B08-SOW_Replace_HVAC_at_Nelson_House_Carriage_House.docx

DOCX document 10 MB Posted

Attached to
Colonial National Historic Park, Yorktown VA - Rep
Solicitation number
140P4326R0025
Issued by

About this file

This is a Statement of Work (SOW) for the replacement of HVAC equipment at the Nelson House Carriage House (Chief Rangers Office) located at 209 Read Street, Yorktown, Virginia 23690, a circa 1732 two-story office building with basement totaling approximately 1,444 square feet. The work is sponsored by Colonial National Historical Park (COLO) under Project Manual COLO PMIS 226735, with an effective date of February 2, 2026.

The base work requires replacement of an existing 3-ton Trane heat pump air handler (Model# 4TEE3F40A1000AB) with equivalent equipment featuring minimum 8kW heat strips, and replacement of the existing 3-ton Trane heat pump condensing unit (Model# 4TWX6036A1000AA) with a high-efficiency equivalent-sized unit. The contractor must install a new service disconnect with voltage monitoring and surge protection, ensure proper refrigerant line sizing and insulation, test the system for proper operation and charge, and dispose of removed equipment in compliance with local and environmental regulations. Option 1 work includes installation of two commercial-grade thermostats with humidity and dehumidification control, replacement of the current Honeywell Zone Panel and Interface Module with new equipment capable of controlling two zones (upstairs and downstairs with separate thermostats), and verification of damper operation. All work must be performed during standard business hours (8:00 AM – 4:30 PM) while the facility remains occupied as a dispatch center. The contractor is responsible for verifying all site conditions, maintaining a clean work site, providing liability insurance, and delivering a one-year warranty against defects plus a five-year workmanship warranty. Final payment is contingent upon correction of all noted deficiencies and submission of closeout documentation, including a cut-sheet binder with all manufacturer product information.

View the file

Other files

File Type Posted
Sol_140P4326R0025_Amd_0002.pdf PDF
B09-Amd002-_RFIs_8-28_0002.docx DOCX document
B09-Amend001_RFIs_1-7_0001.xlsx XLSX spreadsheet
Sol_140P4326R0025_Amd_0001.pdf PDF
Sol_140P4326R0025.pdf PDF
B03-WD-VA20260169-Mod2-5_18_26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLO PMIS 226735 February 02, 2026

COLONIAL NATIONAL HISTORICAL PARK

Yorktown, Virginia Replace HVAC at Nelson House Carriage House (Chief Rangers Office) PROJECT MANUAL Summary of Work

NATIONAL PARK SERVICE

February 02, 2026

STATEMENT OF WORK

Replace HVAC at Nelson House Carriage House (Chief Rangers Office) 209 Read St. Yorktown VA 23690 Colonial National Historical Park (COLO) Virginia

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This contract provides for the replacement of existing 3-ton Trane heat pump air handler (up-flow, multi speed w/8kw aux heat model# 4TEE3F40A1000AB) & existing 3-ton Trane heat pump condensing unit (MODEL# 4TWX6036A1000AA). Newly installed equipment will be connected to a new zone control system. New control zone system will allow for control zone 1 upstairs and zone 2 downstairs. Installation of 2 new thermostats to connect to system is also required.

1. The building is a two-story office with an additional basement. The structure was built circa 1732. SF is approximately 1,444.

2. The building will be occupied during this contract and serves as a dispatch center for COLO.

B. The contract work includes:

Base Work:

· Replacement of existing 3-ton Trane heat pump air handler (up-flow, multi speed w/8kw aux heat model# 4TEE3F40A1000AB) with equivalent in size equipment and with a minimum 8kw heat strips.

· Mount the indoor air handler securely in location of the current air handler, tie into existing duct work.

· Replacement of existing 3-ton Trane heat pump condensing unit (MODEL# 4TWX6036A1000AA) with high efficiency equivalent sized unit.

· Position the outdoor condenser in location of current condenser. Outside consider unit should be elevated at least 4 inches above the current pad.

· Line set should match manufacturers’ unit size. If needed for replacement or identified decencies run necessary insulated refrigerant lines, electrical wiring and conduits, and drainage tubing. Flush line set if not replacing the entire line set.

· Test system for proper operation and refrigerant charge.

· Install new service disconnect, appropriately sized with voltage monitoring and surge protection.

· All newly installed equipment must be of same manufacturer and capable of working efficiently together.

· Properly dispose of all removed equipment following local regulations and environmental guidelines.

· Ensure system functions correctly.

Option 1 Work:

· Provide and Install 2 Commercial Grade Thermostats that can control humidity and dehumidification to replace current thermostats.

· Replace Current Honeywell Zone Panel and Honeywell Interface Module with new Zone Panel and Interface Module that controls/communicates with new equipment

· Ensure operation of current dampers to allow system to function with 2 different thermostats (1 Upstairs and 1 Downstairs)

· Properly dispose of all removed equipment following local regulations and environmental guidelines.

· Ensure system functions correctly for the 2 different zones.

C. All work will be performed under a single contract.

D. Work and materials shall adhere to the following mitigations:

1. All Parts and Equipment must operate effectively and efficiently together.

2. Materials shall be stored at work location.

1.02 LOCATION AND ACCESS

A. The project site is located at 209 Read St. Yorktown VA 23690.

1.03 CONTRACTOR-FURNISHED ITEMS

A. The Contractor shall furnish all necessary supervision, personnel, equipment, transportation, materials, and incidentals required to complete the contract requirements.

B. Contractor shall provide proof of liability insurance for all personnel working in completion of this project.

1.04 WORK CONDITIONS AND LIMITATIONS

A. FACILITY USE

1. There are open public restrooms within walking distance of work location.

B. REQUIRED PERFORMANCE PERIOD

1. Work performance period is to be determined; all work shall be performed between 8 AM – 4:30 PM.

C. CONTRACTOR’S USE OF PREMISES

1. Confine on-site material storage, equipment and vehicle parking, and staging to paved parking areas or other areas specifically designated by the Contracting Officer’s Representative (COR).

2. Keep job site clear of trash and debris. Dispose of any trash, debris and other unusable material legally at authorized facilities on non-Federal land.

D. FIELD VERIFICATION

1. The measurements and quantities specified are estimates and provided for information only. The Contractor must verify all locations, dimensions and conditions affecting the work.

1.05 QUALITY ASSURANCE

A. All proposed materials and methods must meet or exceed the current local, state, and federal codes, standards, and regulations applicable to the contract work.

B. All personnel performing work shall be fully qualified and experienced in the type of work they will execute.

1.06 WARRANTIES

A. Building components: Minimum 1-year warranty against defects. Provide a minimum 5-year warranty for workmanship.

B. Prior to beginning work, report to the COR any conflict in warranty requirements, work scheduling or material availability before proceeding with the work.

1.07 MATERIAL HANDLING

A. Deliver materials to the job site as per COR instructions. Comply with all manufacturers’ recommendations for storage, protection and handling.

PART 2 - MATERIAL

2.01 GENERAL

A. Use new materials except as otherwise approved by the Contracting Officer (CO).

2.02 REQUIRED SUBMITTALS AND APPROVALS

A. LIST OF REQUIRED SUBMITTALS

1. Contractor Liability Insurance

2. Warranty Information

B. CHANGES TO MATERIAL REQUIREMENTS

1. Any proposed changes by the Contractor to the construction materials shall be submitted in writing to the COR

PART 3 - EXECUTION OF WORK

3.01 GENERAL

A. SERVICE INTERRUPTION

1. Indicate by work schedule expected periods of construction to avoid conflict with operations.

B. SITE INVESTIGATION

1. The Contractor is responsible for investigating site conditions in the vicinity of the required work for any hazards or obstacles which may increase time or cost of the work.

C. CHANGES TO CONSTRUCTION METHODS

1. Any proposed change by the Contractor to the specified construction methods and manufacturer’s instructions must be submitted in writing to the CO along with the justification for the proposed change. Approval from the CO is required for changes in specified construction methods.

D. PROTECTION OF WORK SITE

1. Work site is not protected and is open with no fencing.

2. Maintain the work area and approaches clean and free from trash and debris to reduce interference with ongoing maintenance operations.

3. Provide a safe bypass for NPS employees, and contractor’s personnel.

3.02 PROJECT CLOSEOUT

A. CLEANUP

1. Remove all tools, equipment, excess materials, construction debris, and trash from the project site. Leave project site clean and ready for use at the time of final inspection.

2. Legally dispose of all excess and unusable materials at authorized disposal facilities.

B. FINAL INSPECTION AND ACCEPTANCE OF WORK

1. When all work including any site restoration and cleanup has been completed, the Contractor shall contact the COR to arrange the final inspection.

2. The Contractor shall be notified of any deficiencies found during the final inspection. After all deficiencies have been corrected and all required closeout submittals have been forwarded to the COR, the CO will issue a letter of final acceptance and request the release of claims.

C. CLOSEOUT SUBMITTALS

A. Provide to the COR the following closeout submittals and any other closeout submittals required by the CO:

1. Cut-Sheet Binder: Submit one binder with all manufacturer product information and cut-sheets for all materials installed under this contract. Label binder with project title and include one “contents” page.

PART 4 – PAYMENT

1. Final payment shall be processed upon confirming all noted contractor performance deficiencies have been satisfactorily corrected.

PART 5 – POC’s

1. COR will be assigned at contract award.

Statement of Work (SOW)

Attachment A

Project Site Map

Attachment B

Photos of Existing Conditions image3.png image4.png image5.png image6.png image7.png image8.png image1.png image2.png

File details come from the government source that posted it. Updated .