B12 Subcontracting Percentage Worksheet.pdf

PDF 17 KB Posted

Attached to
DUMPSTER AND DEBRIS DISPOSAL
Solicitation number
140P3020R0044
Issued by

About this file

This document contains a subcontracting percentage worksheet and details of a federal contract opportunity for dumpster and debris disposal services. The subcontracting percentage worksheet provides a template for prime contractors and subcontractors to calculate the percentage of work to be performed by subcontractors in accordance with FAR Clause 52.219-14.

The federal contract opportunity is a solicitation issued by the National Park Service National Mall Memorial Park seeking dumpster and debris removal services. Solicitation number 140P3020R0044 has a NAICS code of 562111 with a $41.5 million size standard. The opportunity is set aside exclusively for small businesses. The RFP seeks a firm-fixed price contract for an initial base year plus four option years. Offerors must have a DUNS number and be registered in SAM to be eligible for award. The point of contact is Sherri Miller at sherri_miller@nps.gov.

View the file

Other files

File Type Posted
B03 SCA Wage Determination.txt TXT text file
A04 Statement of Work.docx DOCX document
B12 Bid Sheet.xlsx XLSX spreadsheet
Sol_140P3020R0044.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior

FAR Clause 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet

PRIME CONTRACTOR:

SUBCONTRACTOR:

SOURCE:

SOURCE:

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure jn (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE= %

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $ $

FRINGE BENEFITS* $ $

SUB TOTAL (A)$ (B) $

LABOR G&A** @ % $ $

TOTAL LABOR COSTS (C) $ (D) $

U.S. Department of the Interior
Subcontracting Percentage Worksheet

File details come from the government source that posted it. Updated .