B08 - SolicitationAttachment1Specifications1.pdf

PDF 1 MB Posted

Attached to
Paint Exterior of Buildings at Hot Springs Nationa
Solicitation number
140P6220B0003
Issued by

About this file

This solicitation seeks exterior painting services for four historic buildings located within Hot Springs National Park in Arkansas. The selected contractor will paint the exteriors of the Ozark Bathhouse, Administration Building and two comfort stations, Maurice Bathhouse, and Fordyce Visitor Center. Services include surface preparation, application of paint systems, and minor wood repairs to windows, doors, and other elements. Paint colors must match existing. The contractor must complete work by November 30, 2020 within the park's standard and non-standard working hours while minimizing disruptions. The National Park Service is the contracting agency.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hot Springs National Park Hot Springs, AR

Paint Exterior of Administration Building, 2 Comfort Stations, Fordyce & Maurice Bathhouses

PMIS# 175036, 206379, 225336

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

April 30, 2020

140P6220B0003 Attachment 1

HOSP – 175036, 206379, 225336 00 01 10 - 1

051020 TABLE OF CONTENTS

SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 - Table of Contents

DIVISION 01 -- GENERAL REQUIREMENTS (SHORT FORM)

Item 1 - Description of Work Item 2 – Existing Utilities Item 3 – Contractor’s Use of Premises Item 4 – Commencement, Prosecution and Completion Item 5 – Examination of the Site Item 6 – Abbreviations Item 7 – Accident Prevention Item 8 – Preconstruction Conference Item 9 – Submittals Item 10 – Temporary Services Item 11 – Project Closeout

DIVISION 02 -- EXISTING CONDITIONS

DIVISION 03 -- CONCRETE

DIVISION 04 -- MASONRY

DIVISION 05 -- METALS

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

DIVISION 08 -- OPENINGS

DIVISION 09 -- FINISHES

09 91 13 - Exterior Painting

DIVISION 10 -- SPECIALTIES

HOSP – 175036, 206379, 225336 00 01 10 - 2

051020 TABLE OF CONTENTS

DIVISION 11 -- EQUIPMENT

DIVISION 12 -- FURNISHINGS

DIVISION 13 -- SPECIAL CONSTRUCTION

DIVISION 14 -- CONVEYING EQUIPMENT

DIVISION 21 -- FIRE SUPPRESSION

DIVISION 22 -- PLUMBING

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

DIVISION 26 -- ELECTRICAL

DIVISION 27 -- COMMUNICATIONS

DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY

DIVISION 31 -- EARTHWORK

DIVISION 32 -- EXTERIOR IMPROVEMENTS

DIVISION 33 -- UTILITIES

END OF SECTION

HOSP – 175036, 206379, 225336 01 10 00 - 1

051020 DIVISION 1 SHORT FORM

DIVISION 1 SHORT FORM GENERAL REQUIREMENTS

SECTION 01 10 00 – GENERAL REQUIREMENTS

PART 1 - GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: All buildings that work will be performed on are found within the Bathhouse Row at the Hot Springs National Park in Hot Springs, Arkansas.

The Administrative Building (the park’s former visitor center) is the first building from the south on Bathhouse Row and faces west toward Central Avenue. The building is L-shape in plan, although the façade is symmetrical. The Administration Building (Bldg. 1) is a two-story building, with basement, of about 7,960 gross square feet and was constructed in 1935. Its architectural style is Spanish Revival, whose receding windows suggest the nascent Art Deco movement. The building’s exterior consists of a masonry stucco surface. Exterior paintable surface area is approximately 6,700 square feet. The Spanish Revival architectural style provides significant elements of decorative wood including decorative rafters, wood frame French doors on the upper floor, and wood frame windows throughout. Short balconies accentuate the French door openings on three sides of the building. The slightly "L" shaped building has a red mission tile roof with a built-in gutter system. There are ten French doors with balconies, 17 wood frame windows, and three exterior wood doors. The 17 wood-framed windows are of various sizes and are of casement in style.

The Men’s and Women’s Comfort Stations were built in 1923 and are set back and between the Quapaw and the Ozark Bathhouses. They are rectangular in plan with arched, centered entrances with white stucco walls and red-tiled roofing. Each building is approximately 271 gross square feet.

The Fordyce Bathhouse (the park’s newest Visitor Center location) was built in 1915 and is a complex combination of concrete walls and cement block and tile. The outer shell consists of a combination of glazed brick, plain brick with geometric designs utilizing different colors of brick, and extensive use of Terra Cotta in elaborate window and door ornamentation. On the east side of the building, there are several hundred square feet of stucco and the West exterior first floor area consists almost entirely of Terra Cotta Tile. The building has a tile mansard roof with ornamental soffit on all sides extending four feet with parapet walls rising another three feet. On this are mounted iron tails with light globes mounted inline and on terminal posts. The roof was originally designed as a sunbathing area for clients. There are over 110 wood framed windows of various sizes and type, both casement and sash.

The Maurice Bathhouse (Bldg. 106) was built in 1911~1912 and is of the Italian renaissance revival with a prominent, “hipped” roof and a symmetrical façade with a sunporch, stained glass skylights and windows, and stucco exterior walls. The building’s exterior is masonry stucco construction that consists of a distinctive, hand-thrown stucco finish on the front elevation with wood frame windows and doors, and aluminum frame decorative storefront-style window units on the front porch. The building is three story’s tall, with basement, with a gross square footage of approximately 23,675 feet. Exterior paintable surface area exceeds 15,700 square feet. There are 204 wood framed windows primarily casement type. The Maurice Bathhouse is a National Historic Landmark and is one of the significant cultural resources of Hot Springs National Park on Bathhouse Row.

HOSP – 175036, 206379, 225336 01 10 00 - 2

Bathhouse Row and its environs were nominated as a Historic District in 1973. Bathhouse Row was placed on the National Register of Historic Places on November 13, 1974 and included the Administration Building, Comfort Stations, Maurice Bathhouse, and the Fordyce as contributing structures. The Bathhouse Row Historic District received designation as a National Historic Landmark on May 28, 1987.

The National Park Service intends to contract for the painting of the exterior of the Administration Building and two Comfort Stations, the Maurice Bathhouse, and the Fordyce Visitor Center all of which are in Hot Springs, Arkansas. Generally, the work to be performed is for the rehabilitation of the exterior of each of the buildings to include windows, doors, and exterior walls and the painting of each building’s exterior. New paint colors shall match all existing paint colors. Additionally, the Fordyce building will require tuckpointing work of approximately 12,000 square feet. A six-inch downspout that is causing the water issue on the Fordyce exterior will also need to be extended in order to correct a water issue. All the buildings for this project are listed as historic structures, so the Contractor must take care not to disturb or change important resources that may be located within the project area. The buildings will be inhabited by park staff and/or visitors for the duration of the project. The work schedule must reflect the need to accommodate the Park Service employees working in the space and the visitors which patronize the building.

1.2 Work Covered by the Contract Documents:

A. Project Location: Hot Springs National Park; Bathhouse Row, Hot Springs, AR 71901

1. Administration Building (Bldg 1); 101 Reserve Street, Hot Springs, AR 71901

2. Men’s (Bldg 3A) & Women’s (Bldg 3B) Comfort Stations

3. Fordyce/Visitor Center (Bldg 105); 369 Central Avenue, Hot Springs, AR 71901

4. Maurice Bathhouse (Bldg 106); 359 Central Avenue, Hot Springs, AR 71901

B. Work consists of: The Contractor shall field verify all square footages and all measurements related to the project prior to work, and the Contractor will provide all labor, qualified supervision, products, equipment, materials, tools, supplies, incidentals, and other services and expertise necessary, to:

1. Paint the exterior of the historic Administration Building and Comfort Stations located in the historic district on Bathhouse Row. New paint is to match the existing paint for all surfaces. The building exterior is masonry stucco work with wood frame windows and doors and this work includes the basement stairwell walls and parapet wall next to ramp. Painting requires the use of scaffold in places and the use of an aerial lift to reach certain areas of the buildings. Total exterior paintable surface area for the Administration Building is approximately 6,700 square feet. There is 850 square feet of paintable, exterior surface for each comfort station. There is a men’s comfort station and a women’s comfort station.

Work will also consist of surface preparation to include the initial, low-pressure washing and cleaning of all exterior surfaces, patching cracks in masonry, stucco, and all wood and masonry joints. All stucco repairs are to match the existing surface and/or structure.

2. Administration Building - Minor repairs on wood elements are to include wood-framed windows, soffit, fascia, exposed wood rafter tails, entrance doors, and French doors. Spot priming, patching and repairs and application of finish coats of paint. There are 17 wood

HOSP – 175036, 206379, 225336 01 10 00 - 3

framed casement windows, 10 French doors, 3 exterior wood doors and 1 metal exterior door. Repairs of 700 linear feet with new glazing on windows and French doors. Apply 700 linear feet of new caulking throughout the exterior of the building. Painting requires the use of scaffold in places and the use of an aerial lift to reach certain areas of the building that are 20 feet to 40 feet in height.

Comfort Stations - Minor repairs on wood elements to include gable vents, fascia and soffit on the Janitor’s closet. Apply 200 linear feet of new caulking throughout the exterior of the Comfort Stations. Painting requires the use of scaffold in places and the use of an aerial lift to reach certain areas of the buildings.

Metal surfaces to be painted (to match existing colors) will consist of:

a. Administration Building – Basement door and casing; balcony handrails;

window security bars, entrance-step handrails, and basement handrails.

b. Comfort Stations – Entrance doors and side doors/doors to Janitor’s closet and casings.

3. Paint the exterior of the historic Fordyce Visitor Center located in the historic district on Bathhouse Row. The building exterior is a complex combination of concrete walls and cement block and tile. New paint colors are to match the existing, historic paint color/palate for all surfaces. There is approximately 2000 square feet of recessed wood soffit and wood rafters on the perimeter of the Fordyce to be painted. 110 wood windows will be painted. There is approximately 650 square feet of stucco on the east side, first story that will be painted. Prior to painting windows and tuck-pointing the metal screens, the plexiglass and awnings will have to be removed. Windows will be painted to match the existing paint. Paint, stucco, and tuck-pointing work requires the use of scaffold in places and the use of an aerial lift to reach certain areas of the 3-story building. Do not paint over any powder coated surfaces, to include the powder coated handrails.

Work consists of surface preparation to include the initial, low pressure washing and cleaning of all exterior surfaces. Work will also consist of patching cracks in masonry, stucco, and all wood and masonry joints. All stucco repairs are to match existing surface and/or structure. A six-inch, galvanized downspout on the southwest side will need to be extended by at least 4 inches in order to divert the water that is pooling and causing the issue. Exterior brick, of approximately 12,000 square feet, will be tuck-pointed.

Tuckpointing will include the limestone windowsills around the building. In the courtyard area, tuckpoint up to or around the metal vents and downspouts. For the front of the Fordyce, tuckpoint up to and around the supports/bracing for the marquee. No tuckpointing will take place for the white, glazed brick. Removal of old joint mortar should be carefully executed to prevent damage to surrounding masonry. Replacement mortar shall match the color and texture of existing, and joints shall be struck to match existing. Refer to Preservation Brief #2 for repointing methods and materials at:

https://www.nps.gov/tps/how-to-preserve/briefs/2-repoint-mortar-joints.htm

Remove and re-apply approximately 300 linear feet of caulking in areas of deteriorated caulking in and around the windows and stucco. Approximately 12 linear feet of cracks of the stucco surface will need to be repaired on the east side of the first story.

HOSP – 175036, 206379, 225336 01 10 00 - 4

Minor repairs on wood elements as necessary.

Metal surfaces to be painted (to match existing colors) will consist of a rear-entrance metal door and casing at the east side, 5 metal-framed windows on the east side, a copper downspout on the southeast side, handrails that lead to the stairwell to the basement entrance, the handrails for the accessibility ramp, and vent pipes on the southside of the building.

4. Paint the exterior of the historic Maurice Bathhouse located in the historic district on

Bathhouse Row. New paint is to match the existing paint for all surfaces. Exterior paintable surface area exceeds 15,700 square feet. Wood surfaces to be painted include all wood-framed windows (204), soffit, rafters, and exhaust vents. Do not paint over any powder coated surfaces which includes the powder coated lobby windows, lobby doors, and the powder coated handrails.

Work consists of surface preparation to include the initial, low pressure washing and cleaning of all exterior surfaces, patching cracks in masonry, stucco, and all wood and masonry joints. All stucco repairs are to match existing surface and/or structure. The entrance ramp and basement ramp walls will also be painted. Painting requires the use of scaffold in places and the use of an aerial lift to reach certain areas of the building.

Remove old and re-apply 300 linear feet of new caulking in cracks throughout the exterior stucco. Remove old and re-apply 400 linear feet of new caulking between windows and stucco. Remove old and apply 150 linear feet of new glazing around windows.

Minor repairs on wood elements including the rotted wood on the Northeast wooden exhaust vent and any other minor wood repairs as necessary.

Metal surfaces to be painted (to match existing paint/colors) will consist of basement stairwell access door and handrails. The galvanized skylight soffit and fascia will also be painted.

5. All materials shall be new and unused. Any exceptions must be in writing; requested by the Contractor, and approved by the CO.

6. Care must be taken to protect exterior walkways, both concrete and lawn spaces, plants, trees from any materials, equipment, and work performance, such as paint, stains, dust, lubricants, scratches, and markings.

7. Windows for all of the building are not weather-tight or sealed, so care must be taken when executing low-pressure washing.

8. To the Government’s knowledge there are no asbestos-containing or lead-based substances in the areas where work is to be performed.

HOSP – 175036, 206379, 225336 01 10 00 - 5

9. The Contractor will be responsible for the entire scope of this project; all work required by the project documents shall be accomplished even though minor items required may not be specifically mentioned in the previous description.

10. Paint, Finish Products and Application

a. Due to all buildings being historic buildings, pressure wash p.s.i. is not to exceed

600 p.s.i. Pressure wash and clean entire structure using care not to damage existing historic material. (Refer to the National Park Service Preservation Brief # 10 (https://www.nps.gov/tps/how-to-preserve/briefs/10-paint-problems.htm)).

b. For any areas that cannot be cleaned using the low-pressure wash method

(recommended for historic preservation), these areas may be cleaned using a ½ cup of household detergent per gallon of water with a medium soft bristle brush (Refer to NPS Preservation Brief # 10). For any areas that may still have any loose or peeling paint after pressure washing, loose paint shall be removed using powered sanders and/or hand scraping for the surfaces to accept new primer and paint. For any smooth wood or smooth metal, surfaces should be feathered in so that the surface is even and smooth.

c. Use highest quality exterior-rated paint and filler products produced by a nationally known manufacturer (refer to the Master Painters Institute (MPI) for guidance). Provide primers and other undercoat paint produced by the same manufacturer as finish coats. Paint products shall be fresh and well ground; shall not settle readily, cake, or thicken in the container; shall be broken up readily with paddle to smooth consistency; and shall have easy application properties.

d. All paint shall be hand applied using rollers and brushes. Due to the age of the buildings and because of the proximity to visitors and other historic structures and buildings, no spraying methods will be permitted.

e. All metal surfaces to include any windows, doors, and other metal surfaces shall be primed with an approved metal primer and two (2) coats of alkyd oil-based enamel (refer to the Master Painters Institute (MPI) for further guidance). New paint color shall match

f. All wood components shall be primed and painted with two (2) coats of latex enamel (refer to the Master Painters Institute (MPI) for guidance).

g. All masonry cracks over ¼” shall be cleaned out of all loose material and a bonding agent will be applied prior to filing with approved, exterior stucco patching material. Patched areas will be inspected by the COR prior to priming and painting. Smaller cracks may be filled using pre-approved, forty (40) year siliconized latex caulk. All old caulking shall be removed before new caulk is applied (refer to the Master Painters Institute (MPI) for further guidance).

C. All work will be performed under a single contract.

D. Period of performance: Work shall be completed within approximately 90 calendar days of contract award with the anticipated performance dates of September 1st to November 30th, 2020.

HOSP – 175036, 206379, 225336 01 10 00 - 6

ITEM 2 - EXISTING UTILITIES

2.1 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

2.2 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

A. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: The contractor shall always conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. The contractor shall comply with all applicable National Park Service regulations and directives pertaining to security, safety, occupational health, fire, traffic, and personnel clearances while on the premises of the Park.

Contractor will brief contractor’s employees and subcontractors on the same and maintain documentation that all employees and subcontractors have been briefed.

A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Pubic Use of Site: The Contractor shall always conduct his operations that will ensure the least inconvenience to, and heightened safety awareness for, Park employees and the public. The building will be occupied by Park employees and volunteers during painting. Contractor is to provide adequate barriers in work areas to protect persons from injury from paint operations.

3.2 On-site work hours: Work shall be generally performed during the standard hours of 7:00 AM and

4:00PM local time, Monday through Thursday and 7:30 AM to 4:00 pm local time Fridays, excluding federal holidays, and except when otherwise indicated by the Contracting Officer. If desiring to work outside the standard hours, Contractor must submit a written request to the CO at least three (3) workdays prior to the proposed performance of work. The written request should state the proposed performance of work, day/days, time/amount of work, and reason why authorization should be granted to perform work during non-standard hours. Work outside the standard hours is prohibited unless approved by the CO. Work during non-standard work hours shall be at no additional expense to the Government.

HOSP – 175036, 206379, 225336 01 10 00 - 7

A. The Contractor shall coordinate all work schedules with the CO or COR prior to the start of work.

Notify the COR at least five (5) working days prior to moving onto the work site to commence work. Before initiating any work, the Contractor shall meet with the COR to discuss, at a minimum: a sequence of procedures; parking (there is no on-site parking); a means of access to premises and buildings; placement of dumpsters and haul routes; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of egress; communications, the location of partitions and barriers; eating spaces, and restroom for contractor’s employees, and any other incidentals to the project.

B. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least three (3) workdays prior to the proposed performance of any work outside of the standard workday hours.

C. Except for inclement weather, Acts of God, and conditions experienced or events planned by the

Park which would prevent the Contractor from performing, it is expected the Contractor shall be on the site performing each workday. If it becomes necessary for the Contractor to interrupt work activities, the Contractor shall submit a written request to the Contracting Officer at least three

(3) working days in advance. Contractor must provide notification the day Contractor moves back to the work site after an interruption of work of two or more workdays.

D. Project Superintendent: Contractor must always have a designated superintendent at the contract site during work performance, to include work which may be performed by a subcontractor. The superintendent’s duties shall include the overall management of the project, coordination of the subcontractor’s work, and liaison with the CO and COR. The designated Project Superintendent, and any alternate, shall be thoroughly familiar with the scope of work, specifications, drawings, and terms and conditions of the contract. No work shall be performed without the presence of the superintendent on the job site.

E. 24-Hour Point of Contact: Provide the CO and COR with a 24-hour number or numbers where the designated superintendent and an alternate can be contacted at any time.

F. Job Camp: Establishment of a camp within the Park will not be permitted.

G. Equipment Restrictions: Use only equipment that can safely negotiate work area and as authorized by the COR.

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to the Ozark Bathhouse where work is to be performed. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Limits: Work will be confined to the immediate area near the Ozark Bathhouse as designated and pre-approved by the COR. Only loading and unloading of materials and equipment will be allowed at the work site. No prolonged parking will be allowed. Vehicles will need to park in designed parking spaces. Specific areas of parking can be identified at the site during the pre-construction meeting.

HOSP – 175036, 206379, 225336 01 10 00 - 8

C. Driveways and Entrances: Always keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

D. Limit site disturbance to:

1. 10 feet beyond building perimeter

2. 10 feet beyond surface walkways, stairways, patios, and utilities less than 12 inches in diameter

3. 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.

E. Security and Protection facilities installation:

1. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

2. The security of Contractor’s materials, tools, equipment and other properties will always be the Contractor’s responsibility. The Park will accept no responsibility and shall not be liable for Contractor’s properties left on site should they become lost, damaged or stolen at any time during the contract period.

3.4 Storage - Staging Areas:

A. Office space / storage which may be required for the Contractor’s operation shall be the responsibility of the Contractor. Contractor is to confine storage of materials to Contractor’s work vehicles or approved location.

1. The types and locations of office space / storages/are to be approved, in advance, by the

COR.

2. Contractor must provide suitable storage for all combustible and flammable materials.

Type and location of storage is to be approved, in advance, by the CO.

B. There will be no storage available inside of the Ozark building or anywhere else at the park.

Staging areas for equipment and materials must be designated and pre-approved by the COR.

3.5 Preservation of Natural Features and Historic Structures:

A. Confine all operations within the work limits of the project. Exercise special care to leave the natural surroundings undamaged. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government. Contractor will be responsible for all costs associated with restoration of the project area.

B. Do not remove, injure, or destroy trees or other plants without prior approval of the CO or COR.

Consult with the CO or COR to remove agreed-on roots and branches that interfere with work.

HOSP – 175036, 206379, 225336 01 10 00 - 9

C. Every precaution shall be taken to prevent damage to the structures and the surrounding areas.

Should any damage be incurred as a result of the Contractor’s operations, it will be repaired and/or the damaged materials replaced, in kind, by the Contractor, to the satisfaction of the Contracting Officer at no additional expense to the Government.

3.6 Hauling Restrictions: Comply with all State and County road and legal load requirements for hauling materials and equipment for all park work and park access. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

3.7 Housekeeping: Contractor is responsible for general maintenance and housekeeping of job site and any storage and office area(s) daily. This includes proper disposal of trash and debris.

A. Always keep project neat, orderly, and in a safe condition. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish.

Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.

B. Dispose of non-hazardous waste materials legally and properly. Unless otherwise specified by the CO or COR, all removed material and excess material that cannot be used in the completion of the project is to be disposed of outside the park at an approved landfill, recycling center, or disposed of at other locations in accordance with federal, state, and local regulations. All recyclable work debris/scrap/materials will be turned in to a recycling center when possible.

Contractor is to provide the Government with documentation from the recycling center identifying the type, weight/volume of the recyclable materials accepted from the Contractor.

C. All recyclable work debris/scrap/materials will be turned in to a recycling center when possible.

Contractor is to provide the Government with documentation from the recycling center identifying the type, weight/volume of the recyclable materials accepted from the Contractor.

D. The Contractor shall also recycle general administrative refuse associated with this project.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

B. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

1. Maintain access to existing walkways, corridors, sidewalks, streets, roads, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, sidewalks, streets, roads, or other occupied or used facilities without written permission from the CO. Proper directional signage and barriers are to be provided by the Contractor.

2. Maintain existing building in a weather tight condition throughout construction period.

Repair damage caused by construction operations. Protect building and its occupants during construction period.

HOSP – 175036, 206379, 225336 01 10 00 - 10

3.9 Photo Documentation:

A. All photos shall be in focus, show maximum range of depth of field general photo and then up-close detail photos as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days or as approved by COR.

B. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc... that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

C. No after-work photos are required.

3.10 Fire and Life Safety:

A. As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.

1. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).

2. A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall, at a minimum, include locating and maintaining fire protective equipment.

3. Take all necessary precautions to prevent fire during contract. Do not store flammable or combustible liquids in historic structures or existing buildings. Provide adequate ventilation during use of volatile or noxious substance.

4. Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes. Smoking shall only be allowed in smoking areas as designated and approved by the COR.

5. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical

a. Immediately report all spills of hazardous materials to the park.

b. Maintain a spill emergency response kit.

c. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management:

A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer.

B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

HOSP – 175036, 206379, 225336 01 10 00 - 11

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75

C. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a Residential receiving area :

Daytime: 65 dB Nighttime: 45 dB b Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on-ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit. Please see FAR 52.236-27 - Site Visit (Construction).

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

E. It is always the Contractor’s responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair. As a minimum, maintain four hard hats and all other APP required equipment.

7.2 Submittals:

A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:

https://www.nps.gov/orgs/1671/do-business-with-us.htm

HOSP – 175036, 206379, 225336 01 10 00 - 12

1. Name of responsible supervisor to carry out the program

2. First aid procedures

3. Training, both initial and continuing

4. Planning for possible emergency situations

5. Contractor to identify nearest location of medical facility for emergencies

6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to the CO.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Protective Equipment: It is always the Contractor’s responsibility to require all those working on or visiting the site to wear necessary protective equipment. Protective Equipment will meet NIOSH and MSHA requirements.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26

HOSP – 175036, 206379, 225336 01 10 00 - 13

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed forms to the CO.

B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list.

The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

C. Preconstruction Conference Submittal: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF 1413).

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8. Waste Management and Recycling Plan.

9. Quality Control Plan.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Provide shop drawing details where repairs are required.

B. Product Data: Provide product data for all materials and finishes being used in this scope of work.

C. Samples: Submit 2 color samples 4” x 6” in size of each actual paint finish color selected on like-kind materials that the paint will be applied to on the building.

D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval.

E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons

HOSP – 175036, 206379, 225336 01 10 00 - 14

for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of the vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit

Progress Schedule. Contracting Officer will review the Progress Schedule for format and content.

Submit four copies of Progress Schedule (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.

A sample Schedule of Values will be provided by the Contracting Officer.

HOSP – 175036, 206379, 225336 01 10 00 - 15

ITEM 10 – TEMPORARY SERVICES

10.1 Description: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.

10.2 Fire Prevention and Protection:

Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.

10.3 Utility Services:

A. Power Sources: Coordinate with the COR, if required.

B. Water Sources: Coordinate with the COR, if required.

C. Restrooms: Restrooms are available on Bathhouse Row.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be substantially complete, following the final inspection, the.

Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.

B. If the work is not determined to be substantially complete following the final inspection, the

Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days, documented weather permitting.

D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.

HOSP – 175036, 206379, 225336 01 10 00 - 16

F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

G. Disposition of any permits and warranties required by the specifications in this section.

11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of Substantial Completion.

B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.

C. Information shall include operation and maintenance manuals for each warranted material.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

HOSP – 175036, 206379, 225336 01 10 00 - 17

SUBMITTAL LIST

Hot Springs NP, PMIS 175036, 206379, 225336, Paint 5 Building Exteriors

SUBMITTAL REQUIREMENTS (indicate with an "X")

Spec.

Sec.

Para.

No.

Description

INFORMATIONAL ACTION

C

ER

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A L

O R

P

LA

N

M fg

. D A

TA

IN

ST

R

U C

TI

O

S

SH

O

P D

R A

W

G

SA

M

PL

E

M fg

. D A

TA

ST

R

U C

TI

O

S

01 10 00 7.2 Accident Prevention Plan X

01 10 00 7.2 Safety Meetings and Inspection Reports X

01 10 00 9.1 Preconference Submittals X

01 10 00 9.2 Shop Drawings X

01 10 00 9.2 Product Data X X

01 10 00 9.2 Color Samples X etc.

HOSP – 175036, 206379, 225336 09 91 13 - 1

051020 EXTERIOR PAINTING

DIVISION 9 – FINISHES

SECTION 09 91 13 – EXTERIOR PAINTING

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Project Location: Hot Springs National Park; Bathhouse Row, Hot Springs, AR 71901

B. Building(s) Name/Identifier:

1. Administrative Building (Building 1);

2. Men’s (Building 3A) and Women’s (Building 3B);

3. Fordyce/Visitor Center (Building 105);

4. Maurice Bathhouse (Building 106)

C. Work consists of the following:

1. Complete maintenance refinishing of exterior substrates as listed in Summary and Schedules below.

1.2 SUMMARY

A. Section includes surface preparation and the application of paint systems on the following exterior substrates:

1. Concrete

2. Steel and iron

3. Wood

4. Galvanized metal

5. Portland cement plaster (stucco)

1.3 DEFINITIONS (Master Painters Institute-MPI)

A. Master Painters Institute (MPI) (http://www.specifypaint.us & http://paintinfo.com/)

B. MPI Gloss Level 1: Not more than five units at 60 degrees and 10 units at 85 degrees, according to ASTM D 523.

C. MPI Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to

ASTM D 523.

D. MPI Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D 523.

E. MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.

F. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.

140P6220B0003 Attachment 1 http://www.specifypaint.us/ http://paintinfo.com/

HOSP – 175036, 206379, 225336 09 91 13 - 2

G. MPI Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product. Include preparation requirements and application instructions.

1. Include printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.

2. Include Safety Data Sheet (SDS).

B. Samples: For each type of paint system and each color and gloss of topcoat, provide a 3”X5” sample card.

1.5 QUALITY ASSURANCE

A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Contracting Officer’s Representative (COR) will select one surface to represent surfaces and conditions for application of each paint system.

a. Vertical and Horizontal Surfaces: Provide samples of colors on…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .