This document contains a technical questionnaire and details for a federal solicitation seeking riverbank stabilization services. The National Park Service, Interior Regions 3/4/5, Ohio Major Acquisition Buying Office is soliciting proposals for riverbank stabilization work along 1250 linear feet of riverbank along the Valley Railway within three locations of Cuyahoga Valley National Park totaling between $1 million to $5 million. Offerors must provide all labor, materials, tools and equipment to complete the riverbank stabilization in accordance with project specifications and drawings within the proposed contract performance period and budget. The solicitation number is 140P6423R0004 and is set aside 100% for total small businesses. The NAICS code is 238910 and size standard is $19 million. Evaluation criteria includes technical approach, key personnel, project experience, and safety. The closing date is TBD.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_Riverbank_Stabilization_0001.pdf | ||
| Site_Visit_Sheet_-_RBS_0001.pdf | ||
| Track_Authority_Policy_REV_B_(1)_0001.pdf | ||
| Sol_140P6423R0004_Amd_0001.pdf | ||
| B08_Solicitation_-Bid_Schedule_RBS.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Construction_Contract_Administration.pdf | ||
| Sol_140P6423R0004.pdf | ||
| B08_Solicitation_-_Drawings.pdf | ||
| B08_Solicitation_-_Notice_to_Contractors.pdf | ||
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Technical_Questionnaire_w_SF_-_Construction.docx | DOCX document | |
| B08_Solicitation_-_Past_Performance_Questionnaire.pdf | ||
| B08_Solicitation_-_Past_Performance_Questionnaire.doc | DOC document | |
| B08_Solicitation_-_Specifications.pdf | ||
| B08_Solicitation_-_Submittal_List.pdf | ||
| B08_Solicitation_-_DOL_Wage_Determination.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONNAIRE
Riverbank Stabilization – Valley Railway
Cuyahoga Valley National Park
OFFEROR:
SOLICITATION #:
DATE:
PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID/PRICE SCHEDULE, YOUR
RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE
QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A
PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER
RATING (PLEASE SEE SECTION M OF THE SOLICITATION FOR EVALUATION INFORMATION).
YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.
SUBFACTOR #1 – Technical Approach
Technical approach is your means and methods to complete the technical aspect of required work in riverbank stabilization as described in the project specifications. Submit a written narrative limited to 5 pages describing your technical approach to the specific aspects below. Additional pages will not be evaluated. Pictures can be included and will not be counted towards the page limitation.
Approach to Critical Contract Requirements: Describe your approach to successfully accomplish riverbank stabilization in accordance with requirements outlined in the Project Specifications and Drawings within proposed contract performance period and budget.
SUBFACTOR #2 – Key Personnel
Submit resumes for key personnel as identified below with experience in riverbank stabilization. All personnel proposed are subject to substitution requirements contained in this solicitation.
Project Manager Superintendent Construction Management (field staff On-Site Quality Control Specialist On-Site Safety Specialist/Manager
SUBFACTOR #3 – Project Experience
Submit "Project Experience" addressing specific experience working in riverbank stabilization in the below section/box, preferably a minimum of 3 and/or a maximum of 5, relevant projects completed in the last 7 years.
NOTE: Submit the same projects for Past Performance as submitted under this factor.
SUBFACTOR #4 – Safety
Submit an overview of your company’s Construction Safety Program and an assessment of the safety risks associated with this construction project. Submit a written narrative limited to 10 pages describing your safety plan for a project of this nature.
Include the names, resumes, and specific safety training completed (i.e., OSHA, etc.) for the proposed Project On-Site Safety Specialist/Manager for this project.