Quality Assurance Surveillance Plan Summary
This is a Quality Assurance Surveillance Plan (QASP) for the National Mall and Memorial Parks Dumpster On-Call and Debris Disposal Contract issued by the National Park Service, U.S. Department of the Interior. The QASP provides a systematic framework for monitoring contractor performance in delivering dumpster and debris disposal services, establishing quality standards, surveillance methodologies, and performance evaluation procedures. The plan establishes that the contractor bears primary responsibility for implementing quality control measures to meet contractual requirements, while the Government maintains oversight through periodic inspections and documentation.
The QASP defines four key performance objectives tracked through specific surveillance methods: dumpsters must be delivered clean and in working condition (90% acceptable quality level via random visual inspection); pickups must be scheduled and accomplished with communication for each request (90% via COR 100% monitoring); areas around dumpsters and compactors must be maintained (90% via random visual inspection); and monthly reports must be accurate, legible, and timely (90% via COR 100% monitoring). Additional critical requirements include weight tickets and invoices submitted for COR approval (100% compliance), 24-hour response to pickup calls (90%), availability of project management personnel within two hours of notification (90%), maintenance of current point-of-contact listings and Quality Control Plans (100%), and OSHA safety compliance (90%). Performance is evaluated using a four-tier rating system ranging from "Substantially Above Standards" to "Below Standards," with documented surveillance conducted monthly through Contract Discrepancy Reports and contractor performance checklists submitted to the Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P3026Q0002_Amd_0003.pdf | ||
| B08f_Wage_Determination_DC_Rev_37_gov_0003.pdf | ||
| Sol_140P3026Q0002_Amd_0002.pdf | ||
| B08e_Q_A_Responses_-_Updated_0002.xlsx | XLSX spreadsheet | |
| Sol_140P3026Q0002_Amd_0001.pdf | ||
| Sol_140P3026Q0002.pdf | ||
| B08a_Performance_Work_Statement.pdf | ||
| B08b_DOL_WD_15-4281.pdf | ||
| B08d_Price_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – NAMA Recycling Program
TECHNICAL EXHIBIT
NATIONAL MALL AND MEMORIAL PARKS
DUMPSTER ON-CALL AND DEBRIS DISPOSAL
CONTRACT
Quality Assurance Surveillance Plan
August 2024
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 GENERAL
2.01 METHODOLOGY
2.02 SERVICE PROVIDER RESPONSIBILITY
2.03 GOVERNMENT RESPONSIBILITY
2.04 SERVICE PROVIDER NON-CONFORMANCE
2.05 CONTRACT PERFORMANCE REQUIREMENT
2.06 GOVERNMENT REMEDIES
3.0 QUALITY ASSURANCE REQUIREMENTS
4.0 QUALITY ASSURANCE METHODS
4.01 REQUIRED PERIODIC REPORTS
4.02 COMBINING METHODS
4.03 PERFORMANCE REQUIREMENTS SUMMARY
5.0 QUALITY ASSURANCE SURVEILLANCE SCHEDULE
5.01 QUALITY ASSURANCE EVALUATOR SCHEDULE
5.02 ACTUAL SURVEILLANCE
5.03 SURVEILLANCE DOCUMENTATION
1.0 INTRODUCTION
The Quality Assurance Surveillance Plan (QASP) is designed to assist the Government in monitoring the quality and quantity of services that may be provided by a government or a contractor organization. The plan must comply with the requirements of the contract.
The QASP consists of four sections:
Section 2.0, General, contains an overview of the quality assurance (QA) methodology, an outline of contractor and government responsibilities, a definition of non-conformance with quality requirements, and a discussion of remedies available to the Government.
Section 3.0, Quality Assurance Requirements, contains an overview and general description of the elements relating to the quantity and quality of the services required by the contractor. This section references contractual functional and performance requirements.
Section 4.0, Quality Assurance Methods, describes planned methods for monitoring compliance with the performance requirements. The Contracting Officer (CO) will use information from this section to decide on the level of quality assurance resources which can be supported.
Section 5.0, Quality Assurance Surveillance Schedule, provides a method for scheduling, conducting, and documenting quality assurance activities.
2.0 GENERAL
This QA has been developed to provide the governmental Quality Assurance Evaluators (QAEs) and Contracting Officer Representatives (CORs) an effective and systematic method for surveying selected functions described in the contract. The QASP is also intended to help the QAEs understand the significance of each requirement and its associated assurance procedure.
2.01 METHODOLOGY
This QASP provides a systematic method to evaluate the contractor's delivery of required services. The contractor's performance is evaluated on a variety of factors, including quality, quantity, timeliness, etc. This document identifies the various surveillance methods that, when properly utilized, assure the Government of satisfactory contractor performance. The QASP is not designed to provide the details of how the contractor accomplishes its work.
2.02 SERVICE PROVIDER RESPONSIBILITY
This QASP is based on the premise that the contractor, not the Government, is responsible for employing management and quality control activities to ensure the contractor meets the terms of the contract. The performance requirements and measures outlined in the contract reflect the fact that contractor’s performance will not be perfect and that unforeseen and uncontrollable problems do occur. Good management and the use of an adequate quality control plan (QCP), however, will allow the contractor to operate successfully within specified performance requirements.
2.03 GOVERNMENT RESPONSIBILITY
The Government's intention is to minimize the level of the Government’s involvement and give the contractor the responsibility to perform to, or exceed, contract standards. If the contractor’s performance is not satisfactory, and it appears that the contractor's quality control (QC) process has not produced the desired result, the QAE(s) has the option to increase the frequency of quality assurance surveillance to protect the Government's rights.
The contractor is the owner of the QC process and will institute procedures that, if followed, will produce the desired outcomes. The contractor is responsible for developing, implementing, and modifying this quality control process. The QAEs will vary the level of surveillance depending on the contractor's conformance to quality levels. The QAEs will use statistically valid samples to ensure that the contractor’s process is accomplishing the desired performance standards of the contract.
QAE(s) may base the level of contractor quality on the Standards Rating table:
Table 1: Standards Rating Table
Quality Level Explanation
Substantially Above Standards
Contractor exceeds most standards in performing required tasks and work is highly professional. Contractor solves problems with very little, if any, government involvement. Contractor is proactive and takes an aggressive approach in identifying problems and their resolution.
Above Standards Contractor exceeds some standards in performing required tasks. Contractor resolves problems with only minimal government supervision and assistance.
Contractor does not wait to be told about problems before resolving.
Meets Standards Contractor meets standards in performing required tasks. Contractor is able to solve basic problems. Contractor only seeks government assistance on complex unusual problems. Contractor shows initiative in problem resolution.
Below Standards Contractor does not meet requirements. Contractor is unable to solve problems and seeks government assistance for problem resolution.
2.04 SERVICE PROVIDER NON-CONFORMANCE
Any contractor’s non-conformance, in whole or in part, with contract requirements is a “defect.”
The terms “defective” and “discrepancy” are used in reference to a service output that does not meet the output’s associated standard as defined in the contract. If any government action or lack of action causes unacceptable performance which results in a defect, then these defects shall not be counted against the contractor. All costs associated with rework due to contractor defects are the responsibility of the contractor.
2.05 CONTRACT PERFORMANCE REQUIREMENT
When the contractor’s performance does not meet the minimum satisfactory rating, the COR will initiate a contract performance report. If the contractor receives a contract performance report, the contractor shall explain in writing within 14 calendar days why performance was unsatisfactory, how performance will be returned to acceptable levels, and how recurrence of the unsatisfactory performance will be prevented in the future.
If the contractor’s performance does not meet the minimum satisfactory rating within 30 days of issuance of the contract performance report or the performance falls below the minimum satisfactory rating twice within any six month period, the COR will initiate a repeat contract performance report. Just as for the contract performance report, the contractor shall explain in writing within 14 calendar days why performance was unsatisfactory, how performance will be returned to acceptable levels, and how recurrence of the unsatisfactory performance will be prevented in the future.
In addition to any other authority or recourse the CO may have, the CO may take any of the following actions if a contract performance report or a repeat contract performance report is sent to the contractor:
Require the contractor to present a response in person Require additional information or certification before fees are paid Unilaterally modify the Performance Requirement Summary (PRS) or Statement of Work
(SOW)
Perform the work through other means and deduct the cost from the contractor’s invoice Increase compliance inspection to be paid for by the contractor
2.06 GOVERNMENT REMEDIES
The contractor's failure to meet performance measures or failure to comply with regulations may result in other contract remedies. Contract remedies may include suspension or termination for cause, reduced payment, or a decision not to exercise contract options. The CO will determine the appropriate remedy for non-compliance based on his/her judgment and the severity of non-compliance. Contractor negligence will almost certainly result in contract default.
3.0 QUALITY ASSURANCE REQUIREMENTS
The contract specifies specific performance requirements that the contractor must meet. The QAE is responsible for knowing and understanding all of these requirements. Although all of the requirements in the contract are important, not all of them are equally critical to assuring the adequacy of the overall performance of the operation. These requirements are grouped below according to the PRS provided in Section 4.03 Performance Requirements Summary.
4.0 QUALITY ASSURANCE METHODS
This section provides an overview of the methods used to monitor the critical requirements.
Included in this discussion are the risks and benefits of each method and their appropriate usage.
This section also includes the Performance Requirements Summary (PRS), outlined below in paragraph 4.03. This table details where specific performance requirements are referenced in the contract, and defines performance measures, QA procedures, and the minimum satisfactory rating to be achieved by the contractor. The PRS will assist the QAE in ensuring that the appropriate performance standards are being measured and will provide standards against which the contractor will monitor its own performance.
4.01 REQUIRED PERIODIC REPORTS
The contractor shall submit regular, standardized periodic reports to the QAE(s) on the specific performance matters proposed in the QCP and referenced in the PRS. These reports are generally directed at overall program performance and not at the specifics of the PRS. These reports are an important first step in QA and must be received in a timely manner and then monitored closely.
Reviewing these reports will be the first means of monitoring the contractor's adherence to the contract and of measuring its performance against the PRS. The QAE(s) should review these reports when they are submitted and, as appropriate, request supporting or clarifying information. Required periodic reports will also be used to identify performance requirements that may need heightened scrutiny. If additional surveillance is needed, other monitoring methods should be used. The QAE(s) may want to use information gathered from report reviews to identify a special population from which to select files or property inspections for review. The QAE(s) may use information from the reports to select specific files or properties to review or inspect more closely. Similarly, if the contractor has consistently been rated "Substantially Above Standards" or “Above Standards” in its performance, QAE may choose to limit its review of the contractor to post-closing reviews only. The contractor shall comply with FAR 42.15, Contractor Performance Information.
The contractor shall assist the CO in its post competition accountability endeavors by performing the following activities:
1. Collecting statistics about its performance throughout the life of the contract or a letter of obligation
2. Submitting information for use in a Quarterly Report at the request of the CO to the Office of Management and Budget that details in-progress and completed competitions
3. Monitoring performance
4. The contractor shall track actual personnel costs, material and supply costs, and other specifically attributable costs for the purposes of post competition accountability.
4.02 COMBINING METHODS
The COR/QAE will monitor the contractor’s performance on a continuous basis for the full performance period. The sheer volume of service request actions to be provided by the contractor makes 100% inspections impractical. Therefore, the COR/QAE will use a combination of methodologies to monitor the contractor’s performance. The methodologies include random inspections and documented customer complaints using a Customer Complaint Record form.
The Customer Complaint Record form could include the following information:
1. Date and time of complaint;
2. Source of complaint (organization and /or individual(s));
3. A narrative description of the nature of the complaint;
4. The contract reference of compliant related services (including the PRS reference);
5. A determination if the complaint has validity (Yes / No);
6. Date the contractor was informed of complaint;
7. Any action taken by contractor;
8. The signature of person receiving and validating the complaint; and
9. Any closure responses to the complainant.
These various methods of surveillance are not mutually exclusive and, as noted, are intended to be used in conjunction with one another. The PRS will provide the QAE(s) with an effective method to monitor the activities of the contractor. The selection of these surveillance methods is intended to minimize the effort required on the part of the inspector. However, these methods will be reviewed from time-to-time and modified based on actual contractor performance.
4.03 PERFORMANCE REQUIREMENTS SUMMARY
Listed below in Table 2 are performance measures associated with specifically identified performance requirements.
Table 2: Performance Requirements Summary
Contract Reference
Performance Objective
Performance Standard Acceptable Quality Level
Surveillance Method
PWS (1.1,
1.6.7.5, 5.1.3, 5.2.11)
Dumpsters are as delivered, clean and in working condition
Accomplish per specifications and frequency schedule
90% Random visual inspection
PWS (1.1,
1.6.1.1, 5.1.1, 5.2- 5.2.7, 5.3.5)
Pickups are scheduled and accomplished, communication occurs for each
Accomplish per specifications and frequency schedule
90% COR to check 100% of the time
PWS (1.1,
1.6.4, 5.2.4)
Area around Dumpsters and Compactor are maintained
Accomplish per specifications and frequency schedule
90% Random visual inspection
PWS (1, 1.1,
1.3, 1.6.1.1, 1.6.11, 1.6.15.7, 2.1.5, 5.3, 5.3.2, 5.4.6, 5.4.10)
Monthly Reports are accurate, legible and on time
Accomplish per specifications and frequency schedule
90% COR to check 100% of the time
Contract Reference
Performance Objective
Performance Standard Acceptable Quality Level
Surveillance Method
PWS (1,
1.6.1.1, 5.3.1, 5.3.5, 5.3.6, 5.4.2-5.4.5, 5.4.10)
Weight tickets and invoices are emailed to the COR for approval to upload to IPP
Accomplish per specifications and frequency schedule
100% COR to check 100% of the time
PWS (1.4,
1.6.1.1, 5.3.1, 5.3.5, 5.3.6, 5.4.2-5.4.5, 5.4.10)
Weight tickets are legible and emailed to
COR
Accomplish per specifications and frequency schedule
100% COR to check 100% of the time
PWS
(1.6.10, 5.2.5)
Contractor responds to calls for pickup within 24 hours and communicates effectively and timely with CO and COR
Accomplish per specifications and frequency schedule
90%
COR to check 100% of the time
PWS
(1.6.1.1, 5.2.5, 5.2.7, 5.4.1)
To maintain effective communications
The PM or designated personnel are available to meet (in person or by telephone) with the CO or
COR:
within two (2) hours after notification
90%
CO / COR
complaint
PWS
(1.6.10)
To provide a current listing of POC(s)
Provide the CO a written list of key POC(s) and after changes are implemented to CO/COR
100% COR deliverable documentation
PWS
(1.6.2, 5.4.9, 5.4.9.1- 5.4.9.4)
To maintain a current Quality Control Plan revisit the QCP six
(6) months after award and annually thereafter
100% COR deliverable documentation
PWS
(1.6.4, 1.6.14)
To provide a safe working environment for employees and the surrounding environment
Fit equipment with required safety devices and/or require employees to wear the required personnel safety gear
90% Visual inspection
PWS
(1.6.4, 1.6.14)
To provide a safe working environment for employees and the surrounding environment
Abide by federal Occupational Safety & Health Administration (OSHA), state, and/or safety requirement
90% Visual inspection based on regulations / guidelines
5.0 QUALITY ASSURANCE SURVEILLANCE SCHEDULE
5.01 QUALITY ASSURANCE EVALUATOR SCHEDULE
The QAE will develop a monthly surveillance schedule based on the SOW and the methods described in above Section 4.0 and Table 2. Copies of the schedule shall be sent to the CO and to the CO Representative. The schedule shall be marked “FOR OFFICIAL USE ONLY” and shall NOT be provided to the contractor. Changes will be sent to the CO and the COR.
5.02 ACTUAL SURVEILLANCE
Actual surveillance, or inspections, will be comparable to the planned surveillance schedule with any deviations noted in writing. A reduced number of inspections increase the Government’s risk of defective contractor performance. Therefore, it is essential that the number of planned inspections be accomplished to maintain an effective quality assurance system.
5.03 SURVEILLANCE DOCUMENTATION
The QAE(s) will document the results of the surveillance on the appropriate contractor performance checklist. All discrepancies/defects will be annotated in a Contract Discrepancy Report (CDR). The CDR and the accompanying checklists and forms shall be submitted monthly to the Contracting Officer. This documentation will allow for the Government to:
1. Consistently document the progress / regress of the contractor.
2. Objectively survey the contractor. Surveillance of the contractor’s performance of the requirements is subjective in nature. Therefore, consistent documentation allows the evaluator to build more objectivity into the process.
3. Maintain performance documentation that will provide a legal basis to take action.
(Informal anecdotal evidence cannot be used to reward the contractor or to initiate corrective actions).
4. Maintain that the requirements in the contract are properly implemented and executed.