B08_Transmittal.pdf
PDF 175 KB Posted
- Attached to
- Bike trail surface repair, Lake Mead, Nevada
- Solicitation number
- 140P8122R0007
About this file
This transmittal document outlines submittal requirements for a National Park Service contract to repair bike trails at Lake Mead National Recreation Area in Nevada. The contractor must submit items such as liners, closeout documents, and operation and maintenance requirements for review and approval according to the specified process and deadlines. The National Park Service Pacific West Region is the contracting agency responsible for the solicitation numbered 140P8122R0007 to repair bike trails at the park.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8122R0007.pdf | ||
| B08_Price_Schedule.pdf | ||
| A04_Specifications.pdf | ||
| B03_General_Decision_NV20220001.pdf | ||
| B08_Past_Performance_Questionnaire.pdf | ||
| B08_River_Mountain_Loop_Trail_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park: Project: Contract No.: Pkg. No.: Date:
Contractor: Subcontractor/Supplier:
NPS ACTION
Ite m
N o.
Specification Section No. P ar ag ra ph
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature Recommended By
Title Date Title Date I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments Action By Date Contracting Officer's Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From Contractor [__________], To Reviewer [__________], From Reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim
CM-16Rev. 4/00 (Formerly DSC-1)
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 2 of:
Park: Project: Contract No.: Pkg. No.: Date:
Contractor: Subcontractor/Supplier:
NPS ACTION
Ite m
Specification Section No. P ar ag ra ph
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16Rev. 4/00 (Formerly DSC-1)
| BB Lagoon Liners - Geomembrane Specs.pdf |
| Closeout and O&M Requirements.pdf |
| Template |
File details come from the government source that posted it. Updated .