B08 Solicitation W912EK26QA019 Cassville Cottage and Clinton County Cottage.pdf
PDF 3 MB Posted
- Attached to
- Cassville Cottage Asbestos Removal and Demolition and Clinton County Cottage Asbestos Removal
- Solicitation number
- W912EK26QA019
About this file
This is a Request for Proposal (RFP) for asbestos removal and demolition services at two residential cottage locations.
The U.S. Army Corps of Engineers, Rock Island District, is soliciting proposals for asbestos removal and demolition work at Cassville Cottage in Cassville, Wisconsin, and asbestos removal at Clinton County Cottage (Pool 13, Cottage 4379) in Clinton County, Iowa. The solicitation number is W912EK26QA019, issued on 30 March 2026, with a proposal due date of 9 April 2026 at 2:00 PM Central Time. This is a 100% small business set-aside with a size standard of $19,000,000. The contract is firm fixed price, and all work must be completed within 45 consecutive calendar days following contract award, with performance beginning within 10 calendar days of award. The period of performance is 23 April 2026 through 11 June 2026. Line Item 01 requires abatement and removal of all asbestos-containing materials, demolition of the cottage, foundations and slabs, backfilling of the basement to a minimum of three feet below grade, and regrading with grass seed at the Cassville location. Line Item 02 requires abatement and removal of all asbestos-containing materials at the Clinton County location. Evaluation will be conducted as lowest price technically acceptable (LPTA) based on technical experience and price factors. Offerors must demonstrate at least three years of asbestos removal experience and submit documentation of one relevant past project completed within the last three years. Performance and payment bonds are required if the bid exceeds $150,000; if the bid is between $35,000 and $150,000, either a payment bond or irrevocable letter of credit is required. Proposals must be submitted via email to the Contract Specialist, Carrie Holub (carrie.l.holub@usace.army.mil), and offerors must be registered in SAM and certified to transact business in Wisconsin and Iowa before award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF
□ SEALED BID (IFB)
AND AWARD INVITATION FOR BID
30 MAR 2026 W912EK26QA019 □ NEGOTIATED (RFP)
(Construction, Alteration, or Repair) REQUEST FOR PROPOSAL
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
N/A
7. ISSUED BY CODE W912EK 8. ADDRESS OFFER TO
W07V ENDIST ROCK ISLAND
KO CONTRACTING DIVISION, 1 ROCK ISLAND ARSENAL
ROCK ISLAND, IL 61299-5001
UNITED STATES
�-----------1
CARRIE HOLUB, EMAIL: CARRIE.L.HOLUB@USACE.ARMY.MIL TELEPHONE: 309-
794-5667
W07V ENDIST ROCK ISLAND
KO CONTRACTING DIVISION, 1 ROCK ISLAND ARSENAL
ROCK ISLAND, IL 61299-5001
UNITED STATES
9. FOR I a. NAME
INFORMATION CALL: ► I CARRIE HOLUB
l b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
309-794-5667
SOLICITATION
NOTE: In sealed bid solicitations "offer'' and "offeror" mean "bid and "bidder''.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
PROJECT TITLE: CASSVILLE COTTAGE ASBESTOS REMOVAL AND DEMOLITION AND CLINTON COUNTY COTTAGE ASBESTOS REMOVAL
PROJECT LOCATION: CASSVILLE, WI AND CLINTON COUNTY, IA
COMPLTION DAYS: 45 CONSECUTIVE CALENDAR DAYS
NAICS: 238990
SIZE STANDARD: $19,000,000.00
100% SMALL BUSINESS SET-ASIDE
11. The contractor shall begin performance within 10 calendar days and complete it within 45 calendar days after receiving
[8] award, D notice to proceed. This performance period is D mandatory D negotiable. (See
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
□ YES (8] NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by
FAR 52.211-10
12b. CALENDAR DAYS
02:00 PM
local time 09 APR 2026 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee Dis, [8] is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(hour)
d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
PAGES
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1 {d)
Section A - Solicitation/Contract Form
W912EK26QA019
Instrument Name: CASSVILLE COTTAGE ASBESTOS REMOVAL AND DEMOLITION AND
CLINTON COUNTY COTTAGE ASBESTOS REMOVAL
Completion Days: 45 Consecutive Calendar Days
NAICS: 238990
Size Standard: $19,000,000.00
100% Small Business Set-Aside
INSTRUCTIONS OF QUOTERS
1. Complete Block 14 on the SF1442 - Enter Name, Address, and Current Phone Number of Person to Contact Regarding Quote.
2. If amendments to this solicitation are issued, they must be acknowledged, either in Block 19 of the SF1442, or on each amendment individually.
3. Note Section M - Evaluation Factors for Award.
4. Quotes shall be emailed to Contract Specialist, Carrie Holub (carrie.l.holub@usace.army.mil) with the following subject: "W912EK26QA019 - Cassville Cottage and Clinton County Cottage - (Company Name)." NO HARD COPY QUOTES WILL BE ACCEPTED. It is the responsibility of the offeror to verify that their offer has been received and is legible.
5. Quoters shall provide a total price for the project include all costs.
6. Quoters shall provide the entire solicitation filled out completely and legible in response to this action.
7. Quoters must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made. https://www.sam.gov/.
8. Quotes submitted in response to this solicitation should include best and final price quote with relevant experience, and conform to the solicitation and statement of work for the requirment.
MVR.03 QUESTIONS AND ANSWER VIA EMAIL
Technical Inquiries and questions relating to this solicitation are to be submitted via email to the Contract Specialist, Ms. Carrie Holub, Email: carrie.l.holub@usace.army.mil, no later than 06 April 2026 by 2PM Central Time.
MVR.11 CERTIFIED TO TRANSACT BUSINESS
Pursuant to FAR 52.236-7, the Contractor must comply with State Law. The Contractor must be certified to transact business in the state of Wisconsin and Iowa before award may be issued. The certification is shown as an active registration on the Secretary of State website of the state where the work is to be performed.
*** END OF NARRATIVE ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity
0001 PROVIDE ALL LABOR, EQUIPMENT, 1
SUPPLIES, AND SUPERVISION AS
SPECIFIED TO PERFORM
CONSTRUCTION REQUIREMENT FOR
ASBESTOS REMOVAL AND DEMOLITION
AT CASSVILLE COTTAGE IN CASSBILLE,
WI AND ASBESTOS REMOVAL AT
CLINTON COUNTY COTTAGE POOL 13,
COTTAGE 4379 IN CLINTON COUNTY, IA.
PERFORM IN ACCORDANCE WITH
SOLICITATION AND STATEMENT OF
WORK(SOW).
Pricing Arrangement: Firm Fixed Price
Unit Unit
Price
Job
W912EK26QA019
Amount
U.S Army Corps of Engineers Rock Island District
Cassville Cottage Asbestos Removal, Demolition and Clinton County, Iowa - Pool 13, Cottage 4379
Asbestos Removal
Statement of Work
Line Item Description Unit Unit Price
Asbestos Removal and Demolition at Cassville Cottage Each $
Asbestos Removal at Clinton County Cottage 4379 Each
1. Description of Purchase:
The Army Corps of Engineers require the Asbestos Removal and Demolition at Cassville Cottage and Asbestos Removal at Clinton County Cottage.
2. Scope of Work:
Line Item 01 (Cassville Cottage):
a. Abatement/Removal of all asbestos containing materials.
b. Demolition of cottage, foundations and slabs including driveway.
c. Basement is to be backfilled and burying in at a minimum of (3) three feet below grade.
d. Regrade disturbed areas and apply grass seed.
Line Item 02 (Clinton County Cottage 4379):
a) Abatement/Removal of all asbestos containing materials.
All work for Line Item 01 and 02 to be completed 6 weeks after Contract agreement has been signed.
Section C - Description/Specifications/Statement of Work
STATEMENT OF WORK
3. Location:
Line Item 01: Residential Cottage 7101 Closing Dam Road Cassville, WI 53806
Line Item 02: Residential Cottage Pool 13 (Cottage 4379) Clinton County, Iowa
See attached photos and GPS location maps.
4. General security requirements and guidance:
The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements.
Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative.
The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
5. Pre-screen candidates using E-Verify Program:
Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
6. Invoicing/Payment Processing: Invoices are to be submitted via email to Michael.L.Lindsey@usace.army.mil Please ensure that your invoice reflects the company name(s) and address exactly as listed on your System for Award Management (SAM) registration.
7. Technical POC:
US Army Corps of Engineers, Mississippi River Project Office Mike Lindsey Plant and Facilities Management Specialist 25549 182nd Street, Pleasant Valley, IA 52767 Office Ph. #: 309-794-5523 Michael.L.Lindsey@usace.army.mil
W912EK26QA019
mailto:Michael.L.Lindsey@usace.army.mil mailto:Michael.L.Lindsey@usace.army.mil
Cassville Cottage
Clinton County Cottage Site 4379
Requirements
W912EK26QA019
United States Army Corps of Engineers (USAGE) - Rock Island District has a construction requirement for asbestos removal and demolition at Cassville Cottage in Cassville, WI and asbestos removal at Clinton County Cottage Pool 13, Cottage 4379 in Clinton County, IA. See
Statement of Work (SOW) for additional information on requirement.
Product Service Code : P400
North American Industry Classification System (NAICS) : 238990
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title
52.246-12 Inspection of Construction.
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both
Destination
Effective
Date
1996-08
W912EK26QA019
Page 14 of67
Alternate
Deviation
Variation
Effective
Date
Instructions: See Statement of Work (SOW) for Inspection and Acceptance as well as
Invoicing and Payment Processing requirements.
DoDAAC: W912EK
CountryCode: USA
W07V ENDIST ROCK ISLAND
KO CONTRACTING DIVISION, 1 ROCK ISLAND ARSENAL
ROCK ISLAND, IL 61299-5001
UNITED STATES
Michael Lindsey
Section F - Deliveries or Performance
0001 Quantity 1 Job
Address and POC
Period of Performance
From
23 Apr 2026
To
11 Jun 2026
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title
252.201-7000 Contracting Officer's
Representative.
252.232-7003 Electronic Submission of
Payment Requests and
Receiving Reports.
252.236-7000 Modification Proposals--Price
Breakdown.
Effective
Date
1991-12
2018-12
1991-12
W912EK26QA019
Alternate
Deviation
Variation
Effective
Date
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title
52.203-19 Prohibition on Requiring Certain
Internal Confidentiality
Agreements or Statements.
52.204-10 Reporting Executive
Compensation and First-Tier
Subcontract Awards. (Deviation)
52.204-13 System for Award Management-
Maintenance. (Deviation)
52.204-19 Incorporation by Reference of
Representations and
Certifications.
52.209-6 Protecting the Government's
Interest When Subcontracting
With Contractors Debarred, Suspended, Proposed for
Debarment, or Voluntarily
Excluded. (Deviation)
52.209-10 Prohibition on Contracting With
Inverted Domestic Corporations.
(Deviation)
52.219-6 Notice of Total Small Business
Set-Aside. (Deviation)
52.222-6 Construction Wage Rate
Requirements. (Deviation)
Effective
Date
2017-01
2026-02
2026-02
2014-12
2026-02
2026-02
2026-02
2026-02
Alternate
W912EK26QA019
Variation
Deviation Effective
52.222-7 Withholding of Funds. (Deviation)
52.222-8 Payrolls and Basic Records.
(Deviation)
52.222-9 Apprentices and Trainees.
(Deviation)
52.222-10 Compliance with Copeland Act
Requirements. (Deviation)
52.222-11 Subcontracts (Labor Standards).
(Deviation)
52.222-12 Contract Termination-Debarment.
52.222-13 Compliance with Construction
Wage Rate Requirements and
Related Regulations.
52.222-14 Disputes Concerning Labor
Standards. (Deviation)
52.222-15 Certification of Eligibility.
52.222-35 Equal Opportunity for Veterans.
(Deviation)
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation)
52.222-37 Employment Reports on
Veterans. (Deviation)
52.222-50 Combating Trafficking in
Persons. (Deviation)
52.222-55 Minimum Wages for Contractor
Workers Under Executive Order
14026. (Deviation)
2026-02
2026-02
2026-02
2026-02
2026-02
2014-05
2014-05
2026-02
2014-05
2026-02
2026-02
2026-02
2026-02
2026-02
Page 18 of67
52.222-62 Paid Sick Leave Under Executive
Order 13706. (Deviation)
52.223-23 Sustainable Products. (Deviation)
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While
Driving.
52.232-23 Assignment of Claims.
52.232-27 Prompt Payment for Construction
Contracts.
52.232-33 Payment by Electronic Funds
Transfer-System for Award
Management.
52.232-39 Unenforceability of Unauthorized
Obligations.
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors.
52.233-3 Protest after Award. (Deviation)
52.233-4 Applicable Law for Breach of
Contract Claim. (Deviation)
52.236-2 Differing Site Conditions.
(Deviation)
52.236-3 Site Investigation and Conditions
Affecting the Work. (Deviation)
52.236-5 Material and Workmanship.
(Deviation)
52.236-6 Superintendence by the
2026-02
2026-02
2024-05
2014-05
2017-01
2018-10
2013-06
2023-03
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
Page 19 of67
Contractor. (Deviation)
52.236-7 Permits and Responsibilities.
(Deviation)
52.236-8 Other Contracts. (Deviation)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation)
52.236-10 Operations and Storage Areas.
(Deviation)
52.236-11 Use and Possession Prior to
Completion. (Deviation)
52.236-12 Cleaning Up. (Deviation)
52.236-13 Accident Prevention. (Deviation)
52.236-14 Availability and Use of Utility
Services. (Deviation)
52.236-17 Layout of Work. (Deviation)
52.236-21 Specifications and Drawings for
Construction. (Deviation)
52.240-91 Security Prohibitions and
Exclusions. (Deviation)
52.242-14 Suspension of Work.
52.243-5 Changes and Changed
Conditions. (Deviation)
52.244-6 Subcontracts for Commercial
Products and Commercial
Services. (Deviation)
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
2026-02
1984-04
2026-02
2026-02
Page 20 of67
DFARS Clauses Incorporated by Reference
Number Title
252.203-7000 Requirements Relating to
Compensation of Former DoD
Officials.
252.203-7002 Requirement to Inform
Employees of Whistleblower
Rights.
252.204-7003 Control of Government
Personnel Work Product.
252.204-7018 Prohibition on the Acquisition of
Covered Defense
Telecommunications Equipment or Services.
252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.
252.223-7008 Prohibition of Hexavalent
Chromium.
252.225-7048 Export-Controlled Items.
252.225-7056 Prohibition Regarding Business
Operations with the Maduro
Regime.
252.225-7060 Prohibition on Certain
Procurements from the Xinjiang
Uyghur Autonomous Region.
Effective
Date
2011-09
2022-12
1992-04
2023-01
2014-09
2023-01
2013-06
2023-01
2023-06
Alternate
W912EK26QA019
Variation
Deviation Effective
252.243-7001 Pricing of Contract Modifications.
FAR Clauses Incorporated by Full Text
Number
52.232-5
Title
Payments under Fixed-Price
Construction Contracts.
1991-12
Effective
Date
2014-05
Payments under Fixed-Price Construction Contracts (May 2014)
W912EK26QA019
Alternate
Deviation
Variation
Effective
Date
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the
Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
__ (Name)
__ (Title)
__ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph U) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the
Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting
Officer may retain from previously withheld funds and future progress payments that amount the
Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the
Contractor's claim to amounts payable under this contract has been assigned under the
Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
U) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1 ), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
(End of clause)
52.252-2 Clauses Incorporated by
Reference.
1998-02
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov.
(End of clause)
Section K - Representations, Certification, & Other Statements
FAR Provisions Incorporated by Reference
Number
52.240-90
Title
Security Prohibitions and
Exclusions Representations and
Certifications. (Deviation)
DFARS Provisions Incorporated by Reference
Number Title
252.203-7005 Representation Relating to
Compensation of Former DoD
Officials.
252.204-7008 Compliance with Safeguarding
Covered Defense Information
Controls.
252.225-7055 Representation Regarding
Business Operations with the
Maduro Regime.
252.225-7059 Prohibition on Certain
Procurements from the Xinjiang
Uyghur Autonomous Region-
Representation.
DFARS Provisions Incorporated by Full Text
Effective
Date
2026-02
Effective
Date
2022-09
2016-10
2022-05
2023-06
Alternate
Deviation
Alternate
Deviation
Variation
Effective
Date
Variation
Number Title
252.204-7017 Prohibition on the Acquisition of
Covered Defense
Telecommunications Equipment or Services-Representation.
Effective
Date
2021-05
W912EK26QA019
Alternate
Deviation
Variation
Effective
Date
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES-REPRESENTATION (MAY 2021)
The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications
Equipment or Services-Representation, that it "does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the
Government in the performance of any contract, subcontract, or other contractual instrument."
(a) Definitions. "Covered defense telecommunications equipment or services," "covered mission," "critical technology," and "substantial or essential component," as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.
(b) Prohibition. Section 1656 of the National Defense Authorization Act for Fiscal Year 2018
(Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award
Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.
(d) Representation. If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense
Telecommunications Equipment or Services-Representation, that it "does" provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation:
The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.
(e) Disclosures. If the Offeror has represented in paragraph (d) of this provision that it "will provide covered defense telecommunications equipment or services," the Offeror shall provide the following information as part of the offer:
(1) A description of all covered defense telecommunications equipment and services offered
(include brand or manufacturer; product, such as model number, original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable).
(2) An explanation of the proposed use of covered defense telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition referenced in paragraph (b) of this provision.
(3) For services, the entity providing the covered defense telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known).
(4) For equipment, the entity that produced or provided the covered defense telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).
(End of provision)
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
FAR Provisions Incorporated by Reference
Number
52.204-7
52.214-34
52.214-35
52.222-5
Title
System for Award Management
Registration. (Deviation)
Submission of Offers in the
English Language.
Submission of Offers in U.S.
Currency.
Construction Wage Rate
Requirements-Secondary Site of the Work. (Deviation)
DFARS Provisions Incorporated by Reference
Number Title
252.204-7024 Notice on the Use of the Supplier
Performance Risk System.
252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
FAR Provisions Incorporated by Full Text
Effective
Date
2026-02
1991-04
1991-04
2026-02
Effective
Date
2023-03
2023-01
Alternate
Deviation
Alternate
Deviation
Variation
Effective
Date
Variation
Number Title Effective
52.252-1 Solicitation Provisions 1998-02
Incorporated by Reference.
Solicitation Provisions Incorporated by Reference (Feb 1998)
Alternate
W912EK26QA019
Variation
Deviation Effective
Date
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offerer is cautioned that the listed provisions may include blocks that must be completed by the offerer and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offerer may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov.
(End of provision)
52.252-5 Authorized Deviations in
Provisions.
Authorized Deviations in Provisions (Nov 2020)
2020-11
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
Section M - Evaluation Factors for Award
EVALUATION OF QUOTES
W912EK26QA019
The Government will award a firm fixed price construction contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
Evaluation Criteria and Methods
Quotes will be evaluated as lowest price technically acceptable (LPTA) including one technical experience factor and a price factor. The contractor must have at least three (3) years of experience with asbestos removal. Technical: For Evaluation of experience, provide documentation of one relevant past project within the last three (3) years of the solicitation due date that is similar to this requirement. If more than one (1) project is submitted, only the first one
(1) listed will be evaluated. Your submitted project will be evaluated for RECENCY and RELEVANCY to this requirement and given a rating of ACCEPTABLE or UNACCEPTABLE as defined below. The past project submitted must be included as a Word or PDF attachment to your quote.
Price: Award will be made to the lowest price offer that has been found technically acceptable.
Definitions:
RECENCY is defined as a project completed within the last three (3) years of the solicitation closing date.
RELEVANCY is defined as a project including asbestos removal.
ACCEPTABLE: A relevant project submitted has been completed within three (3) years from date of solicitation closing will be found to meet the minimum requirements of the contract and will be found acceptable.
UNACCEPTABLE: A relevant project has not been submitted or has not been completed within three (3) years from date of solicitation closing will not be found to meet the minimum requirements of the contract and will be found unacceptable.
Note on Required Bonds: If a quoter's quote exceeds $150,000, performance and payment bonds with a penal sum of 100% of the contract price are required to be submitted after award. If the quoter's quote is greater than $35,000, but not greater than $150,000, the contractor will be required to submit either a payment bond or an irrevocable letter of credit with a penal sum of 100% of the contract price after award.
FAR Provisions Incorporated by Reference
Number
52.225-10
Title
Notice of Buy American
Requirement-Construction
Materials.
Effective
Date
2014-05
W912EK26QA019
Alternate
Deviation
Variation
"General Decision Number: WI20260011 01/02/2026
Superseded General Decision Number: WI20250011
State: Wisconsin
Construction Type: Building
Counties: Adams, Ashland, Barron, Bayfield, Buffalo, Burnett, Clark, Columbia, Crawford, Dodge, Door, Dunn, Florence, Fond Du Lac, Forest, Grant, Green, Green Lake, Iowa, Iron, Jackson, Jefferson, Juneau, Kewaunee, Lafayette, Langlade, Lincoln, Manitowoc, Marinette, Marquette, Menominee, Monroe, Oconto, Oneida, Pepin, Polk, Portage, Price, Richland, Rusk, Sauk, Sawyer, Shawano, Taylor, Trempealeau, Vernon, Vilas, Walworth, Washburn, Waupaca, Waushara and Wood Counties in Wisconsin.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number
ASBE0019-002 06/01/2025
Publication Date 01/02/2026
COLUMBIA, CRAWFORD, DODGE, GRANT, GREEN, IOWA, JEFFERSON,
JUNEAU, LAFAYETTE, MARQUETTE, MONROE, RICHLAND, SAUK, VERNON,
AND WALWORTH COUNTIES
Rates
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems.
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not) .... $ 45.88
Fringes
38.15
WAGE DETERMINATIONS CASSVILLE WISCONSIN W912EK26QA019
ASBE0034-005 06/09/2025
BARRON, BUFFALO, DUNN, PEPIN, AND POLK COUNTIES
Rates
Asbestos Workers/Insulator (Includes the application of all insulating materials;
protective coatings, coverings, and finishes to all types of mechanical systems. Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not) .... $ 55.34
ASBE0049-003 05/01/2025
Fringes
34.03
ASHLAND, BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES
Rates
Asbestos Workers/Insulator (Includes the application of all insulating materials;
protective coverings, coatings, and finishes to all types of mechanical systems.
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not) .... $ 49.17
ASBE0127-002 06/01/2025
Fringes
23.83
ADAMS, CLARK, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,
JACKSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARINETTE,
MENOMINEE, OCONTO, ONEIDA, PORTAGE, PRICE, RUSK, SHAWANO,
TAYLOR, TREMPEALEAU, VILAS, WAUPACA, WAUSHARA, AND WOOD COUNTIES
Rates
Heat and Frost Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems;
and the application of firestopping material in walls, floors, ceilings.
Includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not) .... $ 45.24
BOIL0107-001 01/01/2025
Rates
BOILERMAKER
Boilermaker ................. $ 46.52
BRWI0001-003 06/01/2025
Fringes
30.56
Fringes
34.63
CRAWFORD,JUNEAU, MONROE,TREMPEALEAU, AND VERNON COUNTIES
Rates
Bricklayer & Tile Setter ......... $ 40.09
BRWI0002-003 06/01/2025
ASHLAND, BURNETT, IRON, WASHBURN
Rates
BRICKLAYER
Bricklayer, Tile Setter ..... $ 48.60 Cement Mason/Concrete Finisher .................... $ 46.01
BRWI0002-004 06/01/2025
BAYFIELD COUNTY
Fringes
28.10
Fringes
29.31
29.31
Rates Fringes
BRICKLAYER
Bricklayer & Tile Setter .... $ 48.60 29.31
BRWI0003-001 06/01/2024
DOOR, KEWAUNEE, FLORENCE, FOND DU LAC, GREEN LAKE, MANITOWOC,
MARINETTE, MARQUETTE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA
COUNTIES
Rates
BRICKLAYER
Bricklayer, Cement Mason, Tile Setter ................. $ 38.45
BRWI0004-003 06/01/2025
WALWORTH COUNTY
Rates
BRICKLAYER ....................... $ 44. 71
CEMENT MASON/CONCRETE FINISHER ... $ 40.50
TILE SETTER ...................... $ 39.19
BRWI0006-001 06/01/2025
Fringes
27.41
Fringes
28.90 28.90 28.90
ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MENOMINEE, ONEIDA,
PORTAGE, TAYLOR, VILAS AND WOOD COUNTIES
BRICKLAYER
Bricklayer,Cement
Rates
Mason,Tile Setter ........... $ 39.36
BRWI0006-004 06/01/2025
PRICE COUNTY
Rates
Bricklayer & Tile Setter ......... $ 39.36
Fringes
28.83
Fringes
28.83
BRWI0007-003 06/01/2025
GREEN AND LAFAYETTE COUNTIES
Rates
Bricklayer & Tile Setter ......... $ 40.34
BRWI0013-003 06/01/2025
GRANT, IOWA, AND RICHLAND COUNTIES
Rates
Bricklayer ...................... $ 41.17 Tile Layer ....................... $ 38.39
BRWI0019-004 06/01/2025
Fringes
29.49
Fringes
28.66 29.79
BARRON, BURNETT (Southern half), DUNN, PEPIN, POLK, RUSK, AND WASHBURN (Southern half) COUNTIES
Rates
BRICKLAYER
Bricklayer, Cement Mason, Tile Layer .................. $ 39. 50
BRWI0019-005 06/01/2025
SAWYER COUNTY
Rates
Bricklayer & Tile Setter ......... $ 39.50
BRWI0021-001 06/01/2025
DODGE AND JEFFERSON COUNTIES
Rates
BRICKLAYER
Bricklayer, Cement Mason, Tile Layer .................. $ 40.14
BRWI0034-001 06/01/2025
Fringes
28.69
Fringes
28.69
Fringes
29.67
COLUMBIA AND SAUK COUNTIES
BRICKLAYER
Bricklayer, Cement Mason, Tile Layer .................. $ 41.17 28.66
CARP0068-013 05/05/2025
BURNETT (West of highway 48) AND POLK(West of Highways 35, 48 &
65) COUNTIES
Rates
CARPENTER (Including Drywall Hanging, Acoustical work) ........ $ 48.54
CARP0310-007 06/01/2025
Fringes
28.84
ADAMS, BAYFIELD (Eastern 2/3), FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO (Western Portion of the County), TAYLOR, VILAS, AND WOOD COUNTIES
Rates
CARPENTER (Including Acoustical Work & Drywall Hanging) ......................... $ 41.43
PILEDRIVERMAN .................... $ 41.43
CARP0310-008 06/01/2025
ASHLAND COUNTY
CABINET INSTALLER (Including Acoustical Work & Drywall
Rates
Hanging) ......................... $ 41.43
CARP0314-006 06/02/2025
Fringes
29.99
29.99
Fringes
29.99
COLUMBIA, DODGE, GRANT, GREEN, IOWA, JEFFERSON, LAFAYETTE,
RICHLAND, SAUK, AND WALWORTH COUNTIES
Carpenter (Including Drywall Hanging, Acoustical Work) ........ $ 42.45
Piledriverman ............... $ 44.45
CARP0361-006 05/05/2025
BAYFIELD COUNTY (West of Hwy 63)
Rates
Carpenters: (Including Drywall Hanging, Acoustical work) ............................ $ 40. 79
CARP0731-006 06/01/2025
Fringes
28.78
28.78
Fringes
27.90
FOND DU LAC (Eastern Portion of the County) AND MANITOWOC
COUNTIES
Rates
CARPENTER (Including Acoustical Work & Drywall Hanging) ......................... $ 41.43
PILEDRIVERMAN .................... $ 41.43
CARP0955-004 06/01/2025
Fringes
29.99 29.99
FOND DU LAC (Western Portion of the County), GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES
CARPENTER (Including Acoustical Work & Drywall
Rates
Hanging) ......................... $ 41.43
PILEDRIVERMAN .................... $ 41.43
CARP1056-004 06/01/2024
Fringes
29.99 29.99
ADAMS, ASHLAND, BARRON, BAYFIELD (Eastern 2/3), BUFFALO, BURNETT, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, PEPIN, POLK (E. of Hwy. 35, 48 & 65), PORTAGE, PRICE, RICHLAND, RUSK, SAUK, SAWYER, SHAWANO, TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, AND WOOD COUNTIES
Rates Fringes
MILLWRIGHT. ...................... $ 42.00 28.85
CARP1074-009 06/01/2025
BARRON, BURNETT (East of Hwy 48), CLARK, DUNN, POLK (East of Hwy 35, 48, 65), RUSK, SAWYER, AND WASHBURN COUNTIES
Rates
CARPENTER (Including Acoustical Work & Drywall Hanging) ......................... $ 41.43
PILEDRIVERMAN .................... $ 41.43
CARP1143-006 06/01/2025
Fringes
29.99 29.99
BUFALO, CRAWFORD, JACKSON, MONROE, TREMPEALEAU, AND VERNON
COUNTIES
Rates
CARPENTER (Including Acoustical Work & Drywall Hanging) ......................... $ 41.43
PILEDRIVERMAN .................... $ 41.43
CARP1146-006 06/01/2025
Fringes
29.99 29.99
DOOR, FLORENCE (Except area bordering Michigan), KEWAUNEE, MARINETTE (Except N.E. corner), MENOMINEE, OCONTO, AND SHAWANO (Western Portion of the County) COUNTIES
Rates
CARPENTER (Including Acoustical Work & Drywall Hanging) ......................... $ 41.43
PILEDRIVERMAN .................... $ 41.43
Fringes
29.99 29.99
CARP1348-006 05/01/2025
BAYFIELD COUNTY (Western 1/3)
Rates
MILLWRIGHT ....................... $ 41.90
ELEC0014-001 05/25/2025
Fringes
29.51
ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK
(Except Colby, Fremont, Lynn, Maryville, Sherman, Sherwood, Unity), CRAWFORD, DUNN, GRANT, IRON, JACKSON, MONROE, PEPIN, POLK, PRICE, RICHLAND, RUSK, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN COUNTIES
Rates
ELECTRICIAN ...................... $ 44.29
ELEC0014-005 05/25/2025
Rates
Electricians (Teledata System Installer/Technician) ............ $ 31.17
Fringes
25.21
Fringes
20.08
Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).
ELEC0158-007 05/25/2025
DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES
Rates Fringes
Electricians: .................... $ 42.00 23.93
ELEC0159-001 05/26/2024
COLUMBIA, DODGE (West of Hwy 26 except Chester and Emmet Twps), GREEN LAKE COUNTY (Except Townships of Berlin, Seneca & St.
Marie), IOWA, MARQUETTE COUNTY (Except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), AND SAUK COUNTIES
Rates Fringes
Electricians: .................... $ 48.55 25.91
ELEC0219-006 06/01/2019
FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)
Rates
ELECTRICIAN
Electrical contracts over $180,000 .................... $ 33.94 Electrical contracts under $180,000 .................... $ 31.75
ELEC0388-004 06/01/2024
Fringes
21.80
21.73
ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS AND WOOD
COUNTIES
Rates
ELECTRICIAN ...................... $ 40.19
ELEC0494-010 06/01/2025
Fringes
26%+12.45
DODGE COUNTY (Area East of Hwy 26 including all of Chester Township, but excluding Emmet Township), FOND DU LAC (except Waupun), AND MANITOWOC (Schleswig) COUNTIES
ELECTRICIAN ...................... $ 45.20 25.27
ELEC0494-014 06/01/2025
DODGE (Area East of Hwy 26 including Chester Twp but excluding Emmet Twp), FOND DU LAC (Except Waupun), AND MANITOWOC (Schleswig) COUNTIES
Rates
Sound & Communications Installer ................... $ 37.13 Technician .................. $ 37.13
Fringes
21.58
21.58
Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems. Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system.
work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products
ELEC0577-001 06/01/2025
GREEN LAKE (N. Part including Twps of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Twps of Crystal Lake, Neshkoro, Newton, and Springfield), WAUPACA, AND WAUSHARA
COUNTIES,
Rates Fringes
ELECTRICIAN ...................... $ 41.76 23.65
ELEC0890-005 06/01/2024
DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, AND
WALWORTH COUNTIES
Rates
ELECTRICIAN ...................... $ 43.65
ENGI0139-004 06/02/2025
OPERATOR: Power Equipment
(1) Cranes, Tower Cranes with or w/o attachments over 100 tons; Cranes, tower Cranes with boom, leads and or jib length
Rates
176 ft or longer ............ $ 50.53
(2) Cranes, Tower Cranes with or w/o attachments 100 tons or less; Cranes, Tower Cranes with boom, leads, and or jib lengths 175 ft or less .............. $ 49.28
(3) Travelling Crane ( bridge type) ............... $ 45. 73
(4) Hydraulic Crane, 10 tons or less ................ $ 45.20
(6) Forklift ............... $ 41.60
HAZARDOUS WASTE PREMIUMS:
EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1. 00 per hour
IRON0008-012 06/01/2025
Fringes
25.95%+12.26
Fringes
27.89
27.89
27.89
27.89 27.89
CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE,
OCONTO, OUTAGAMIE, SHAWANO AND WALWORTH (Northeastern part)
COUNTIES
Rates Fringes
IRONWORKER ....................... $ 44.66 33.67
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
IRON0383-004 06/01/2025
ADAMS, COLUMBIA, CRAWFORD, DODGE, FLORENCE, FOREST, GRANT,
GREENE (Except S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD
COUNTIES
Rates Fringes
IRONWORKER ....................... $ 44.00 32.66
IRON0498-007 06/01/2025
GREEN (S.E. 1/3) AND WALWORTH (Except N.E. part) COUNTIES
Rates Fringes
IRONWORKER ....................... $ 48. 74 49.65
IRON0512-009 05/01/2025
BARRON, BUFFALO, CLARK, DUNN, JACKSON, PEPIN, POLK, RUSK,
TAYLOR AND TREMPEALEAU COUNTIES
Rates Fringes
IRONWORKER ....................... $ 46.35 36.86
IRON0512-023 05/01/2025
ASHLAND, BAYFIELD, BURNETT, IRON, LINCOLN, ONEIDA, PRICE,
SAWYER, VILAS AND WASHBURN COUNTIES
Rates Fringes
IRONWORKER ....................... $ 42.89 36.86
LABO0140-003 06/01/2025
BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND,
TREMPEALEAU (Southern part), AND VERNON COUNTIES
Rates Fringes
Laborer, General ................. $ 37.70 19.97 Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical
Systems) ....................... $ 36.65 19.97
NOTE: Mason Tender $1.00 over general laborer scale;
Pipelayer $1.00 over general laborer scale
LABO0268-005 06/02/2025
AREA 1: BARRON, CLARK (West 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (West 1/3)
AREA 2: CLARK (East 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (East 2/3), VILAS, WOOD
AREA 3: BURNETT, IRON, SAWYER, WASHBURN
Rates
Laborer, General Area 1 ...................... $ 37.70 Area 2 ...................... $ 37 .05 Area 3 ...................... $ 36.35
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems)
Area 1, 2, and 3 ............ $ 36.65
Fringes
19.97 19.97 19.97
19.97
NOTE: Mason Tender $1.00 over general laborer. Burnett, Iron, Sawyer & Washburn $.70 over general laborer.
LABO0330-001 06/01/2025
DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,
KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO,
PORTAGE, SHAWANO, WAUPACA,WAUSHARA
Rates
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems) ......................... $ 36.65 Laborers, General ................ $ 37.05
NOTE: Mason Tender $1.00 over general laborer.
LABO0464-005 06/01/2025
Fringes
19.97 19.97
ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND
WALWORTH COUNTIES
Rates
Laborer, General Adams County ................ $ 37.05 Remaining Area .............. $ 37.70
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous Materials from Non-mechanical Systems)
Ada…