B08_Solit_140P2021R0056_-_Attachment_1_-_Combined_Specifications.pdf

PDF 28 MB Posted

Attached to
NAMA 303091 Rehabilitate Lower Level of the Jeffer
Solicitation number
140P2021R0056
Issued by

About this file

This solicitation seeks proposals to rehabilitate the lower level of the Jefferson Memorial, modernize an elevator, and provide accessible walkways at various National Park Service sites. The Department of the Interior National Park Service National Office issued Solicitation Number 140P2021R0056 to rehabilitate the lower level, modernize the elevator at the Jefferson Memorial, and provide accessible walkways. Proposals are due by the dates specified in the Combined Specifications attachment. The contractor will be expected to complete the projects by the dates outlined in the awarded contract.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL MALL AND MEMORIAL PARKS

WASHINGTON, D.C.

PMIS NO. 303091: REHABILITATION OF THE THOMAS JEFFERSON

MEMORIAL LOWER LEVEL & EXHIBITS

REHABILITATION AND MODERNIZATION OF THE THOMAS

JEFFERSON ELEVATOR AND INSTALL ABAAS-COMPLIANT

PATHWAYS AT THE THOMAS JEFFERSON MEMORIAL

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

FINAL CONSTRUCTION DOCUMENTS

July 1, 2021 winemiller Image winemiller Image

DLP

Snapshot

DLP

Snapshot

DLP

Snapshot

DLP

Image

DLP

Snapshot

NAMA - 303091 TOC-1

TABLE OF CONTENTS

REHABILITATION OF THE THOMAS JEFFERSON MEMORIAL LOWER LEVEL AND

EXHIBITS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 11 00.01 Special Construction Conditions

01 26 01 Contract Modification Procedures

01 27 00 Definition of Contract Line Items

01 31 00 Project Management & Coordination

01 32 16 Construction Schedule

01 32 33 Photographic Documentation

01 33 23 Submittal Procedures

01 35 23 Safety Requirements

01 35 91 Historic Preservation Treatment Procedures

01 40 00 Quality Requirements

01 42 00 Reference Standards

01 50 00 Temporary Facilities and Controls

01 57 19.11 Indoor Air Quality

01 57 19.12 Noise & Acoustics Management

01 57 23 Under an Acre Pollution Prevention

01 67 00 Product Requirements

01 73 29 Cutting and Patching

01 73 40 Execution

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

01 78 23 Operation and Maintenance Data

01 79 00 Demonstration and Training

01 81 13 Sustainable Design Requirements

01 91 14 Total Building Commissioning

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Selective Demolition

02 41 13 Selective Site Demolition

02 81 00 Transportation and Disposal of Hazardous Materials

02 82 00 Asbestos Remediation

02 82 13 Asbestos Abatement

02 82 16 Engineering Controls for Asbestos-Containing Materials

02 82 33 Removal and Disposal of Asbestos-Containing Materials

02 83 13 Lead Hazard Control Activities

02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury

02 87 13 Mold Remediation

DIVISION 03 – CONCRETE

03 30 00 Cast in Place Concrete

NAMA - 303091 TOC-2

DIVISION 04 – MASONRY

04 20 00 Unit Masonry

04 40 50 Exterior Dimension Stone

04 42 00 Exterior Stone Cladding

DIVISION 05 – METALS

05 12 00 Structural Steel

05 31 00 Steel Decking

05 40 00 Cold Formed Metal Framing

05 52 13 Pipe and Tube Railings

05 70 00 Decorative Metal

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 21 00 Thermal Insulation

07 92 00 Joint Sealants

DIVISION 08 – OPENINGS

08 11 13 Hollow Metal Doors and Frames

08 11 16 Aluminum Doors and Frames

08 35 16 Folding Grilles

08 39 50 Forced Entry, Ballistic & Blast Resistant Door

08 41 26 All-Glass Entrances and Storefronts

08 43 13 Aluminum-Framed Storefront

08 71 00 Door Hardware

08 80 00 Glazing

DIVISION 09 – FINISHES

09 05 61 Common Work Results for Flooring Preparation

09 21 16 Gypsum Board Assemblies

09 22 16 Non-Structural Metal Framing

09 24 00 Cement Plastering

09 30 00 Tiling

09 51 00 Acoustical Ceilings

09 66 23 Resinous Matrix Terrazzo Flooring

09 68 13 Tile Carpeting

09 72 00 Column Covers and Wall Base

09 78 00 Interior Wall Paneling

09 91 23 Interior Painting

DIVISION 10 – SIGNAGE

NAMA - 303091 TOC-3

10 14 00 Signage

10 28 00 Toilet, Bath and Laundry Accessories

10 44 00 Fire Protection Specialties

DIVISION 11 – FURNISHINGS

12 36 00 Countertops

12 48 13 Entrance Floor Mats and Frames

DIVISION 13 – NOT USED

DIVISION 14 – CONVEYING EQUIPMENT

14 24 00 Hydraulic Elevators

DIVISION 15 THRU 20 – NOT USED

DIVISION 21 – FIRE SUPPRESSION

21 13 13 Wet Pipe Sprinkler Systems

21 13 16 Dry Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

22 11 29 Plumbing System Pumps

22 34 00 Domestic Water Heaters

22 40 00 Plumbing Fixtures and Equipment

DIVISION 23 – MECHANICAL

23 05 00 Basic Mechanical Material & Methods

23 05 48 Mech Sound & Vibration Control

23 05 93 Testing, Adjusting & Balancing

23 07 00 Mechanical Insulation

23 08 16 Commissioning of HVAC Systems

23 09 23 HVAC Instrumentation and Controls

23 20 00 Building Services Piping

23 31 13 Ductwork

23 33 00 Air Duct Accessories

23 34 16 Fans

23 37 13 Air Outlets and Inlets

23 63 00 Air Cooled Condensing Units

23 72 13 Energy Recovery Equipment

23 73 13 Modular Indoor Central Station Air Handling Units

23 81 26 Split System Air Conditioners

NAMA - 303091 TOC-4

DIVISION 26 – ELECTRICAL

26 05 00 Common Work Results for Electrical

26 05 19 Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 29 Hangers and Supports for Electrical Systems

26 05 33 Raceways and Boxes for Electrical Systems

26 05 43 Underground Ducts and Raceways for Electrical Systems

26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

26 05 53 Identification for Electrical Systems

26 05 72 Short-Circuit Study

26 05 74 Overcurrent Arc Flash Study

26 09 23 Lighting Control Devices

26 24 16 Panelboards

26 27 26 Wiring Devices

26 28 16 Enclosed Switches and Circuit Breakers

26 33 23 Central Battery Inverters

26 51 00 Interior Lighting

DIVISION 27 - TELECOMMUNICATIONS

26 05 28 Pathways for Communications

27 11 16 Cabinets, Racks, Frames and Enclosures

27 15 00 Communications Horizontal Cabling

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00.10 Common Work Results for Electronic Security

28 05 07.10 Power Sources for Electronic Security

28 05 31.10 Communications Equipment for Electronic Security

28 10 00 Access Control

28 20 00 Video

28 31 00 Intrusion Detection

28 31 11 Digital, Addressable Fire Alarm Systems

DIVISION 31 – EARTHWORK

31 10 00 Site Clearing

31 20 00 Earth Moving

31 23 19 Dewatering

31 25 00 Erosion and Sedimentation Controls

31 63 33 Drilled Micropiles

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 13 13 Concrete Paving

32 92 00 Turf and Grasses

32 93 00 Plants

NAMA - 303091 TOC-5

DIVISION 33 – UTILITIES

33 41 00 Storm Utility Drainage Piping

33 46 00 Subdrainage

DIVISION 29 THRU 49 - NOT USED

END OF CONTENTS

APPENDIX A - GEOTECHNICAL REPORT

APPENDIX B – PRE-ALTERATION HAZARDOUS MATERIAL SURVEY

APPENDIX C – SOIL DELINEATION SAMPLING REPORT

NAMA – 303091 01 11 00 - 1

091015 SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government Furnished Materials.

5. Contractor use of premises.

6. Public use of site.

7. Occupancy requirements for buildings.

8. Work Restrictions.

9. Special Construction Requirements.

10. Soils Investigation Report.

11. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Thomas Jefferson Memorial, 701 East Bain Drive SW, Washington, D.C. 20242

B. The Work consists of the following:

1. The Work includes reconfiguration of the lower level, including access from the exterior, the exhibit space, restrooms, bookstore, and utilities. The Work includes modernizing the existing hydraulic elevator, raising the floor level at the elevator lobby by 4”, creating two ramps to create an accessible route to the chamber level and the portico level from the elevator lobby.

2. The Work includes providing two symmetrical granite clad concrete sloped walkways (on either side of the Memorial) adjacent to the existing granite Terrace Retaining Wall, connecting the Lower Level Terrace to the Tidal Basin at the north side of the Memorial.

C. Project will be constructed under a single prime contract.

D. All Work to comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties (https://www.nps.gov/tps/standards.htm) and the Secretary of the Interior’s Standards for Historic Properties and Guidelines for the Treatment of Cultural Landscapes.

(https://www.nps.gov/tps/standards/four-treatments/landscape-guidelines/) https://www.nps.gov/tps/standards.htm

NAMA – 303091 01 11 00 - 2

1.3 WORK PHASES

A. The Work shall be conducted in two phases in the following order, with each phase substantially complete before beginning the next phase:

1. Phase 1: Work on the west side of the Memorial, including: exterior sloped walkways on the west side of the Memorial, concrete replacement on the west side of the lower terrace level, elevator rehabilitation work, elevator lobby work on the portico level, and the west side of the lower level.

a. Phase 1 shall be substantially complete 9 months after the Notice to Proceed.

b. During both phases of construction, the existing security cameras should remain operational. Contractor is required to clean camera of dust and debris daily or more often if required for the camera dome to stay clean. Refer to the security documents for additional information.

2. Phase 2: Work on the east side of the Memorial, including: exterior sloped walkways on the east side of the Memorial, concrete replacement on the east side of the lower terrace level, east side portico level work, and the work on the east side of the lower level.

a. Phase 2 Work shall be substantially complete, ready for exhibit installation, and ready for occupancy at time of Substantial Completion. Substantial Completion will be August 1, 2023.

b. During both phases of construction, the existing security cameras should remain operational. Contractor is required to clean camera of dust and debris daily or more often if required for the camera dome to stay clean. Refer to the security documents for additional information.

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.

B. Preceding Work: Government has awarded a separate contract for the following construction operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins.

1. Jefferson Memorial Roof & Portico Restoration. A separate contract has been awarded to Grunley Construction Co, Inc. to replace the non-historic membrane roofing systems at the colonnade and upper roofs, addressing the water infiltration issues at the marble portico roof, and cleaning and repointing from the top of the dome to the top of the column capitals.

Additionally, work will be completed in the attic spaces below the portico roof and at the underside of the portico and colonnade ceilings in order to repair previous water infiltration and other damage.

2. Jefferson Memorial Roof & Portico Additional Scope: A separate contract has been awarded to Grunley Construction Co, Inc. for the following work: clean biofilm from the marble on the Stylobate Steps, clean biofilm from the marble on the front entry steps, clean biofilm from the upper marble terrace wall, repoint vertical joints that are open or contain

NAMA – 303091 01 11 00 - 3

loose mortar, replace sealant joints, approximately 6 stone pin repairs, approximately 3’- 1” of injection crack repairs, and ACM removal.

C. Future Work: Government will award a separate contract for the following additional work to be performed at the site after Substantial Completion. Completion of that work will depend on successful completion of preparatory work under this Contract.

1. Thomas Jefferson Memorial, Lower Level Exhibits: A separate contract will be awarded for the exhibit design in the Lower Level and the Portico Level (east side).

1.5 GOVERNMENT-FURNISHED MATERIALS

A. Government will furnish products indicated.

1. Government will arrange and pay for delivery of Government-furnished items according to Contractor's Construction Schedule.

2. After delivery, Government will inspect delivered items for damage. Contractor shall be present for and assist in Government's inspection.

3. If Government-furnished items are damaged, defective, or missing, Government will arrange for replacement.

4. Contractor is responsible for receiving, unloading, and handling Government-furnished items at Project site.

5. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.

6. If Government-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.

7. Contractor shall install and otherwise incorporate Government-furnished items into the Work.

1.6 CONTRACTOR USE OF SITE

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to work areas as indicated on the site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations and material staging area to area indicated on the site plan.

2. Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet beyond building perimeter; 10 feet beyond surface walkways, paved plazas, surface parking, and utilities less than 12 inches in diameter; 15 feet beyond primary roadway curbs and main utility branch trenches; and 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.

B. Storage of Materials: Confine storage of materials to areas indicated on the site plans.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

NAMA – 303091 01 11 00 - 4

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with

Contracting Officer and remove agreed-on roots and branches that interfere with construction.

4. Contractor to consultant with the Park Landscape Architect and Supervisory Arborist about tree protection prior to installation of staging materials and after removal of staging materials.

5. Do not fasten ropes, cables, or guys to existing trees.

6. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

7. Due to the proximity of the Memorial to the Tidal Basin, all construction run-off must be

100% contained.

8. Contractor to maintain lawn/sodded area within staging and fenced areas, and locations where temporary facilities are located. Maintenance includes, but is not limited to, mowing, weeding, trash removal for pest control and general site “tidiness”, etc. Contractor to coordinate with the CO to determine the schedule for regular maintenance.

9. The Contractor shall restore any turf that is disturbed during construction in accordance with NAMA’s turf specifications.

D. Preservation of Cultural Features

1. All work to be performed with the utmost care and respect for the existing structure, including but not limited to temporary protection of historic architectural features. All work to follow the Secretary of the Interior’s Standards for the Treatment of Historic Properties (https://www.nps.gov/tps/standards.htm).

2. Prevent damage to the existing historic structure. Restore damaged areas, repairing or replacing building elements, as coordinated with the CO and at no additional expense to the Government.

3. Protect site features, including but not limited to the following:

a. Gates at the circular roadway entrance

b. Granite Curbs

c. Marble

d. Marble Terrace Wall

e. Granite Terrace Wall

f. Exposed aggregate paving

g. Post and chain fence

h. Bollards

i. Security Gate

j. Trees, Hedges, Vegetation

k. Historic Bronze Doors

l. Existing Stone (marble) floors

4. Do not remove or damage any building element not identified in the Contract Documents without prior approval from the Contracting Officer.

5. Do not fasten ropes, cables or guys to the existing structure.

6. Carefully supervise all work to minimize damage to existing structure.

7. Contractor to provide temporary protection to protect existing historic structure, building elements, etc. Contractor to choose temporary protection that does not impact the historic fabric and is removable.

E. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials unless otherwise agreed upon by the Contracting Officer.

https://www.nps.gov/tps/standards.htm

NAMA – 303091 01 11 00 - 5

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

F. Construction Camp: Establishment of a camp within the park will not be permitted.

G. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

1.7 PUBLIC USE OF SITE

A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.

Chamber Level of the Memorial to remain open to the public at all times during construction. The building will be open to the NPS at all times during construction. Sidewalk and pathway closures will be permitted, when required, upon specific approval of Contracting Officer for an amount of time as agreed upon with the Contracting Officer.

1.8 OCCUPANCY REQUIREMENTS FOR BUILIDING

A. Existing Building

1. Partial Government Occupancy: Government will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Contractor to maintain an accessible path for public use throughout the site and Memorial at all times, excluding the area designated for staging.

c. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period. Contractor is responsible for monitoring and correcting any situations caused by inclement weather.

d. Contractor is responsible for monitoring and correcting any situations caused by inclement weather as soon as possible.

e. In case of damage caused by inclement weather, the United States Park Police (USPP) and CO should be notified as soon as possible. This requirement stands 24 hours a day, 7 days a week.

NAMA – 303091 01 11 00 - 6

1.9 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests at least 7 days in advance of the work to the Contracting Officer for approval.

1. Although not Federal holidays, work may be restricted during the Cherry Blossom Festival (typically occurring annually from March 15th through April 8th), during the days surrounding Independence Day, and during the day of April 13th and the surrounding days.

Contractor should submit requests two weeks in advance of the work to the Contracting Officer for approval.

C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1. This includes proprietary language/signs on trailers, fences, etc.

1.10 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 6 a.m. to 6 p.m., Monday through Friday, except when otherwise indicated.

1. Weekend Hours: As approved by the Contracting Officer and USPP with 7 days advanced notice.

2. Early Morning Hours: As approved by the Contracting Officer.

3. Hours for Core Drilling: As approved by the Contracting Officer

4. Please note there may be unexpected work restrictions due to closures for visiting dignitaries, security reasons, or other unforeseen circumstances.

5. Work may be restricted during the Cherry Blossom Festival. This normally occurs between

March 15th – April 8th annually. Work may also be restricted on or around April 13th, which is the celebration of Thomas Jefferson’s birthday.

B. Existing Utilities

1. Existing Utilities: The NPS owns all utilities within the project site. Notify Contracting Officer of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

a. The contractor shall share utility location information with the Park and the Park’s

GIS specialist.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

NAMA – 303091 01 11 00 - 7

1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Hours for Utility Shutdowns: As approved by the Contracting Officer and limited to no more than eight (8) hours at a time.

D. Nonsmoking Building: Smoking is not permitted anywhere within the building or on site. This includes vaping and other substances.

1.11 ACCESS AND SECURITY

A. Summary

1. This section includes administrative and procedural requirements for instructing the contractor including the following:

a. Contractor personnel criminal history background checks.

b. Material and equipment screening.

c. Contractor access to project site and staging area.

d. Screening procedures for personnel and vehicles.

e. Prohibited items to project site.

2. Although the Thomas Jefferson Memorial and associated grounds experience a significant change in their day-to-day use and operations, additional security measures are needed during construction.

3. The goal is to ensure the safety and security of visitors, park staff, park resources, contractors, law enforcement and security resources throughout the duration of the project without producing any unnecessary burdens on the construction team or security personnel.

B. Security Overview

1. All United States Park Police (USPP) officers, contract security guards and K-9 units come at a cost to the government. Any additional days awarded to the contractor will have a direct impact on security requirements and needs.

2. There shall be a USPP K-9-unit station at the existing east security gate during construction deliveries Monday through Friday from 6:00 am to 10:00 am.

a. Personal Contractor vehicles are not allowed past the security gate.

b. All vehicles passing through the security gate are subject to USPP K-9-unit inspection each time the vehicles pass through the security gate.

C. Contractor Personnel Criminal History Background Checks

1. Security Criminal History Background Check

a. All employees of the Contractor including subcontractors, vendors and testing agencies shall be required to undergo a criminal history background check prior to accessing the project site.

1) Requirements shall also apply to the Governments A/E design and

Construction Management teams as well as testing agencies. Each employee shall fill out questionnaires and other forms required for criminal history background checks by the USPP.

b. Contractor shall submit criminal history background check paperwork in Division 1 submittals. Applications shall be received a minimum of six (6) weeks in advance of mobilizing on site. Subsequent (maximum 5 applications at a time) shall be received a minimum of 10 days in advance for any new personnel requiring access on site (no exceptions). The contractor to pay a $1,000.00 fee prior to submitting

NAMA – 303091 01 11 00 - 8

any applications to the security fund established by the government for this project.

The payment should be by check and written out to the United States Park Police.

D. Personnel, Material and Equipment Screening and Access

1. Background

a. All access to the Project Site will be through the existing east security gate located southeast of the Memorial off East Basin Drive SW (as indicated on the site plan).

1) Personnel must present identification at the existing security gate.

2) All vehicles and personnel are subject to screening of materials, bags, tools, vehicles and personal items, etc. by USPP.

2. Deliveries

a. General Procedures

1) All deliveries will enter through the existing east security gate as noted on the site plan.

2) Deliveries will be limited to a maximum of 4 hours a day (from 6:00 am – 10:00 am) 5 days a week.

3) All vehicles and materials will be inspected by a USPP (including K-

9-unit inspection) located at the gate upon arrival.

4) Contractor shall provide a list of deliveries including driver and passengers including subcontractors and suppliers a minimum of 48 hours prior to delivery. Drivers shall present a government issued ID (such as a driver’s license)

5) Contractor shall keep project team up to date on upcoming delivers on the three-week look-ahead construction schedule.

6) USPP requires seven (7) days advance notice for any schedule changes.

Schedule to be confirmed after award based on Contractor schedule input and as per 3-week look ahead schedule updates.

b. Screening Procedures

1) Access for all vehicles (including authorized and delivery vehicles) will only be available from 6:00 am -10:00 am Monday through Friday. USPP will consider request for screening after 10:00 am on a case-by-case basis with forty-eight (48) hours’ notice to the USPP.

1) All times listed above are subject to change.

2) All personnel shall power off and exit the vehicle/piece of equipment upon arrival on site.

3) The K-9 officer will conduct a sweep of the vehicle for explosives using his/her bomb detection K-9 unit and visual observation.

4) The K-9 officer will then conduct a visual and physical inspection of the interior of the vehicle and any accessible compartments (trunks, cargo boxes, storage boxes, etc.) for any prohibited items.

5) If the vehicle/piece of equipment passes inspection, the vehicle is allowed entry into the site.

6) The K-9 officer shall operate the drop gate to allow vehicular access

3. Short Term Visitors

a. Screening Procedures

1) Occasionally there will be a need for visitor access of non-credentialed personnel to the secure area. In order to facilitate access, the Construction Manager should notify USPP Icon Protection Unit (USPP_IPU@nps.gov) 24 hours in advance of the visit. The visitor will be subject to a full screening by security guards and USPP personnel. The visitor will also need to be escorted

NAMA – 303091 01 11 00 - 9

by the Construction Manager (or another person on the approved escort list) at times they are within the secure area.

b. Contractor furnished elements

1) Vehicle canopy

c. Prohibited Items

1) Contractor staff is not allowed to bring any of the following items onto the grounds and designated construction site:

1) Firearms or similar devices that expels a projectile through the action of an explosive

2) BB or pellet guns

3) Antique firearms

4) Flare guns

5) Realistic replica or toy firearms

6) Spear guns

7) Starter pistols

8) Stun guns, cattle prods, dart-firing stun guns, and other electronic weapons or controlled devices

9) Ammunition, shotgun shell or firearm cartridges, black powder, smokeless propellent powder

10) Slingshots

11) Axes and hatchets

12) Bows and arrows

13) Ice axe/ice picks

14) Throwing stars (martial arts)

15) Knives with a blade longer than 4 inches, including sabers, swords, daggers and other bladed devices with a blade of more than 4 inches

16) Billy clubs

17) Blackjacks

18) Brass knuckles

19) Nightsticks

20) Martial arts weapons, including nun chucks and kabatons

21) Blasting caps or detonators

22) Dynamite, nitroglycerin, trinitrololuene, ammonium nitrate and other explosives

23) Fireworks

24) Gunpowder

25) Hand grenades, mine, bomb, rocket, missile, pipe bomb, plastic explosives

26) Realistic replicas of explosives or similar devices

27) Mace, pepper spray, tear gas gun, or other chemical spray designed for self defense

28) Poisonous gases

29) Alcohol

30) Narcotics, including marijuana

31) Any other objects deemed dangerous by USPP that have no legitimate need for construction purposes

NAMA – 303091 01 11 00 - 10

1.12 VIBRATION RESTRICTIONS

A. Excessive vibration at Jefferson Memorial and the surrounding historic site is potentially detrimental to the existing building materials, landscape features, wildlife and visitor health and safety. Sources of vibration include, but are not limited to, construction activities, heavy traffic, helicopters, etc.

B. Vibration limits to mitigate the risk of damage to historic structures must be in accordance with the following Swiss standards SN 640 312a. Sources of vibration must be operated and located in such a fashion that peak particle velocities stay below the guideline values identified for buildings in the Sensitivity Class: (3) Normally Sensitive. Specific peak particle velocities are noted in the Vibration Criteria section below.

C. Vibration Sources: At a minimum, the contractor must address the following potential sources of vibration:

1. Demolition or demolition equipment, such as hammers or chipping guns.

2. Moving heavy equipment or materials with floor jacks.

3. Dropping heavy loads (off handcarts, from a crane or lift)

D. Vibration Mitigation Plan: The Contractor must provide a written vibration mitigation plan for approval by the Contracting Officer prior to starting any construction activity that may produce deleterious vibrations. This study must include the following sections:

1. Identification of existing finishes susceptible to damage caused by vibrations.

2. Descriptions of sources of vibrations and schedules.

a. Construction schedule of activities.

b. Equipment type, model, etc.

c. Purpose and location of use.

d. Duration of use.

3. Proposal for a vibration study of the existing conditions prior to the start of construction.

a. Proposal must address vibration concerns at the Memorial to the satisfaction of the

Contracting Officer.

b. Submit proposal for review and approval by the Contracting Officer prior to commencing study.

4. Results from the vibration study of existing conditions describing baseline conditions at the site with vibration monitoring recommendations during construction.

5. Methods planned to minimize vibration.

6. Vibration monitoring consultant contact and methodology.

E. Vibration Monitoring: The Contractor is required to continuously monitor vibration generated by construction activities. This testing must be undertaken by qualified personnel using non-destructive methods, such as triaxial geophone monitoring equipment (vertical, radial traversal) with a microphone. Monitors must have wireless capacity to transmit responses as quickly as possible.

1. If vibration levels exceed predetermined threshold levels, work must cease and new approaches to completing the tasks must be proposed. New methods must minimize levels of vibration within acceptable standards.

F. Vibration Criteria: These requirements must be performed in collaboration with the CO following the CO approved monitoring methodologies and CO approved submission requirements described in the Vibration Mitigation Plan. NPS may stop work at any time if protocol is breached:

NAMA – 303091 01 11 00 - 11

1. Continuous Vibrations:

a. Frequency (f) < 30 Hz, Peak Particle Velocity (V) < 3 mm/s (0.12 in/sec)

b. Frequency: 30 Hz < (f) < 60 Hz, Peak Particle Velocity (V) < 4 mm/s (0.16 in/sec)

c. Frequency (f) > 60 Hz, Peak Particle Velocity (V) < 6 mm/s (0.24 in/sec)

2. Frequent Vibrations

a. Frequency (f) < 30 Hz, Peak Particle Velocity (V) < 6 mm/s (0.24 in/sec)

b. Frequency: 30 Hz < (f) < 60 Hz, Peak Particle Velocity (V) < 8 mm/s (0.31 in/sec)

c. Frequency (f) > 60 Hz, Peak Particle Velocity (V) < 12 mm/s (0.47 in/sec)

3. Occasional Vibrations:

a. Frequency (f) < 30 Hz, Peak Particle Velocity (V) < 15 mm/s (0.59 in/sec)

b. Frequency: 30 Hz < (f) < 60 Hz, Peak Particle Velocity (V) < 20 mm/s (0.79 in/sec)

c. Frequency (f) > 60 Hz, Peak Particle Velocity (V) < 30 mm/s (1.18 in/sec)

G. Exceeding Vibration Criteria: In the event that the vibration exceeds the criteria, the Contractor must adhere to the following protocol and is required to:

1. Stop all work if vibration criteria is exceeded.

2. Immediately notify the CO if a vibration level is exceeded.

3. Identify what activities generate the excessive vibration and propose measures to limit or reduce this condition. The CO must approve these measures.

4. Have alternative methods and/or plans read to implement if vibration limits are exceeded.

1.13 COVID-19 REQUIREMENTS

A. Contractors are solely responsible for complying with all applicable COVID-19 protocols while at any NPS facility or work site. Each contractor is responsible for ensuring compliance by all of its subcontractors and suppliers while on the work site or other NPS facility. Failure to comply with applicable COVID-19 protocols will result in immediate removal of the noncompliant worker(s) from the work site.

1.14 SPECIAL CONSTRUCTION REQUIREMENTS

A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

NAMA – 303091 01 11 00 - 12

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.

B. Seasonal Restrictions

1. Tree/shrub removal to ensure compliance with The Migratory Bird Act (1918), The Bald and Eagle Protection At (1940), and the District of Columbia regulations (2015), and Executive Order 13186 (2009).

2. To protect migratory birds, tree/shrub removal should not occur between March 15 – August 15. See following section for special construction conditions.

1.15 SOILS INVESTIGATION REPORT

A. A soils investigation report entitled Report of Geotechnical Study, NAMA 231958 Thomas Jefferson Memorial Accessibility Improvement, May 4, 2018 has been prepared by Froehling and Robertson, Inc.

B. A copy of the report is available to all plan holders with this package.

C. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

1.16 ADDITIONAL REPORTS

A. A report entitled Pre-alteration Hazardous Material Survey, date April 9, 2020 has been prepared by Arc Environmental, Inc. and is included as an appendix.

B. A report entitled Soil Delineation Sampling Report, date March 22, 2021 has been prepared by Arc Environmental, Inc. and is included as an appendix.

C. A copy of the report is available to all plan holders with this package.

D. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

The National Mall and Memorial Parks (NAMA) supports several District of Columbia (DC) avian and mammal species of greatest conservation need (Table 1). Most birds at NAMA are protected by the Migratory Bird Act. In addition, Executive Order 13186 (2009), directs Federal agencies to minimize negative impact to birds and promote conservation. Since birds nest in locations other than trees, such as bare ground and shrubs, construction projects should consider the entire project area and inspect for nesting birds and other denned/roosted wildlife. Table 2, not only highlights the U.S. Fish and

Wildlife Services’ list of birds of conservational concern, but where these species nest. Although NAMA is not occupied by any federally threatened or endangered species it is adjacent to critical habitat for the endangered Atlantic Sturgeon (Acipenser oxyrinchus oxyrinchus) and the threatened Northern long-eared bat (Myotis septentrionalis) has been documented within NAMA boundaries, although the extent of it’s occupation is unknown.

We suggest the following recommendations for tree/shrub removal to ensure compliance with

The Migratory Bird Act (1918), The Bald and Golden Eagle Protection Act (1940), and District of

Columbia regulations (2015):

To protect migratory birds, tree/shrub removal should not occur between March 15 – August 15.

If this can not be accommodated, a survey will be conducted to ensure that the trees/shrubs to be removed do not contain any nesting birds (eggs/nestlings). If an active nest is found, all work must stop, and the natural resources program manager should be contacted immediately. Please see Appendix A for additional information regarding construction and bird conservation provided by the U.S. Fish and

Wildlife Service. There are also species-specific guidelines:

• Bald eagle: December 15th – July 15th, 0.25 mile buffer around the nest, during breeding season, restricting vehicle/pedestrian access.

• Black-crowned night heron: (listed as Tier Priority 1 for D.C. Species of Greatest

Conservation Need 2015, Table 1) nesting restrictions are April 1 – August 15, activities should be restricted within 0.25 miles of the rookery and maintain undisturbed vegetated buffer of at least 500’ around rookery.

To protect bats in the area, roosting trees and a 150-foot radius buffer will have no tree removal, or other disturbance within the zone, between June 1st and July 31st. If this can not be accommodated a survey will be conducted to ensure that the trees to be removed are not utilized by roosting bats. Bat monitoring should be conducted ½ hour before sunset, and 1 hour after. Common bat sign can be found in Appendix B. If an active bat roost is found, all work must stop, and the natural resources program manager should be contacted immediately. The northern long-eared bat was listed as a federally

DLP

Snapshot

DLP

Text Box

SECTION 01 11 00.01 - SPECIAL CONSTRUCTION CONDITIONS

DLP

Text Box

011100.01 - 1

SPECIAL CONSTRUCTION CONDITIONS

threatened species in 2015. Although, roosting trees for northern long-eared bats have not been identified in NAMA, Rock Creek Park and other parks within the National Capital Area have known roosting areas.

Northern long-eared have been detected during the last acoustic monitoring survey at NAMA (2016-

2018), so monitoring is imperative if trees are being removed/pruning from June 1 – July 31.

Table 1. District of Columbia Listed Species of Greatest Conservation Need (Last Updated 2015).

Scientific Name Common Name Tier Priority

Icterus galbula Baltimore Oriole 1

Nycticorax nycticorax Black-crowned Night Heron 1

Empidonax trailii Willow flycatcher 1

Hylocichla mustelina Wood Thrush 1

Myotis lucifugus Little Brown Bat 1

Perimyotis subflavus Tri-colored Bat 1

Lasiurus cinereus Hoary Bat 1

Lasiurus borealis Eastern Red Bat 1

Eptesicus fuscus Big Brown Bat 1

Lasionycteris notivagans Silver Haired Bat 1

Table 2. U.S. Fish and Wildlife Service Birds of Conservation Concern at the National Mall and Memorial Parks (from Information for Planning and Consultation [IPaC] 2018).

Scientific Name Common Name Category of

Concern*

Status Nest

Location

Haliaeetus leucocephalus Bald Eagle Non-BCC Vulnerable Year round Tree

Coccyzus erythropthalmus Black-billed Cuckoo BCC Rangewide (CON) Migration Tree

Dolichonyx oryzivorus Bobolink BCC Rangewide (CON) Migration Ground

Cardellina Canadensis Canada Warbler BCC Rangewide (CON) Migration Ground

Dendroica cerulean Cerulean Warbler BCC Rangewide (CON) Breeding Tree

Calidris alpine arcticola Dunlin BCC-BCR Migration Ground N/A

Antrostomus vociferous Eastern Whip-poor-will BCC Rangewide (CON) Not Found Past

10yrs

Ground

Aquila chrysaetos Golden Eagle Non-BCC Vulnerable Migration Cliff N/A

Vermivora chrysoptera Golden-winged Warbler BCC Rangewide (CON) Migration Ground

Oporonis formosus Kentucky Warbler BCC Rangewide (CON) Breeding Ground

Sterna antillarum Least Tern BCC-BCR Breeding nearby Ground N/A

Tringa flavipes Lesser Yellowlegs BCC Rangewide (CON) Migration Ground

Dendroica discolor Prairie Warbler BCC Rangewide (CON) Breeding Shrub

Protonotaria citrea Prothonotary Warbler BCC Rangewide (CON) Breeding Cavity

DLP

Snapshot

DLP

Text Box

011100.01 - 2

Melanerpes erythrocephalus

Red-headed

Woodpecker

BCC Rangewide (CON) Breeding & wintering

Cavity

Gavia stellata Red-throated Loon BCC Rangewide (CON) Nonbreeding Ground N/A

Arenaria interpres morinella

Ruddy Turnstone BCC-BCR Nonbreeding Ground N/A

Euphagus carolinus Rusty Blackbird BCC Rangewide (CON) Nonbreeding Tree N/A

Calidris pusilla Semipalmated

Sandpiper

BCC Rangewide (CON) Migration Ground N/A

Limnodromus griseus Short-billed Dowitcher BCC Rangewide (CON) Migration Ground N/A

Bubo scandiacus Snowy Owl BCC Rangewide (CON) Winter (irruptive) Ground N/A

Numenius phaeopus Whimbrel BCC Rangewide (CON) Migration Ground N/A

Tringa semipalmata Willet BCC Rangewide (CON) Not Found Past

10yrs

Ground N/A

Hylocichla mustelina Wood Thrush BCC Rangewide (CON) Breeding Tree

*Category for Concern

1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands);

2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and

3. "Non-BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non-eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing).

Pruning trees and shrubs

When pruning, you should modify your work to not disturb, injure, or kill protected wildlife (Tree Care Industry Association, 2017). The following information on tree and shrub pruning has been adapted from “Tree Care for Birds & Other Wildlife, Best Management Practices in California” (2018) and “Avoiding Impacts on Nesting Birds, Best Management Practices, Vegetation and Construction Projects” (2016).

Dates for pruning follow the guidelines for tree/shrub removal listed above.

1. Plan work accordingly to avoid bird/bat breeding season (March 15 – August 15, for most bird species).

a. Birds and other wildlife not only utilize tree/shrub limbs as breeding/resting/foraging areas, but use tree cavities, leaves, bark, and standing dead trees (Figure 1). Regardless if a nest is present the tree/shrub may be providing nesting/denning habitat for wildlife.

DLP

Text Box

011100.01 - 3

SPECIAL CONSTRUCTION CONDITIONS

https://www.fws.gov/birds/management/managed-species/birds-of-conservation-concern.php https://www.fws.gov/birds/management/managed-species/bald-and-golden-eagle-information.php

Figure 1. Common nest locations (Illustration from Tree Care for Birds & Other Wildlife, 2018).

b. Nests and wildlife dens/habitat can also be found in human structures, and should be considered when planning construction and other projects (Figure 2).

DLP

Snapshot

DLP

Text Box

011100.01 - 4

Figure 2. Human structure related bird nest/wildlife habitat locations (Illustration from Avoiding Impacts on Nesting Birds, Best Management Practices, Vegetation and Construction Projects, 2016).

2. If work is near a nesting bird/wildlife den, minimize disturbance in the area, especially during inclement weather.

3. If risk is managed and human safety is not an issue, consider keeping dead or dying trees since they provide habitat for insects/birds/wildlife. Different pruning techniques can be used to reduce the risk to human safety while still preserving the snag for wildlife habitat (Figure 3). If all branches are unsafe, remove the branches and leave the trunk.

DLP

Snapshot

DLP

Text Box

011100.01 - 5

Figure 3. Different cuts used to remove the hazard but retain the dead/dying tree (Illustration from Tree Care for Birds & Other Wildlife, 2018).

Literature Cited

City of Portland Environmental Services. 2016. Avoiding Impacts on Nesting Birds: Best Management Practices for Vegetation and Construction Projects. City of Portland, Portland, OR.

District of Columbia Department of Energy and Environment. 2015. District of Columbia Wildlife Action Plan. Government of the District of Columbia.

Donohue, K., R. Gilpin, and C. Bassett. 2018. Tree Care for Birds & Other Wildlife, Best Management Practices in California.

Tree Care Industry Association. 2017. American National Standard, Tree, Shrub, and Other Woody Plant Management – Standard Practices (Pruning).

DLP

Text Box

011100.01 - 6

Laws Protecting Birds

Migratory Bird Treaty Act (1918): Makes it illegal for anyone to take, possess, import, export, transport, sell, purchase, barter, or offer for sale, purchase, or barter any migratory bird, or the parts, nests, or eggs of such a bird except under the terms of a valid permit issued pursuant to Federal regulations.

The Bald and Golden Eagle Protection Act (1940): Prohibits anyone, without a permit issued by the

Secretary of the Interior, from “taking” bald eagles, including their parts, nests, or eggs. There are criminal penalties for persons who “take, possess, sell, purchase, barter, offer to sell, purchase or barter, transport, export or import, at any time or any manner any bald eagle… [or any golden eagle], alive or dead, or any part, nest, or egg thereof.” The Act also defines “take” as “pursue, shoot, shoot at, poison, wound, kill, capture, trap, collect, molest or disturb.”

Executive Order 13186 (2001): Support bird conservation by enhancing or restoring habitat, reducing negative impacts, integrate migratory birds in educational activities, etc. A memorandum of understanding between the National Park Service and Fish and Wildlife Service was signed 04/10/2010.

District of Columbia Regulations (2015): Chapter 15 Title 19 Section 1574.5

A migratory bird shall be controlled only in accordance with the federal Migratory Bird Treaty Act (16

U.S.C. §§ 703-712) and its’ implementing regulations, and as follows:

(a) A nest with eggs or young may not be moved, relocated, destroyed, or altered in any way without first obtaining a federal permit.

(b) A nest with no eggs or young may be removed from structures such as boats, docks, and construction equipment, or relocated without a federal permit.

DLP

Text Box

011100.01 - 7

Appendix A. Nationwide Standard Conservation Measures for Construction Sites, U.S. Fish and

Wildlife Service.

NATIONWIDE STANDARD CONSERVATION MEASURES

Listed below are effective measures that should be employed at all project development sites nationwide with the goal of reducing impacts to birds and their habitats. These measures are grouped into three categories: General, Habitat Protection, and Stressor Management. These measures may be updated through time. We recommend checking the Conservation Measures website regularly for the most up-to-date list.

1. General Measures

a. Educate all employees, contractors, and/or site visitors of relevant rules and regulations that protect wildlife. See the Service webpage on Regulations and Policies for more information on regulations that protect migratory birds.

b. Prior to removal of an inactive nest, ensure that the nest is not protected under the Endangered Species Act (ESA) or the Bald and Golden Eagle Protection Act (BGEPA). Nests protected under ESA or BGEPA cannot be removed without a valid permit.

i. See the Service Nest Destruction Policy

c. Do not collect birds (live or dead) or their parts (e.g., feathers) or nests without a valid permit. Please visit the Service permits page for more information on permits and permit applications.

d. Provide enclosed solid waste receptacles at all project areas. Non-hazardous solid waste (trash) would be collected and deposited in the on-site receptacles. Solid waste would be collected and disposed of by a local waste disposal contractor. For more information about solid waste and how to properly dispose of it, see the EPA Non-Hazardous Waste website.

e. Report any incidental take of a migratory bird, to the local Service Office of Law Enforcement.

f. Consult and follow applicable Service industry guidance.

2. Habitat Protection

a. Minimize project creep by clearly delineating and maintaining project boundaries (including staging areas).

b. Consult all local, State, and Federal regulations for the development of an appropriate buffer distance between development site and any wetland or waterway. For more information on wetland protection regulations see the Clean Water Act sections 401 and 404.

c. Maximize use of disturbed land for all project activities (i.e., siting, lay-down areas, and construction).

d. Implement standard soil erosion and dust control measures. For example:

i. Establish vegetation cover to stabilize soil

ii. Use erosion blankets to prevent soil loss

iii. Water bare soil to prevent wind erosion and dust issues

3. Stressor Management Stressor: Vegetation Removal Conservation Goal: Avoid direct take of adults, chicks, or eggs.

Conservation Measure 1: Schedule all vegetation removal, trimming, and grading of vegetated areas outside of the peak bird breeding season to the maximum extent practicable.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .