
SD-07 Certificates
1.4Bullet Resistant Components
SD-10 Operation and Maintenance
Data
1.4 GBullet Resistant Components
08 34 59 SD-02 Shop Drawings
2.1 GVault Door Unit
2.3 GDay Gate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
08 34 59 SD-03 Product Data
2.2Vault Door and Frame
SD-07 Certificates
2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions
3.1Installation
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.3 GFinish
2.1.1.2 SRecycled Content of Aluminum
Material
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.3Deflection
3.4.1Air Infiltration
3.4.4Condensation Resistance and
Thermal Transmittance
3.4.5Water Infiltration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
08 41 13 SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.10 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
SD-03 Product Data
2.2Metal Wall Louvers
3.1.2Door Louvers
SD-04 Samples
1.5 GWall Louver Samples
1.5 GDoor Louver Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
09 29 00 SD-03 Product Data
2.1.7Cementitious Backer Units
2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.3Water-Resistant Gypsum Backing
Board
2.1.5Abuse Resistant Gypsum Board
2.1.11Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.8 SVOC Content of Joint Compound
SD-04 Samples
3.2.14 GPredecorated Gypsum Board
SD-06 Test Reports
2.1.6.1 GASTM E90 Factory Test Report
3.7 GASTM E90 Factory Test Report
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 GIndoor Air Quality for Gypsum
Board
2.1.10 GIndoor Air Quality for Non-aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
09 29 00 2.1.10 GIndoor Air Quality for Aerosol
Adhesives
09 30 10 SD-03 Product Data
2.1.1 GPorcelain Tile
2.8 GCrack Isolation Membrane
SD-08 Manufacturer’s Instructions
3.8Manufacturer's Approved
Cleaning Instructions
09 51 00 SD-03 Product Data
2.2.1.1 SRecycled Content for Type III
Ceiling Tiles
2.3 SRecycled Content for Suspension
Systems
2.1.1Acoustical Performance
SD-04 Samples
2.2Acoustical Units
2.2.1.1Acoustical Ceiling Tiles
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Type III
Ceiling Tiles
2.2.1.1 SIndoor Air Quality for Type IX
Ceiling Tiles
2.2.2.1 SIndoor Air Quality for Humidity
Resistant Ceiling Tiles
2.5 SIndoor Air Quality for Adhesives
09 62 38 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
09 62 38 2.1 GStatic-Control Resilient Flooring
SD-08 Manufacturer’s Instructions
2.1 GStatic-Control Resilient Flooring
SD-10 Operation and Maintenance
Data
2.1 GStatic-Control Resilient Flooring
09 67 23.13 SD-02 Shop Drawings
2.1Installation Drawings
SD-03 Product Data
1.2.2Manufacturer's Catalog Data
SD-05 Design Data
1.2.3Design Mix Data
SD-07 Certificates
1.5.2Listing of Product Installations
1.5Referenced Standards
Certificates
SD-11 Closeout Submittals
1.6 GWarranty
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1 GCarpet
2.3 SIndoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 GCarpet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
09 68 00 SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1.2 SIndoor Air Quality for Carpet
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
3.2.5Sealant
SD-04 Samples
2.2 GColor
1.5.6 GTextured Wall Coating System
SD-07 Certificates
1.5.5.2 GQualification Testing
1.5.4Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
09 90 00 SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 14 00.20 SD-02 Shop Drawings
1.4.2 GDetail Drawings
SD-03 Product Data
2.1 GRoom Identification And
Directional Signage System
2.2 GStair Signage
2.3 GExit Door Tactile Sign
SD-04 Samples
1.4.1 GInterior Signage
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.3 GInstallation Drawings
SD-03 Product Data
2.1Cleaning and Maintenance
Instructions
2.9Colors And Finishes
2.2.2Anchoring Devices and Fasteners
2.2.4Hardware and Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
10 21 13 2.2.3Brackets
2.2.5Door Hardware
2.7Pilaster Shoes
2.2.4.2 GFinishes
2.9.2 GFinishes
SD-04 Samples
2.9 GColors and Finishes
2.2.4Hardware and Fittings
2.2.2Anchoring Devices and Fasteners
SD-07 Certificates
1.6Warranty
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
2.2 GCorner Guards
SD-04 Samples
2.2 GCorner Guards
SD-06 Test Reports
2.1.1.2Fire Resistance Rating
SD-07 Certificates
2.5 SIndoor air quality for adhesives
SD-10 Operation and Maintenance
Data
2.2 GCorner Guards
10 28 13 SD-02 Shop Drawings
2.1 GProduct Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
10 28 13 SD-03 Product Data
2.1 SRecycled content for stainless
steel toilet accessories
2.1.3 GItem A5030
2.1.5 GItem A5080
2.1.6 GItem A5083
2.1.8 GItem A5109
2.1.9 GItem A5110
2.1.10 GItem A5135
2.1.11 GItem A5145
2.1.12 GItem A5170
2.1.13 GItem A5175
2.1.14 GItem A5200
SD-10 Operation and Maintenance
Data
2.1.3 GItem A5030
2.1.5 GItem A5080
2.1.6 GItem A5083
2.1.7 GItem A5090
2.1.8 GItem A5109
2.1.9 GItem A5110
2.1.10 GItem A5135
2.1.11 GItem A5145
2.1.12 GItem A5170
2.1.13 GItem A5175
2.1.14 GItem A5200
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
10 44 16 SD-02 Shop Drawings
Part 2 GCabinets
2.2.2 GWall Brackets
1.4 GSchedule
SD-03 Product Data
Part 2 GCabinets
2.2.2 GWall Brackets
3.2.1 GReplacement Parts List
10 51 13 SD-02 Shop Drawings
2.1 GTypes
1.4 GLocation
3.1Installation
3.2Numbering system
SD-03 Product Data
2.2Material
2.3.4Handles
2.2.3Finish
2.3components
3.1Assembly
SD-04 Samples
1.5.1 GColor chips
10 56 13 SD-01 Preconstruction Submittals
2.1Shelving Units
SD-03 Product Data
2.1Shelving Units
2.2Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
10 56 13 3.2Installation instructions
SD-04 Samples
2.3Finish
SD-06 Test Reports
2.1Shelving Units
2.3Finish
14 21 23 SD-02 Shop Drawings
2.1 GElevator
1.2.1 GElevator Components
1.2.1 GElevator Machine
1.2.1 GElevator Controller
1.3.4 GWiring Diagrams
SD-03 Product Data
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GData Sheets
2.5.2 GElevator Microprocessor
Controller
SD-05 Design Data
1.2.3.2Heat Loads
1.2.3.1Reaction Loads
SD-07 Certificates
1.3.2 GPrice Lists
1.4Warranty
1.3.1.1Endorsement Letter
1.2.4Welders' Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
14 21 23 2.5.2.3 GElevator Controller Certification
SD-10 Operation and Maintenance
Data
2.1 GElevator
1.2.5 GMaintenance Control Program
(MCP)
2.5.2.2 GSoftware and Documentation
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
2.2.1 GPipe
2.3.1.2 GFittings
2.3.4 GValves
2.8.5 GRelief Valves
2.7 GSprinklers
2.3.3 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
21 13 13 2.8.6 GAir Vent
2.5.1 GHose Valve
2.1.2 GNameplates
SD-05 Design Data
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
3.7.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.9As-built drawings
22 00 00 SD-02 Shop Drawings
3.8.1 GPlumbing System
SD-03 Product Data
3.8.1.1 GBackflow Prevention Assemblies
2.6.2 GShower Faucets
2.4Fixtures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
22 00 00 2.4.1 SWaterSense Label for Flush
Valve Water Closet
2.4.2 SWaterSense Label for Urinal
2.4.4Wall Hung Lavatories
2.4.5Countertop Lavatories
2.4.6Kitchen Sinks
2.4.7Service Sinks
2.4.8 SEnergy Star Label for Wheelchair
Electric Water Cooler
2.6.2 SWaterSense Label for
Showerhead
3.8.1Plumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
23 05 15 SD-02 Shop Drawings
1.2Record Drawings
SD-03 Product Data
2.2Pipe and Fittings
1.7.1Valves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
23 05 15 2.4Valves
SD-05 Design Data
2.2Pipe and Fittings
1.7.1Valves
2.4Valves
SD-06 Test Reports
3.1Hydrostatic Tests
SD-07 Certificates
1.4.2List of Qualified Permanent
Service Organizations
1.2Listing of Product Installations
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data
2.2.5 GIsolators
SD-06 Test Reports
2.4 GType of Isolator
2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 48.19 SD-02 Shop Drawings
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
23 05 48.19 SD-03 Product Data
3.1 GCoupling and Bracing
1.2.4 GContractor Designed Bracing
3.6Anchor Bolts
SD-06 Test Reports
3.6 GAnchor Bolts
23 05 93 SD-03 Product Data
1.3 GEquipment and Performance
Data
SD-06 Test Reports
3.3.5 GFinal DALT Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
23 07 00 SD-02 Shop Drawings
3.2.2.4MICA Plates
2.3.1Recycled content for insulation materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-07 Certificates
2.2.1Indoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3Pipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
23 07 00 3.3Duct Insulation Systems
3.4Equipment Insulation Systems
23 08 00.00 20 SD-03 Product Data
2.1 GTest Equipment
SD-06 Test Reports
1.6 GPipe Flushing, Testing, And
Water Treatment Reports
3.7 GSeasonal Test Report
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
1.7.3 GProgramming Software
1.7.4 GController Application Programs
1.7.1 GConfiguration Software
1.7.2 GController Configuration Settings
1.1.1.3 GProprietary Multi-Split
Engineering Tool Software
2.2 GManufacturer's Product Data
SD-10 Operation and Maintenance
Data
3.5 GOperation and Maintenance
(O&M) Instructions
SD-11 Closeout Submittals
2.5 GEnclosure Keys
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 60 PAGES
Renovate for Consolidated Security Forces Operations Center/AFOSI
23 09 00 3.1.6.1 GPassword Summary Report
1.8.3 GCloseout Quality Control (QC)
Checklist
23 11 20 SD-02 Shop Drawings
1.5.1 GGas Piping System
SD-03 Product Data
1.5.1 GGas Equipment Connectors
1.5.1 GGas Piping System
2.1 GPipe Coating Materials
2.2.5 GTransition…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .