Sol_140P3023Q0001_Amd_0002.pdf
PDF 202 KB Posted
- Attached to
- CATO Deer Management BPA Federal contract opportunity
- Solicitation number
- 140P3023Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P3023Q0001_Amd_0005.pdf | ||
| Sol_140P3023Q0001_Amd_0004.pdf | ||
| Sol_140P3023Q0001_Amd_0003.pdf | ||
| Sol_140P3023Q0001_Amd_0001.pdf | ||
| B08g_Attachment_6_-_SCA_Wage_Determination_2015-4269_Rev20_27_June_22.pdf | ||
| B08f_Attachment_5_-_Quote_Submission_Package.docx | DOCX document | |
| B08d_Attachment_3_-_QASP_CATO_Deer_Managment_29_September_22.pdf | ||
| Sol_140P3023Q0001.pdf | ||
| B08e_Attachment_4_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08c_Attachment_2_-_Annual_Report_Deer_Management.pdf | ||
| B08b_Attachment_1_-_Daily_Briefing_Form.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P3023Q0001 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PCR
Washington DC 20242-0001 1100 Ohio Drive SW Contracting Annex Acquisition Management Division DOI, NPS, NCR - Regional Contractin
PCR
Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division NPS, NCR - Regional Contracting
10/25/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/21/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to respond to vendor questions received to date, #5-8.
Period of Performance: 12/09/2022 to 12/08/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Brianna Jackson
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.
United States Department of the Interior
NATIONAL PARK SERVICE
Interior Region 1 - National Capital Area 1100 Ohio Drive S.W.
Washington, D.C. 20242
09 November 2022
National Park Service – National Capital Area
RFQ 140P3023Q0001
Deer Management BPA
Catoctin Mountain Park (CATO)
AMENDMENT 0002:
The purpose of this amendment is to respond to vendor questions received to date, #5-8:
Question #5:
Looking at the price sheet it shows 9 days total per year over 5 years does that mean your only allocated 9 days per year to complete project?
Response: The maximum number of days that could be allocated to complete the project is 9 days per year.
Question #6:
Also looking at the previous contracts there was two bids a few months apart were those totals what was awarded for each contract period that was listed, for the two periods of 2021? Or did those amounts cover more time then was shown on those previous contracts?
Response: Contract 140P3021C0006 had a modification that de-obligated funds. The contractor did not have to work as many days as we paid them for because they reached the goal.
Question #7:
I see this is broke down by day is it a paid total for the year or is it paid by the day for instance if the quota was met in 2 days would you only be paid the price per day for 2 days or would you still be paid total contract amount for that year beings it would be complete for the year and vice versa if the project takes long will the contractor be paid the same price per day beyond the 9 days till the quota is met I only ask because hunting can be very unpredictable and have alot of variables to complete something like this.
Response: If you complete the work in less days than were awarded then you would still be paid the awarded price. Contractor is responsible for culling a minimum of 90% of the proposed deer culling goal set forth by the deer survey. If less than 90% have been removed after working the number of awarded days, the contractor shall prepare a written statement outlining all facts that directly contributed to the contractor's inability to achieve the goal and submit it to the COR for review. If the reasoning is acceptable to the COR, the project will either end for the season or the COR may decide to award additional calls for days of work to reach the goal, not to exceed a total of 9 days per call. If the reasoning is not acceptable to the COR, the contractor will be asked to work more days without additional funding and if they do not, the COR may decide not to place any more calls on the BPA.
Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.
Question #8:
When would be the actual start of this contract performance period?
Response: A call will be issued against the BPA as soon as the BPA is awarded. Discussions with the park about bait and tree stand placement will take place in December. The contractor will be required to apply for a Maryland deer cooperator permit in December. The park will begin baiting in January with a start date for shooting as early as January 15.
All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .