B08(c)_-_Attachment_2_-_SOW_Attachments_1-4_for_USPP_NYFO_MPU_Vessels.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- NYFO Marine Patrol Unit Vessel Maintenance
- Solicitation number
- 140P2124R0047
About this file
This document is a Statement of Work (SOW) for the maintenance of four marine vessels operated by the United States Park Police (USPP) New York Field Office (NYFO) Marine Patrol Unit. The SOW outlines the specific maintenance tasks and frequencies required for each vessel, which includes two 37-foot aluminum catamarans, one 32-foot aluminum V-hull, and two 44-foot aluminum catamarans. The maintenance requirements cover a range of services, such as bottom painting, anode replacement, engine and generator maintenance, and other scheduled inspections and repairs.
The related federal contract opportunity is a combined synopsis/solicitation (Solicitation Number: 140P2124R0047) issued by the Department of the Interior National Park Service for the NYFO Marine Patrol Unit Vessel Maintenance. This is a full and open competition with a NAICS code of 811490 - Other Household and Goods Repair and Maintenance and a size standard of $9 million. The contract is anticipated to be a Firm-Fixed Price award with a base year and four option years. The agency is seeking vendors who can provide the necessary labor and resources to perform the required maintenance services at a location near the Liberty District in Queens, NY.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
| ATTACHMENT 1 | ||
| USPP NYFO Marine Vessel #4 | ||
| Manufacturer: Moose Boats | ||
| Model Year: 2015 | ||
| Hull Information: 37 foot Aluminum Catamaran | ||
| Engine Information: Twin Cummins QSB 6.7 425HP. Turbo Diesel. | ||
| Drive Unit Information: Twin Disc Marine | ||
| Gear Propulsion: Hamilton Water Jet | ||
| Generator: Northern Lights 8KW, Diesel. | ||
| SOW Reference | Maintenance Service Item | Frequency |
| 2.1.1 | Bottom Paint with two (2) coats of Tri-Lux aluminum paint or equal (includes scraping and light sanding, haul and wash). This is the first haul out during the annual period of performance. | Annually |
| 2.1.2 | Replace ALL hull, engine and generator anodes. | Annually |
| 2.1.3 | Clean raw water systems. | Annually |
| 2.1.4 | Replace hydraulic pump V belts. | Annually |
| 2.1.5 | Replace engine V belts. | Annually |
| 2.1.6 | Inspect all hoses, clamps, pipes and electrical connections for excessive wear. | Annually |
| 2.1.7 | Adjust valves on engines and generator. Grease all Zerk fittings. | Annually |
| 2.1.8 | Replace engine coolant with manufacturer required additives and filter. | Annually |
| 2.1.9 | Haul, wash and inspect hull and clean sea chest screens. This is the second haul out during the annual period of performance and is in conjunction with reference 2.1.10. | Annually |
| 2.1.10 | Remove jet drives, disassemble, replace all Zincs w/Hamilton zinc kits, prime and paint with manufacturer's recommended paint, reassemble, install, and test. | Annually |
| 2.1.11 | Clean air intake system at each oil change. | Quarterly |
| 2.1.12 | Replace transmission filter and fluid. | Semi-annually |
| 2.1.13 | Replace fuel filters (engines and generator). | Quarterly |
| 2.1.14 | Replace Racor water separator filters (engine and generator). | Quarterly |
| 2.1.15 | Change oil with filter (engines and generator). | Quarterly |
| 2.1.16 | Certification in the Vessel Maintenance Log that the required work was performed IAW the SOW and respective manufacuturer's standards. | After each Service Item |
Attachment 2
| ATTACHMENT 2 | ||
| USPP NYFO Marine Vessel #5 | ||
| Manufacturer: Metal Shark | ||
| Model Year: 2015 | ||
| Hull Information: 32 foot Aluminum V Hull | ||
| Engine Information: Twin Yamaha 350, 4-stroke outboard | ||
| Generator: Northern Lights 5KW, Gasoline. | ||
| SOW Reference | Maintenance Service Item | Frequency |
| 2.2.1 | Bottom Paint with two (2) coats of Tri-Lux aluminum paint or equal (includes scraping and light sanding, sanding and preparation). This is the first haul out during the annual period of performance. | Annually |
| 2.2.2 | Replace water pumps on engines. Grease all Zerk fittings. | Annually |
| 2.2.3 | Pressure test and vacuum test lower unit. | Semi-Annually |
| 2.2.4 | Semi-annually, remove lower units. Pressure test, service, and replace raw water pumps. | Semi-Annually |
| 2.2.5 | Replace spark plugs. | Semi-Annually |
| 2.2.6 | Replace all anodes (hull, engines and generator). | Semi-Annually |
| 2.2.7 | Replace fuel filters. | Semi-Annually |
| 2.2.8 | Oil & filter change (engine and generator). | Quarterly |
| 2.2.9 | Replace coolant (generator). | Annually |
| 2.2.10 | Inspect propellers and replace annually. | Annually |
| 2.2.11 | Haul, wash, and inspect hull. This is the second haul out during the annual period of performance. | Annually |
| 2.2.12 | Winterize motors and generator | Annually |
| 2.2.13 | Certification in the Vessel Maintenance Log that the required work was performed IAW the SOW and respective manufacuturer's standards. | After each Service Item |
Attachment 3
| ATTACHMENT 3 | ||
| USPP NYFO Marine Vessel #6 | ||
| Manufacturer: Moose Boats | ||
| Model Year: 2013 | ||
| Hull Information: 44 foot Aluminum Catamaran | ||
| Engine Information: Twin Cummins QSB 8.3, 600 HP, Turbo Diesel. | ||
| Drive Unit Information: Twin Disc Marine Gear | ||
| Gear Propulsion: Hamilton Water Jet | ||
| Generator: Northern Lights 9KW, Diesel. | ||
| SOW Reference | Maintenance Service Item | Frequency |
| 2.3.1 | Bottom Paint with two (2) coats of Tri-Lux aluminum paint or equal (includes haul out, light scraping, sanding, and preparation). This is the first haul out of the annual period of performance. | Annually |
| 2.3.2 | Replace hydraulic pump V belts. | Annually |
| 2.3.3 | Clean raw water systems. | Annually |
| 2.3.4 | Replace engine V belts. | Annually |
| 2.3.5 | Inspect all hoses, clamps, pipes and electrical connections for excessive wear. | Annually |
| 2.3.6 | Adjust valves on engines and generator. Grease all Zerk fittings. | Annually |
| 2.3.7 | Replace engine coolant with manufacturer required additives and filter. Grease all Zerk fittings. | Annually |
| 2.3.8 | Haul, wash and inspect hull and clean sea chest screens. This is the second haul out during the annual period of performance and is in conjunction with reference 2.3.9. | Annually |
| 2.3.9 | Remove jet drives, disassemble, replace all Zincs with Hamilton zinc kits, prime and paint with manufacturer's recommended paint. Reassemble, install, and test. | Annually |
| 2.3.10 | Clean air intake system at each oil change. | Quarterly |
| 2.3.11 | Replace transmission filter and fluid. | Semi-annually |
| 2.3.12 | Replace fuel filters (engines and generator). | Quarterly |
| 2.3.13 | Replace Racor water separator filters (engine and generator). | Quarterly |
| 2.3.14 | Change oil with filter (engines and generator). | Quarterly |
| 2.3.15 | Certification in the Vessel Maintenance Log that the required work was performed IAW the SOW and respective manufacuturer's standards. | After each Service Item |
Attachment 4
| ATTACHMENT 4 | |||
| USPP NYFO Marine Vessel #7 | |||
| Manufacturer: SeaArk | |||
| Model Year: 2003 | |||
| Hull Information: 44 foot Aluminum V Hull | |||
| Engine Information: Twin Cummins QSM 11, 580HP, Turbo Diesel. | |||
| Drive Unit Information: Twin Disc Marine | |||
| Transmission: Twin Disc - Shaft Drive/Propeller | |||
| Generator: Northern Lights 9KW, Diesel. | |||
| SOW Reference | Maintenance Service Item | Frequency | |
| 2.4.1 | Bottom Paint with two (2) coats of Tri-Lux aluminum paint or equal (includes haul out, light scraping, sanding and preparation). This is the first haul out during the annual period of performance. | Annually | |
| 2.4.2 | Replace hydraulic pump V belts. | Annually | |
| 2.4.3 | Clean raw water systems. | Annually | |
| 2.4.4 | Replace engine V belts. | Annually | |
| 2.4.5 | Inspect all hoses, clamps, pipes and electrical connections for excessive wear. | Annually | |
| 2.4.6 | Adjust valves on engines and generator. Grease all Zerk fittings. | Annually | |
| 2.4.7 | Replace engine coolant with manufacturer required additives and filter. Grease all Zerk fittings. | Annually | |
| 2.4.8 | Haul, wash and inspect hull and clean sea chest screens. This is the second haul out during the annual period of performance and is in conjunction with reference 2.4.9. | Annually | |
| 2.4.9 | Remove/inspect propellers, replace with customer supplied spare propellers, and supply and install new shaft and | ||
| rudder anodes. | Annually | ||
| 2.4.10 | Replace transmission filter and fluid. | Semi-annually | |
| 2.4.11 | Replace fuel filters (engines and generator). | Quarterly | |
| 2.4.12 | Replace Racor water separator filters (engine and generator). | Quarterly | |
| 2.4.13 | Change oil with filter (engines and generator). | Quarterly | |
| 2.4.14 | Clean air intake system at each oil change. | Quarterly | |
| 2.4.15 | Replace all hull, engine and generator anodes. | Annually | |
| 2.4.16 | Certification in the Vessel Maintenance Log that the required work was performed IAW the SOW and respective manufacuturer's standards. | After each Service Item |
File details come from the government source that posted it. Updated .