B12 Subcontracting Percentage Worksheet.pdf

PDF 17 KB Posted

Attached to
DUMPSTER AND DEBRIS DISPOSAL Federal contract opportunity
Solicitation number
140P3020R0044
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains a subcontracting percentage worksheet and details of a federal contract opportunity for dumpster and debris disposal services. The subcontracting percentage worksheet provides a template for prime contractors and subcontractors to calculate the percentage of work to be performed by subcontractors in accordance with FAR Clause 52.219-14.

The federal contract opportunity is a solicitation issued by the National Park Service National Mall Memorial Park seeking dumpster and debris removal services. Solicitation number 140P3020R0044 has a NAICS code of 562111 with a $41.5 million size standard. The opportunity is set aside exclusively for small businesses. The RFP seeks a firm-fixed price contract for an initial base year plus four option years. Offerors must have a DUNS number and be registered in SAM to be eligible for award. The point of contact is Sherri Miller at sherri_miller@nps.gov.

View the file

Other files for this federal contract opportunity

Other files attached to DUMPSTER AND DEBRIS DISPOSAL, newest first.
File Type Posted
B03 SCA Wage Determination.txt TXT text file
Sol_140P3020R0044.pdf PDF
B12 Bid Sheet.xlsx XLSX spreadsheet
A04 Statement of Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior

FAR Clause 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet

PRIME CONTRACTOR:

SUBCONTRACTOR:

SOURCE:

SOURCE:

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure jn (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE= %

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $ $

FRINGE BENEFITS* $ $

SUB TOTAL (A)$ (B) $

LABOR G&A** @ % $ $

TOTAL LABOR COSTS (C) $ (D) $

U.S. Department of the Interior
Subcontracting Percentage Worksheet

File details come from the government source that posted it. Updated .