B08d_Attachment_3_-_QASP_CATO_Deer_Managment_29_September_22.pdf
PDF 182 KB Posted
- Attached to
- CATO Deer Management BPA Federal contract opportunity
- Solicitation number
- 140P3023Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P3023Q0001_Amd_0005.pdf | ||
| Sol_140P3023Q0001_Amd_0004.pdf | ||
| Sol_140P3023Q0001_Amd_0003.pdf | ||
| Sol_140P3023Q0001_Amd_0002.pdf | ||
| Sol_140P3023Q0001_Amd_0001.pdf | ||
| B08g_Attachment_6_-_SCA_Wage_Determination_2015-4269_Rev20_27_June_22.pdf | ||
| B08c_Attachment_2_-_Annual_Report_Deer_Management.pdf | ||
| B08b_Attachment_1_-_Daily_Briefing_Form.pdf | ||
| B08e_Attachment_4_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08f_Attachment_5_-_Quote_Submission_Package.docx | DOCX document | |
| Sol_140P3023Q0001.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan Catoctin Mountain Park (CATO) White-Tailed Deer Management
6602 Foxville Road Thurmont, MD 21788 29 September 2022
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Catoctin Mountain Park (CATO) White-Tailed Deer Management. This plan sets forth the procedures and guidelines the National Park Service, Catoctin Mountain Park will use in ensuring the required performance standards or services levels are achieved by the contractor.
Purpose
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the Government pays only for the level of services received.
This QASP defines the roles and responsibilities of the Contracting Officer and the Contracting Officer’s Representative, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach
The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the National Park Service (NPS), CATO to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.
The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated Government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the Government to take advantage of the contractor’s QC program.
The Government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.
The Government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by CATO. The CO will designate one full-time Contracting Officer’s Representative (COR) as the Government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
The Contracting Officer’s Representative
The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are outlined in the Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid as agreed upon in the contract. Failure to meet the required service or performance level will result nonpayment until the work is performed to a satisfactory level.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Monitoring Techniques
In an effort to minimize the performance management burden, simplified surveillance methods may be used by the Government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
File Reviews – COR review contractor logs and reports typically performed on a monthly basis.
Random monitoring, which shall be performed by the COR designated inspector.
Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.
Customer Complaints - COR will keep track of customer complaints on a monthly basis.
Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO and COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels
The acceptable quality levels (AQLs) are outlined throughout the PWS and in the Performance Requirements Summary, where contractor’s performance is structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 – General Industry and working closely with and alongside NPS personnel for the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall performance at CATO.
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes.
Performance standards are expressed in the performance requirements summary may be assessed using the surveillance monitoring techniques previously identified.
Monitoring Forms
The Government’s QA surveillance may be reported using a monitoring form similar to the one on the final page of this document or communicated in an email. The completed form and/or email will document the Government’s assessment of the contractor’s performance under the contract to ensure that the required service results are being achieved.
The COR will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance
Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Reporting
At the end of each month, the COR may prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report will become part of the QA documentation. It will enable the Government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution
The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other Park personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
Issues arising from the performance monitoring processes
The Quality Assurance Report must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the
CO.
PERFORMANCE REQUIREMENTS SUMMARY
The Government shall inspect the contractor’s performance under this contract periodically through the service and when the contractor declares the service complete. The Government must do so to ensure that the contractor has performed in accordance with the performance standards. If the Government should find any performance deficiencies, the Contractor shall correct the deficiencies within 24-hours of written notification by the COR, Park POC, or CO.
Required
Services/Tasks (from PWS)
Performance Standard
Acceptable Quality Level
(AQL)
Method Used/ Frequency
Incentive (Positive and/or Negative)
(Impact on Contractor Payments)
Final Operations Plan Produced in Collaboration with NPS
Per PWS 3.1 100% Final Inspection Contractor is not permitted to mobilize, and Services cannot begin until the plan is approved by COR.
Final Safety Plan Produced in Collaboration with the NPS.
Per PWS 3.13 100% Final Inspection Contractor is not permitted to mobilize, and Services cannot begin until the plan is approved by COR.
Provide COR a Draft Shooting Schedule within 1 week of call
Per PWS 3.12 100% Final Inspection Deer culling services cannot begin until the plan is approved COR.
Submit Deer Cooperator Permit Package to MD DNR 30 days prior to culling activities
Per PWS 5.4 7th bullet point
100% Final Inspection Deer culling services cannot begin until permit is obtained.
Daily Briefing Attendance
Per PWS 3.7 100% Periodic Inspection Deer culling services cannot begin until briefing is complete with all in attendance.
Submission of Daily Briefing Sheet
Per PWS 3.8. 95% Periodic Inspection Contractor will not receive final payment until compliant.
Remove contractor property from park
Per PWS 3.11 100% Final Inspection Contractor will not receive final payment until compliant.
Area Cleanliness
Per PWS 5.4, 4th bullet point
100% Customer Feedback, Periodic, and Final COR inspection
Work will be STOPPED until condition is brought into compliance. No payment will be made until compliant.
Firearm and Ammunition Security
Per PWS 5.3 All bullet points
100% Customer Feedback and Periodic COR inspection
Work will be STOPPED until condition is brought into compliance.
Contractor Employee Conduct
Per PWS 5.4 95% No more than 2 reported instances in writing as outlined in
5.4 may occur per employee
Offending employee will be dismissed from the premises and shall not return for the remainder of the job.
Minimum 90% Deer Removal
Per PWS 3.2 100% Final Inspection The contractor shall provide all facts in writing that directly contributed to the contractor’s inability to achieve the goal and submit it to the COR for review and approval.
SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling File Review Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
| INTRODUCTION |
| Purpose |
| The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the perf... |
| This QASP defines the roles and responsibilities of the Contracting Officer and the Contracting Officer’s Representative, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, descr... |
| Performance Management Approach |
| The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the N... |
| Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates... |
| Performance Management Strategy |
| The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this c... |
| ROLES AND RESPONSIBILITIES |
| The Contracting Officer |
| The Contracting Officer’s Representative |
| IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| METHODOLOGIES TO MONITOR PERFORMANCE |
| Surveillance Monitoring Techniques |
| Customer Feedback |
| Acceptable Quality Levels |
| QUALITY ASSURANCE DOCUMENTATION |
| The Performance Management Feedback Loop |
| Monitoring Forms |
| The COR will retain a copy of all completed QA surveillance forms. |
| ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| Determining Performance |
| Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how... |
| Reporting |
| At the end of each month, the COR may prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report will become part of the QA documentation. It will en... |
| Reviews and Resolution |
| The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other Park personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the co... |
| The Quality Assurance Report must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance. |
| The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be i... |
PERFORMANCE REQUIREMENTS SUMMARY